CN110852611A - Real-time management and control system for construction workers on capital construction project site - Google Patents

Real-time management and control system for construction workers on capital construction project site Download PDF

Info

Publication number
CN110852611A
CN110852611A CN201911088134.2A CN201911088134A CN110852611A CN 110852611 A CN110852611 A CN 110852611A CN 201911088134 A CN201911088134 A CN 201911088134A CN 110852611 A CN110852611 A CN 110852611A
Authority
CN
China
Prior art keywords
information
project
construction
module
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911088134.2A
Other languages
Chinese (zh)
Inventor
徐飞
周永华
周睿
陈海涛
黄双青
张梦婷
杨羽
黄尚渊
徐灏逸
李卫彬
王月强
黄冬
许斌
盛誉
朱铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201911088134.2A priority Critical patent/CN110852611A/en
Publication of CN110852611A publication Critical patent/CN110852611A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/02Network architectures or network communication protocols for network security for separating internal from external traffic, e.g. firewalls
    • H04L63/0209Architectural arrangements, e.g. perimeter networks or demilitarized zones
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/021Services related to particular areas, e.g. point of interest [POI] services, venue services or geofences
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/029Location-based management or tracking services

Abstract

The invention discloses a real-time management and control system for construction workers on a capital construction project site, which comprises an information internal network, an information external network and the internet which are sequentially interacted; the Internet deploys a plurality of mobile client devices and a plurality of intelligent wearable devices; the information extranet deploys an extranet security interaction gateway and a mobile support service system; and the information intranet deploys a database and a client management system. By the construction of the infrastructure project site construction worker real-time management and control system, site construction workers, progress information and the like can be managed and controlled through the system, and a large management level is improved for power business. For the construction of the infrastructure construction, the use scene of the infrastructure construction business is widened gradually by means of mobile informatization and intelligent wearable equipment, and the management and control requirements of the infrastructure construction business requirements on a construction site are deepened.

Description

Real-time management and control system for construction workers on capital construction project site
Technical Field
The invention relates to the field of infrastructure engineering, in particular to a real-time management and control system for construction personnel on a infrastructure engineering site.
Background
The foundation construction project management requirements are continuously improved, the field management level is continuously strict, certain defects exist in the field operation management aspect of the existing foundation construction, the situation of a construction team is supervised by each project responsible person on site, the general situation and the progress of construction project information cannot be intuitively understood, the situation of the construction site of site workers cannot be understood, the informatization means is weak, and the like. If the site information of the infrastructure construction project can be monitored in real time, the working efficiency is improved, the engineering safety control quality is improved, and various services of infrastructure construction management are promoted to be stably improved.
At present, in recent years, informatization of the power industry is rapidly developed, various office requirements of employees cannot be met gradually by a traditional project manager through on-site supervision, especially in field work, which is more and more mobile application and field engineering management and control which is gradually perfect, and when a project manager is responsible for projects in a plurality of different places at the same time, supervision one by one on the site cannot be completed.
Disclosure of Invention
The invention aims to provide a real-time management and control system for capital construction project site constructors, which is used for meeting the requirements of site constructors on real-time positioning and checking, position early warning, engineering information comprehensive display and precise supervision of a capital construction site, realizing all-round understanding of a construction process, and more accurately and comprehensively mastering the construction condition of a constructed distribution network project, so that the capital construction informatization construction can be more suitable for the development requirement of a capital construction service, and the improvement of the aspects of site engineering personnel monitoring, engineering management and the like is promoted.
In order to achieve the aim, the invention provides a real-time control system for construction workers on a construction site, which comprises an information inner network, an information outer network and the internet, wherein the information inner network, the information outer network and the internet are sequentially interacted;
the Internet deploys a plurality of mobile client devices and a plurality of intelligent wearable devices; the intelligent wearable equipment sends the real-time positioning of the site constructor to the mobile client equipment; the mobile client device is used for monitoring the position of a site constructor and giving an early warning when the site constructor exceeds a set area;
the information extranet deploys an extranet security interaction gateway and a mobile support service system; the extranet security interaction gateway is connected with the plurality of mobile client devices and used for providing security guarantee for the access of the internet to the information extranet; the mobile support service system is connected with the extranet safe interaction gateway and is used for providing service support for the function interaction of the mobile client equipment;
the information intranet deploys a database and a client management system; the database is connected with the mobile support service system and used for providing data storage for the mobile client equipment; and the client management system is connected with the database and is used for checking the early warning information of the site constructors in real time.
In the system for real-time management and control of the construction personnel in the infrastructure construction project site, the extranet security interaction gateway is connected with the plurality of mobile client devices through the firewall.
In the system for real-time management and control of the construction personnel in the capital construction project site, the mobile support service system is connected with the database through the isolation device.
The real-time management and control system for the construction site constructors of the capital construction project is characterized in that the intelligent wearable equipment is a safety helmet capable of acquiring position information of the construction site constructors.
The above-mentioned real-time management and control system of capital construction project site constructor, wherein, mobile client equipment includes:
the system comprises an engineering information module, a data processing module and a data processing module, wherein the engineering information module is used for displaying a current infrastructure construction project list, checking detailed information of the infrastructure construction project and checking equipment information related to the infrastructure construction project;
the early warning information module is used for monitoring the position of the site constructor, giving early warning when the site constructor exceeds a set area, and checking early warning information of the constructor, wherein the early warning information comprises early warning time, constructor and construction site information;
the work log module is used for providing a recording function of daily work logs;
the rectification list module is used for initiating a rectification list notification to rectify according to the work logs or the early warning information with problems; inquiring the record of the rectification list and checking the current rectification state of a certain rectification list; after the correction, returning to the receipt correction list;
and the statistical data checking module is used for checking the statistics of the early warning information on the current day, the statistics of the adjustment and modification conditions on the current day and the statistics of the working log conditions on the current day.
The real-time management and control system for the construction workers on the capital construction project site comprises the following engineering information modules:
the project preview list module is used for displaying a capital construction project list, and the capital construction project list comprises project names and construction management unit information;
the system comprises a project detailed information checking module, a data processing module and a data processing module, wherein the project detailed information checking module is used for checking detailed information of the infrastructure project, and comprises project names, voltage levels, transformation capacities and main construction content information;
and the engineering equipment information viewing module is used for viewing the equipment information related to the capital construction, and comprises an equipment name, an equipment type and position information.
The real-time management and control system of construction personnel on the capital construction project site comprises: and the permission management module is used for setting the use permission of project management personnel, construction team responsible personnel and field construction personnel on the mobile client equipment.
The above-mentioned infrastructure construction field constructor real-time management and control system, wherein, the client management system includes:
the map function management module is used for checking the position of the electronic map of the infrastructure project and checking the basic information of the infrastructure project; checking the position of the electronic map where the engineering equipment is located and checking the basic information of the engineering equipment; checking an electronic fence area of projects and engineering equipment on an electronic map, checking the position of a real-time site constructor on the electronic map, marking the site constructor on the electronic map in real time when the site constructor exceeds a set area, and pushing early warning information in time;
the project information management module is used for maintaining basic information of the infrastructure project; maintaining the engineering equipment information; editing an electronic fence area of a certain infrastructure project or a certain engineering device on line;
the engineering personnel information management module is used for maintaining the information of the on-site construction personnel; inquiring the historical track of the field constructor;
the early warning information management module is used for inquiring early warning information of on-site constructors;
the working log query module is used for querying the working log record;
and the rectification management module is used for initiating a rectification flow, inquiring the rectification records and checking the current rectification state of a certain rectification.
The real-time management and control system for the construction workers on the capital construction project site comprises a map function management module and a map function management module, wherein the map function management module comprises:
the project information preview module is used for checking the position of the electronic map where the infrastructure project is located and checking the basic information of the infrastructure project;
the engineering equipment previewing module is used for checking the position of the electronic map where the engineering equipment is located and checking the basic information of the engineering equipment;
the electronic fence area viewing module is used for viewing the electronic fence areas of the projects and the engineering equipment on the electronic map;
the real-time constructor position checking module is used for checking the real-time site constructor position on the electronic map; when the site constructor exceeds the set area, the site constructor marks the electronic map in real time and pushes early warning information in time.
The real-time management and control system for the construction workers on the capital construction project site comprises the following engineering information management modules:
the basic information maintenance module of the project, is used for maintaining the basic information of the capital construction project;
the engineering equipment information maintenance module is used for maintaining the engineering equipment information;
and the electronic fence area maintenance module is used for editing the electronic fence area of a certain infrastructure project or certain engineering equipment on line.
Compared with the prior art, the invention has the following beneficial effects:
by the construction of the infrastructure project site construction worker real-time management and control system, site construction workers, progress information and the like can be managed and controlled through the system, and a large management level is improved for power business. For the construction of the infrastructure construction, the use scene of the infrastructure construction business is widened gradually by means of mobile informatization and intelligent wearable equipment, and the management and control requirements of the infrastructure construction business requirements on a construction site are deepened.
Drawings
FIG. 1 is a schematic diagram of a construction site constructor real-time management and control system of a capital construction project.
Detailed Description
The invention will be further described by the following specific examples in conjunction with the drawings, which are provided for illustration only and are not intended to limit the scope of the invention.
As shown in fig. 1, the invention provides a real-time management and control system for construction workers in a construction site, which comprises an information intranet 10, an information extranet 20 and an internet 30, which are sequentially interacted with each other.
The internet 30 deploys a plurality of mobile client devices 31 and a plurality of intelligent wearable devices 32; the intelligent wearable device 32 sends the real-time positioning of the site constructor to the mobile client device 31; further, the intelligent wearable device 32 is a safety helmet capable of acquiring the position information of the site constructors. The mobile client device 31 is used for monitoring the position of the site constructor and giving an early warning when the site constructor exceeds a set area.
Specifically, the mobile client device 31 includes: the system comprises an engineering information module, an early warning information module, a working log module, an order module, a statistical data checking module and a permission management module.
1.1 engineering information Module
1.1.1 engineering Preview List Module
And displaying a current infrastructure project list, including basic information such as project names and construction management units.
1.1.2 engineering detail information viewing module
And selecting a certain record in the project preview list, and checking the detailed information of the project, including information such as project names, voltage levels, transformation capacities, main construction contents and the like.
1.1.3 engineering equipment information checking module
And viewing the engineering related equipment information, including equipment name, equipment type, position information and the like.
1.2 early warning information module
The method comprises the steps of monitoring the position of a site constructor, carrying out early warning when the site constructor exceeds a set area, and checking early warning information of the constructor, wherein the early warning information comprises information such as early warning time, constructor and construction site.
1.3 work Log Module
The method provides a daily work log recording function for a construction team leader, and starts log management, performs log maintenance, supports photo uploading, log description and other information maintenance under the conditions of construction start, construction process, construction end and log maintenance requirement.
1.4 rectification single module
Initiating an rectification list: project management personnel can initiate a rectification flow according to logs or early warning information with problems, notify construction responsible persons to carry out rectification, support functions such as photographing and the like.
And (3) rectification list query: and inquiring the record of the rectification list according to conditions such as the date of the rectification list and the like, and checking the current rectification state of a certain rectification list.
And (4) correcting and reforming a receipt: and (4) the construction responsible person corrects the condition of the site violation, and the correction is finished by taking a picture, describing and the like.
1.5 statistical data viewing module
The project manager can check the statistical conditions of the management and control system, including the following contents: 1) counting the day early warning information; 2) counting the conditions of the correction on the same day; 3) and carrying out statistics on the condition of the daily working log.
1.6 Authority management Module
Project manager authority: 1) engineering preview; 2) early warning information; 3) rectification and order management; 4) and (6) checking the statistical data.
The construction team is responsible for personnel authority: 1) engineering preview; 2) early warning information; 3) rectification and order management; 4) and managing the work logs.
Constructor authority: 1) engineering preview; 2) and managing the work logs.
The information extranet 20 is provided with an extranet safety interaction gateway 21 and a mobile support service system 22; the extranet secure interaction gateway 21 is connected to the plurality of mobile client devices 31, and is configured to provide security for access to the information extranet 20 from the internet 30. Further, the extranet secure interactive gateway 21 is connected to the plurality of mobile client devices 31 through a firewall 41, so as to enhance the security of information transmission. The mobile support service system 22 is connected to the extranet secure interaction gateway 21, and is configured to provide service support for the functional interaction of the mobile client device 31.
The information extranet 20 is a secure interaction gateway of SSL VPN, and complies with SSL VPN technical specification issued by the national code administration. The information extranet 20 safety interaction gateway is positioned as a network safety transmission device, is deployed at the boundary between the company information extranet 20 and the Internet 30, is positioned to provide the Internet 30 safety interaction capability meeting the company requirements for the company information extranet 20 service system, and provides safety guarantee for the access flow from the Internet 30 terminal to the information extranet 20 service system from the three aspects of identity management, trusted transmission channel protection and access authority control of the Internet 30 terminal.
The extranet 20 security interaction gateway provides a secure channel for data transmission, wherein the mobile support service is deployed behind the extranet 20 security interaction gateway to provide service support for the function interaction of the client, such as determining a background interface of each function module of the client device.
The information intranet 10 is provided with a database 11 and a client management system 12; the database 11 is connected to the mobile support service system 22, and is used for providing data storage for the mobile client device 31. Further, the mobile support service system 22 is connected with the database 11 through an isolation device 42, so that the security of data transmission is enhanced. The client management system 12 is connected to the database 11 and is configured to check the early warning information of the site constructors in real time.
The client management system 12 includes: the map information management system comprises a map function management module, an engineering information management module, an engineering personnel information management module, an early warning information management module, a working log query module and an adjustment and modification list management module.
2.1 map function management Module
The project management system has the functions of providing project overview for project management personnel, integrating the geographical position of a project through map application, and displaying statistical information, electronic fence information and the like related to the project.
Geo-fencing is an application of LBS that uses a virtual fence to enclose a virtual geographic boundary, and the system can automatically notify and alert through a fence computing service when the GPS enters, leaves, or is active in a particular geographic area.
2.1.1 engineering information preview module
The project manager checks the position of the map where the project is located through the map label of the project information, clicks a certain project label, and can check some basic information of the project, including basic information such as project names, construction management units, line lengths and the like.
2.1.2 engineering equipment preview module
The project manager checks the position of the map where the equipment is located through the map label of the engineering equipment, clicks a certain equipment label, and can check some basic information of the equipment, including information such as equipment name, equipment type and affiliated project.
2.1.3 electronic fence area viewing module
Project managers view the project and the electronic fence area of the engineering equipment on a map.
2.1.4 real-time position checking module for constructors
And (4) the project manager checks the real-time position of the constructor on the map, and if early warning occurs, the map can be marked in real time and the message is pushed to the project manager in time.
2.2 engineering information management Module
And providing project management personnel with maintenance of engineering related information.
2.2.1 engineering basic information maintenance module
The project manager maintains basic project information including project names, project codes, construction addresses, construction units, and the like through the function.
2.2.2 engineering equipment information maintenance module
And clicking a certain project record to maintain the equipment information of the project, wherein the equipment information comprises information such as equipment name, equipment type, the project to which the equipment belongs and the like.
2.2.3 electronic fence area maintenance module
Project managers can edit the electronic fence area of a certain project or a certain project device on line.
2.3 engineering personnel information management module
Maintenance of basic information of engineering personnel: and maintaining the information of the engineering personnel, wherein the information comprises the personal information of the members, and the personal information comprises the information of the name of the member, the account number of the member, the equipment number, the post type, the company to which the post responsibility belongs and the like.
And (3) querying a historical trajectory of the personnel: and inquiring the historical track of the personnel according to the conditions of the personnel name, the equipment number, the use date and the like.
2.4 early warning information management module
And inquiring the early warning information of the constructors by the project managers according to the conditions such as early warning time and the like, wherein the early warning information comprises the information such as early warning time, the constructors, construction sites and the like.
2.5 work log query module
And the project manager inquires the working log record including information of submitting personnel, log content, log location and the like according to the conditions of the personnel name, the date, the log state and the like.
2.6 correction sheet management Module
Initiating an rectification list: project management personnel can initiate a rectification flow according to the log with problems or early warning information.
And (3) rectification list query: and inquiring the record of the rectification list by a project manager according to conditions such as the date of the rectification list and the like, and checking the current rectification state of a certain rectification list.
The invention satisfies the requirements of on-site personnel for real-time positioning and viewing, position early warning, engineering information comprehensive display and precise supervision of a infrastructure construction site, realizes all-round understanding of the construction process, and more accurately and comprehensively masters the construction condition of the network construction, so that the infrastructure informatization construction can better adapt to the development requirement of infrastructure service, and the monitoring of on-site engineering personnel, engineering management and the like are promoted.
The core technology of the invention relates to the construction of a real-time management and control system for field personnel, and the integration of functions of intelligent equipment communication, electronic map integration and the like.
In the aspect of intelligent wearing equipment, if the safety helmet of position location is provided, can provide accurate personnel management and control function for the system, can frame staff's construction area, carry out the early warning when staff surpasss construction area, can provide the engineering information that combines geographic information for managers in addition and look over, functions such as constructor construction position control.
In the aspect of electronic maps, many commercialized open-source electronic maps are available for users to develop for the second time, wherein the electronic maps most used in domestic and civil fields include Baidu maps and Gaode maps. The navigation aspect is currently mainly GPS. The existing mature open-source electronic map also provides a good technical basis for the application and secondary development of portable and mobile equipment.
In order to solve the above situation, the construction site personnel management and control system based on the intelligent safety helmet with the GPS function is adopted for research, construction site checking and comprehensive information display based on geographic information are realized, an informatization means of mobile office is provided for managers, in addition, a geographical position area of engineering construction is built in the system by combining the intelligent safety helmet, the functions of accurate position monitoring of the constructors, information early warning of workers deviating from the construction area and the like are realized, and a modern site management means is provided for the construction business. In addition, the system completes the optimal path planning and guiding functions predetermined by the system by means of the GPS positioning technology and the secondary development of the existing commercial electronic map, and provides convenience for the on-site post-checking of managers.
Through the construction of the infrastructure construction engineering field personnel management and control system based on the intelligent wearable equipment, a plurality of defects existing in the existing infrastructure construction field operation working mode are effectively overcome, the purposes of standard, efficient and burden reduction of infrastructure construction field operation control are achieved, and the construction of engineering projects is ensured to be completed safely and with high quality.
The technology of mobile interconnection, intelligent wearable equipment and the like is combined, and a foundation engineering field personnel management and control system is built through pilot test; the information management level of the site infrastructure project is improved, the workload of the basic level is reduced, the blank between business consultation and an information system is filled, and powerful support is provided for the management level of all levels of infrastructure work of a company.
From the perspective of improving the field construction safety of the infrastructure construction project, the construction is responsible for the work log management, and project management personnel are used for reorganizing and changing the work list to manage, so that the company can comprehensively arrange the relevant work of monitoring the safety of the infrastructure construction project, the safety risk of field work is reduced, and the management and control strength of the infrastructure field work in the infrastructure management work is further enhanced.
According to the construction engineering site personnel management and control system based on the intelligent wearable equipment, the post checking of constructors of the system is realized, the position is checked in real time, and managers can know site working conditions in time conveniently; in addition, early warning push information of a construction area is combined, some abnormal conditions on the site are monitored and managed in time, and the construction safety risk on the site is reduced.
Meanwhile, real-time position monitoring and construction area early warning are achieved through the integrated intelligent wearable device. The intelligent safety helmet provides real-time field positioning information for the infrastructure mobile application platform besides providing safety guarantee for field construction personnel; whether the constructor is not in the construction range can be monitored based on the planned construction area of the system, so that early warning is provided for a manager, the manager is assisted to effectively supervise and manage field operation, and the intelligent degree of infrastructure management is improved.
In addition, the system provides project information query related to infrastructure, displays each project on the map by combining geographic information, provides display interaction related to the project information, provides a statistical condition display function of the project progress for management personnel, and the like, solves the requirement of mobile office on the infrastructure site, and improves the informatization level of the infrastructure.
While the present invention has been described in detail with reference to the preferred embodiments, it should be understood that the above description should not be taken as limiting the invention. Various modifications and alterations to this invention will become apparent to those skilled in the art upon reading the foregoing description. Accordingly, the scope of the invention should be determined from the following claims.

Claims (10)

1. A real-time management and control system for construction workers on a capital construction project site is characterized by comprising an information internal network, an information external network and the Internet which are sequentially interacted;
the Internet deploys a plurality of mobile client devices and a plurality of intelligent wearable devices; the intelligent wearable equipment sends the real-time positioning of the site constructor to the mobile client equipment; the mobile client device is used for monitoring the position of a site constructor and giving an early warning when the site constructor exceeds a set area;
the information extranet deploys an extranet security interaction gateway and a mobile support service system; the extranet security interaction gateway is connected with the plurality of mobile client devices and used for providing security guarantee for the access of the internet to the information extranet; the mobile support service system is connected with the extranet safe interaction gateway and is used for providing service support for the function interaction of the mobile client equipment;
the information intranet deploys a database and a client management system; the database is connected with the mobile support service system and used for providing data storage for the mobile client equipment; and the client management system is connected with the database and is used for checking the early warning information of the site constructors in real time.
2. The real-time infrastructure field constructor management and control system according to claim 1, wherein the extranet security interaction gateway is connected with the plurality of mobile client devices through a firewall.
3. The real-time construction work site operator management and control system according to claim 1, wherein the mobile support service system is connected with the database through an isolation device.
4. The infrastructure construction project site constructor real-time management and control system of claim 1, wherein the intelligent wearable device is a safety helmet capable of acquiring site constructor position information.
5. The infrastructure work site constructor real-time management and control system of claim 1, wherein the mobile client device comprises:
the system comprises an engineering information module, a data processing module and a data processing module, wherein the engineering information module is used for displaying a current infrastructure construction project list, checking detailed information of the infrastructure construction project and checking equipment information related to the infrastructure construction project;
the early warning information module is used for monitoring the position of the site constructor, giving early warning when the site constructor exceeds a set area, and checking early warning information of the constructor, wherein the early warning information comprises early warning time, constructor and construction site information;
the work log module is used for providing a recording function of daily work logs;
the rectification list module is used for initiating a rectification list notification to rectify according to the work logs or the early warning information with problems; inquiring the record of the rectification list and checking the current rectification state of a certain rectification list; after the correction, returning to the receipt correction list;
and the statistical data checking module is used for checking the statistics of the early warning information on the current day, the statistics of the adjustment and modification conditions on the current day and the statistics of the working log conditions on the current day.
6. The real-time construction project site constructor management and control system of claim 5, wherein the project information module comprises:
the project preview list module is used for displaying a capital construction project list, and the capital construction project list comprises project names and construction management unit information;
the system comprises a project detailed information checking module, a data processing module and a data processing module, wherein the project detailed information checking module is used for checking detailed information of the infrastructure project, and comprises project names, voltage levels, transformation capacities and main construction content information;
and the engineering equipment information viewing module is used for viewing the equipment information related to the capital construction, and comprises an equipment name, an equipment type and position information.
7. The real-time construction work site constructor management and control system of claim 5, characterized by further comprising: and the permission management module is used for setting the use permission of project management personnel, construction team responsible personnel and field construction personnel on the mobile client equipment.
8. The infrastructure project site constructor real-time management and control system of claim 1, wherein the client management system comprises:
the map function management module is used for checking the position of the electronic map of the infrastructure project and checking the basic information of the infrastructure project; checking the position of the electronic map where the engineering equipment is located and checking the basic information of the engineering equipment; checking an electronic fence area of projects and engineering equipment on an electronic map, checking the position of a real-time site constructor on the electronic map, marking the site constructor on the electronic map in real time when the site constructor exceeds a set area, and pushing early warning information in time;
the project information management module is used for maintaining basic information of the infrastructure project; maintaining the engineering equipment information; editing an electronic fence area of a certain infrastructure project or a certain engineering device on line;
the engineering personnel information management module is used for maintaining the information of the on-site construction personnel; inquiring the historical track of the field constructor;
the early warning information management module is used for inquiring early warning information of on-site constructors;
the working log query module is used for querying the working log record;
and the rectification management module is used for initiating a rectification flow, inquiring the rectification records and checking the current rectification state of a certain rectification.
9. The infrastructure project site constructor real-time management and control system of claim 8, wherein the map function management module comprises:
the project information preview module is used for checking the position of the electronic map where the infrastructure project is located and checking the basic information of the infrastructure project;
the engineering equipment previewing module is used for checking the position of the electronic map where the engineering equipment is located and checking the basic information of the engineering equipment;
the electronic fence area viewing module is used for viewing the electronic fence areas of the projects and the engineering equipment on the electronic map;
the real-time constructor position checking module is used for checking the real-time site constructor position on the electronic map; when the site constructor exceeds the set area, the site constructor marks the electronic map in real time and pushes early warning information in time.
10. The real-time construction project site constructor management and control system of claim 8, wherein the project information management module comprises:
the basic information maintenance module of the project, is used for maintaining the basic information of the capital construction project;
the engineering equipment information maintenance module is used for maintaining the engineering equipment information;
and the electronic fence area maintenance module is used for editing the electronic fence area of a certain infrastructure project or certain engineering equipment on line.
CN201911088134.2A 2019-11-08 2019-11-08 Real-time management and control system for construction workers on capital construction project site Pending CN110852611A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911088134.2A CN110852611A (en) 2019-11-08 2019-11-08 Real-time management and control system for construction workers on capital construction project site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911088134.2A CN110852611A (en) 2019-11-08 2019-11-08 Real-time management and control system for construction workers on capital construction project site

Publications (1)

Publication Number Publication Date
CN110852611A true CN110852611A (en) 2020-02-28

Family

ID=69600092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911088134.2A Pending CN110852611A (en) 2019-11-08 2019-11-08 Real-time management and control system for construction workers on capital construction project site

Country Status (1)

Country Link
CN (1) CN110852611A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111832937A (en) * 2020-07-10 2020-10-27 安徽明坦信息科技有限公司 Accurate control auxiliary system for capital construction project and implementation method
CN112465309A (en) * 2020-11-11 2021-03-09 鼎旺天成科技(青岛)有限公司 Visual construction management and control system and implementation method thereof
CN113110243A (en) * 2021-05-14 2021-07-13 国网陕西省电力公司 Construction work site safety intelligent management and control platform
CN113112180A (en) * 2021-04-30 2021-07-13 上海华兴数字科技有限公司 Engineering equipment information pushing method and device and engineering equipment
CN116311076A (en) * 2023-04-07 2023-06-23 北京甲板智慧科技有限公司 Park safety control system and method based on artificial intelligence

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101350814A (en) * 2008-08-26 2009-01-21 成都卫士通信息产业股份有限公司 Safety remote access technology and gateway thereof
CN102413127A (en) * 2011-11-09 2012-04-11 中国电力科学研究院 Database generalization safety protection method
CN102790773A (en) * 2012-07-30 2012-11-21 深圳市共进电子股份有限公司 Method for realizing firewall in household gateway
CN103916458A (en) * 2014-01-27 2014-07-09 国家电网公司 Power enterprise internal application program remote monitoring system based on short message technology
CN106096820A (en) * 2016-05-31 2016-11-09 中交第航务工程局有限公司 Engineering project management system for monitoring based on GIS
CN107087260A (en) * 2017-04-20 2017-08-22 浙江舟水建设有限公司 A kind of live localization method of the water conservancy construction based on alignment system
CN206757689U (en) * 2017-03-24 2017-12-15 国网上海市电力公司 A kind of power consumer site inspection intelligent end device
CN107529144A (en) * 2017-09-30 2017-12-29 四川超影科技有限公司 Intelligent safety helmet alignment system based on UWB communications
CN108063492A (en) * 2017-12-07 2018-05-22 全球能源互联网研究院有限公司 A kind of integrated system and application process of anti-work of combating typhoon of power grid
CN108469752A (en) * 2018-04-27 2018-08-31 中国建筑第二工程局有限公司 A kind of security management and control system and method based on GPS positioning and BIM models
CN108960360A (en) * 2018-06-12 2018-12-07 浙江大境筑科技发展有限公司 A kind of construction site task distribution system
CN109711690A (en) * 2018-12-17 2019-05-03 广州天越电子科技有限公司 The method and system of management scene control project process real-time update
CN109984414A (en) * 2019-04-09 2019-07-09 国网浙江省电力有限公司建设分公司 A kind of labor service system of real name intelligent safety helmet and management system

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101350814A (en) * 2008-08-26 2009-01-21 成都卫士通信息产业股份有限公司 Safety remote access technology and gateway thereof
CN102413127A (en) * 2011-11-09 2012-04-11 中国电力科学研究院 Database generalization safety protection method
CN102790773A (en) * 2012-07-30 2012-11-21 深圳市共进电子股份有限公司 Method for realizing firewall in household gateway
CN103916458A (en) * 2014-01-27 2014-07-09 国家电网公司 Power enterprise internal application program remote monitoring system based on short message technology
CN106096820A (en) * 2016-05-31 2016-11-09 中交第航务工程局有限公司 Engineering project management system for monitoring based on GIS
CN206757689U (en) * 2017-03-24 2017-12-15 国网上海市电力公司 A kind of power consumer site inspection intelligent end device
CN107087260A (en) * 2017-04-20 2017-08-22 浙江舟水建设有限公司 A kind of live localization method of the water conservancy construction based on alignment system
CN107529144A (en) * 2017-09-30 2017-12-29 四川超影科技有限公司 Intelligent safety helmet alignment system based on UWB communications
CN108063492A (en) * 2017-12-07 2018-05-22 全球能源互联网研究院有限公司 A kind of integrated system and application process of anti-work of combating typhoon of power grid
CN108469752A (en) * 2018-04-27 2018-08-31 中国建筑第二工程局有限公司 A kind of security management and control system and method based on GPS positioning and BIM models
CN108960360A (en) * 2018-06-12 2018-12-07 浙江大境筑科技发展有限公司 A kind of construction site task distribution system
CN109711690A (en) * 2018-12-17 2019-05-03 广州天越电子科技有限公司 The method and system of management scene control project process real-time update
CN109984414A (en) * 2019-04-09 2019-07-09 国网浙江省电力有限公司建设分公司 A kind of labor service system of real name intelligent safety helmet and management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁雪青;: "基于互联网+的配网基建现场作业移动应用研究与建设", no. 22, pages 30 - 33 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111832937A (en) * 2020-07-10 2020-10-27 安徽明坦信息科技有限公司 Accurate control auxiliary system for capital construction project and implementation method
CN112465309A (en) * 2020-11-11 2021-03-09 鼎旺天成科技(青岛)有限公司 Visual construction management and control system and implementation method thereof
CN113112180A (en) * 2021-04-30 2021-07-13 上海华兴数字科技有限公司 Engineering equipment information pushing method and device and engineering equipment
CN113110243A (en) * 2021-05-14 2021-07-13 国网陕西省电力公司 Construction work site safety intelligent management and control platform
CN113110243B (en) * 2021-05-14 2023-10-17 国网陕西省电力公司 Construction operation site safety intelligent management and control platform
CN116311076A (en) * 2023-04-07 2023-06-23 北京甲板智慧科技有限公司 Park safety control system and method based on artificial intelligence

Similar Documents

Publication Publication Date Title
CN110852611A (en) Real-time management and control system for construction workers on capital construction project site
CN104766173B (en) Water system user cuts off the water the digitalized processing method of alarm
CN109034577A (en) A kind of Video Applications based on three-dimensional map and scheduling early warning system platform
CN103558827A (en) Mine emergency command communication and management information system
CN108551393B (en) Optical cable line operation and maintenance management system based on enterprise internal and external network data intercommunication
CN104091241A (en) Field cultural relic patrolling management system based on mobile intelligent terminals
CN110825037A (en) Intelligent active management and control system for operation site
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN104978692A (en) Handheld terminal collecting system
CN111792487A (en) Elevator intelligent management system and management method based on big data platform
CN113315838A (en) Intelligent building site comprehensive safe operation informatization supervision platform
CN103150618A (en) Generating system and method for working plan of power transmission network
CN107644326A (en) It is a kind of based on it is noninductive check card with recruitment confirm paying out wages method
CN114548656B (en) Safe emergency management commanding and dispatching system
CN111105330A (en) Intelligent community management system based on one-stop management platform
CN112258159A (en) BIM + GIS-based hydraulic structure management system and method
CN106157166A (en) Intelligent power supply gathers service system
CN114399265A (en) Electric power engineering construction project overall process management and control system
CN102938712A (en) Digital operation field management and control system
CN105023085A (en) City state mobile supervision system and method
CN113064391B (en) Equipment management system of three-dimensional visual wisdom mill
CN116503021A (en) Digital tool system and method for on-site rush repair of power base unit
CN114157687B (en) Concentrated transformer information display system and method based on cloud platform deployment
CN116347359A (en) Method and system for managing user position information
CN116502886A (en) Burn power plant wisdom security protection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination