CN110747809A - Integrated silt dam without management and protection and construction method thereof - Google Patents

Integrated silt dam without management and protection and construction method thereof Download PDF

Info

Publication number
CN110747809A
CN110747809A CN201911004446.0A CN201911004446A CN110747809A CN 110747809 A CN110747809 A CN 110747809A CN 201911004446 A CN201911004446 A CN 201911004446A CN 110747809 A CN110747809 A CN 110747809A
Authority
CN
China
Prior art keywords
dam
slope
downstream
protection
mixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911004446.0A
Other languages
Chinese (zh)
Inventor
张金良
苏茂林
杨顺群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201911004446.0A priority Critical patent/CN110747809A/en
Publication of CN110747809A publication Critical patent/CN110747809A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a management-free and protection-free integrated silt dam which comprises a homogeneous earth dam body, wherein in order to improve the anti-scouring capacity of a protection slope, mixture protection layers with the thickness of 1.0-3.0 meters are arranged on the slope surfaces of an upstream dam and a downstream dam of the homogeneous earth dam body; in order to timely discharge seepage water in the dam body, a plurality of layers of drainage blind pipes are embedded in the homogeneous earth dam body at intervals, and pipe orifices of the drainage blind pipes extend out of a downstream dam slope; the dam top of the homogeneous earth dam body is filled with a mixed material layer with the thickness of 2 meters, and the mixed material layer is connected with the mixed material protective layers paved on the surfaces of the upstream dam slope and the downstream dam slope into a whole. The invention also discloses a construction method of the non-management and protection integrated check dam. The silt dam is convenient to construct, the anti-scouring capability of the upstream and downstream dam slopes is increased, the dam body can overflow, a water outlet structure can be omitted, and the engineering investment is greatly saved; meanwhile, due to the strong anti-scouring capability of the dam slope, the problem that the dam is easy to break when the silt dam passes over the over-standard flood is well solved, and meanwhile, the engineering management and protection task is simplified.

Description

Integrated silt dam without management and protection and construction method thereof
Technical Field
The invention relates to the technical field of check dam construction, in particular to a management-free and protection-free integrated check dam, and further relates to a construction method of the management-free and protection-free integrated check dam.
Background
In northwest loess plateau areas of China, gullies are vertical and horizontal, water and soil loss is serious, and a large number of silt dams are built in the gullies in order to intercept silt formed by water and soil loss. The arrangement of the siltation dams is generally that a series of step dams are respectively built on the furrows, the branch ditches and the main ditches according to the area of a channel watershed, and the building of the siltation dams has very important significance for lifting a channel erosion reference surface, preventing and controlling water and soil loss, retaining flood, blocking mud, silting land, reducing river sediment and the like, and is an important measure for comprehensive treatment of small watersheds.
The currently built silt dam consists of a dam and a water discharge building, wherein the dam is generally made of local materials and is built into a homogeneous earth dam, and the flood control standard is low. Due to the fact that the number of the silt dam is large, the silt dam is distributed and dispersed, the management and protection task is huge, and the flood prevention standard of the silt dam is low, the silt dam is easy to break and damage when the silt dam is turned over in case of exceeding standard flood in a flood season, the exceeding standard flood formed when the upstream silt dam breaks can threaten the downstream silt dam, and therefore chain reaction is formed. Therefore, the invention provides a silt dam which has strong anti-scouring capability, can exceed standard flood and is free from management and protection, and is particularly urgent and necessary.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a management-free and protection-free integrated silt dam with high flood control standard and strong erosion damage prevention capability and a construction method of the management-free and protection-free integrated silt dam.
In order to achieve the purpose, the invention can adopt the following technical scheme:
the invention relates to a pipe-protection-free integrated silt dam which comprises a homogeneous earth dam body, wherein in order to improve the anti-scouring capacity of a protective slope, protective layers with the thickness of 1.0-3.0 m are arranged on the slope surfaces of an upstream dam and a downstream dam of the homogeneous earth dam body, wherein the protective layers are formed by paving and rolling a mixture which is formed by uniformly mixing damming earth materials and a argillaceous fine sand consolidation agent according to the weight ratio of 70-90: 10-30.
The dam crest of the homogeneous earth dam body is filled with a mixed material layer with the thickness of 2 meters, the mixed material layer is connected with the protective layers paved and rolled on the surfaces of the upstream dam slope and the downstream dam slope into a whole, and the mixture used by the mixed material layer is the same as the mixture used by the protective layers on the surfaces of the upstream dam slope and the downstream dam slope. The silt dam with the structure increases the anti-scouring capability of the upstream and downstream dam slopes, so that the dam body can overflow (or exceed standard flood), further a water release structure can be cancelled, and the engineering investment of the dam body is greatly saved.
Because the downstream dam slope is subjected to continuous scouring of water flow, the thickness of the downstream protective layer is larger than that of the upstream protective layer, and generally, the thickness of the protective layer of the upstream dam slope is 1.0-1.5 meters, and the thickness of the protective layer of the downstream dam slope is 2.0-3.0 meters.
In order to timely discharge seepage water in the homogeneous earth dam body, a plurality of layers of drainage blind pipes are embedded in the homogeneous earth dam body at intervals, and pipe orifices of the drainage blind pipes extend out of a downstream dam slope.
During specific construction, the distance between two adjacent layers of drainage blind pipes is 3 meters; the distance between two adjacent drainage blind pipes in the same layer is 3-5 m.
The construction method of the pipe-protection-free integrated check dam comprises the following steps:
firstly, rolling and filling a dam body of a homogeneous earth dam according to the designed section of the homogeneous earth dam and a construction method;
secondly, uniformly mixing the damming soil and the argillaceous powder fine sand consolidation agent according to the weight ratio of 70-90: 10-30 to form a mixture, conveying the mixture to the upper and lower dam slopes for paving, and synchronously rolling and constructing the mixture and a homogeneous earth dam body and lifting the mixture;
thirdly, burying a plurality of layers of drainage blind pipes at intervals in the homogeneous earth dam body, so that pipe orifices of the drainage blind pipes extend out of a downstream dam slope;
and fourthly, filling the mixture prepared in the second step within the thickness range of 2m below the elevation of the dam crest, connecting the formed mixture layer with the upper and lower slope protection impact-resistant layers into a whole, and completing the construction of the non-management and protection integrated silt dam.
The invention has the advantages of convenient construction, low construction cost and strong anti-scouring capability of the dam slope, well solves the problem that the silt dam is easy to break when over-standard flood flows, and simplifies the engineering management and protection task.
Drawings
FIG. 1 is a schematic view of the structure of a dam according to the present invention.
Detailed Description
As shown in figure 1, the non-management and protection integrated silt dam comprises a homogeneous earth dam body 1 which is rolled and filled according to a conventionally designed section, in order to improve the erosion resistance of the dam body protection slope, a protection layer with the thickness of 1.0-1.5 m, namely an upstream slope protection layer 2, is arranged on the surface of an upstream dam slope of the homogeneous earth dam body 1, a protection layer with the thickness of 2.0-3.0 m, namely a downstream anti-scouring layer 3, is arranged on the surface of a downstream dam slope, a mixture used by the protection layer is formed by uniformly mixing damming soil (loess) and argillaceous powdery fine sand consolidation agent according to the proportion of 70-90: 10-30 by weight (during actual construction, the mixture can be properly adjusted according to the soil of the concrete damming soil in the range disclosed by the invention), wherein the argillaceous powdery fine sand consolidation agent is prepared by calcining argillaceous powdery fine sand fine powder and mineral powder and cement according to the weight percentage of 70-80% -5-10% -25%, the concrete preparation method of the argillaceous powder fine sand consolidation agent is disclosed in the invention patent application of a manufacturing method of a sand consolidation agent (application number 201811405697.5, application dates 2018, 11 and 23); in order to ensure that the dam body can overflow and the dam cannot break when the flood exceeds the standard, a mixed material layer 4 with the thickness of 2 meters is filled at the top of the homogeneous earth dam body 1, the mixed material layer 4 is connected with the upstream slope protection layer 2 and the downstream anti-impact layer 3 into a whole, wherein the mixed material used by the mixed material layer 4 is the same as the mixed material used by the upstream slope protection layer 2 and the downstream anti-impact layer 3; in order to discharge the seepage water in the dam body out of the dam body in time to increase the stability of the dam body, a plurality of layers of drainage blind pipes 5 are embedded in the homogeneous earth dam body 1 at intervals, generally, every 3m of the height of the dam body rises, namely, a layer of drainage blind pipe 5 is embedded in the dam body, the distance between two adjacent drainage blind pipes in the same layer is 3-5 m (during actual construction, the drainage blind pipes 5 can be properly adjusted according to the concrete soil condition), the drainage blind pipes 5 are arranged close to a downstream dam slope, and pipe orifices of the drainage blind pipes extend out of the downstream dam slope.
The construction method of the integrated type silt dam without management and protection comprises the following steps:
firstly, rolling and filling a dam body 1 of a homogeneous earth dam according to the design section of the homogeneous earth dam and a construction method;
secondly, uniformly mixing the damming soil (loess) and the argillaceous powder fine sand consolidation agent in a temporary mixing field at a construction site according to the weight ratio of 70-90: 10-30 to obtain a mixture, conveying the mixture to upstream and downstream dam slopes of a homogeneous dam body 1 for spreading, and synchronously rolling and constructing the homogeneous dam body and lifting the homogeneous dam body; during specific construction, according to different heights of the dam body, the thickness of the upstream slope protection layer 2 is 1.0-1.5 meters, and the thickness of the downstream anti-scouring layer 3 is 2.0-3.0 meters (since the downstream dam slope is subjected to continuous scouring of water flow, the thickness of the downstream protective layer is larger than that of the upstream protective layer);
the argillaceous fine sand consolidation agent is added into the damming soil (loess), so that the strength of the upstream and downstream dam slopes is obviously improved (the strength is equivalent to C10-C15 concrete through tests), the scouring resistance and the comprehensive durability of the upstream and downstream dam slopes are improved, and the aim of no management and protection is fulfilled;
thirdly, embedding drainage blind pipes 5 (commercially available products) at intervals in the homogeneous earth dam body 1, wherein in general, when the height of the dam body rises by 3m, a layer of drainage blind pipes 5 are embedded in the dam body to reach a downstream dam slope, and the drainage blind pipes 5 can drain seepage water in the dam body out of the dam body in time so as to increase the stability of the dam body;
and fourthly, filling the dam with the same mixture as the upstream and downstream slope protection protective layers within the thickness range of 2m below the elevation of the dam crest, and connecting the formed mixture layer 4 with the upstream slope protection layer 2 and the downstream anti-impact layer 3 into a whole to finish the construction of the non-management and protection integrated silt dam.
Because the upstream dam slope, the downstream dam slope and the dam top are filled with the mixture formed by the damming soil and the argillaceous powder fine sand consolidation agent, the scouring resistance of the dam body is improved, the homogeneous earth dam body can overflow, the drainage building can be omitted, the investment is saved, and the overflow of the dam body can also exceed the standard flood.
In fig. 1, H is the height of the deposition surface, S is the water surface line, and J is the dam toe guard.

Claims (6)

1. The utility model provides a exempt from to manage and protect integral type check dam, includes the homogeneity earth dam body, its characterized in that: the surface of the upstream dam slope and the downstream dam slope of the homogeneous earth dam body are provided with protective layers with the thickness of 1.0-3.0 m, wherein the protective layers are formed by paving and rolling a mixture which is formed by uniformly mixing damming earth materials and argillaceous fine sand consolidation agents according to the weight ratio of 70-90: 10-30.
2. The maintenance-free integrated check dam according to claim 1, wherein: the dam crest of the homogeneous earth dam body is filled with a mixed material layer with the thickness of 2 meters, the mixed material layer is connected with the protective layers paved and rolled on the surfaces of the upstream dam slope and the downstream dam slope into a whole, and the mixture used by the mixed material layer is the same as the mixture used by the protective layers on the surfaces of the upstream dam slope and the downstream dam slope.
3. The maintenance-free integrated silt dam according to claim 1 or 2, wherein: the thickness of the protective layer of the upstream dam slope is 1.0-1.5 meters, and the thickness of the protective layer of the downstream dam slope is 2.0-3.0 meters.
4. The maintenance-free integrated silt dam according to claim 1 or 2, wherein: and a plurality of layers of drainage blind pipes are embedded in the homogeneous earth dam body at intervals, and pipe orifices of the drainage blind pipes extend out of a downstream dam slope.
5. The maintenance-free integrated check dam according to claim 4, wherein: the distance between two adjacent layers of drainage blind pipes is 3 meters; the distance between two adjacent drainage blind pipes in the same layer is 3-5 m.
6. A construction method of a maintenance-free integrated type check dam comprises the following steps:
firstly, rolling and filling a dam body of a homogeneous earth dam according to the designed section of the homogeneous earth dam and a construction method;
secondly, uniformly mixing the damming soil and the argillaceous powder fine sand consolidation agent according to the weight ratio of 70-90: 10-30 to form a mixture, conveying the mixture to the upper and lower dam slopes for paving, and synchronously rolling and constructing the mixture and a homogeneous earth dam body and lifting the mixture;
thirdly, burying a plurality of layers of drainage blind pipes at intervals in the homogeneous earth dam body, so that pipe orifices of the drainage blind pipes extend out of a downstream dam slope;
and fourthly, filling the mixture prepared in the second step within the thickness range of 2m below the elevation of the dam crest, connecting the formed mixture layer with the upper and lower slope protection impact-resistant layers into a whole, and completing the construction of the non-management and protection integrated silt dam.
CN201911004446.0A 2019-10-22 2019-10-22 Integrated silt dam without management and protection and construction method thereof Pending CN110747809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911004446.0A CN110747809A (en) 2019-10-22 2019-10-22 Integrated silt dam without management and protection and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911004446.0A CN110747809A (en) 2019-10-22 2019-10-22 Integrated silt dam without management and protection and construction method thereof

Publications (1)

Publication Number Publication Date
CN110747809A true CN110747809A (en) 2020-02-04

Family

ID=69279290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911004446.0A Pending CN110747809A (en) 2019-10-22 2019-10-22 Integrated silt dam without management and protection and construction method thereof

Country Status (1)

Country Link
CN (1) CN110747809A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535249A (en) * 2020-05-08 2020-08-14 张金良 Non-management and protection integrated check dam and construction method thereof
CN113026675A (en) * 2021-03-25 2021-06-25 黄河勘测规划设计研究院有限公司 Non-management and protection integrated silt dam and downstream slope protection layer face construction process thereof
RU2768715C1 (en) * 2021-10-13 2022-03-24 Федеральное государственное бюджетное образовательное учреждение высшего образования «Государственный университет морского и речного флота имени адмирала С.О. Макарова» Earth dam drainage system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202809559U (en) * 2012-09-20 2013-03-20 徐国东 Gangue-filled riverway dike
CN206784329U (en) * 2017-06-08 2017-12-22 山东水利建设集团有限公司 A kind of Earth dam arti-seepage and row ooze structure
CN207846349U (en) * 2017-11-02 2018-09-11 中国电建集团港航建设有限公司 A kind of water blocking earth dam
CN109354429A (en) * 2018-11-23 2019-02-19 黄河勘测规划设计有限公司 A kind of manufacturing method of sand consolidating agent
CN211171814U (en) * 2019-10-22 2020-08-04 张金良 Integrated check dam without management and protection

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202809559U (en) * 2012-09-20 2013-03-20 徐国东 Gangue-filled riverway dike
CN206784329U (en) * 2017-06-08 2017-12-22 山东水利建设集团有限公司 A kind of Earth dam arti-seepage and row ooze structure
CN207846349U (en) * 2017-11-02 2018-09-11 中国电建集团港航建设有限公司 A kind of water blocking earth dam
CN109354429A (en) * 2018-11-23 2019-02-19 黄河勘测规划设计有限公司 A kind of manufacturing method of sand consolidating agent
CN211171814U (en) * 2019-10-22 2020-08-04 张金良 Integrated check dam without management and protection

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王观平: "《分散性粘土与水利工程》", 31 December 1999, 中国水利水电出版社 *
百度文库: "《淤地坝》", 28 February 2012 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535249A (en) * 2020-05-08 2020-08-14 张金良 Non-management and protection integrated check dam and construction method thereof
CN113026675A (en) * 2021-03-25 2021-06-25 黄河勘测规划设计研究院有限公司 Non-management and protection integrated silt dam and downstream slope protection layer face construction process thereof
RU2768715C1 (en) * 2021-10-13 2022-03-24 Федеральное государственное бюджетное образовательное учреждение высшего образования «Государственный университет морского и речного флота имени адмирала С.О. Макарова» Earth dam drainage system

Similar Documents

Publication Publication Date Title
CN110747809A (en) Integrated silt dam without management and protection and construction method thereof
CN211171814U (en) Integrated check dam without management and protection
CN110080166B (en) Geotextile bag dam reinforcing method
CN111535249A (en) Non-management and protection integrated check dam and construction method thereof
CN109930606A (en) Fast blockage impervious grouting construction method
CN113818402A (en) Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof
CN209555882U (en) A kind of hydraulic engineering ecological protection slope
CN110747819A (en) Concrete face rockfill dam with geotextile layer between bedding material and transition material
CN208899423U (en) A kind of hilly pond reservoir dam with water storage for preventing flood function
CN205875096U (en) Enrockment is from dam break
CN112195874B (en) High homogeneity dam of dispersion soil
CN111501683A (en) Method for treating Feng river by using hydraulic steel dam gate
CN214301603U (en) Earth and rock dam body's antiseep structure
CN220550516U (en) Mixed dam pivot arrangement structure
CN114892602B (en) Piping inlet quick plugging method based on hydrated granular material
CN217267294U (en) Earth-rock dam body structure combining downstream stepping and over-standard flood discharging
CN219992659U (en) Ecological diversion structure of rainwater on high steep side slope of river course
CN209099302U (en) A kind of hydraulic engineering river course slope protection
CN215715020U (en) Hydraulic engineering slope protection structure
CN220977926U (en) Pumped storage dam crest structure
CN219653642U (en) Subsurface flow type ecological slope protection
CN218622112U (en) Earth-rock dam overtopping and bursting prevention water outlet structure
CN213203992U (en) Slope protection drainage reinforcing apparatus for hydraulic engineering
CN216275518U (en) Reinforcing and reinforcing structure of clay core rockfill dam
CN206359952U (en) A kind of dike structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200204

RJ01 Rejection of invention patent application after publication