CN110771291A - Covering layer partitioning method for improving leaching and salt discharging efficiency - Google Patents

Covering layer partitioning method for improving leaching and salt discharging efficiency Download PDF

Info

Publication number
CN110771291A
CN110771291A CN201911069334.3A CN201911069334A CN110771291A CN 110771291 A CN110771291 A CN 110771291A CN 201911069334 A CN201911069334 A CN 201911069334A CN 110771291 A CN110771291 A CN 110771291A
Authority
CN
China
Prior art keywords
leaching
salt
covering layer
desalting
media
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911069334.3A
Other languages
Chinese (zh)
Other versions
CN110771291B (en
Inventor
鲁春辉
张加旭
张雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201911069334.3A priority Critical patent/CN110771291B/en
Publication of CN110771291A publication Critical patent/CN110771291A/en
Application granted granted Critical
Publication of CN110771291B publication Critical patent/CN110771291B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B77/00Machines for lifting and treating soil

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a covering layer partitioning method for improving leaching and salt-removing efficiency, which comprises the following steps: (1) measuring the permeability coefficient K of the saline-alkali soil of the target desalting land block; (2) preparing n kinds of modified permeation media with different permeation coefficients according to the permeation coefficient K; (3) according to the distance between the salt removal systems, covering layer grids are transversely arranged on the surface of a target land, the covering layer grids are divided into n penetrating medium filling areas, modified penetrating media are filled in the filling areas, and the penetration coefficients of the penetrating media are sequentially increased according to the increase of the distance between the filling areas and the underground pipes; (4) draining and leaching the saline-alkali soil of the target desalting land block; (5) and after the desalting is finished, recovering the covering layer for secondary utilization. On one hand, the invention ensures that the infiltration intensity of the soil surface is evenly distributed, shortens the leaching and desalting period and reduces the total leaching water amount; on the other hand, progressive leaching is not needed in the desalting process, and a leaching field is always kept to be completely submerged in a leaching period, so that the leaching measure is convenient to implement.

Description

Covering layer partitioning method for improving leaching and salt discharging efficiency
Technical Field
The invention relates to a method for improving leaching and salt-removing efficiency, in particular to a covering layer partitioning method for improving leaching and salt-removing efficiency.
Background
Soil degradation is a potential threat to human survival, and soil salinization is a common soil degradation mode. According to the data in 2003, the total area of the saline-alkali soil in the world is 955 km 2And accounts for about 10% of the total land area worldwide. The salinization problem of cultivated land in China is particularly serious, and the total area of the saline-alkali land in China is counted to be about 3.6 hundred million mu, which occupies 1/5 of the arable land area in China. Excessive salt accumulation on the surface of soil particles can change the physicochemical properties of soil, affect crop growth and ecological balance, and cause serious environmental and economic risks.
Flood irrigation drainage leaching systems (either underdrains or open channels) are an improved method of salt-alkali soil in widespread use throughout the world. In the soil leaching process, fresh water or reclaimed water is delivered to the soil surface in a flood irrigation mode, so that the soil surface is submerged to a certain degree. Under the action of the downward water flow, the saline water is mixed with the water flow and is washed towards the deep soil, and finally is discharged along with the water flow through the concealed pipe or the open channel. In fact, the rate of salt leaching is largely dependent on the soil surface infiltration intensity, without considering soil salt retention. The higher the infiltration strength, the faster the elution rate. However, according to the water quantity required by the unit area of the field for leaching, leaching efficiency is represented, and researches show that spatial differences exist in the distribution of field infiltration strength in the process of flood irrigation and leaching, namely the infiltration strength is higher at a position closer to a salt discharge system, and is lower at a position farther from the salt discharge system, and the difference of the infiltration strength is usually up to 1-2 orders of magnitude, so that the area near the salt discharge system is excessively leached, the area far from the salt discharge system is not sufficiently leached, the flood irrigation and leaching efficiency is reduced, and the consumption of fresh water resources is increased.
In order to increase the washing efficiency of the salt discharge system, a progressive washing method was proposed since the last 50 th century. The gradual leaching is to leach an area far away from the salt discharge system, and then gradually enlarge the leaching range until the soil surface is completely submerged. From the analysis and calculation perspective, Yongsi and the like in the early century of this century quantitatively discuss the rationality and effectiveness of the progressive leaching method. However, the progressive washing method is complex to implement, and needs to change the soil submerging range in the washing process, so that the automation degree is low, and the large-scale integrated operation is not facilitated.
Disclosure of Invention
The purpose of the invention is as follows: the invention aims to provide a covering layer partitioning method which has uniform infiltration, short leaching period and improved leaching efficiency of a salt discharge system.
The technical scheme is as follows: the invention relates to a covering layer partitioning method for improving leaching and salt discharging efficiency, which comprises the following steps:
(1) measuring the permeability coefficient K of the saline-alkali soil of the target desalting land block;
(2) according to the permeability coefficient K, n kinds of modified permeation media with different permeability coefficients are prepared, and the permeability coefficients are respectively K 1、K 2、K 3……K n,n≥3;
(3) According to the distance between the salt removal systems, covering layer grids are transversely arranged on the surface of the target land, the covering layer grids are divided into n penetrating medium filling areas, n kinds of modified penetrating media in the step (2) are filled into the filling areas, and according to the increase of the distance between the filling areas and the salt removal systems, the penetrating coefficients of the penetrating media are sequentially increased;
(4) draining and leaching the saline-alkali soil of the target desalting land block;
(5) and after the desalting is finished, recovering the covering layer for secondary utilization.
The salt discharge system is a concealed conduit salt discharge system or an open channel salt discharge system. When the salt discharge system is an open channel salt discharge system, the permeable medium filling area is arranged between adjacent open channels, and the edge of the permeable medium filling area is provided with a water retaining weir.
Preferably, the following steps are carried out before (1): and (3) selecting a target desalting land, burying a plurality of salt discharging and salt discharging systems (concealed pipes or open channels) at equal intervals, and directly entering (1) if the salt discharging systems exist in the field.
Preferably, the following steps are carried out before (1): and ploughing, loosening and leveling the surface soil according to the target depth of desalination.
Preferably, in the step (1), the diameter of the hidden pipe can be 10-20cm, the burial depth D of the hidden pipe can be 0.6-2.0 m, and the gradient of the hidden pipe can be 1-2.5%.
Preferably, in the step (1), the excavation depth of the open channel is 1m-2.5m, the slope of the side slope of the open channel is 45% -30%, and the slope of the bottom of the open channel can be 1% -2.5%.
Preferably, in (1), the spacing between the salt discharge systems of the concealed conduitThe selection of L is carried out according to specific topographic and geological conditions or a reference specification, part 2 of technical rules for improving saline-alkali soil by a salt elimination system: the empirical formula in planning design and implementation is as follows: l ═ gamma · K sD/100, wherein K sIs the saturated permeability coefficient, cm/d; d is the buried depth of the salt removing system, cm; gamma is empirical coefficient, clay is 40, loam is 30, sand is 20.
Preferably, in the step (1), the distance L between the open channel salt discharge system and the open channel salt discharge system is selected according to specific topographic and geological conditions, wherein the selectable range of clay foundations is 40-100 m, the selectable range of loam foundations is 100-150 m, and the selectable range of sandy soil foundations is 150-300 m
In (1), the permeability coefficient K of the saline-alkali soil is an average value of a plurality of sampling points which are equidistantly distributed in the horizontal direction and the vertical direction.
The filling areas are symmetrically arranged left and right by taking a single concealed pipe or an open channel of the salt discharging system as a center.
Preferably, in (2), the log of the ratio of the permeability coefficient of the modified permeation media to the permeability coefficient of the saline-alkali soil is 10(K nThe value range of/K) is as follows: -3 to 4.
Preferably, different logs 10(K nand/K) equally dividing the value range according to the number of the partitions.
The proportion of each component in the modified osmotic medium mixed material is changed according to the osmotic coefficient.
Preferably, in (3), the overlay layer grid is divided into n permeable medium filled areas, and the width of each permeable medium filled area is L/2n, wherein L is the distance between two adjacent salt discharge systems.
And the covering layer grid walls of the adjacent permeable medium filling areas are made of permeable materials.
And a screen is arranged at the bottom of the covering layer grid.
Preferably, in the step (4), the depth of the submerged water on the surface of the desalted land can be selected from 5cm to 10cm, and the mineralization degree of the leaching water is not more than 2 mg/g.
Has the advantages that: compared with the prior art, the invention has the following remarkable advantages:
(1) the subarea covering layer adopted by the invention inhibits the area with high infiltration strength of the field surface, strengthens the area with low infiltration strength, ensures that the infiltration strength of the soil surface is uniformly distributed, is favorable for uniformly leaching salt in the whole desalting field range, improves the utilization rate of fresh water or reclaimed water, and has water-saving efficiency of about 70-80%;
(2) the zonal covering layer adopted by the invention increases the infiltration strength of the soil surface in the area far away from the salt discharge system, accelerates the leaching period of the salt discharge system, and has the period reduction rate of 65-75%;
(3) the invention can ensure that the surface of the desalted soil can be completely submerged and leached at one time in the leaching process of the salt discharge system, and the soil submerging range is not required to be changed by extra measures, thereby facilitating the implementation of leaching measures;
(4) when the leaching process is temporarily stopped (such as extreme evaporation weather conditions, blockage of a water pipeline and completion of desalination), the partitioned covering layer on the soil surface can effectively reduce the evaporation of water on the soil surface, slow down the formation process of a non-saturated zone on the soil surface and effectively inhibit the phenomenon of capillary negative pressure salt return;
(5) the partition covering layer can be paved and recovered through machinery, large-scale integrated operation is facilitated, and subsequent agricultural planting and natural drainage processes are not affected.
Drawings
FIG. 1 is a schematic diagram of the seepage of a concealed conduit salt discharge system without a zoned cover layer;
FIG. 2 is a schematic diagram of the seepage of an open channel salt rejection system without a zoned cover;
FIG. 3 is a cross-sectional seepage diagram of example 1;
FIG. 4 is a cross-sectional seepage diagram of example 2;
FIG. 5 is a graph showing the variation of the infiltration amount per unit area of the soil surface in example 1;
fig. 6 is a simulation of total water infiltration distribution in example 1.
Detailed Description
The technical scheme of the invention is further explained by combining the attached drawings.
Example 1
FIG. 1 shows a desalination plot without zone cover, in this embodiment the salt rejection system is a closed conduit salt rejection system, which includes a closed conduit 10 and a desalination plot 12, where the groundwater flow line 13 of the salt rejection system is in the shape shown in the figure.
FIG. 3 shows the desalted land after the formation of zone cover, where n is 4. Including concealed conduits 10, desalination plots 13, screens 112, zonal covers, ground water flow lines (with no zonal covers) 141, and ground water flow lines (with zonal covers) 142. The partitioned overlay comprises an overlay mesh 111, K 1Permeable Medium filled regions 121, K 2Permeate media fill zones 122, K 3Permeate media fill regions 123, K 4The infiltration medium fills region layer 124.
The method for partitioning the cover layer to improve the salt leaching efficiency is further described with reference to fig. 3:
firstly, a modified saline-alkali soil 13 is selected, and a plurality of salt drainage concealed pipes 10 with equal intervals are buried. Particularly, the diameter of the concealed pipe can be 8-20 cm, the buried depth D of the concealed pipe can be 0.6-2.0 m, and the gradient of the concealed pipe can be 1-2.5%; the interval L of the concealed conduits is selected according to specific topographic and geological conditions or a reference specification, part 2 of technical rules for concealed conduit improvement of saline-alkali soil: the empirical formula in planning design and implementation is as follows: l ═ gamma · K sD/100, wherein K sIs the saturated permeability coefficient, cm/d; d is the buried depth of the concealed pipe, cm; gamma is empirical coefficient, clay is 40, loam is 30, sand is 20.
Then, the following steps are carried out:
(1) according to the target depth of desalination, turning, loosening and leveling the surface soil to ensure the uniformity of surface soil particles and remove pore dead zones, increase the porosity and reduce capillary negative pressure; particularly, the permeability coefficient K of the saline-alkali soil is the average value of a plurality of sampling points, wherein the distance between the horizontal sampling points is L/16cm, and the range is the target desalting plot; the distance between the vertical sampling points is 20 cm-40 cm, and the range is 0 cm-500 cm from the ground surface.
(2) Preparing four modified permeation media according to the permeability coefficient K of the saline-alkali soil, wherein the permeability coefficient of each permeation medium is K 1、K 2、K 3And K 4(ii) a In particularThe value ranges of the permeability coefficients corresponding to the four modified permeable mediums are log respectively 10(K 1/K)=-3~2,log 10(K 2/K)=-1.5~0.5,log 10(K 3(ii) 1-0 and log ═ K- 10(K 4and/K) 1-4, wherein the modified permeation medium is river sand, clay, loam, fly ash, gypsum powder and other materials which are mixed according to a certain proportion, and the proportion of each component can be changed according to the permeability coefficient.
(3) The prefabricated overlay mesh 111 is laid according to the interval of the concealed pipes, wherein the bottom of the overlay mesh 111 is provided with a screen 112 to prevent the mixing of the packing materials and facilitate the recycling of the packing materials. Modified osmotic medium K by using construction machinery 1、K 2、K 3And K 4Sequentially filled to K 1Permeate medium filled region 121, K 2Permeate medium fill zone 122, K 3Permeate media fill region 123, K 4Permeate medium fill region 124.
(4) And (3) using water with the mineralization degree not more than 2mg/g as a rinsing water source to submerge the surface of the desalted land to 5cm-10 cm. In the drain rinsing process, the partition is covered with a layer K 1The permeable medium filled region 121 is filled with a porous medium having a lower permeability coefficient, thereby reducing the surface infiltration strength of the region, while the porous medium having a higher permeability coefficient is disposed away from the concealed conduit region, resulting in the convergence of the surface water flow of the lateral blanket to the higher permeability filled region, increasing the surface infiltration strength of these regions. On the other hand, K 1The infiltration medium filled area 121 is decreased in infiltration amount, resulting from K 2Permeate medium fill zone 122, K 3Permeate media fill region 123, K 4The subsurface flow line 142 of the permeate filled region 124 may flow laterally to the closed conduit. Compared with the underground water flow line 141, the zonal coverage enhances the cross flow effect, and the cross flow reduces the water flow seepage path and accelerates the discharge of salt into the concealed conduit. In addition, when the leaching process is temporarily stopped (such as extreme evaporation weather conditions, blockage of a water pipeline and completion of desalination), the partitioned covering layer on the soil surface can effectively reduce the evaporation of water on the soil surface, slow down the formation process of a soil surface unsaturated zone and effectively inhibit the phenomenon of capillary negative pressure salt return.
(5) And after the desalting is finished, recovering the partitioned covering layer for secondary utilization.
In order to show that the partitioned covering layer designed by the invention can improve the leaching desalination efficiency of the concealed conduit salt discharge system, the surface infiltration amount, the leaching period and the total leaching water amount under the two conditions of setting and not setting the partitioned covering layer are compared by using a numerical simulation mode.
Example 2
Fig. 2 shows a desalination plot without a zone cover, and the salt discharge system in this embodiment is an open channel salt discharge system, which includes an open channel 20, a desalination plot 14, and a weir 11, where the groundwater flow line 15 of the salt discharge system is in the shape shown in the figure.
Fig. 4 shows the desalted land after the formation of the partitioned cover layer, where n is 4. Including screen 212, zoned overlay. The partitioned overlay includes an overlay mesh 211, K 1Permeate medium fill regions 221, K 2Permeate media fill region 222, K 3Permeate medium fill regions 223, K 4The infiltration medium fills region layer 224. The groundwater flow line 16 of the salt discharge system now takes the shape of the figure.
Firstly, the improved saline-alkali land 14 is selected, the salt-draining open channel 20 is excavated or the existing channel is reconstructed, and the open channel drainage system is arranged. The open channel excavation depth is 1m-2.5m, and the slope of the open channel side slope is 45% -30%. The distance L between the two open channels is selected according to specific topographic and geological conditions, the clay foundation can be selected within the range of 40m-100m, the loam foundation can be selected within the range of 100m-150m, and the sandy soil foundation can be selected within the range of 150m-300 m. And arranging a water retaining weir at the position of the covering layer to be paved at the edge of the open channel.
Then, the following steps are carried out:
(1) same as in example 1, step (1);
(2) preparing four modified permeation media according to the permeability coefficient K of the saline-alkali soil, wherein the permeability coefficient of each permeation medium is K 1、K 2、K 3And K 4(ii) a Particularly, the value ranges of the corresponding permeability coefficients of the four modified permeation media are log respectively 10(K 1/K)=-2--1,log 10(K 2/K)=-1-0,log 10(K 3K) ═ 0-1 and log 10(K 4The modified penetrating medium is river sand, clay, loam, fly ash, gypsum powder and other materials mixed in certain proportion, and the proportion of each component may be changed based on the penetrating coefficient.
(3) Steps (3) to (5) are the same as those in steps (3) to (5) of example 1.
The subarea covering layer adopted by the invention inhibits the area with high infiltration strength of the field surface, strengthens the area with low infiltration strength, ensures that the infiltration strength of the soil surface is uniformly distributed, is favorable for uniformly leaching salt in the whole desalting field range, improves the utilization rate of fresh water or reclaimed water, and has water-saving efficiency of about 70-80%; the zonal covering layer adopted by the invention increases the infiltration strength of the soil surface in the area far away from the salt discharge system, accelerates the leaching period of the salt discharge system, and has the period reduction rate of 65-75%; the invention can ensure that the surface of the desalted soil can be completely submerged and leached at one time in the leaching process of the salt discharge system, and the soil submerging range is not required to be changed by extra measures, thereby facilitating the implementation of leaching measures; when the leaching process is temporarily stopped (such as extreme evaporation weather conditions, blockage of a water pipeline and completion of desalination), the partitioned covering layer on the soil surface can effectively reduce the evaporation of water on the soil surface, slow down the formation process of a non-saturated zone on the soil surface and effectively inhibit the phenomenon of capillary negative pressure salt return; the partition covering layer can be paved and recovered through machinery, large-scale integrated operation is facilitated, and subsequent agricultural planting and natural drainage processes are not affected.
Taking example 1 as an example, numerical simulations were performed using groundwater seepage and solute transfer processes in the SUTRA software package.
According to the field survey data of the east region of the Chongming island, the permeability coefficient of the desalted land is 1m/D, the porosity is 0.3, and the longitudinal dispersion coefficient D L0.1m, transverse diffusion coefficient D T0.01m, and the initial concentration of groundwater in aquifer is 10kg/m 3. The buried depth of the concealed pipes is 1m, the diameter of the concealed pipes is 8cm, the distance between the concealed pipes is 20m, the water-impermeable layer is-5 m, and the fixed water head on the soil surface is 5cm high. Because the groundwater flow is distributed symmetrically about the concealed pipe, half of the model is selected for numerical simulation, and the size of the modelIs 10 m.times.5 m. Numerical simulation 1 (hereinafter referred to as simulation 1) represents a case where the partition covering layer is not provided, and numerical simulation 2 (hereinafter referred to as simulation 2) represents a case where the partition covering layer is provided. Wherein each permeability coefficient of the covering layer of the numerical simulation subarea is K 1=0.01m/d,K 2=0.1m/d, K 31m/d and K 410m/d, i.e. log 10(K 1/K)=-2,log 10(K 2/K)=-1,log 10(K 3K) ═ 0 and log 10(K 4/K)=1。
Fig. 5 is a graph showing the variation tendency of infiltration per unit area of soil surface, with the solid line representing simulation 1 and the dotted line representing simulation 2. As shown by the solid line, the unit infiltration intensity of the soil surface at the position near the concealed conduit is quite large, which indicates that the water flow velocity of the area is large, the salt scouring capability is strong, and the salt can be quickly washed into the concealed conduit. Along with the increase of the distance from the concealed pipe, the unit infiltration strength of the soil surface is sharply reduced by 1-2 orders of magnitude, which indicates that the flow velocity of infiltration water flow in the area far away from the concealed pipe is small, the salt scouring capability is insufficient, and the downward leaching progress of salt in the area between the two concealed pipes is slow. The huge difference of the spatial distribution of the unit infiltration strength delays the leaching desalination period on one hand, and on the other hand, the high-strength infiltration is carried out in an area close to the concealed pipe for a long time, so that the salt scouring efficiency of unit water volume is reduced, and the utilization rate of water resources is reduced. As shown by the dotted line, at a position near the dark tube (e.g., K) 1Osmotic agent filled region 121) had a sharp drop in unit infiltration strength compared to numerical simulation 1 in this region due to the inhibition of infiltration by the zoned coating. While the permeability coefficient of the permeable medium in each partition along the direction far away from the concealed conduit is distributed in a manner of increasing by one order of magnitude, resulting in the convergence of the water flow on the surface of the transverse covering layer to a higher permeability filling area, increasing K 2Permeate medium fill zone 122, K 3Permeate media fill region 123, K 4The surface infiltration strength of the osmotic agent-filled zone 124, thereby shortening the leaching cycle.
Fig. 6 shows the distribution of total water volume of four subareas during the whole desalting period in the two modes of simulation 1 and simulation 2. Simulation 1 at K 1The total infiltration amount of the infiltration medium filling area 121 reaches approximately 8.3m 3/m 2Occupying 80% of the total infiltration of the soil surface, and K 2Permeate medium fill zone 122, K 3Permeate filled regions 123 and K 4The total infiltration amount of the permeable medium filled region 124 is 1.3m 3/m 2,0.5m 3/m 2And 0.3m 3/m 2The distribution accounts for 12%, 5% and 3% of the total infiltration amount on the soil surface. And in simulation 2, K 1Permeate medium filled region 121, K 2Permeate medium fill zone 122, K 3Permeate filled regions 123 and K 4The total infiltration amount of the infiltration medium filling area 124 is 0.31m 3/m 2,0.83m 3/m 2,0.84m 3/m 2And 0.41m 3/m 2Which respectively account for 13%, 34%, 36% and 17% of the total infiltration amount of the soil surface. According to the data, the infiltration total amount of the simulation 2 is saved by 77% compared with that of the simulation 1, the distribution of the infiltration amount of each sub-filling area is more balanced, the salt is enabled to be uniformly leached downwards, and the leaching efficiency is improved.

Claims (10)

1. A covering layer partitioning method for improving the salt leaching and discharging efficiency is characterized by comprising the following steps:
(1) measuring the permeability coefficient K of the saline-alkali soil of the target desalting land block;
(2) according to the permeability coefficient K, n kinds of modified permeation media with different permeability coefficients are prepared, and the permeability coefficients are respectively K 1、K 2、K 3……K n,n≥3;
(3) According to the distance between the salt removal systems, covering layer grids are transversely arranged on the surface of the target land, the covering layer grids are divided into n penetrating medium filling areas, n kinds of modified penetrating media in the step (2) are filled into the filling areas, and the penetrating coefficients of the penetrating media are sequentially increased according to the increase of the distance between the filling areas and the underground pipes;
(4) draining and leaching the saline-alkali soil of the target desalting land block;
(5) and after the desalting is finished, recovering the covering layer for secondary utilization.
2. The overburden partitioning method for improving the efficiency of leaching salt rejection of claim 1, wherein said salt rejection system is a closed conduit salt rejection system.
3. The overburden partitioning method for improving stripping salt efficiency of claim 1 wherein said salt rejection system is an open channel salt rejection system.
4. The method of claim 3, wherein the permeate-filled region is disposed between two adjacent channels.
5. The method of claim 4, wherein the permeable media-filled region is provided with a water dam at the edge thereof.
6. The overburden partitioning method for improving the efficiency of leaching salt rejection of claim 1 wherein said salt rejection system is a combination concealed conduit and open channel salt rejection system.
7. The overburden partitioning method for improving the efficiency of leaching reject salts as recited in claim 1 wherein in (1) the permeability coefficient K of the saline alkali soil is an average of a plurality of sampling points that are equally spaced horizontally and vertically.
8. The method of claim 1, wherein the fill zones are arranged side-to-side symmetrically about a single closed conduit or open channel of the salt rejection system.
9. The method of claim 1, wherein the walls of the cells of the cover layer adjacent the permeable media-filled zone are permeable to water.
10. The method of claim 1, wherein a screen is placed on the bottom of the grid of the cover layer.
CN201911069334.3A 2019-11-05 2019-11-05 Covering layer partitioning method for improving leaching and salt discharging efficiency Active CN110771291B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911069334.3A CN110771291B (en) 2019-11-05 2019-11-05 Covering layer partitioning method for improving leaching and salt discharging efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911069334.3A CN110771291B (en) 2019-11-05 2019-11-05 Covering layer partitioning method for improving leaching and salt discharging efficiency

Publications (2)

Publication Number Publication Date
CN110771291A true CN110771291A (en) 2020-02-11
CN110771291B CN110771291B (en) 2022-01-28

Family

ID=69388919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911069334.3A Active CN110771291B (en) 2019-11-05 2019-11-05 Covering layer partitioning method for improving leaching and salt discharging efficiency

Country Status (1)

Country Link
CN (1) CN110771291B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111896429A (en) * 2020-07-10 2020-11-06 武汉大学 Method for improving drainage and salt drainage boundary of concealed conduit in water salt simulation model
CN111898257A (en) * 2020-07-16 2020-11-06 武汉大学 Regional concealed pipe layout and water and salt discharge numerical simulation method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6666903B1 (en) * 1996-08-14 2003-12-23 Discovery Resources, Inc. Method for improved recovery of metals
CN102037806A (en) * 2010-11-04 2011-05-04 天津市绿源环境景观工程有限公司 Greening method for dredger fill
CN103329658A (en) * 2013-06-21 2013-10-02 河海大学 Sectional three-dimensional structure for fast desalting and soil improvement of saline-alkali soil of new tidal marsh reclamation area
CN104115586A (en) * 2014-06-13 2014-10-29 宁波高新区围海工程技术开发有限公司 Moderate and severe saline-alkali soil treatment method
CN204131941U (en) * 2014-09-05 2015-02-04 山东胜伟园林科技有限公司 Alkali combined type hidden pipe device falls in saline land salt discharge
CN106358479A (en) * 2016-08-30 2017-02-01 山东胜伟园林科技有限公司 Open trench-concealed conduit combined water discharging and salt reducing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6666903B1 (en) * 1996-08-14 2003-12-23 Discovery Resources, Inc. Method for improved recovery of metals
CN102037806A (en) * 2010-11-04 2011-05-04 天津市绿源环境景观工程有限公司 Greening method for dredger fill
CN103329658A (en) * 2013-06-21 2013-10-02 河海大学 Sectional three-dimensional structure for fast desalting and soil improvement of saline-alkali soil of new tidal marsh reclamation area
CN104115586A (en) * 2014-06-13 2014-10-29 宁波高新区围海工程技术开发有限公司 Moderate and severe saline-alkali soil treatment method
CN204131941U (en) * 2014-09-05 2015-02-04 山东胜伟园林科技有限公司 Alkali combined type hidden pipe device falls in saline land salt discharge
CN106358479A (en) * 2016-08-30 2017-02-01 山东胜伟园林科技有限公司 Open trench-concealed conduit combined water discharging and salt reducing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111896429A (en) * 2020-07-10 2020-11-06 武汉大学 Method for improving drainage and salt drainage boundary of concealed conduit in water salt simulation model
CN111898257A (en) * 2020-07-16 2020-11-06 武汉大学 Regional concealed pipe layout and water and salt discharge numerical simulation method and device

Also Published As

Publication number Publication date
CN110771291B (en) 2022-01-28

Similar Documents

Publication Publication Date Title
Haghnazari et al. Factors affecting the infiltration of agricultural soils
CN100473271C (en) System engineering method for modifying alkaline land by use of pipe drainage method
CN103460843B (en) Quick saline-alkali land desalting system method by means of concealed-tube irrigation and drainage
JP2013535597A (en) In-situ leaching method by liquid injection
CN202503891U (en) Saline-alkali land soil improvement system provided with pit
CN202503890U (en) Water and soil improvement system of saline and alkaline land
CN102160480A (en) Saline-alkali soil irrigation and drainage ecological improvement method
CN110771291B (en) Covering layer partitioning method for improving leaching and salt discharging efficiency
CN205990603U (en) A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud
Charlesworth et al. The Burdekin Delta—Australia’s oldest artificial recharge scheme
CN108781576B (en) Beach desalting method coupling water circulation
CN108990452B (en) Coupling diving layer salt and fresh water replacing and leaching desalting device
Kruseman Recharge from intermittent flow
CN110990753B (en) Method for calculating leaching effect of concealed pipe system
CN109429605A (en) A kind of salt-soda soil and desertification administering method
Singh et al. Basics of soil erosion
CN105421314B (en) A kind of construction method of the three-dimensional regulator control system of accumulated water Farmland Water
CN203646005U (en) Local collection permeation-enhancing evaporation-suppression saline-alkali land improvement system
CN108283031A (en) A kind of marine solonchak seepage pipe Salt discharge method
CN212506609U (en) Sponge city oozes row structure
CN104145673A (en) Integrated green belt system based on flood drainage and water conservation and flood drainage and water conservation method
CN104196005A (en) Efficient and anti-blocking water-bearing stratum supply device
CN210579944U (en) Saline and alkaline land soil drainage salt-washing system
Shanan The impact of irrigation
CN214177981U (en) Earthwork structure for ecological improvement of saline-alkali soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Jiaxu

Inventor after: Lu Chunhui

Inventor after: Zhang Lei

Inventor before: Lu Chunhui

Inventor before: Zhang Jiaxu

Inventor before: Zhang Lei

GR01 Patent grant
GR01 Patent grant