CN110656733A - 一种预灌浆式全灌浆套筒结构及施工方法 - Google Patents

一种预灌浆式全灌浆套筒结构及施工方法 Download PDF

Info

Publication number
CN110656733A
CN110656733A CN201910952627.XA CN201910952627A CN110656733A CN 110656733 A CN110656733 A CN 110656733A CN 201910952627 A CN201910952627 A CN 201910952627A CN 110656733 A CN110656733 A CN 110656733A
Authority
CN
China
Prior art keywords
grouting
grout
cylinder
sleeve structure
type full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910952627.XA
Other languages
English (en)
Inventor
龙莉波
马跃强
戚健文
王竹君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201910952627.XA priority Critical patent/CN110656733A/zh
Publication of CN110656733A publication Critical patent/CN110656733A/zh
Priority to PCT/CN2020/107256 priority patent/WO2021068631A1/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

为了简化灌浆套筒的施工工艺,提高灌浆套筒的施工效率,本发明提供一种预灌浆式全灌浆套筒结构及施工方法。一种预灌浆式全灌浆套筒结构,包括浆料筒,所述浆料筒的筒壁上开设溢浆孔,所述浆料筒两端的筒口处分别设置筒口封套,所述溢浆孔的溢浆口处设置溢浆口封套,所述浆料筒内灌装灌浆料。本发明的一种预灌浆式全灌浆套筒结构,将灌浆料预制于浆料筒中,在对预灌浆式全灌浆套筒结构进行施工时,只需要将待连接钢筋直接插入浆料筒中即可。相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,提高灌浆套筒的施工效率。

Description

一种预灌浆式全灌浆套筒结构及施工方法
技术领域
本发明属于预制装配工程技术领域,特别涉及一种预灌浆式全灌浆套筒结构及施工方法。
背景技术
灌浆套筒是目前我国装配式建筑常用的钢筋连接方式之一。其中,全灌浆套筒是两端钢筋均通过灌浆料进行连接的套筒,一般用于预制梁主筋的连接。
灌浆套筒中,灌浆料一般是以水泥为基本材料并配以细骨料,外加剂及其他材料混合而成的干混料。硬化后的灌浆料分别与钢筋和灌浆套筒握裹作用,以实现钢筋连续可靠传力的连接构造。
灌浆套筒适用面广,但是需要复杂的灌浆操作,其质量也难以得到保证。因此,需要一种施工简便的新型灌浆套筒结构及其施工方法。
发明内容
为了简化灌浆套筒的施工工艺,提高灌浆套筒的施工效率,本发明提供一种预灌浆式全灌浆套筒结构及施工方法。
本发明的一种预灌浆式全灌浆套筒结构的技术方案如下:
一种预灌浆式全灌浆套筒结构,包括浆料筒,所述浆料筒的筒壁上开设溢浆孔,所述浆料筒两端的筒口处分别设置筒口封套,所述溢浆孔的溢浆口处设置溢浆口封套,所述浆料筒内灌装灌浆料。
本发明的一种预灌浆式全灌浆套筒结构,将灌浆料预制于浆料筒中,在对预灌浆式全灌浆套筒结构进行施工时,只需要将待连接钢筋直接插入浆料筒中即可。相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,提高灌浆套筒的施工效率。
进一步的,所述预灌浆式全灌浆套筒结构中,还包括表面设置催化剂层的待连接钢筋。在将待连接钢筋插入浆料筒前,可以在待连接钢筋的表面涂抹催化剂。当待连接钢筋插入浆料筒后,催化剂会加快灌浆料的凝固,提高施工效率。
进一步的,所述预灌浆式全灌浆套筒结构中,所述筒口封套为单向封套。单向的筒口封套可以从浆料筒的外部打开。单向封套的设置既能保证施工前灌浆料不会从浆料筒中流出,又能在施工时便于待连接钢筋的插入。
进一步的,所述预灌浆式全灌浆套筒结构中,为了便于灌浆料的溢出,所述溢浆孔设置于浆料筒的中部。
本发明还提供一种上述预灌浆式全灌浆套筒结构的施工方法。
本发明的预灌浆式全灌浆套筒结构的施工方法的技术特征如下,包括如下步骤:
第一步,在预灌浆式全灌浆套筒结构的浆料筒内灌装灌浆料;
第二步,在预制构件制作过程中,将预灌浆式全灌浆套筒结构埋入预制构件;
第三步,移除溢浆口封套;
第四步,将待连接钢筋分别从浆料筒两端的筒口处插入浆料筒,待多余的灌浆料从溢浆孔排出后,再将溢浆口封套设置于溢浆孔的溢浆口处。
本发明的一种预灌浆式全灌浆套筒结构的施工方法,将灌浆料预制于浆料筒中,在对预灌浆式全灌浆套筒结构进行施工时,只需要将待连接钢筋直接插入浆料筒中即可。相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,提高灌浆套筒的施工效率。
进一步的,所述预灌浆式全灌浆套筒结构的施工方法中,第三步中还包括,在待连接钢筋的表面涂抹催化剂,形成催化剂层。在将待连接钢筋插入浆料筒前,可以在待连接钢筋的表面涂抹催化剂。当待连接钢筋插入浆料筒后,催化剂会加快灌浆料的凝固,提高施工效率。
附图说明
图1是本发明的一种预灌浆式全灌浆套筒结构的示意图;
图2是本发明的一种预灌浆式全灌浆套筒结构的施工方法的示意图。
具体实施方式
以下结合附图和具体实施例对本发明作进一步详细说明。根据下面说明和权利要求书,本发明的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。
实施例1:
参考图1至图2,本实施例提供一种预灌浆式全灌浆套筒结构,包括浆料筒1,所述浆料筒1的筒壁上开设溢浆孔2,所述浆料筒1两端的筒口处分别设置筒口封套4,所述溢浆孔2的溢浆口处设置溢浆口封套5,所述浆料筒1内灌装灌浆料8。
本实施例的一种预灌浆式全灌浆套筒结构,将灌浆料8预制于浆料筒1中,在对预灌浆式全灌浆套筒结构进行施工时,只需要将待连接钢筋7直接插入浆料筒1中即可。相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,提高灌浆套筒的施工效率。
作为较佳的实施方式,所述预灌浆式全灌浆套筒结构中,还包括表面设置催化剂层6的待连接钢筋7。在将待连接钢筋7插入浆料筒1前,可以在待连接钢筋7的表面涂抹催化剂。当待连接钢筋7插入浆料筒1后,催化剂会加快灌浆料8的凝固,提高施工效率。
作为较佳的实施方式,所述预灌浆式全灌浆套筒结构中,所述筒口封套4为单向封套。单向的筒口封套4可以从浆料筒1的外部打开。单向封套的设置既能保证施工前灌浆料8不会从浆料筒1中流出,又能在施工时便于待连接钢筋7的插入。
作为较佳的实施方式,所述预灌浆式全灌浆套筒结构中,为了便于灌浆料8的溢出,所述溢浆孔2设置于浆料筒1的中部。
实施例2:
本实施例提供一种实施例1所述的预灌浆式全灌浆套筒结构的施工方法。
本实施例的预灌浆式全灌浆套筒结构的施工方法的技术特征如下,包括如下步骤:
第一步,在预灌浆式全灌浆套筒结构的浆料筒1内灌装灌浆料8;
第二步,在预制构件制作过程中,将预灌浆式全灌浆套筒结构埋入预制构件;
第三步,移除溢浆口封套5;
第四步,将待连接钢筋7分别从浆料筒1两端的筒口处插入浆料筒1,待多余的灌浆料8从溢浆孔2排出后,再将溢浆口封套5设置于溢浆孔2的溢浆口处。
本实施例的一种预灌浆式全灌浆套筒结构的施工方法,将灌浆料8预制于浆料筒1中,在对预灌浆式全灌浆套筒结构进行施工时,只需要将待连接钢筋7直接插入浆料筒1中即可。相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,提高灌浆套筒的施工效率。
作为较佳的实施方式,所述预灌浆式全灌浆套筒结构的施工方法中,第三步中还包括,在待连接钢筋7的表面涂抹催化剂,形成催化剂层6。在将待连接钢筋7插入浆料筒1前,可以在待连接钢筋7的表面涂抹催化剂。当待连接钢筋7插入浆料筒1后,催化剂会加快灌浆料8的凝固,提高施工效率。
上述描述仅是对本发明较佳实施例的描述,并非对本发明范围的任何限定,本领域的普通技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求书的保护范围。

Claims (6)

1.一种预灌浆式全灌浆套筒结构,其特征在于,包括浆料筒(1),所述浆料筒(1)的筒壁上开设溢浆孔(2),所述浆料筒(1)两端的筒口处分别设置筒口封套(4),所述溢浆孔(2)的溢浆口处设置溢浆口封套(5),所述浆料筒(1)内灌装灌浆料(8)。
2.如权利要求1所述的预灌浆式全灌浆套筒结构,其特征在于,还包括表面设置催化剂层(6)的待连接钢筋(7)。
3.如权利要求1所述的预灌浆式全灌浆套筒结构,其特征在于,所述筒口封套(4)为单向封套。
4.如权利要求1所述的预灌浆式全灌浆套筒结构,其特征在于,所述溢浆孔(2)设置于浆料筒(1)的中部。
5.一种如权利要求1至4的任意一种预灌浆式全灌浆套筒结构的施工方法,其特征在于,包括如下步骤:
第一步,在预灌浆式全灌浆套筒结构的浆料筒(1)内灌装灌浆料(8);
第二步,在预制构件制作过程中,将预灌浆式全灌浆套筒结构埋入预制构件;
第三步,移除溢浆口封套(5);
第四步,将待连接钢筋(7)分别从浆料筒(1)两端的筒口处插入浆料筒(1),待多余的灌浆料(8)从溢浆孔(2)排出后,再将溢浆口封套(5)设置于溢浆孔(2)的溢浆口处。
6.如权利要求5所述的预灌浆式全灌浆套筒结构的施工方法,其特征在于,第三步中还包括,在待连接钢筋(7)的表面涂抹催化剂,形成催化剂层(6)。
CN201910952627.XA 2019-10-09 2019-10-09 一种预灌浆式全灌浆套筒结构及施工方法 Pending CN110656733A (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910952627.XA CN110656733A (zh) 2019-10-09 2019-10-09 一种预灌浆式全灌浆套筒结构及施工方法
PCT/CN2020/107256 WO2021068631A1 (zh) 2019-10-09 2020-08-06 一种预灌浆式全灌浆套筒结构及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910952627.XA CN110656733A (zh) 2019-10-09 2019-10-09 一种预灌浆式全灌浆套筒结构及施工方法

Publications (1)

Publication Number Publication Date
CN110656733A true CN110656733A (zh) 2020-01-07

Family

ID=69038642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910952627.XA Pending CN110656733A (zh) 2019-10-09 2019-10-09 一种预灌浆式全灌浆套筒结构及施工方法

Country Status (2)

Country Link
CN (1) CN110656733A (zh)
WO (1) WO2021068631A1 (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021068631A1 (zh) * 2019-10-09 2021-04-15 上海建工二建集团有限公司 一种预灌浆式全灌浆套筒结构及施工方法
CN112832465A (zh) * 2020-12-31 2021-05-25 上海建工二建集团有限公司 一种灌浆套筒结构及施工方法
CN114892891A (zh) * 2022-07-14 2022-08-12 北京建筑大学 一种免灌浆钢筋连接装置

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541452B (zh) * 2022-02-23 2024-04-26 深圳市品尚工程有限公司 基坑预埋型双液注浆堵漏结构
CN115198972A (zh) * 2022-07-12 2022-10-18 中国二十冶集团有限公司 用于预灌浆式全灌浆套筒的防溢结构

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008063730A (ja) * 2006-09-04 2008-03-21 Godo Steel Ltd 鉄筋継手用ハーフスリーブ、該ハーフスリーブを使用した継手およびプレキャスト鉄筋コンクリート成形品
JP2011006876A (ja) * 2009-06-24 2011-01-13 Godo Steel Ltd 一端側開口型スリーブによる鉄筋継手構造
CN105298134A (zh) * 2015-11-13 2016-02-03 中国建筑股份有限公司 无独立注浆口钢筋灌浆连接套筒及系统及施工方法
CN106351404A (zh) * 2016-09-30 2017-01-25 杨晓彤 一种建筑用预置灌浆料套筒、预制件连接结构及连接方法
CN207812840U (zh) * 2017-12-29 2018-09-04 玫德集团有限公司 一种全灌浆套筒
CN108678287A (zh) * 2018-04-27 2018-10-19 东南大学 一种钢筋连接用浆销组合全灌浆套筒
CN209025322U (zh) * 2018-09-26 2019-06-25 湖南大学 一种基于水泥基粘结介质的纤维增强复合材料连接体系
CN110258947A (zh) * 2019-06-21 2019-09-20 上海易拼利联建筑科技有限责任公司 一种移动套管全灌浆套筒钢筋连接器
CN211499484U (zh) * 2019-10-09 2020-09-15 上海建工二建集团有限公司 一种预灌浆式全灌浆套筒结构

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0791883B2 (ja) * 1986-06-26 1995-10-09 正 門田 モルタル充填式鉄筋継手スリ−ブ
US6192647B1 (en) * 1999-04-15 2001-02-27 Kjell L. Dahl High strength grouted pipe coupler
US20100031607A1 (en) * 2008-08-11 2010-02-11 Oliva Michael G Splice System for Fiber-Reinforced Polymer Rebars
CN108915157A (zh) * 2018-08-24 2018-11-30 江苏工程职业技术学院 一种压力控制出浆型灌浆套筒操作方法
CN109898694A (zh) * 2019-03-12 2019-06-18 中联世纪建设集团有限公司 露套筒混凝土预制墙板的倒装配方法
CN110656733A (zh) * 2019-10-09 2020-01-07 上海建工二建集团有限公司 一种预灌浆式全灌浆套筒结构及施工方法
CN110656734A (zh) * 2019-10-09 2020-01-07 上海建工二建集团有限公司 一种预灌浆式半灌浆套筒结构及施工方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008063730A (ja) * 2006-09-04 2008-03-21 Godo Steel Ltd 鉄筋継手用ハーフスリーブ、該ハーフスリーブを使用した継手およびプレキャスト鉄筋コンクリート成形品
JP2011006876A (ja) * 2009-06-24 2011-01-13 Godo Steel Ltd 一端側開口型スリーブによる鉄筋継手構造
CN105298134A (zh) * 2015-11-13 2016-02-03 中国建筑股份有限公司 无独立注浆口钢筋灌浆连接套筒及系统及施工方法
CN106351404A (zh) * 2016-09-30 2017-01-25 杨晓彤 一种建筑用预置灌浆料套筒、预制件连接结构及连接方法
CN207812840U (zh) * 2017-12-29 2018-09-04 玫德集团有限公司 一种全灌浆套筒
CN108678287A (zh) * 2018-04-27 2018-10-19 东南大学 一种钢筋连接用浆销组合全灌浆套筒
CN209025322U (zh) * 2018-09-26 2019-06-25 湖南大学 一种基于水泥基粘结介质的纤维增强复合材料连接体系
CN110258947A (zh) * 2019-06-21 2019-09-20 上海易拼利联建筑科技有限责任公司 一种移动套管全灌浆套筒钢筋连接器
CN211499484U (zh) * 2019-10-09 2020-09-15 上海建工二建集团有限公司 一种预灌浆式全灌浆套筒结构

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021068631A1 (zh) * 2019-10-09 2021-04-15 上海建工二建集团有限公司 一种预灌浆式全灌浆套筒结构及施工方法
CN112832465A (zh) * 2020-12-31 2021-05-25 上海建工二建集团有限公司 一种灌浆套筒结构及施工方法
CN114892891A (zh) * 2022-07-14 2022-08-12 北京建筑大学 一种免灌浆钢筋连接装置
CN114892891B (zh) * 2022-07-14 2022-10-04 北京建筑大学 一种免灌浆钢筋连接装置

Also Published As

Publication number Publication date
WO2021068631A1 (zh) 2021-04-15

Similar Documents

Publication Publication Date Title
CN110656733A (zh) 一种预灌浆式全灌浆套筒结构及施工方法
CN107893415B (zh) 一种耐腐蚀微型钢管桩及制造方法
CN110656734A (zh) 一种预灌浆式半灌浆套筒结构及施工方法
CN102535472B (zh) 一种孔管封填、高压冲挤灌浆的方法
CN211499484U (zh) 一种预灌浆式全灌浆套筒结构
CN109537894B (zh) 一种装配式墙体的灌浆施工方法
CN110485552A (zh) 套筒、预制构件连接头、预制构件及预制构件装配体
CN115370001B (zh) 一种预应力装配式混凝土框架节点灌浆施工工艺
CN211499485U (zh) 一种预灌浆式半灌浆套筒结构
CN202544864U (zh) 一种用于隧道的串联接力长距离送灌浆装置
CN108532772A (zh) 装配式结构球栓灌浆连接件及施工方法
CN113293933A (zh) 一种用于灌浆套筒的封浆装置及封浆方法
CN206646348U (zh) 一种高强度预制混泥土拼接板
CN209163028U (zh) 套筒、预制构件连接头、预制构件
CN110644481A (zh) 一种径向变模量复合桩及其施工设备和施工方法
CN205712760U (zh) 一种灌浆套筒及预制件
CN205712775U (zh) 一种灌浆套筒及预制件
CN211286302U (zh) 一种内腔凸起多点分布式灌浆套筒
CN205712765U (zh) 一种灌浆套筒及预制件
CN213890628U (zh) 一种具有高耐磨的建筑施工用石膏砂浆搅拌装置
CN113417465A (zh) 一种装配式建筑灌浆套筒灌浆系统
CN104912069B (zh) 一种疏水复合钢芯玻璃纤维抗浮锚杆及其施工方法
KR102049822B1 (ko) 속경형 저유동 모르타르 그라우팅 시스템
CN205712764U (zh) 一种灌浆套筒及预制件
CN205712762U (zh) 一种灌浆套筒及预制件

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200107

RJ01 Rejection of invention patent application after publication