CN113112180A CN202110484046.5A CN202110484046A CN113112180A CN 113112180 A CN113112180 A CN 113112180A CN 202110484046 A CN202110484046 A CN 202110484046A CN 113112180 A CN113112180 A CN 113112180A
Authority
CN
China
Prior art keywords
information
engineering equipment
push
authority
operator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110484046.5A
Other languages
Chinese (zh)
Inventor
王正滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huaxing Digital Technology Co Ltd
Original Assignee
Shanghai Huaxing Digital Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Huaxing Digital Technology Co Ltd filed Critical Shanghai Huaxing Digital Technology Co Ltd
Priority to CN202110484046.5A priority Critical patent/CN113112180A/en
Publication of CN113112180A publication Critical patent/CN113112180A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/44Program or device authentication
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention provides an engineering equipment information pushing method and device and engineering equipment, wherein the method comprises the following steps: acquiring push information sent to engineering equipment by a server; acquiring authority information corresponding to the push information; and performing access control of pushing information on an operator operating the engineering equipment according to the authority information. By the method, the push information related to the attribute information of the engineering equipment can be acquired, so that accurate information push aiming at the engineering equipment is realized; acquiring authority information corresponding to different types of push information while acquiring the push information, wherein the authority information can be used for controlling the accessibility of the push information; and can carry out access control to the operative employee of operation engineering equipment according to the authority information that different propelling movement information corresponds, can make propelling movement information accurately show for the operative employee that accords with the authority, the operative employee can not look over other propelling movement information that do not accord with the authority to make information push more accurate.

Description

Engineering equipment information pushing method and device and engineering equipment
Technical Field
The invention relates to the technical field of information pushing of engineering equipment, in particular to an information pushing method and device of the engineering equipment and the engineering equipment.
Background
In the information pushing process of the existing engineering equipment, generally, the registration information of an operator of the engineering mechanical equipment is collected, and information pushing or questionnaire investigation is performed on the engineering equipment. If accurate pushing cannot be effectively performed according to the type and model of the engineering equipment and the type of the manipulator, the engineering equipment can receive a lot of irrelevant and useless pushing information, which brings a lot of information interference to the manipulator. Therefore, in the art, how to perform accurate information pushing for an operator of a certain type or model of construction machinery equipment and for the type of the operator is a technical problem to be solved.
Disclosure of Invention
In view of this, the invention provides an engineering equipment information pushing method and device and engineering equipment, which can push accurate information according to attribute information of the engineering equipment and attribute information of an operator.
In a first aspect, the present invention provides an engineering device information pushing method, including: acquiring push information sent to the engineering equipment by a server; acquiring authority information corresponding to the push information; and performing access control of the push information on an operator operating the engineering equipment according to the authority information.
With reference to the first aspect, in a possible implementation manner, the controlling, according to the authority information, access to the push information for an operator operating the engineering equipment includes: when the authority information comprises first authority information corresponding to the push information, acquiring a first time limit calculated after the engineering equipment is logged in by any manipulator in the first authority information; and if the current time is within the first time limit, allowing all operators operating the engineering equipment to access the push information.
With reference to the first aspect, in a possible implementation manner, the method further includes: and if the current time is within the first time limit, sending the push information to a mobile terminal application program corresponding to the engineering equipment for all operators to check.
With reference to the first aspect, in a possible implementation manner, the method further includes: acquiring login information of an operator operating the engineering equipment; wherein the access control of the push information to an operator operating the engineering equipment according to the authority information comprises: when the authority information comprises second authority information corresponding to the push information, acquiring a second time limit calculated after the engineering equipment is logged in by a specific manipulator in the second authority information; and if the current time is within the second time limit and the manipulator operating the engineering equipment is determined to be the specific manipulator according to the login information, allowing the specific manipulator to access the push information after logging in the engineering equipment.
With reference to the first aspect, in a possible implementation manner, the method further includes: and if the current time is within the second time limit, after the specific manipulator logs in the engineering equipment, sending viewing prompt information to a mobile terminal application program corresponding to the engineering equipment so as to prompt the specific manipulator to access the push information.
With reference to the first aspect, in a possible implementation manner, the method further includes: acquiring login information of an operator operating the engineering equipment; wherein the access control of the push information to an operator operating the engineering equipment according to the authority information comprises: when the authority information comprises third authority information corresponding to the push information, acquiring manipulator list information associated with the engineering equipment in the third authority information; and if the operator operating the engineering equipment is determined to be positioned in the operator list information according to the login information, allowing the operator to access the push information.
With reference to the first aspect, in a possible implementation manner, the method further includes: and when the authority information comprises third authority information corresponding to the push information, sending the push information to a mobile terminal held by an operator in the operator list information for the operator in the operator list information to view.
With reference to the first aspect, in a possible implementation manner, the method further includes: acquiring feedback information of an operator on the push information; and sending the feedback information to the server.
With reference to the first aspect, in a possible implementation manner, the obtaining push information sent by the server to the engineering device includes: acquiring push information sent by a server according to the attribute information of the engineering equipment; wherein the attribute information includes: at least one of type, model, operating age, operating environment, geographic location, operating conditions, and operating mode.
In a second aspect, the present invention provides an information pushing apparatus, including: a first acquisition module configured to: acquiring push information sent to the engineering equipment by a server; a second acquisition module configured to: acquiring authority information corresponding to the push information; and an access control module configured to: and according to the authority information, carrying out access control on the push information on an operator operating the engineering equipment.
In a third aspect, the present invention provides an engineering apparatus, comprising: the engineering equipment body is used for executing engineering operation; and the engineering equipment information pushing device.
The invention provides an engineering equipment information pushing method and device and engineering equipment, wherein the method comprises the following steps: acquiring push information sent to engineering equipment by a server; acquiring authority information corresponding to the push information; and performing access control of pushing information on an operator operating the engineering equipment according to the authority information. By the method, the push information related to the attribute information of the engineering equipment can be acquired, so that accurate information push aiming at the engineering equipment is realized; acquiring authority information corresponding to different types of push information while acquiring the push information, wherein the authority information can be used for controlling the accessibility of the push information; and can carry out access control to the operative employee of operation engineering equipment according to the authority information that different propelling movement information corresponds, can make propelling movement information accurately show for the operative employee that accords with the authority, the operative employee can not look over other propelling movement information that do not accord with the authority to make information push more accurate. The push information is not limited to questionnaires, operation instructions, marketing service recommendations, dispatch recommendations, and the like.
Drawings
Fig. 1 is a schematic diagram illustrating steps of an information pushing method according to an embodiment of the present invention.
Fig. 2 is a schematic diagram illustrating steps of an information pushing method according to another embodiment of the present invention.
Fig. 3 is a schematic diagram illustrating steps of an information pushing method according to another embodiment of the present invention.
Fig. 4 is a schematic diagram illustrating steps of an information pushing method according to another embodiment of the present invention.
Fig. 5 is a schematic diagram illustrating method steps of an information pushing method according to another embodiment of the present invention.
Fig. 6 is a schematic diagram illustrating module components of an information pushing apparatus according to an embodiment of the present invention.
Fig. 7 is a schematic diagram illustrating module components of an information pushing apparatus according to another embodiment of the present invention.
Fig. 8 is a schematic structural diagram of an engineering device according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Fig. 1 is a schematic diagram illustrating steps of a method for pushing information of an engineering device according to an embodiment of the present invention. The present invention provides an information pushing method, which in an embodiment can be executed by a processing module having a computing processing function, and the processing module can be integrated on an engineering device, as shown in fig. 1, the method includes:
and step 110, acquiring push information sent to the engineering equipment by the server.
The server and a processing module specifically executing the information pushing method can interact through a network, and the server is used for sending matched pushing information to the processing module on the engineering equipment according to the type or model of the engineering equipment, so that accurate information pushing for the engineering equipment is realized. The processing process of the processing module can be realized through a man-machine interaction program of the engineering equipment, the man-machine interaction program can be provided with an inbox function, and the push information of the server can be stored in the inbox.
And step 120, acquiring authority information corresponding to the push information.
When the push information is obtained, the authority information corresponding to different types of push information is obtained at the same time, and the authority information can be used for controlling the accessibility of the push information.
And step 130, performing access control of pushing information on an operator operating the engineering equipment according to the authority information.
According to the authority information corresponding to different push information, access control is carried out on an operator operating the engineering equipment, the push information can be accurately displayed for the operator meeting the authority, other push information which does not meet the authority cannot be looked up by the operator, and therefore information push is more accurate.
Fig. 2 is a schematic diagram illustrating steps of an information pushing method according to another embodiment of the present invention. In one embodiment, as shown in fig. 2, step 130 may specifically include:
and step 131, when the authority information comprises first authority information corresponding to the push information, acquiring a first time limit calculated by logging in the engineering equipment by any manipulator in the first authority information.
In the first authority information, a first time deadline related to time is included for limiting access authority of push information stored in a certain engineering device in a time limiting manner.
Specifically, a mobile terminal application program may be developed in advance, an operator registers in the mobile terminal application program, and then logs in the engineering equipment by using a registered account, and the first time limit may be calculated when the engineering equipment is logged in by a certain operator for the first time.
Step 132, determine whether the current time is within the first time limit.
And step 133, if the current time is within the first time limit, allowing all operators operating the engineering equipment to access the push information.
In implementation, whether the current time is within a first time limit or not may be determined, and if the current time is within the first time limit, all the operators operating the specific engineering equipment are allowed to access the push information corresponding to the first permission information stored in the specific engineering equipment, where the current time may be specifically a time when a certain operator enters the engineering equipment to work. That is, as long as a certain engineering device is logged in by a certain manipulator for the first time, any manipulator operating the engineering device can access the push information corresponding to the first authority within the first time limit.
Specifically, the pushed information may be questionnaire survey, market preference information, training guidance information, employment requirement information, and the like. When the questionnaire survey is carried out during information pushing, the questionnaire survey can be carried out on all operators of the specific engineering equipment receiving the questionnaire, such as the comfort level, the operation convenience and the work efficiency of the specific engineering equipment during working, the questionnaire survey can be oriented to all the operators capable of operating the engineering equipment, and the operators can check the questionnaire without logging in. The questionnaire survey can be single-choice, multiple-choice and non-question, so that the number of questions and answers is reduced as much as possible, and the character input of an operator is avoided.
And step 134, if the current time exceeds the first time limit, the pushed information is invalid and cannot be accessed.
Specifically, if the current time exceeds the first time limit, the push information is invalid, and any operator operating the engineering equipment cannot access the engineering equipment any more unless another operator logs in the engineering equipment again. When the operator logs in the construction equipment again, the next access control is executed again in step 131, step 132, step 133, and step 134.
In an embodiment where the authority information includes first authority information corresponding to push information, as shown in fig. 2, the information push method further includes:
and 150, if the current time is within the first time limit, sending the push information to a mobile terminal application program corresponding to the engineering equipment for all operators to check.
In implementation, whether the current time is within a first time limit or not is judged, and if the current time is within the first time limit, the push information is sent to a mobile terminal application program developed for the engineering equipment for viewing. As long as the engineering equipment is logged in by any manipulator for the first time, the mobile terminal application program can receive the push information within the first time limit so as to be checked by all the manipulators downloading and registering the mobile terminal application program, and the manipulators can remotely check in the mobile terminal application program without entering the engineering equipment. In the embodiment, some questionnaire surveys, market offer information and employment requirement information can be pushed to be conveniently checked by an operator in the mobile terminal.
Fig. 3 is a schematic diagram illustrating steps of an information pushing method according to another embodiment of the present invention. In an embodiment, as shown in fig. 3, the information pushing method may further include:
and 200, acquiring login information of an operator operating the engineering equipment.
When the method is implemented, the acquisition mode can be obtained after an operator enters a man-machine interaction program of the engineering equipment for logging in.
Wherein step 130 comprises:
and 135, when the authority information comprises second authority information corresponding to the push information, acquiring a second time limit calculated after the engineering equipment is logged in by a specific manipulator in the second authority information.
In the second authority information, a second time period related to time and related to a specific manipulator is included, so as to limit the access authority of the push information stored in a specific engineering device through time limitation and the limitation of the specific manipulator.
Specifically, a mobile terminal application program may be developed in advance, an operator registers in the mobile terminal application program, and then logs in the engineering equipment by using the registered account, and the second time limit may be calculated when a certain engineering equipment is logged in by a specific operator for the first time.
Step 136, determine whether the current time is within the second time limit.
And 137, if the current time is within the second time limit and the manipulator operating the engineering equipment is determined to be the specific manipulator according to the login information, allowing the specific manipulator to access the push information after logging in the engineering equipment.
In implementation, whether the current time is within a second time limit or not may be determined, and if the current time is within the second time limit, the specific manipulator is allowed to log in the specific engineering equipment and then access the push information corresponding to the second permission information stored in the specific engineering equipment, where the current time may be a time when the specific manipulator enters the engineering equipment to work. That is, after a certain specific manipulator logs in a certain specific engineering device for the first time, only after the certain specific manipulator logs in the engineering device, since the login information of the specific manipulator can indicate that the current manipulator is the specific manipulator, the specific manipulator can still access the push information corresponding to the second authority within the second time limit.
Specifically, the pushed information may be questionnaire survey, market preference information, training guidance information, employment requirement information, and the like. The pushed information is only aimed at specific operators who log in specific engineering equipment, the specific operators are generally specific users who use the engineering equipment specially, the content of the pushed information can include some problems with depth for the specific users, and other operators cannot directly view the pushed information. For the specific user, some push information suitable for the specific user can be pushed.
And 138, if the current time exceeds the second time limit, the push information is invalid and cannot be accessed.
And if the current time exceeds the second time limit, the push information is invalid, and the specific operator cannot access the push information any more unless logging in the engineering equipment again. If the particular manipulator logs into the construction machine again, the following access control is performed again through steps 135, 136, 137, and 138.
In an embodiment where the authority information includes second authority information corresponding to the push information, as shown in fig. 3, the information push method further includes:
and step 160, if the current time is within the second time limit, after the specific manipulator logs in the engineering equipment, sending a viewing prompt message to a mobile terminal application program corresponding to the engineering equipment to prompt the specific manipulator to access the push information.
In implementation, whether the current time is within the second time limit or not can be judged, if the current time is within the second time limit, the checking prompt message is sent to the mobile terminal application program developed for the engineering equipment, but all contents of the whole push message are not sent, and after the checking prompt message is seen by a specific operator aiming at the deep requirement, the specific operator enters the engineering equipment and logs in the engineering equipment to access the push message. The push information can be prevented from being seen by operators who only register the mobile terminal application program but do not actually operate the engineering equipment, and certain confidentiality is achieved.
Fig. 4 is a schematic diagram illustrating steps of an information pushing method according to another embodiment of the present invention. In an embodiment, as shown in fig. 4, the information pushing method further includes:
and 200, acquiring login information of an operator operating the engineering equipment.
When the method is implemented, the acquisition mode can be obtained after an operator enters a man-machine interaction program in the engineering equipment and logs in.
Wherein, step 130 may include:
and step 139, when the authority information includes third authority information corresponding to the push information, acquiring manipulator list information associated with the engineering equipment in the third authority information.
In the third authority information, the operator list information related to the engineering equipment is included, so as to limit the access authority of the push information stored in a specific engineering equipment in the specific engineering equipment by means of the associated operator list. The association method may be preset, for example, after the manipulator is previously registered in the mobile terminal application program corresponding to the engineering equipment, the manipulator is summarized in the manipulator list information corresponding to the engineering equipment.
And 140, if the identity information of the current manipulator of the manipulator operating the engineering equipment is determined to be in the manipulator list information according to the login information, allowing the current manipulator to access the push information.
And when the current manipulator logging in the engineering equipment is in the manipulator list information associated with the engineering equipment, the current manipulator meets the condition and is allowed to access the push information. And other operators which are not registered in the mobile terminal application program corresponding to the engineering equipment cannot view the push information.
Specifically, the pushed information may be questionnaire survey, market preference information, training guidance information, employment requirement information, and the like. The operator in the operator list information may generally be an operator who is interested in the engineering equipment, the operator does not necessarily drive and operate the engineering equipment, but the operator who has registered the engineering equipment can push some training guidance information to the operator to train the operator to drive the engineering equipment.
In an embodiment where the authority information includes third authority information corresponding to the push information, the information push method further includes:
and 170, when the authority information comprises third authority information corresponding to the push information, sending the push information to the mobile terminal held by the manipulator in the manipulator list information, so that the manipulator in the manipulator list information can view the push information.
In the implementation process, the push information is sent to the mobile terminal of the manipulator in the manipulator list information, specifically, the manipulators are registered in the mobile terminal application program corresponding to the engineering equipment, and the manipulators can remotely check in the mobile terminal application program without entering the engineering equipment. In the embodiment, some questionnaire surveys, market offer information and employment requirement information can be pushed to be conveniently checked by a registered operator in the mobile terminal.
Fig. 5 is a schematic diagram illustrating method steps of an information pushing method according to another embodiment of the present invention. In an embodiment, as shown in fig. 5, the information pushing method further includes:
and 180, acquiring feedback information of the operator to the push information.
In implementation, feedback made by the operator on the push information is acquired, for example, a result obtained after the operator answers to a questionnaire survey, and for example, a response of the operator on a recruitment requirement is acquired.
Step 190, sending the feedback information to a server.
In implementation, after the feedback information fed back according to the push information is sent to the server, the server can issue a statistical result according to the feedback information. For example, when a questionnaire survey needs to be performed on a certain engineering device, the server can issue a questionnaire report according to the questionnaire survey after acquiring the feedback result of the operator on the questionnaire survey.
In an embodiment, step 110 specifically includes: acquiring push information sent by a server according to attribute information of the engineering equipment; wherein the attribute information includes: at least one of type, model, operating age, operating environment, geographic location, operating conditions, and operating mode. When the information pushing method and device is used, more accurate information pushing can be conducted according to the attribute information of the engineering equipment, the actual situation of the engineering equipment can be reflected by the attribute information, and the pushing information acquired by the engineering equipment is strongly related to various actual situations of the engineering equipment.
Fig. 6 is a schematic diagram illustrating module components of an information pushing apparatus according to an embodiment of the present invention. As shown in fig. 6, the information pushing apparatus 610 includes:
a first obtaining module 620 configured to: acquiring push information sent to engineering equipment by a server;
a second obtaining module 630 configured to: acquiring authority information corresponding to the push information; and
an access control module 640 configured to: and carrying out access control on the push information of an operator operating the engineering equipment according to the authority information.
In this embodiment, the server and the processing module specifically executing the information pushing method may interact through a network, and the server is configured to send the matched pushing information to the processing module on the engineering equipment according to the type or model of the engineering equipment, so as to implement accurate information pushing for the engineering equipment. The processing process of the processing module can be realized through a man-machine interaction program of the engineering equipment, the man-machine interaction program can be provided with an inbox function, and the push information of the server can be stored in the inbox. When the push information is obtained, the authority information corresponding to different types of push information is obtained at the same time, and the authority information can be used for controlling the accessibility of the push information. According to the authority information corresponding to different push information, access control is carried out on an operator operating the engineering equipment, the push information can be accurately displayed for the operator meeting the authority, other push information which does not meet the authority cannot be looked up by the operator, and therefore information push is more accurate.
In an embodiment of the information push device, when the authority information includes first authority information corresponding to the push information, the access control module 640 is further configured to: acquiring a first time limit calculated by logging in the engineering equipment by any operator in the first authority information; and if the current time is within the first time limit, allowing all operators operating the engineering equipment to access the push information.
In this embodiment, access control is performed on the pushed information in a time-limited manner, where the current time may specifically be a time when a certain manipulator enters the engineering equipment to work. The push information can be further accurately pushed to a proper manipulator, and the manipulator cannot look up other push information which is not in accordance with the authority, so that the information is pushed more accurately.
Specifically, a mobile terminal application program may be developed in advance, an operator registers in the mobile terminal application program, and then logs in the engineering equipment by using a registered account, and the first time limit may be calculated when the engineering equipment is logged in by a certain operator for the first time. The push information may be questionnaires, market offer information, training guidance information, employment requirement information, and the like. When the questionnaire survey is carried out during information pushing, the questionnaire survey can be carried out on all operators of the specific engineering equipment receiving the questionnaire, such as the comfort level, the operation convenience and the work efficiency of the specific engineering equipment during working, the questionnaire survey can be oriented to all the operators capable of operating the engineering equipment, and the operators can check the questionnaire without logging in the engineering equipment. The questionnaire survey can be single-choice, multiple-choice and non-question, so that the number of questions and answers is reduced as much as possible, and the character input of an operator is avoided.
Fig. 7 is a schematic diagram illustrating module components of an information pushing apparatus according to another embodiment of the present invention. In an embodiment of the information push apparatus 610 when the first authority information is included in the authority information, as shown in fig. 7, the method further includes:
an information push module 650 configured to: and if the current time is within the first time limit, sending the push information to a mobile terminal application program corresponding to the engineering equipment for all operators to check.
In this embodiment, if the current time is within the first time limit, the push information is sent to a mobile terminal application program developed for the engineering equipment for viewing. As long as the engineering equipment is logged in by any manipulator for the first time, the mobile terminal application program can receive the push information within the first time limit so as to be checked by all the manipulators downloading and registering the mobile terminal application program, and the manipulators can remotely check in the mobile terminal application program without entering the engineering equipment. In the embodiment, some questionnaire surveys, market offer information and employment requirement information can be pushed to be conveniently checked by an operator in the mobile terminal.
In an embodiment, as shown in fig. 7, the information pushing apparatus 610 further includes:
a login module 660 configured to: and showing login guide information to the operator, and acquiring login information triggered by the operator according to the login guide information.
When the embodiment is used, the login module 660 can guide the operator to log in, and acquire login information of the operator for use.
In an embodiment of the information pushing apparatus, after obtaining the login information of the manipulator, the access control module is further configured to: when the authority information comprises second authority information corresponding to the push information, acquiring a second time limit calculated by logging in the engineering equipment by a specific manipulator in the second authority information; and if the current time is within the second time limit and the manipulator operating the engineering equipment is determined to be the specific manipulator according to the login information, allowing the specific manipulator to access the push information after logging in the engineering equipment.
In this embodiment, the second authority information includes a second time limit related to time and related to a specific manipulator, so as to limit the access authority of the push information stored in a specific engineering device in a certain specific engineering device through time limitation and limitation of the specific manipulator. And judging whether the current time is within a second time limit, if so, allowing the specific manipulator to log in the specific engineering equipment, and then accessing push information corresponding to second authority information stored in the specific engineering equipment, wherein the current time can be specifically the time when the specific manipulator enters the engineering equipment to work. That is, after a certain specific manipulator logs in a certain specific engineering device for the first time, only after the certain specific manipulator logs in the engineering device, since the login information of the specific manipulator can indicate that the current manipulator is the specific manipulator, the specific manipulator can still access the push information corresponding to the second authority within the second time limit.
Specifically, a mobile terminal application program may be developed in advance, an operator registers in the mobile terminal application program, and then logs in the engineering equipment by using the registered account, and the second time limit may be calculated when a certain engineering equipment is logged in by a specific operator for the first time. The push information may be questionnaires, market offer information, training guidance information, employment requirement information, and the like. The pushed information is only aimed at specific operators who log in specific engineering equipment, the specific operators are generally specific users who use the engineering equipment specially, the content of the pushed information can include some problems with depth for the specific users, and other operators cannot directly view the pushed information. For the specific user, some push information suitable for the specific user can be pushed.
In an embodiment of the information pushing apparatus, when the authority information includes the second authority information, the information pushing module is further configured to: and if the current time is within the second time limit, sending a viewing prompt message to a mobile terminal application program corresponding to the engineering equipment to prompt a specific manipulator to log in the engineering equipment to access the push message.
And if the current time is within the second time limit, sending viewing prompt information to a mobile terminal application program developed for the engineering equipment, but not sending all contents of the whole push information, and after viewing the viewing prompt information by a specific operator aiming at the depth requirement, entering the engineering equipment and logging in the engineering equipment to access the push information. The push information can be prevented from being seen by operators who only register the mobile terminal application program but do not actually operate the engineering equipment, and certain confidentiality is achieved.
In an embodiment of the information pushing apparatus, after obtaining the login information of the manipulator, the access control module is further configured to: when the authority information comprises third authority information corresponding to the push information, acquiring operator list information related to the engineering equipment in the third authority information; and if the identity information of the current manipulator of the manipulator operating the engineering equipment is determined to be in the manipulator list information according to the login information, allowing the current manipulator to access the push information.
In this embodiment, the third authority information includes the operator list information related to the engineering equipment, so as to limit the access authority of the push information stored in a certain specific engineering equipment in the specific engineering equipment by means of the associated operator list. The association method may be preset, for example, after the manipulator is previously registered in the mobile terminal application program corresponding to the engineering equipment, the manipulator is summarized in the manipulator list information corresponding to the engineering equipment. And when the current manipulator logging in the engineering equipment is in the manipulator list information associated with the engineering equipment, the current manipulator meets the condition and is allowed to access the push information. And other operators which are not registered in the mobile terminal application program corresponding to the engineering equipment cannot view the push information.
Specifically, the pushed information may be questionnaire survey, market preference information, training guidance information, employment requirement information, and the like. The operator in the operator list information may generally be an operator who is interested in the engineering equipment, the operator does not necessarily drive and operate the engineering equipment, but the operator who has registered the engineering equipment can push some training guidance information to the operator to train the operator to drive the engineering equipment.
In an embodiment of the information pushing apparatus, when the authority information includes third authority information, the information pushing module is further configured to: and when the authority information comprises third authority information corresponding to the push information, sending the push information to the mobile terminal held by the manipulator in the manipulator list information for the manipulator in the manipulator list information to check.
In this embodiment, the push information is sent to the mobile terminal of the manipulator in the manipulator list information, specifically, the manipulators are registered in the mobile terminal application program corresponding to the engineering equipment, and the manipulators can remotely view the mobile terminal application program without entering the engineering equipment. In the embodiment, some questionnaire surveys, market offer information and employment requirement information can be pushed to be conveniently checked by a registered operator in the mobile terminal.
In an embodiment, as shown in fig. 7, the information pushing apparatus further includes:
an information feedback module 670 configured to: and acquiring feedback information of the operator on the push information, and sending the feedback information to the server 680.
In this embodiment, the information feedback module 670 obtains feedback made by the operator on the push information, for example, a result obtained after the operator answers to the questionnaire survey, and for example, a response of the operator to a requirement of employment. After the feedback information fed back according to the push information is sent to the server 680, the server 680 may issue a statistical result according to the feedback information. For example, when a questionnaire survey needs to be performed on a certain engineering device, the server 680 may obtain a feedback result of the operator on the questionnaire survey, and then issue a questionnaire report according to the questionnaire survey.
The present invention also provides an engineering apparatus comprising: the engineering equipment comprises an engineering equipment body and the engineering equipment information pushing device; the engineering equipment body is used for executing engineering operation; the information pushing device is electrically connected with the engineering equipment body and used for acquiring pushing information sent by the server according to the engineering equipment and carrying out access control on the pushing information on the manipulator according to the authority information.
In this embodiment, the engineering equipment can not only perform engineering operation, but also perform pushing information for an operator operating the engineering equipment, and perform access control on the pushing information, so that the operator operating the engineering equipment can obtain accurate information pushing, and the operator is prevented from receiving irrelevant information.
Fig. 8 is a schematic structural diagram of an engineering device according to an embodiment of the present invention. As shown in fig. 8, the engineering device 80 includes one or more processors 801 and a memory 802.
The processor 801 may be a Central Processing Unit (CPU) or other form of processing unit having data processing capabilities and/or instruction execution capabilities, and may control other components in the engineering device 80 to perform desired functions. The processor 801 is configured to execute the information pushing method according to any of the above embodiments.
Memory 802 may include one or more computer program products that may include various forms of computer-readable storage media, such as volatile memory and/or non-volatile memory. The volatile memory may include, for example, Random Access Memory (RAM), cache memory (cache), and/or the like. The non-volatile memory may include, for example, Read Only Memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium and executed by the processor 801 to implement the information pushing methods of the various embodiments of the present invention described above or other desired functions. Various content such as information push error parameters may also be stored in the computer readable storage medium.
In one example, the engineering equipment 80 may further include: an input device 803 and an output device 804, which are interconnected by a bus system and/or other form of connection mechanism (not shown).
The input device 803 may include, for example, a keyboard, a mouse, a joystick, a touch screen, and the like.
The output device 804 may output various information including the determined exercise data and the like to the outside. The output device 804 may include, for example, a display, a communication network, a remote output device connected thereto, and so forth.
Of course, for the sake of simplicity, only some of the components of the engineering device 80 relevant to the present invention are shown in fig. 8, and components such as buses, input/output interfaces, and the like are omitted. In addition, the engineering device 80 may include any other suitable components depending on the particular application.
In addition to the above-described methods and apparatuses, embodiments of the present invention may also be a computer program product comprising computer program instructions which, when executed by a processor, cause the processor to perform the steps in the information push method according to various embodiments of the present invention described in this specification.
The computer program product may write program code for carrying out operations for embodiments of the present invention in any combination of one or more programming languages, including an object oriented programming language such as Java, C + + or the like and conventional procedural programming languages, such as the "C" programming language or similar programming languages. The program code may execute entirely on the user's computing device, partly on the user's device, as a stand-alone software package, partly on the user's computing device and partly on a remote computing device, or entirely on the remote computing device or server.
Furthermore, an embodiment of the present invention may also be a computer-readable storage medium having stored thereon computer program instructions, which, when executed by a processor, cause the processor to perform the steps in the information push method according to various embodiments of the present invention described herein.
The computer-readable storage medium may take any combination of one or more readable media. The readable medium may be a readable signal medium or a readable storage medium. A readable storage medium may include, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or a combination of any of the foregoing. More specific examples (a non-exhaustive list) of the readable storage medium include: an electrical connection having one or more wires, a portable disk, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
The basic principles of the present invention have been described above with reference to specific embodiments, but it should be noted that the advantages, effects, etc. mentioned in the present invention are only examples and are not limiting, and the advantages, effects, etc. must not be considered to be possessed by various embodiments of the present invention. Furthermore, the foregoing disclosure of specific details is for the purpose of illustration and description and is not intended to be limiting, since the invention is not limited to the specific details described above.
The block diagrams of devices, apparatuses, systems involved in the present invention are only given as illustrative examples and are not intended to require or imply that the connections, arrangements, configurations, etc. must be made in the manner shown in the block diagrams. These devices, apparatuses, devices, systems may be connected, arranged, configured in any manner, as will be appreciated by those skilled in the art. Words such as "including," "comprising," "having," and the like are open-ended words that mean "including, but not limited to," and are used interchangeably therewith. The words "or" and "as used herein mean, and are used interchangeably with, the word" and/or, "unless the context clearly dictates otherwise. The word "such as" is used herein to mean, and is used interchangeably with, the phrase "such as but not limited to".
It should also be noted that in the apparatus, devices and methods of the present invention, the components or steps may be broken down and/or re-combined. These decompositions and/or recombinations are to be regarded as equivalents of the present invention.
The previous description of the disclosed aspects is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these aspects will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other aspects without departing from the scope of the invention. Thus, the present invention is not intended to be limited to the aspects shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and the like that are within the spirit and principle of the present invention are included in the present invention.

Claims (11)

1. An engineering equipment information pushing method is characterized by comprising the following steps:
acquiring push information sent to the engineering equipment by a server;
acquiring authority information corresponding to the push information; and
and according to the authority information, carrying out access control on the push information on an operator operating the engineering equipment.
2. The method for pushing the engineering equipment information according to claim 1, wherein the controlling access to the pushed information to an operator operating the engineering equipment according to the authority information comprises:
when the authority information comprises first authority information corresponding to the push information, acquiring a first time limit calculated after the engineering equipment is logged in by any manipulator in the first authority information;
and if the current time is within the first time limit, allowing all operators operating the engineering equipment to access the push information.
3. The method for pushing the engineering equipment information according to claim 2, further comprising:
and if the current time is within the first time limit, sending the push information to a mobile terminal application program corresponding to the engineering equipment for all operators to check.
4. The method for pushing the engineering equipment information according to claim 1, further comprising:
acquiring login information of an operator operating the engineering equipment;
wherein the access control of the push information to an operator operating the engineering equipment according to the authority information comprises:
when the authority information comprises second authority information corresponding to the push information, acquiring a second time limit calculated after the engineering equipment is logged in by a specific manipulator in the second authority information;
and if the current time is within the second time limit and the manipulator operating the engineering equipment is determined to be the specific manipulator according to the login information, allowing the specific manipulator to access the push information after logging in the engineering equipment.
5. The method for pushing the engineering equipment information according to claim 4, further comprising:
and if the current time is within the second time limit, after the specific manipulator logs in the engineering equipment, sending viewing prompt information to a mobile terminal application program corresponding to the engineering equipment so as to prompt the specific manipulator to access the push information.
6. The method for pushing the engineering equipment information according to claim 1, further comprising:
acquiring login information of an operator operating the engineering equipment;
wherein the access control of the push information to an operator operating the engineering equipment according to the authority information comprises:
when the authority information comprises third authority information corresponding to the push information, acquiring manipulator list information associated with the engineering equipment in the third authority information; and
and if the operator operating the engineering equipment is determined to be positioned in the operator list information according to the login information, allowing the operator to access the push information.
7. The method for pushing the engineering equipment information according to claim 6, further comprising:
and when the authority information comprises third authority information corresponding to the push information, sending the push information to a mobile terminal held by an operator in the operator list information for the operator in the operator list information to view.
8. The method for pushing the engineering equipment information according to claim 1, further comprising:
acquiring feedback information of an operator on the push information; and
and sending the feedback information to the server.
9. The engineering equipment information pushing method according to any one of claims 1 to 8, characterized by comprising: the obtaining of the push information sent by the server to the engineering equipment includes:
acquiring push information sent by a server according to the attribute information of the engineering equipment;
wherein the attribute information includes: at least one of type, model, operating age, operating environment, geographic location, operating conditions, and operating mode.
10. An engineering equipment information pushing device is characterized by comprising:
a first acquisition module configured to: acquiring push information sent to the engineering equipment by a server;
a second acquisition module configured to: acquiring authority information corresponding to the push information; and
an access control module configured to: and according to the authority information, carrying out access control on the push information on an operator operating the engineering equipment.
11. An engineering apparatus, comprising: the engineering equipment body is used for executing engineering operation; and the engineering equipment information pushing device according to claim 10.
CN202110484046.5A 2021-04-30 2021-04-30 Engineering equipment information pushing method and device and engineering equipment Pending CN113112180A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110484046.5A CN113112180A (en) 2021-04-30 2021-04-30 Engineering equipment information pushing method and device and engineering equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110484046.5A CN113112180A (en) 2021-04-30 2021-04-30 Engineering equipment information pushing method and device and engineering equipment

Publications (1)

Publication Number Publication Date
CN113112180A true CN113112180A (en) 2021-07-13

Family

ID=76720792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110484046.5A Pending CN113112180A (en) 2021-04-30 2021-04-30 Engineering equipment information pushing method and device and engineering equipment

Country Status (1)

Country Link
CN (1) CN113112180A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103685423A (en) * 2012-09-24 2014-03-26 腾讯科技(深圳)有限公司 Information receiving method, device and system
CN105629899A (en) * 2014-10-30 2016-06-01 张学一 Remote measurement and control system
KR101659803B1 (en) * 2015-04-06 2016-10-10 코스텍코리아 주식회사 Server of car paking equipment and system for reservation thereof
CN107748959A (en) * 2017-10-25 2018-03-02 东华理工大学 A kind of construction management information service system
CN108228451A (en) * 2017-12-22 2018-06-29 五八有限公司 A kind of information push method, equipment and computer readable storage medium
CN109543101A (en) * 2018-11-07 2019-03-29 斑马网络技术有限公司 The method for pushing and device of electronic documentation
CN110852611A (en) * 2019-11-08 2020-02-28 国网上海市电力公司 Real-time management and control system for construction workers on capital construction project site
US20200236184A1 (en) * 2017-09-21 2020-07-23 Zhangyue Technology Co., Ltd. Method, electronic device and computer storage medium for pushing information
CN112134926A (en) * 2020-08-24 2020-12-25 长城汽车股份有限公司 Vehicle-mounted equipment upgrading system and method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103685423A (en) * 2012-09-24 2014-03-26 腾讯科技(深圳)有限公司 Information receiving method, device and system
CN105629899A (en) * 2014-10-30 2016-06-01 张学一 Remote measurement and control system
KR101659803B1 (en) * 2015-04-06 2016-10-10 코스텍코리아 주식회사 Server of car paking equipment and system for reservation thereof
US20200236184A1 (en) * 2017-09-21 2020-07-23 Zhangyue Technology Co., Ltd. Method, electronic device and computer storage medium for pushing information
CN107748959A (en) * 2017-10-25 2018-03-02 东华理工大学 A kind of construction management information service system
CN108228451A (en) * 2017-12-22 2018-06-29 五八有限公司 A kind of information push method, equipment and computer readable storage medium
CN109543101A (en) * 2018-11-07 2019-03-29 斑马网络技术有限公司 The method for pushing and device of electronic documentation
CN110852611A (en) * 2019-11-08 2020-02-28 国网上海市电力公司 Real-time management and control system for construction workers on capital construction project site
CN112134926A (en) * 2020-08-24 2020-12-25 长城汽车股份有限公司 Vehicle-mounted equipment upgrading system and method

Similar Documents

Publication Publication Date Title
CN110321154B (en) Micro-service interface information display method and device and electronic equipment
CN112988599B (en) Page debugging method and device, electronic equipment and storage medium
CN112685029A (en) Visual template generation method, device, equipment and storage medium
CN113076104A (en) Page generation method, device, equipment and storage medium
CN103546330A (en) Method, device and system for detecting compatibilities of browsers
CN110866205B (en) Method and apparatus for storing information
US20220300395A1 (en) Contextual drill back to source code and other resources from log data
CN108229980B (en) Question feedback method and device and storage medium
US20120317545A1 (en) Systems and methods for providing feedback for software components
CN108984202B (en) Electronic resource sharing method and device and storage medium
CN113961836A (en) Page jump method and device, electronic equipment and storage medium
CN112182037B (en) Data verification method, device, equipment and storage medium
TWI819215B (en) Data acquisition method, data transfer equipment, platform server, data sharing system, storage device
CN110276183B (en) Reverse Turing verification method and device, storage medium and electronic equipment
CN103324567A (en) App engine debugging method and debugging system
CN113112180A (en) Engineering equipment information pushing method and device and engineering equipment
CN111460256A (en) Webpage data crawling method and device, computer equipment and storage medium
CN111400027A (en) Distributed task processing method, device and system
CN110717315A (en) System data batch modification method and device, storage medium and electronic equipment
CN110737861A (en) webpage data processing method, device, equipment and storage medium
CN112448917A (en) Website login method and device, readable medium and electronic equipment
CN111741046B (en) Data reporting method, data acquisition method, device, equipment and medium
CN114968751A (en) Program debugging method and program debugging device of code-free development platform
CN112100061A (en) Visual crawler code compiling and debugging method
CN111708684B (en) Recording method and device for page access and computer system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination