CN209099302U - A kind of hydraulic engineering river course slope protection - Google Patents
A kind of hydraulic engineering river course slope protection Download PDFInfo
- Publication number
- CN209099302U CN209099302U CN201821841259.9U CN201821841259U CN209099302U CN 209099302 U CN209099302 U CN 209099302U CN 201821841259 U CN201821841259 U CN 201821841259U CN 209099302 U CN209099302 U CN 209099302U
- Authority
- CN
- China
- Prior art keywords
- slope
- stone
- laid
- slopes
- protective fence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of hydraulic engineering river course slope protections, slope is laid with including stone, lower slopes, retaining wall, concrete road surface and upper slope surface, the slope surface of the lower slopes is equipped with stone and is laid with slope, and stone is laid in the slope surface on slope and is equipped with cobblestone laying, the lower section of the lower slopes slope surface, which is built, the blocking stone pier, the stone is laid between the blocking stone pier and the first protective fence above slope and is fixedly connected with reinforcing chain, first protective fence is built far from the top that stone is laid with slope side concrete road surface, the concrete road surface is built far from the top of the first protective fence side retaining wall.The utility model is provided with lower slopes and upper slopes, so that the protective performance of slope protection is higher, the plastic cement race track built between upper slopes and lower slopes can be convenient pedestrian and move on slope protection, and then improve the practicability of slope protection, the effect of protection may be implemented in the first protective fence and the second protective fence being arranged, and then improves the safety of whole device.
Description
Technical field
The utility model relates to hydraulic engineering technical field, specially a kind of hydraulic engineering river course slope protection.
Background technique
Hydraulic engineering is the surface water and groundwater for controlling and deploying nature, reaches and removes the evil emerging sharp purpose and build
Engineering, also referred to as Hydraulic Projects, water is human being's production and essential precious resources of living, but the state of its naturally occurring is simultaneously
Not in full conformity with the needs of the mankind, hydraulic engineering is only built, just can control water flow, prevents flood, and carry out water
It adjusts and distributes, to meet people's lives and production to the needs of water resource, hydraulic engineering needs to build dam, dike, spillway, water
Lock, water inlet, channel, the different types of hydraulic structure such as cross mortise, log chute, fish pass, to realize its target.In river two sides
In slope surface, the loss of Soil Slope in order to prevent, protective slope structure can be arranged in we in slope surface, fall for intercepting rain drop erosion
Soil, still, general protective slope structure can only intercept soil, and soil is easy to happen under the drive of long-term rain
Soil erosion, while the bottom of slope protection is often washed away by water flow, common soil slope protection is unable to satisfy demand, therefore has
Necessity improves the prior art, to solve the above problems.
Utility model content
The purpose of this utility model is to provide a kind of hydraulic engineering river course slope protections, to solve to mention in above-mentioned background technique
Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of hydraulic engineering river course slope protection, including
Stone is laid with slope, lower slopes, retaining wall, concrete road surface and upper slope surface, and the slope surface of the lower slopes is equipped with stone and is laid with slope, and
Stone, which is laid in the slope surface on slope, is equipped with cobblestone laying, and the lower section of the lower slopes slope surface, which is built, the blocking stone pier, and stone
The top for being laid with slope slope surface, which is built, the first protective fence, and the stone is laid between the blocking stone pier and the first protective fence above slope
It is fixedly connected with reinforcing chain, first protective fence is built far from the top that stone is laid with slope side concrete road surface, institute
Stating concrete road surface and building far from the top of the first protective fence side has retaining wall, and the lower slopes are far from the side for stopping the stone pier
Build has upper slopes, and build has upper slope surface in upper slopes slope surface, and the top of the upper slopes slope surface, which is built, the second protective fence,
And second protective fence far from upper slope surface side build have dykes and dams driveway.
Preferably, the upper slope surface by the stone setting cushion of bottom surface in the slope surface of upper slopes, stone bed course it is upper
Surface is equipped with sand-gravel cushion, and the upper surface of sand-gravel cushion is equipped with separate layer, and it is husky that the upper surface of separate layer is equipped with plantation
Soil layer, and the upper surface for planting sandy soil layer is equipped with concrete block bed course, plants on the plantation sandy soil layer between concrete block bed course
It is implanted with green plant layer.
Preferably, the concrete road surface is equipped with gutter, and the fixed peace in top in gutter close to the side of retaining wall
Equipped with drain bar.
Preferably, the upper surface of the concrete road surface is equipped with plastic cement race track.
Preferably, the cobblestone laying is laid on the inside that stone is laid with slope by concrete.
Preferably, protective net is fixedly connected between the reinforcing chain.
Compared with prior art, the utility model has the beneficial effects that the hydraulic engineering is provided with descending with river course slope protection
Body and upper slopes, so that the protective performance of slope protection is higher, the plastic cement race track built between upper slopes and lower slopes can be square
Just pedestrian moves on slope protection, and then improves the practicability of slope protection, the first protective fence and the second protective fence of setting
The effect of protection may be implemented, and then improve the safety of whole device, the green plant layer and concrete block bed course of setting can
So that the anti-erosion ability of slope protection is stronger, and then the service life of slope protection is improved, the retaining wall of setting can be to avoid
Because there is a situation where soil erosions to damage to plastic cement race track for rain drop erosion in upper slopes, convenient for promoting the use of.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the front view of the utility model;
Fig. 3 is the local structural graph of the utility model.
In figure: 1, stopping the stone pier;2, stone is laid with slope;3, cobblestone laying;4, chain is reinforced;401, protective net;5,
One protective fence;6, lower slopes;7, retaining wall;8, upper slopes;9, concrete road surface;10, plastic cement race track;11, gutter;12, it arranges
Water plate;13, upper slope surface;1301, green plant layer;1302, concrete block bed course;1303, sandy soil layer is planted;1304, separate layer;
1305, sand-gravel cushion;1306, stone bed course;14, the second protective fence;15, dykes and dams driveway.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " after
The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed
System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary
It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition,
Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " being provided with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to detachably connect
It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through
Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition
Understand the concrete meaning of above-mentioned term in the present invention.
Fig. 1-3 is please referred to, a kind of embodiment provided by the utility model: a kind of hydraulic engineering river course slope protection, including stone
Block is laid with slope 2, lower slopes 6, retaining wall 7, concrete road surface 9 and upper slope surface 13, and the slope surface of lower slopes 6 is equipped with stone and is laid with slope 2,
And stone is laid in the slope surface on slope 2 and is equipped with cobblestone laying 3, stone is laid with slope 2 convenient for the laying to cobblestone laying 3, goose
The protecting against shock ability of lower slopes 6 can be improved in cobble laying 3, and the lower section of lower 6 slope surface of slopes, which builds to have, stops the stone pier 1, and stone
The top for being laid with 2 slope surface of slope, which is built, the first protective fence 5, and the first protective fence 5 can realize pedestrian and protect, and stops the stone pier 1 can
To prevent the cobblestone to fall off in cobblestone laying 3 from directly rolling down in river, stone be laid with the blocking stone pier 1 of the top of slope 2 with
It being fixedly connected between first protective fence 5 and reinforces chain 4, the fastness of cobblestone laying 3 can be increased by reinforcing chain 4, and first
Protective fence 5 is built far from the top that stone is laid with 2 side of slope concrete road surface 9, and concrete road surface 9 is far from the first protective fence 5
The top of side, which is built, retaining wall 7, and retaining wall 7 can improve peace to the silt slid in upper slopes 8 by rain drop erosion
Quan Xing, lower slopes 6 are built far from the side of the blocking stone pier 1 upper slopes 8, and build has upper slope surface 13 in 8 slope surface of upper slopes, on
Slopes 8 can assist lower slopes 6 to realize protection, and the top of upper 8 slope surface of slopes, which is built, the second protective fence 14, and the second protective fence
14 sides far from upper slope surface 13, which are built, dykes and dams driveway 15, and the second protective fence 14 can be to the vehicle on dykes and dams driveway 15
It is protected, improves the safety of slope protection.
Further, upper slope surface 13 is laid in the slope surface of slopes 8 by the stone bed course 1306 of bottom surface, stone bed course
1306 upper surface is equipped with sand-gravel cushion 1305, and the upper surface of sand-gravel cushion 1305 is equipped with separate layer 1304, separate layer
1304 upper surface is equipped with plantation sandy soil layer 1303, and the upper surface for planting sandy soil layer 1303 is equipped with concrete block bed course
1302, kind is implanted with green plant layer 1301 on the plantation sandy soil layer 1303 between concrete block bed course 1302, in embodiment, stone bed course
1306 and sand-gravel cushion 1305 stability and fastness of slope surface 13 can be improved, separate layer 1304 can play separation
Effect avoids the sand in sand-gravel cushion 1305 from being mixed into plantation sandy soil layer 1303, and slope protection can be improved in green plant layer 1301
The fastness of slopes 8 can be improved in aesthetics, concrete block bed course 1302.
Further, concrete road surface 9 is equipped with gutter 11 close to the side of retaining wall 7, and the top in gutter 11 is fixed
Drain bar 12 is installed, in embodiment, gutter 11 convenient for extra water flow on pavement discharge.
Further, the upper surface of concrete road surface 9 is equipped with plastic cement race track 10, and in embodiment, plastic cement race track 10 can be square
Just pedestrian moves.
Further, cobblestone laying 3 is laid on the inside that stone is laid with slope 2 by concrete, in embodiment, cobblestone paving
The protecting against shock ability of lower slopes 6 can be improved in layer 3, and lower slopes 6 is avoided to wash away lower collapse for a long time.
Further, it reinforces between chain 4 and is fixedly connected with protective net 401, in embodiment, reinforce chain 4 and protective net
401 can increase the fastness of lower slopes 6.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in
All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting
Related claim.
Claims (6)
1. a kind of hydraulic engineering river course slope protection, including stone are laid with slope, lower slopes, retaining wall, concrete road surface and upper slope surface,
It is characterized by: the slope surface of the lower slopes, which is equipped with stone, is laid with slope, and stone is laid in the slope surface on slope and is equipped with cobblestone paving
Layer, the lower section of the lower slopes slope surface, which is built, the blocking stone pier, and the top build that stone is laid with slope slope surface has the first protective fence,
The stone is laid between the blocking stone pier and the first protective fence above slope and is fixedly connected with reinforcing chain, first protective fence
Building far from the top that stone is laid with slope side has concrete road surface, top of the concrete road surface far from the first protective fence side
Portion, which is built, a retaining wall, and the lower slopes have upper slopes far from stopping the side of the stone pier to be built, and builds and have in upper slopes slope surface
Upper slope surface, the top of the upper slopes slope surface, which is built, the second protective fence, and the second protective fence is built far from the side of upper slope surface
There is dykes and dams driveway.
2. a kind of hydraulic engineering river course slope protection according to claim 1, it is characterised in that: the upper slope surface passes through bottom surface
Stone setting cushion in the slope surface of upper slopes, the upper surface of stone bed course is equipped with sand-gravel cushion, and sand-gravel cushion is upper
Surface is equipped with separate layer, and the upper surface of separate layer is equipped with plantation sandy soil layer, and the upper surface for planting sandy soil layer be equipped with it is mixed
Soil block bed course is coagulated, kind is implanted with green plant layer on the plantation sandy soil layer between concrete block bed course.
3. a kind of hydraulic engineering river course slope protection according to claim 1, it is characterised in that: the concrete road surface is close
The side of retaining wall is equipped with gutter, and drain bar is fixedly installed at the top of gutter.
4. a kind of hydraulic engineering river course slope protection according to claim 1, it is characterised in that: the concrete road surface it is upper
Surface is equipped with plastic cement race track.
5. a kind of hydraulic engineering river course slope protection according to claim 1, it is characterised in that: the cobblestone laying passes through
Concrete is laid on the inside that stone is laid with slope.
6. a kind of hydraulic engineering river course slope protection according to claim 1, it is characterised in that: solid between the reinforcing chain
Surely it is connected with protective net.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821841259.9U CN209099302U (en) | 2018-11-09 | 2018-11-09 | A kind of hydraulic engineering river course slope protection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821841259.9U CN209099302U (en) | 2018-11-09 | 2018-11-09 | A kind of hydraulic engineering river course slope protection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209099302U true CN209099302U (en) | 2019-07-12 |
Family
ID=67158866
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821841259.9U Expired - Fee Related CN209099302U (en) | 2018-11-09 | 2018-11-09 | A kind of hydraulic engineering river course slope protection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209099302U (en) |
-
2018
- 2018-11-09 CN CN201821841259.9U patent/CN209099302U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735208B (en) | Dykes and dams super standard flood flood diversion siphon pipe band group | |
CN212533968U (en) | Drop ecological landscape dam | |
CN207405576U (en) | For the galvanized wire cage debris dam of mountain area RBS in channel direction | |
KR100965467B1 (en) | Eco-pillar debris barrier | |
CN203755243U (en) | Protection structure of bridgehead conical slopes | |
CN110747809A (en) | Integrated silt dam without management and protection and construction method thereof | |
CN204690698U (en) | A kind of debris flow dam | |
CN206768730U (en) | A kind of retaining wall for hydraulic engineering based on Multiple Protective Structure | |
CN209099302U (en) | A kind of hydraulic engineering river course slope protection | |
CN206581137U (en) | A kind of drainage system device for Highway in Loess Area bridge | |
CN209555882U (en) | A kind of hydraulic engineering ecological protection slope | |
CN211171814U (en) | Integrated check dam without management and protection | |
CN104452690A (en) | Concrete roughing pier flexible apron structure and construction method | |
KR101170789B1 (en) | Complex debris barrier of eco-friendly | |
CN215631156U (en) | Ecological slope protection structure is administered to road and channel integration escape canal and barren hill of small watershed | |
CN105926542A (en) | Asymmetric debris flow drainage groove and design method and application thereof | |
CN214301603U (en) | Earth and rock dam body's antiseep structure | |
CN207392146U (en) | A kind of key water control project with filtering function | |
CN105603942B (en) | Dykes and dams super standard flood flood diversion siphon pipe band | |
CN211948481U (en) | Civil engineering is with bank protection soil erosion and water loss prevention structure | |
CN208899423U (en) | A kind of hilly pond reservoir dam with water storage for preventing flood function | |
CN209703550U (en) | A kind of pervious concrete barrier wall structure | |
CN209941629U (en) | Sluice valve pipeline type fish passing facility | |
CN208441055U (en) | A kind of Water Curtain Cave formula ecoscape dam | |
CN219118065U (en) | Ecological slope protection structure of river course |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190712 Termination date: 20201109 |