CN205990603U - A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud - Google Patents

A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud Download PDF

Info

Publication number
CN205990603U
CN205990603U CN201620721973.9U CN201620721973U CN205990603U CN 205990603 U CN205990603 U CN 205990603U CN 201620721973 U CN201620721973 U CN 201620721973U CN 205990603 U CN205990603 U CN 205990603U
Authority
CN
China
Prior art keywords
layer
heavy metal
solidification
stabilization
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620721973.9U
Other languages
Chinese (zh)
Inventor
裴东辉
任重
黄雷
李红艳
周巍
赵亮
杜林峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cecep Tiehan ecological environment Co.,Ltd.
Original Assignee
Shenzhen Techand Ecology and Environment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Techand Ecology and Environment Co Ltd filed Critical Shenzhen Techand Ecology and Environment Co Ltd
Priority to CN201620721973.9U priority Critical patent/CN205990603U/en
Application granted granted Critical
Publication of CN205990603U publication Critical patent/CN205990603U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud, including the obstruct wall being vertically arranged, intercept wall and be sequentially provided with foundation stone layer towards the side at river course center, polluted river channel sediment layer, solidification and stabilization layer, separated by geotextiles between solidification and stabilization layer with polluted river channel sediment layer between foundation stone layer and polluted bed mud layer, the bottom of solidification and stabilization layer is less than the bottom of polluted river channel sediment layer, what solidification and stabilization layer surfaced is partially covered with overburden layer, solidification and stabilization layer under water be partially covered with pollution-free sediment layer, intercept wall and extend downward horizon d, exceed overburden layer upwards, plant on overburden layer and be implanted with heavy metal accumulation plant, plant in pollution-free sediment layer and be implanted with plant;This utility model combines obstruct solidification and stabilization technology and phytoremediation technology, by high concentration heavy metal polluted bed mud intercepts solidification and stabilization in situ, stops the diffusion of heavy metal with stabilization agent using the mode that obstruct wall is combined.

Description

A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud
Technical field
This utility model is related to river course Heavy Metal Pollution Control technology, more particularly, to a kind of in-situ immobilization heavy metal pollution river The ecoscape revetment structure of road bed mud.
Background technology
During modernized society of China high speed development, with the exploitation year after year of various Ores, ore dressing, each metalloid Smelting, and all kinds of heavy duty industrial waste water such as chemical industry and plating is constantly discharged in natural environment, causes each Tai Ho Road water The pollution of the serious heavy metal of body, the river course in particularly each mining area.In river water body, the heavy metal contaminants of the overwhelming majority pass through Precipitation, absorption different physics chemical action various from complexation, oxidation and reduction etc., proceed in solid phase bed mud by water body, finally Deposit and be progressively enriched with, lead to the content severe overweight of each heavy metal species in bed mud, cause serious environmental pollution.And bed mud Middle heavy metal is in an unsure state, and animal migration is strong, can move towards with river course under field conditions (factors), migrate to downstream water system In, flow into arable land, forest zone etc. with river, even into the drinking water source region in downstream city, heavy damage natural environment simultaneously And ecosystem, the health of the harm mankind.The areas such as Hunan, Guangxi have occurred in that numerous Heavy Metal Pollution in Sediments phenomenons, The pollution repairing river bottom mud has been increasingly becoming a urgent and challenge.
From the point of view of the restorative procedure currently for river bottom mud heavy metal pollution, mainly there are dystopy fixing-stable, dystopy Drip washing process, dystopy intercept the methods such as Landfill, fixation in situ stabilisation, original position phytoremediation technology.Dystopy treatment technology It is to focus on after Sediment Dredging, exists that construction work amount is big, control expense is high, and easy produce secondary pollution etc. and be Lieque point.Intercepted using clay more than dystopy obstruct Landfill, barriering effect is not good.Patent CN204544963U discloses Structure is repaired in a kind of obstruct of heavy metal pollution of soil, uses obstruct Landfill, directly connects including with contaminated soil Tactile stabilized zone, is outwards once provided with impervious barrier and hydrophobic layer by described stabilized zone, is provided with least between impervious barrier and hydrophobic layer One layer of geotextiles, also include vertical obstruct wall, intercept the periphery located at contaminated soil pair for the wall, it extends downward basement rock Layer, exceeds earth's surface upwards, and described contaminated soil is coated on described obstruct within the walls.Contaminated soil is coated on obstruct by this technology Between wall and stabilized zone+impervious barrier+hydrophobic layer composite bed, contaminated soil is intercepted with extraneous soil and comes so that being contaminated Soil cannot occur material exchange with extraneous soil.It is a kind of closing Landfill it is impossible to truly realize contaminated soil The reparation of earth.
In-situ solidifying stabilization technology is the appearance reducing heavy metal polluted bed mud by physics, chemistry or biological method Long-pending, thus reducing the animal migration of heavy metal, and then reach the bed mud comprehensive improvement technology reducing heavy metal release.Original position is repaiied by plant Recovering technology is by heavy-metal -tolerant plant, stablizes plant including heavy metal and heavy metal accumulation plant carrys out repairing heavy metal pollution Bed mud.At present original position phytoremediation technology is substantially from the platymiscium of resistance to a huge sum of money, heavy metal accumulation plant and builds firm The aspects such as phytobiocoenose come to launch study, but these plants are used for the engineering and technological research of the reparation of river bottom mud by reality Seldom.Exploitation is a kind of to build the revetment structure that revetment, more conducively plant growing breeding and heavy metal polluted bed mud are repaired.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of life of in-situ immobilization heavy metal pollution river bottom mud State landscape revetment structure.
Technical solution adopted in the utility model is:
A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud, including the obstruct being vertically arranged Wall, described obstruct wall is sequentially provided with foundation stone layer, pollution located at polluted river channel periphery, described obstruct wall towards the side at river course center River bottom mud layer, solidification and stabilization layer, are separated by geotextiles between described foundation stone layer and described polluted bed mud layer, described foundation stone Layer is used for stablizing revetment structure, is separated by geotextiles, institute between described polluted river channel sediment layer and described solidification and stabilization layer The bottom stating solidification and stabilization layer is less than the bottom of described polluted river channel sediment layer, the portion that described solidification and stabilization layer surfaces Point be coated with overburden layer, described solidification and stabilization layer under water be partially covered with pollution-free sediment layer, described obstruct wall is to downward Extend horizon d, exceed described overburden layer upwards, described overburden layer is planted and is implanted with heavy metal accumulation plant, described pollution-free bed mud The layer ecological region planting more than 20cm for the depth of water has submerged plant, and the ecological region planting that the described pollution-free sediment layer depth of water is less than 20cm has very Water plant.
In a kind of specific embodiment, described obstruct wall is concrete block wall, clay intercepts wall, bentonite intercepts Any one of wall or HDPE film sandwich.
As the further improved procedure of such scheme, the thickness of described obstruct wall is 60mm-500mm.
In a kind of specific embodiment, described fixing-stable layer is the clay being mixed with fixing-stable chemical medicine agent Layer.
In a kind of specific embodiment, described foundation stone layer include from bottom to top bulk riprap layer, fritter riprap layer and Sandy gravel stratum.
As the further improved procedure of such scheme, the thickness of described foundation stone layer is 300-600mm.
In a kind of specific embodiment, described submerged plant is Herba vallisneriae Spiralis or black algae, and described emergent aquactic plant is floral leaf reed Any one in bamboo, Rhizoma Acori Graminei, Canna generalis Bailey or Rhizoma Iridis Tectori, described heavy metal accumulation plant is appointing in Sedum alfredii Hance, red building or Chinese rose A kind of.
The beneficial effects of the utility model are:
This utility model provides a kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud, including The obstruct wall being vertically arranged, described obstruct wall located at polluted river channel periphery, described intercept wall towards river course center side successively It is provided with foundation stone layer, polluted river channel sediment layer, solidification and stabilization layer, between described foundation stone layer and described polluted bed mud layer, pass through geotechnique Cloth separates, and described foundation stone layer is used for stablizing revetment structure, logical between described polluted river channel sediment layer and described solidification and stabilization layer Cross geotextiles to separate, the bottom of described solidification and stabilization layer is less than the bottom of described polluted river channel sediment layer, described solidification is stable Change layer surface be partially covered with overburden layer, described solidification and stabilization layer under water be partially covered with pollution-free sediment layer, Described obstruct wall extends downward horizon d, exceeds described overburden layer upwards, described overburden layer is planted and is implanted with heavy metal accumulation plant Thing, the ecological region planting more than 20cm for the described pollution-free sediment layer depth of water has submerged plant, and the described pollution-free sediment layer depth of water is less than The ecological region planting of 20cm has emergent aquactic plant.Obstruct Landfill different from the past, intercepting Landfill is simple by dirt Dye soil or bed mud are intercepted with extraneous soil and current and come, and this utility model combines the solidification and stabilization technology that intercepts in situ With phytoremediation technology, by high concentration heavy metal polluted bed mud being intercepted in situ solidification and stabilization, using intercept wall with stable The mode of physics+chemistry that chemical medicine agent combines stops the diffusion of heavy metal, and builds rational aquatic vegetation thus reaching The purpose of the long-acting heavy metal pollution repairing river bottom mud, plantation emergent aquactic plant, submerged plant in river course bank band wetland simultaneously And revetment side heavy metal accumulation plant, form emergent vegetation zone, submerged plant band and bank band vegetational zone respectively, make constructed Revetment structure reaches certain ecoscape effect while repairing river bottom mud heavy metal pollution.
Brief description
Fig. 1 is the profile of the ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud.
Specific embodiment
Below with reference to embodiment and accompanying drawing, the technique effect of design of the present utility model, concrete structure and generation is carried out Clearly and completely describe, to be completely understood by the purpose of this utility model, feature and effect.Obviously, described embodiment It is a part of embodiment of the present utility model, rather than whole embodiments, based on embodiment of the present utility model, the skill of this area The other embodiment that art personnel's on the premise of not paying creative work is obtained, belongs to the model of this utility model protection Enclose.In addition, all connection/annexations being related in patent, not singly refer to component and directly connect, and refer to can be according to concrete Performance, by adding or reducing connection auxiliary, to form more excellent draw bail.Each skill in this utility model creation Art feature, can be with combination of interactions on the premise of not conflicting conflict.
Embodiment 1:
With reference to Fig. 1, this utility model provides a kind of ecoscape revetment of in-situ immobilization heavy metal pollution river bottom mud Structure, including the obstruct wall 1 being vertically arranged, located at polluted river channel 2 periphery, described obstruct wall 1 is towards river course 2 for described obstruct wall 1 The side at center is sequentially provided with foundation stone layer 3, polluted river channel sediment layer 4, solidification and stabilization layer 5, described foundation stone layer 3 and described pollution Separated by geotextiles 6 between sediment layer 4, described foundation stone layer 3 is used for stablizing revetment structure, described polluted river channel sediment layer 4 He Separated by geotextiles 6 between described solidification and stabilization layer 5, the bottom of described solidification and stabilization layer 5 is less than described polluted river channel The bottom of sediment layer 4, what described solidification and stabilization layer 5 surfaced is partially covered with overburden layer 7, described solidification and stabilization layer 5 Under water be partially covered with pollution-free sediment layer 8, described obstruct wall 1 extends downward horizon d, exceeds described overburden layer upwards 7, described overburden layer 7 is planted and is implanted with heavy metal accumulation plant 9, the ecological region planting more than 20cm for described pollution-free sediment layer 8 depth of water There is submerged plant 10, the ecological region planting that described pollution-free sediment layer 8 depth of water is less than 20cm has emergent aquactic plant 11.Described obstruct wall 1 For concrete block wall.The described thickness intercepting wall 1 is 500mm.Described fixing-stable layer 5 is to be mixed with fixing-stable chemical medicine The soil horizon of agent.Described foundation stone layer 3 includes bulk riprap layer, fritter riprap layer and sandy gravel stratum from bottom to top.Described foundation stone layer 3 Thickness is 300mm.Described submerged plant 10 is Herba vallisneriae Spiralis, and described emergent aquactic plant 11 is Arundo donax, described heavy metal accumulation plant 9 For Sedum alfredii Hance.Plantation emergent aquactic plant 11, submerged plant 10 and revetment side heavy metal accumulation plant in river course bank band wetland 9, form emergent vegetation zone, submerged plant band and bank band vegetational zone respectively, make constructed revetment structure repair river bottom mud Certain ecoscape effect is reached while heavy metal pollution.
Embodiment 2:
The present embodiment is substantially the same manner as Example 1, and difference is:Described obstruct wall 1 is HDPE film sandwich, institute The thickness stating obstruct wall 1 is 60mm.Described fixing-stable layer 5 is the clay layer being mixed with fixing-stable chemical medicine agent.Described base Rock layers 3 include bulk riprap layer, fritter riprap layer and sandy gravel stratum from bottom to top.The thickness of described foundation stone layer 3 is 600mm.Described Submerged plant 10 is black algae, and described emergent aquactic plant 11 is Canna generalis Bailey, and described heavy metal accumulation plant 9 is red building.
Embodiment 3:
The present embodiment is substantially the same manner as Example 1, and difference is:Described obstruct wall 1 intercepts wall, described resistance for clay The thickness of partition wall 1 is 300mm.Described fixing-stable layer 5 is the clay layer being mixed with fixing-stable chemical medicine agent.Described foundation stone layer 3 include bulk riprap layer, fritter riprap layer and sandy gravel stratum from bottom to top.The thickness of described foundation stone layer 3 is 400mm.Described heavy water Plant 10 is black algae, and described emergent aquactic plant 11 is Rhizoma Acori Graminei, and described heavy metal accumulation plant 9 is Chinese rose.
Embodiment 4:
The present embodiment is substantially the same manner as Example 1, and difference is:Described obstruct wall 1 intercepts wall for bentonite, described The thickness intercepting wall 1 is 400mm.Described fixing-stable layer 5 is the clay layer being mixed with fixing-stable chemical medicine agent.Described foundation stone Layer 3 includes bulk riprap layer, fritter riprap layer and sandy gravel stratum from bottom to top.The thickness of described foundation stone layer 3 is 400mm.Described heavy Water plant 10 is black algae, and described emergent aquactic plant 11 is Rhizoma Iridis Tectori, and described heavy metal accumulation plant 9 is Chinese rose.

Claims (6)

1. a kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud is it is characterised in that include vertically setting The obstruct wall put, described obstruct wall is sequentially provided with base located at polluted river channel periphery, described obstruct wall towards the side at river course center Rock layers, polluted river channel sediment layer, solidification and stabilization layer, are divided by geotextiles between described foundation stone layer and described polluted bed mud layer Every described foundation stone layer is used for stablizing revetment structure, passes through soil between described polluted river channel sediment layer and described solidification and stabilization layer Work cloth separates, and the bottom of described solidification and stabilization layer is less than the bottom of described polluted river channel sediment layer, described solidification and stabilization layer That surfaces is partially covered with overburden layer, described solidification and stabilization layer under water be partially covered with pollution-free sediment layer, described Intercept wall and extend downward horizon d, exceed described overburden layer upwards, described overburden layer is planted and is implanted with heavy metal accumulation plant, institute Stating the ecological region planting that the pollution-free sediment layer depth of water is more than 20cm has submerged plant, and the described pollution-free sediment layer depth of water is less than 20cm's Ecological region planting has emergent aquactic plant.
2. the ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud according to claim 1, its feature Be, described intercept wall be concrete block wall, clay intercept wall, bentonite intercept arbitrary in wall or HDPE film sandwich Individual.
3. the ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud according to claim 2, its feature It is, the described thickness intercepting wall is 60mm-500mm.
4. the ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud according to claim 1, its feature It is, described foundation stone layer includes bulk riprap layer, fritter riprap layer and sandy gravel stratum from bottom to top.
5. the ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud according to claim 4, its feature It is, the thickness of described foundation stone layer is 300-600mm.
6. the ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud according to claim 1, its feature It is, described submerged plant is Herba vallisneriae Spiralis or black algae, described emergent aquactic plant is appointing in Arundo donax, Rhizoma Acori Graminei, Canna generalis Bailey or Rhizoma Iridis Tectori One kind, described heavy metal accumulation plant is any one in Sedum alfredii Hance, red building or Chinese rose.
CN201620721973.9U 2016-07-08 2016-07-08 A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud Active CN205990603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620721973.9U CN205990603U (en) 2016-07-08 2016-07-08 A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620721973.9U CN205990603U (en) 2016-07-08 2016-07-08 A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud

Publications (1)

Publication Number Publication Date
CN205990603U true CN205990603U (en) 2017-03-01

Family

ID=58102869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620721973.9U Active CN205990603U (en) 2016-07-08 2016-07-08 A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud

Country Status (1)

Country Link
CN (1) CN205990603U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106917383A (en) * 2017-03-02 2017-07-04 中钢集团鞍山热能研究院有限公司 The absorption that preventing and treating river course river interacts migration stain with riverbank heavy metal in soil intercepts wall
CN107445422A (en) * 2017-08-03 2017-12-08 山东建筑大学 A kind of pollution of river bed mud ecological restoring method
CN108164106A (en) * 2018-02-02 2018-06-15 清华大学 A kind of curing based on abandoned biomass and pollution of river bed mud recycling
CN109205797A (en) * 2018-09-14 2019-01-15 湖南新九方科技有限公司 A kind of restorative procedure in heavy metal pollution waters
CN109555109A (en) * 2018-10-12 2019-04-02 云南省环境科学研究院(中国昆明高原湖泊国际研究中心) A kind of system that resistance control in situ is carried out to the mine tailings containing heavy metal
CN112723694A (en) * 2021-01-11 2021-04-30 岭南水务集团有限公司 Ecological island with function of in-situ remediation of heavy metal polluted bottom mud and implementation method thereof
CN114160558A (en) * 2021-11-16 2022-03-11 辽宁中博生态环境技术有限公司 Contaminated soil in-situ chemical barrier material and preparation and application thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106917383A (en) * 2017-03-02 2017-07-04 中钢集团鞍山热能研究院有限公司 The absorption that preventing and treating river course river interacts migration stain with riverbank heavy metal in soil intercepts wall
CN107445422A (en) * 2017-08-03 2017-12-08 山东建筑大学 A kind of pollution of river bed mud ecological restoring method
CN107445422B (en) * 2017-08-03 2020-10-23 山东建筑大学 Ecological restoration method for river polluted bottom mud
CN108164106A (en) * 2018-02-02 2018-06-15 清华大学 A kind of curing based on abandoned biomass and pollution of river bed mud recycling
CN108164106B (en) * 2018-02-02 2020-12-01 清华大学 Curing method based on resource utilization of waste biomass and river pollution bottom mud
CN109205797A (en) * 2018-09-14 2019-01-15 湖南新九方科技有限公司 A kind of restorative procedure in heavy metal pollution waters
CN109555109A (en) * 2018-10-12 2019-04-02 云南省环境科学研究院(中国昆明高原湖泊国际研究中心) A kind of system that resistance control in situ is carried out to the mine tailings containing heavy metal
CN112723694A (en) * 2021-01-11 2021-04-30 岭南水务集团有限公司 Ecological island with function of in-situ remediation of heavy metal polluted bottom mud and implementation method thereof
CN114160558A (en) * 2021-11-16 2022-03-11 辽宁中博生态环境技术有限公司 Contaminated soil in-situ chemical barrier material and preparation and application thereof
CN114160558B (en) * 2021-11-16 2023-10-31 辽宁中博生态环境技术有限公司 In-situ chemical barrier material for polluted soil and preparation and application thereof

Similar Documents

Publication Publication Date Title
CN205990603U (en) A kind of ecoscape revetment structure of in-situ immobilization heavy metal pollution river bottom mud
CN205914499U (en) Soil heavy metal mine waste residue separation structure
CN103073111B (en) Urban road rainfall runoff ecological coprocessing device and method
CN202503891U (en) Saline-alkali land soil improvement system provided with pit
CN202503890U (en) Water and soil improvement system of saline and alkaline land
JP2013535597A (en) In-situ leaching method by liquid injection
CN105668680B (en) A kind of method using mercury pollution in magnetic iron ore and bauxite slag in-situ remediation of underground water
CN100551563C (en) A kind of improvement method of heavy-metal contaminated soil
CN203095721U (en) Urban road stormwater runoff ecological coprocessing device
CN106623389A (en) Remediation method for cyanide contaminated soil
CN105712596A (en) In-situ remediation method for mining area watershed heavy metal pollution bottom sludge
CN104358302A (en) Treatment method for initial rainwater of separate system
CN206028294U (en) Ecological processing system of electrolytic manganese sediment safety
Kruseman Recharge from intermittent flow
CN105419812A (en) Application of soil leavening agent in improvement of saline-alkali soil
CN110395867A (en) A kind of ecological restoring method for administering river bottom mud heavy metal pollution
CN113820383A (en) Waste resin powder piling point soil pollution risk control method based on covering and blocking technology
CN109516658A (en) A kind of processing method of bed mud
CN104186178A (en) Economical seashore saline soil greening quick planting method
CN204940363U (en) Groundwater pollution treatment system
CN108442313A (en) River levee structure integrating pollution migration blocking and ecological greening and construction method
CN111592202A (en) Method for determining river sediment treatment scheme based on classified resource utilization
CN209227626U (en) A kind of heavy metal pollution Tailings Dam governing system
Shepelev et al. Ecological engineering as a mean to reduce the anthropogenic impact of production on biota
CN112921192B (en) Ion adsorption type rare earth ore mining and environment treatment integrated method

Legal Events

Date Code Title Description
GR01 Patent grant
CP03 Change of name, title or address

Address after: Unit 2002, 20 / F, block B, phase I, Tianan cloud Valley Industrial Park, 2018 Xuegang Road, Bantian street, Longgang District, Shenzhen, Guangdong 518000

Patentee after: Cecep Tiehan ecological environment Co.,Ltd.

Address before: 518040 No.3 Factory B1401, Tianan Digital Innovation Park, Longcheng Street, Longgang District, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN TECHAND ECOLOGICAL ENVIRONMENT Co.,Ltd.

CP03 Change of name, title or address