CN108283031A - A kind of marine solonchak seepage pipe Salt discharge method - Google Patents
A kind of marine solonchak seepage pipe Salt discharge method Download PDFInfo
- Publication number
- CN108283031A CN108283031A CN201711082829.0A CN201711082829A CN108283031A CN 108283031 A CN108283031 A CN 108283031A CN 201711082829 A CN201711082829 A CN 201711082829A CN 108283031 A CN108283031 A CN 108283031A
- Authority
- CN
- China
- Prior art keywords
- salt discharge
- seepage pipe
- salt
- soil
- discharge method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01B—SOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
- A01B79/00—Methods for working soil
- A01B79/02—Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01B—SOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
- A01B77/00—Machines for lifting and treating soil
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G13/00—Protecting plants
- A01G13/02—Protective coverings for plants; Coverings for the ground; Devices for laying-out or removing coverings
- A01G13/0256—Ground coverings
- A01G13/0268—Mats or sheets, e.g. nets or fabrics
- A01G13/0275—Films
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Soil Sciences (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Toxicology (AREA)
- Cultivation Of Plants (AREA)
Abstract
The invention discloses a kind of marine solonchak seepage pipe Salt discharge method, used process is as follows:(1) preparation of construction measures fixed point unwrapping wire, determines the position absolute altitude of alkaline discharging well, salt discharge ditch;(2) salt discharge ditch is excavated along unwrapping wire position, beginning depth end is shallow, and the gradient is 0.3% 0.5%, a salt discharge ditch is arranged every 15m 30m, the compacting of salt discharge ditch bottom walks clearly the alkaline earth dug out;(3) before being laid with seepage pipe, in salt discharge ditch lower berth 10cm fine sands, the brown skin in seepage pipe surface, geotextiles, woven cloth or piece of sack package are used in combination iron wire or the rope made of hemp to tighten;The present invention can greatly save natural resources and engineering construction cost, effectively prevent soil from giving birth to salination, form good ecological circulation, soil salt content is reduced, salt rejection rate administers salt-soda soil significant effect up to 20 40%, shorten the salt discharge period, increases plant survival rate, it is very promising.
Description
Technical field
The present invention relates to marine solonchak salt discharge technical field, specially a kind of marine solonchak seepage pipe Salt discharge method.
Background technology
Salt-soda soil is a type of salt aggregation, refer to inside soil contained by salinity influence the normal life of crop
Long, according to UNESCO and food and agricultural organization's incomplete statistics, the area in whole world salt-soda soil is 9.5438 hundred million hectares,
Wherein China is 99,130,000 hectares.The formation of China's alkaline earth and alkali-affected soil, it is most of accumulative related with Carbonates In Soil,
Soil pH is generally higher than 8.0, and regional area total soil phosphorus cannot meet higher than 0.5% (part month, numerical value meeting higher)
The growth of most of plant needs, and to build landscape planting engineering in such a situa-tion, must just handle soil issues well, this
It is exactly the meaning of saline land greening engineering.
Utilization with South China to coastal area, corresponding technical measures required for the virescence rebuild in salt-soda soil
Also more and more urgent.The method of alkaline land improving has very much, but the not no operational procedure and method of specification so far.Salt-soda soil gardens
There are many unfavorable factor of greening, and principal contradiction is to contain excessive soluble organic fraction in soil.According to " salt goes come salt with water with water
Salt is with salt waterborne with underwater " characteristics of motion of this water salt, usually the salinity in soil is drained simultaneously with water using irrigation and drainage measure
Rise along capillary interstice under establishing separation layer with blocking saliferous and controls level of ground water below critical depth to reach soil
Desalination and the purpose for preventing the accumulation of salt in the surface soil.The improvement in salt-soda soil is crucial in coastal region saline land greening engineering, alkaline land improving effect
The quality of fruit, is directly related to that can plant survive and can soil property meet the needs of plant growth for a long time, is engineering success or failure
Deciding factor.Though however, this method can obtain certain effect, numerous technical methods showed and construction technology compared with
For lag, salt-soda soil needs 1 year improvement time that could plant trees, slower to China coast Land Resources Exploitation.
Chinese patent mandate publication number:CN104255107B announces a kind of marine solonchak vertical pipe Salt discharge method, the party
Method includes the following steps:1) the smooth and moulding in soil, is carried out first on determining land use for greening;2), smooth good green
On the ground, one interim bright ditch of interval setting, bright ditch width are 50-60cm, and depth is 90-100cm;3), the installation of vertical pipe:
Ready vertical pipe in advance is put into bright bottom of trench, the axial line spacing of adjacent vertical seepage pipe is 5m, at the bottom of vertical pipe
Portion fills a drainpipe, and the drainpipe is directly connected to municipal well or gully;4), bright ditch original soil is backfilled in ditch;5)、
Green land is subjected to second formation and moulding, and overlays the uniform of 10cm thickness more than upper soll layer and has mixed biological modification agent
Original soil soil;Then conventional pouring is carried out, still, there are some defects to be such as unfavorable for towards larger range of shore for the Salt discharge method
Sea salt soil is promoted, moreover, the problems such as cannot adjusting acid-base value and the leak of marine solonchak well.
It is in view of the deficiencies in the prior art and insufficient, it provides that a kind of constructing operation is simple, and economic cost is low, administers salt
Alkali ground significant effect, shortens the salt discharge period, increases the marine solonchak seepage pipe Salt discharge method of plant survival rate, very promising.
Invention content
The present invention provides a kind of marine solonchak seepage pipe Salt discharge method, and used process is as follows:
(1) preparation of construction measures fixed point unwrapping wire, determines the position absolute altitude of alkaline discharging well, salt discharge ditch;
(2) salt discharge ditch is excavated along unwrapping wire position, beginning depth end is shallow, and gradient 0.3%-0.5% is set every 15m-30m
A salt discharge ditch is set, the compacting of salt discharge ditch bottom walks clearly the alkaline earth dug out;
(3) before being laid with seepage pipe, in salt discharge ditch lower berth 10cm fine sands;
(4) seepage pipe is transferred, keeps seepage pipe straight, then backfills 10-20cm soil moved in improve the originals, seepage pipe surface brown skin, geotextiles, volume
Woven fabric or piece of sack package, are used in combination iron wire or the rope made of hemp to tighten, then with gravel mulch seepage pipe, and be higher by seepage pipe 25cm-40cm, then
It is laid with 10-40cm metallings on soil moved in improve the original, 5-20cm geotextiles or organic horizon are spread on metalling, finally fills out planting soil
Layer, shaping;
(5) alkaline discharging well, alkaline discharging well wall red brick masonry are built by laying bricks or stones, bottom is 70mm-120mm element concretes, and inside and outside cement mortar is smeared
Face, the high 20-40cm of well, wide 30-50cm, well top is prefabricated with reinforced concrete cover board.
(6) flower bed for building up high 100-120cm on gutter is improved, the saline-alkali soil below of earth's surface in flower bed is taken out into 30-
35cm, is then laid on the bottom in hole with coarse sand, thickness 20-25cm, the boiler ash sediment after the upper surface of coarse sand is laid with 10-30cm,
Then flower bed is leveled up with soil moved in improve the original;
(7) root-inducing powder is sprinkled in flower bed surface, upper plant is planted after digging.
Preferably, the salt amount of the planting soil layer be not higher than 2 ‰, alkalinity be not higher than 7 ‰, depth however be less than
1000mm。
Preferably, seepage pipe used is diameter 40cm, manages and opens a circle seven apertures in the human head, bore dia 2.5cm, tube bottom every 12.5cm
Not trepanning.
Preferably, the planting soil layer is banketed to pour water to cultivate by plant pit and is made, thickness 1200-1500mm.
Preferably, afforestation waste is inserted in the planting soil layer.
Preferably, the plant planted in the flower bed be the herbaceous plant such as colored globe amaranth, dragon-boat, the liquor-saturated flower of butterfly, flame nettle and
The xylophytas such as fox-brush coconut palm, Chinese tallow tree, flame tree.
Preferably, the metalling is using in the quartz of a diameter of 30-70mm, feldspar particle, gravel, clinker or coarse sand
It is one or more of.
Preferably, overburden soil work cloth in the planting soil layer.
Preferably, the alkaline discharging well outer wall uses 1:2.5 cement mortar are mixed waterproof powder and are painted.
Compared with prior art, the beneficial effects of the invention are as follows:
1, it is relatively low and need to backfill the area for raising absolute altitude and topography is higher, well-drained to be suitable for level of ground water by the present invention
Local topography.Necessarily be greater than long-term level of ground water every the position of salt deposit, metalling mostly use quartz, feldspar gravel, clinker or
Coarse sand, good filtration effect, and adaptation feldspar etc. belongs to acid stone material, can neutralize certain alkalinity;It is designed on metalling organic
Matter layer (straw, wheat straw or nylon gauze) ensures isolation hole, filtering thickness 5-10cm to be filtered to soil particle;Knot
Backfill planting soil is closed, the thickness of the layer can be designed according to the degree of the salt tolerant of plant, while building graceful landform, greatly
It is big to save natural resources and engineering construction cost.
2, the present invention is covered by using bed plant, the effective evaporation for reducing surface water, lowering of watertable, and
Inhibit it is saline and alkaline moving up and accumulating, effectively prevent soil give birth to salination, form good ecological circulation.
3, the present invention can avoid the subterraneous root of the plant caused by flooded stain by inserting afforestation waste in planting soil layer
System's asphyxia is rotted, and can be increased the soil organism and crumb structure, be increase soil fertility and cushion performance soil texture, provide plant
Various nutrients needed for growth, meanwhile, acidic materials can also be generated to neutralize salt during afforestation waste is decomposed
Alkali reduces soil salt content, and salt rejection rate is up to 20-40%.
4, the present invention uses 1 by alkaline discharging well outer wall:2.5 cement mortar are mixed waterproof powder and are painted, and leak can be prevented,
It is equipped with prefabricated reinforced concrete cover board at the top of well, and cover mulch in planting soil layer can effectively control evaporation from topsoil, blocks hair
Accumulation of the salinity that the rising of tubule water is brought in earth's surface.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with specific embodiment, to this
Invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, not
For limiting the present invention.
Embodiment 1
A kind of marine solonchak seepage pipe Salt discharge method, used process are as follows:
(1) preparation of construction measures fixed point unwrapping wire, determines the position absolute altitude of alkaline discharging well, salt discharge ditch;
(2) salt discharge ditch is excavated along unwrapping wire position, beginning depth end is shallow, the gradient 0.3%, and a salt discharge is arranged every 15m
Ditch, salt discharge ditch bottom compacting, the alkaline earth dug out is walked clearly;
(3) before being laid with seepage pipe, in salt discharge ditch lower berth 10cm fine sands;
(4) seepage pipe is transferred, keeps seepage pipe straight, then backfills 10cm soil moved in improve the originals, seepage pipe surface brown skin, geotextiles, braiding
Cloth or piece of sack package, are used in combination iron wire or the rope made of hemp to tighten, then with gravel mulch seepage pipe, and be higher by seepage pipe 25cm, then in soil moved in improve the original
Upper laying 15cm metallings, 5cm geotextiles or organic horizon are spread on metalling, finally fills out planting soil layer, shaping;
(5) alkaline discharging well, alkaline discharging well wall red brick masonry are built by laying bricks or stones, bottom is 70mm element concretes, inside and outside cement sand plaster, well height
20cm, wide 30cm, well top are prefabricated with reinforced concrete cover board.
(6) flower bed for building up high 100cm on gutter is improved, the saline-alkali soil below of earth's surface in flower bed is taken out into 30cm, so
The bottom in hole, thickness 20cm are laid on coarse sand afterwards, then the boiler ash sediment after the upper surface of coarse sand is laid with 10cm will be spent with soil moved in improve the original
Altar is leveled up;
(7) root-inducing powder is sprinkled in flower bed surface, upper plant is planted after digging.
The salt amount of the planting soil layer be not higher than 2 ‰, alkalinity be not higher than 7 ‰, depth however be less than 1000mm.
Seepage pipe used is diameter 40cm, manages and opens a circle seven apertures in the human head, bore dia 2.5cm, tube bottom not trepanning every 12.5cm.
The planting soil layer is banketed to pour water to cultivate by plant pit and is made, thickness 1200mm.
Afforestation waste is inserted in the planting soil layer.
The plant planted in the flower bed is that globe amaranth and dragon-boat are spent.
The metalling uses the quartz and feldspar particle of a diameter of 30mm.
Overburden soil work cloth in the planting soil layer.
The alkaline discharging well outer wall uses 1:2.5 cement mortar are mixed waterproof powder and are painted.
Embodiment 2
A kind of marine solonchak seepage pipe Salt discharge method, used process are as follows:
(1) preparation of construction measures fixed point unwrapping wire, determines the position absolute altitude of alkaline discharging well, salt discharge ditch;
(2) salt discharge ditch is excavated along unwrapping wire position, beginning depth end is shallow, the gradient 0.4%, and a salt discharge is arranged every 20m
Ditch, salt discharge ditch bottom compacting, the alkaline earth dug out is walked clearly;
(3) before being laid with seepage pipe, in salt discharge ditch lower berth 10cm fine sands;
(4) seepage pipe is transferred, keeps seepage pipe straight, then backfills 15cm soil moved in improve the originals, seepage pipe surface brown skin, geotextiles, braiding
Cloth or piece of sack package, are used in combination iron wire or the rope made of hemp to tighten, then with gravel mulch seepage pipe, and be higher by seepage pipe 30cm, then in soil moved in improve the original
Upper berth 20cm metallings, spread 10cm geotextiles or organic horizon on metalling, finally fill out planting soil layer, shaping;
(5) alkaline discharging well, alkaline discharging well wall red brick masonry are built by laying bricks or stones, bottom is 95mm element concretes, inside and outside cement sand plaster, well height
30cm, wide 40cm, well top are prefabricated with reinforced concrete cover board.
(6) flower bed for building up high 110cm on gutter is improved, the saline-alkali soil below of earth's surface in flower bed is taken out into 32cm, so
The bottom in hole, thickness 23cm are laid on coarse sand afterwards, then the boiler ash sediment after the upper surface of coarse sand is laid with 20cm will be spent with soil moved in improve the original
Altar is leveled up;
(7) root-inducing powder is sprinkled in flower bed surface, upper plant is planted after digging.
The salt amount of the planting soil layer be not higher than 2 ‰, alkalinity be not higher than 7 ‰, depth however be less than 1100mm.
Preferably, seepage pipe used is diameter 40cm, manages and opens a circle seven apertures in the human head, bore dia 2.5cm, tube bottom every 12.5cm
Not trepanning.
The planting soil layer is banketed to pour water to cultivate by plant pit and is made, thickness 1350mm.
Afforestation waste is inserted in the planting soil layer.
The plant planted in the flower bed is the liquor-saturated flower of butterfly and flame nettle.
The metalling uses the gravel and clinker of a diameter of 50mm.
Overburden soil work cloth in the planting soil layer.
The alkaline discharging well outer wall uses 1:2.5 cement mortar are mixed waterproof powder and are painted.
Embodiment 3
A kind of marine solonchak seepage pipe Salt discharge method, used process are as follows:
(1) preparation of construction measures fixed point unwrapping wire, determines the position absolute altitude of alkaline discharging well, salt discharge ditch;
(2) salt discharge ditch is excavated along unwrapping wire position, beginning depth end is shallow, the gradient 0.5%, and a salt discharge is arranged every 30m
Ditch, salt discharge ditch bottom compacting, the alkaline earth dug out is walked clearly;
(3) before being laid with seepage pipe, in salt discharge ditch lower berth 10cm fine sands;
(4) seepage pipe is transferred, keeps seepage pipe straight, then backfills 20cm soil moved in improve the originals, seepage pipe surface brown skin, geotextiles, braiding
Cloth or piece of sack package, are used in combination iron wire or the rope made of hemp to tighten, then with gravel mulch seepage pipe, and be higher by seepage pipe 35cm, then in soil moved in improve the original
Upper laying 25cm metallings, 15cm geotextiles or organic horizon are spread on metalling, finally fills out planting soil layer, shaping;
(5) alkaline discharging well, alkaline discharging well wall red brick masonry are built by laying bricks or stones, bottom is 120mm element concretes, inside and outside cement sand plaster, well
High 40cm, wide 50cm, well top are prefabricated with reinforced concrete cover board.
(6) flower bed for building up high 120cm on gutter is improved, the saline-alkali soil below of earth's surface in flower bed is taken out into 35cm, so
The bottom in hole, thickness 25cm are laid on coarse sand afterwards, then the boiler ash sediment after the upper surface of coarse sand is laid with 30cm will be spent with soil moved in improve the original
Altar is leveled up;
(7) root-inducing powder is sprinkled in flower bed surface, upper plant is planted after digging.
The salt amount of the planting soil layer be not higher than 2 ‰, alkalinity be not higher than 7 ‰, depth however be less than 1000mm.
Seepage pipe used is diameter 40cm, manages and opens a circle seven apertures in the human head, bore dia 2.5cm, tube bottom not trepanning every 12.5cm.
The planting soil layer is banketed to pour water to cultivate by plant pit and is made, thickness 1200mm.
Afforestation waste is inserted in the planting soil layer.
The plant planted in the flower bed is fox-brush coconut palm, Chinese tallow tree, flame tree.
The metalling uses the coarse sand of a diameter of 70mm.
Overburden soil work cloth in the planting soil layer.
The alkaline discharging well outer wall uses 1:2.5 cement mortar are mixed waterproof powder and are painted.
Grab sample is carried out for the soil in embodiment 1-3, and is equipped with blank embodiment 4, passes through experiment in situ
It is as follows to draw table for test related data:
Detection project | Embodiment 1 | Embodiment 2 | Embodiment 3 | Comparative example 4 | Professional standard |
Salt rejection rate % | 29.8% | 30.2% | 30.1% | 8.4% | ----- |
PH average values | 8.32 | 8.35 | 8.29 | 8.92 | < 8.5 |
Salt discharge cycles/day | 305 days | 299 days | 303 days | 366 | ----- |
It is apparent from conjunction with above table:Test result in embodiment 1-3 shows:Desalination using this method to marine solonchak
Rate is higher, can reduce soil salt content well, and pH average values are respectively less than 8.5, meet the standard of industry, contribute to agriculture
The growth of crop, the present invention can greatly save natural resources and engineering construction cost, effectively prevent soil from giving birth to salination, shape
At good ecological circulation, soil salt content is reduced, salt rejection rate is up to 20-40%, hence it is evident that be superior to de- in blank Example 4
Salt rate, it was demonstrated that the feasibility of the salt discharge scheme administers salt-soda soil significant effect, shortens the salt discharge period, is superior to traditional use one
Salt discharge period year increases plant survival rate, very promising.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (9)
1. a kind of marine solonchak seepage pipe Salt discharge method, which is characterized in that used process is as follows:
(1) preparation of construction measures fixed point unwrapping wire, determines the position absolute altitude of alkaline discharging well, salt discharge ditch;
(2) salt discharge ditch is excavated along unwrapping wire position, beginning depth end is shallow, gradient 0.3%-0.5%, is arranged one every 15m-30m
Salt discharge ditch, salt discharge ditch bottom compacting, the alkaline earth dug out is walked clearly;
(3) before being laid with seepage pipe, in salt discharge ditch lower berth 10cm fine sands, seepage pipe surface brown skin, geotextiles, woven cloth or piece of sack packet
It wraps up in, iron wire or the rope made of hemp is used in combination to tighten;
(4) seepage pipe is transferred, keeps seepage pipe straight, then backfills 10-20cm soil moved in improve the originals, seepage pipe surface brown skin, geotextiles, woven cloth
Or piece of sack package, it is used in combination iron wire or the rope made of hemp to tighten, then with gravel mulch seepage pipe, and be higher by seepage pipe 25cm-40cm, then in visitor
It is laid with 10-40cm metallings on soil, 5-20cm geotextiles or organic horizon are spread on metalling, finally fills out planting soil layer, it is whole
Shape;
(5) alkaline discharging well, alkaline discharging well wall red brick masonry are built by laying bricks or stones, bottom is 70mm-120mm element concretes, inside and outside cement sand plaster, well
High 20-40cm, wide 30-50cm, well top are prefabricated with reinforced concrete cover board.
(6) flower bed for building up high 100-120cm on gutter is improved, the saline-alkali soil below of earth's surface in flower bed is taken out into 30-35cm,
Then the bottom in hole, thickness 20-25cm are laid on coarse sand, then the boiler ash sediment after the upper surface of coarse sand is laid with 10-30cm is used
Soil moved in improve the original levels up flower bed;
(7) root-inducing powder is sprinkled in flower bed surface, upper plant is planted after digging.
2. a kind of marine solonchak seepage pipe Salt discharge method according to claim 1, which is characterized in that the salt of the planting soil layer
Amount be not higher than 2 ‰, alkalinity be not higher than 7 ‰, depth however be less than 1000mm.
3. a kind of marine solonchak seepage pipe Salt discharge method according to claim 1, which is characterized in that seepage pipe used is diameter
40cm is managed and is opened a circle seven apertures in the human head, bore dia 2.5cm, tube bottom not trepanning every 12.5cm.
4. a kind of marine solonchak seepage pipe Salt discharge method according to claim 1, which is characterized in that the planting soil layer is by setting
Cave is banketed to pour water to cultivate and is made, thickness 1200-1500mm.
5. a kind of marine solonchak seepage pipe Salt discharge method according to claim 1, which is characterized in that filled out in the planting soil layer
Enter afforestation waste.
6. a kind of marine solonchak seepage pipe Salt discharge method according to claim 1, which is characterized in that planted in the flower bed
The xylophytas such as herbaceous plant and fox-brush coconut palm, Chinese tallow tree, flame tree such as plant is globe amaranth, dragon-boat is colored, the liquor-saturated flower of butterfly, flame nettle.
7. a kind of marine solonchak seepage pipe Salt discharge method according to claim 1, which is characterized in that the metalling is using straight
Diameter is one or more of quartz, feldspar particle, gravel, clinker or the coarse sand of 30-70mm.
8. a kind of marine solonchak seepage pipe Salt discharge method according to claim 1, which is characterized in that the planting soil layer overlying
Lid geotextiles.
9. a kind of marine solonchak seepage pipe Salt discharge method according to claim 1, which is characterized in that the alkaline discharging well outer wall is adopted
With 1:2.5 cement mortar are mixed waterproof powder and are painted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711082829.0A CN108283031A (en) | 2017-11-07 | 2017-11-07 | A kind of marine solonchak seepage pipe Salt discharge method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711082829.0A CN108283031A (en) | 2017-11-07 | 2017-11-07 | A kind of marine solonchak seepage pipe Salt discharge method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108283031A true CN108283031A (en) | 2018-07-17 |
Family
ID=62831679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711082829.0A Pending CN108283031A (en) | 2017-11-07 | 2017-11-07 | A kind of marine solonchak seepage pipe Salt discharge method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108283031A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112703847A (en) * | 2020-12-04 | 2021-04-27 | 河海大学 | Coastal saline-alkali soil improvement method based on physical salt elimination |
CN112806124A (en) * | 2021-01-05 | 2021-05-18 | 神华神东煤炭集团有限责任公司 | Construction method for constructing vegetation pit in coal mining subsidence area |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201830631U (en) * | 2010-09-07 | 2011-05-18 | 深圳市文科园艺实业有限公司 | Greening and desalting system for saline-alkali soil |
CN104206064A (en) * | 2013-06-04 | 2014-12-17 | 河南山水园林绿化工程有限公司 | Underground salt elimination method for saline and alkali land |
CN104904469A (en) * | 2015-05-29 | 2015-09-16 | 山东龙泽生态环境开发有限公司 | Greening method for controlling salt elimination area by area in coastal saline area |
CN206333060U (en) * | 2016-12-09 | 2017-07-18 | 上海十方生态园林股份有限公司 | Beneficial to the salt affected soil structure-improved for improving plant survival rate |
-
2017
- 2017-11-07 CN CN201711082829.0A patent/CN108283031A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201830631U (en) * | 2010-09-07 | 2011-05-18 | 深圳市文科园艺实业有限公司 | Greening and desalting system for saline-alkali soil |
CN104206064A (en) * | 2013-06-04 | 2014-12-17 | 河南山水园林绿化工程有限公司 | Underground salt elimination method for saline and alkali land |
CN104904469A (en) * | 2015-05-29 | 2015-09-16 | 山东龙泽生态环境开发有限公司 | Greening method for controlling salt elimination area by area in coastal saline area |
CN206333060U (en) * | 2016-12-09 | 2017-07-18 | 上海十方生态园林股份有限公司 | Beneficial to the salt affected soil structure-improved for improving plant survival rate |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112703847A (en) * | 2020-12-04 | 2021-04-27 | 河海大学 | Coastal saline-alkali soil improvement method based on physical salt elimination |
CN112806124A (en) * | 2021-01-05 | 2021-05-18 | 神华神东煤炭集团有限责任公司 | Construction method for constructing vegetation pit in coal mining subsidence area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106193247B (en) | Integral rain system and its construction method for sponge city | |
CN100473271C (en) | System engineering method for modifying alkaline land by use of pipe drainage method | |
CN103262689B (en) | Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill | |
CN100479641C (en) | Process for improving alkaline land by utilizing brackish water natural freezing | |
CN102037806B (en) | Greening method for dredger fill | |
CN202503890U (en) | Water and soil improvement system of saline and alkaline land | |
CN103141176A (en) | Method for improving saline soil in excavated grooves of border trees in coastal region | |
CN101138294A (en) | High-water level halomorphic soil region selective controlling and greening technique | |
CN104396541B (en) | A kind of original soil long-acting modification method of arid biogeographic zone farmland salting stain | |
CN111149457A (en) | Coastal saline-alkali soil engineering improvement system and method | |
CN104365206B (en) | A kind of water-saving marine solonchak local soil improvement and vegetation implantation methods | |
CN104692532A (en) | High water table coal area ponding secondary wetland landscape construction method | |
CN108990452B (en) | Coupling diving layer salt and fresh water replacing and leaching desalting device | |
CN107889573A (en) | The economical vegetation fast construction method of shale strand heavy salinized ground salt tolerant based on hidden pipe salt discharge | |
CN104234007B (en) | A kind of river saline-alkali soil levee slope greening method | |
CN101473718A (en) | Soil improvement method of alkaline land by making leakage on earth's surface | |
CN108781576A (en) | A kind of beach desalination process of coupling water cycle | |
CN104904469A (en) | Greening method for controlling salt elimination area by area in coastal saline area | |
CN103444293B (en) | The improvement method of beach saline land Regional City street tree underground | |
CN108283031A (en) | A kind of marine solonchak seepage pipe Salt discharge method | |
CN208105449U (en) | A kind of ecostagnation pond | |
CN104186178A (en) | Economical seashore saline soil greening quick planting method | |
CN102144523A (en) | Sidewalk-frozen tree planting method for coastal saline-salt soil | |
CN109479603A (en) | Waterproof place planting tree method suitable for park plaza tree battle array | |
CN109429605A (en) | A kind of salt-soda soil and desertification administering method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180717 |
|
RJ01 | Rejection of invention patent application after publication |