CN112832465A - 一种灌浆套筒结构及施工方法 - Google Patents
一种灌浆套筒结构及施工方法 Download PDFInfo
- Publication number
- CN112832465A CN112832465A CN202011624898.1A CN202011624898A CN112832465A CN 112832465 A CN112832465 A CN 112832465A CN 202011624898 A CN202011624898 A CN 202011624898A CN 112832465 A CN112832465 A CN 112832465A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- grouting
- sleeve structure
- grout
- grouting sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
为了简化灌浆套筒的施工工艺、提高灌浆套筒的施工效率、减少人力财力成本,本发明提供一种灌浆套筒结构及施工方法。本发明的一种灌浆套筒结构,包括套筒、设置于套筒底部的套筒封套、设置于套筒筒壁顶部的溢浆孔、设置于溢浆孔的溢浆口处的溢浆口封套、以及设置于套筒内的结构胶。本发明的一种灌浆套筒结构,将结构胶封装于套筒中,施工时,将待连接钢筋从套筒封套处插入套筒中,套筒内的结构胶与待连接钢筋接触后可发生反应,生成凝固体,从而形成传力结构,完成构件之间的连接。
Description
技术领域
本发明属于预制装配工程技术领域,特别涉及一种灌浆套筒结构及施工方法。
背景技术
灌浆套筒是目前我国装配式建筑常用的钢筋连接方式之一。施工过程中,带肋钢筋插入灌浆套筒后,再将专用灌浆料充满灌浆套筒与钢筋的间隙,从而形成传力结构。
灌浆套筒适应性强,但是施工工艺流程较为复杂,无法提高灌浆效率以及减少人力财力成本。
发明内容
为了简化灌浆套筒的施工工艺、提高灌浆套筒的施工效率、减少人力财力成本,本发明提供一种灌浆套筒结构及施工方法。
本发明的一种灌浆套筒结构的技术方案如下:
一种灌浆套筒结构,包括套筒、设置于套筒底部的套筒封套、设置于套筒筒壁顶部的溢浆孔、设置于溢浆孔的溢浆口处的溢浆口封套、以及设置于套筒内的结构胶。
本发明的一种灌浆套筒结构,将结构胶封装于套筒中,施工时,将待连接钢筋从套筒封套处插入套筒中,套筒内的结构胶与待连接钢筋接触后可发生反应,生成凝固体,从而形成传力结构,完成构件之间的连接。
本发明的一种灌浆套筒结构,相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,从而提高灌浆套筒的施工效率。
进一步的,所述的灌浆套筒结构,还包括设置于套筒顶部的连接槽。连接槽用于连接上部钢筋。
进一步的,所述的灌浆套筒结构,具体的,所述连接槽的接口为直螺纹。
进一步的,所述的灌浆套筒结构,所述套筒封套为单向封套。套筒封套设置为单向封套后,套筒封套从外部受到一定压力后即可打开。待连接钢筋可直接从套筒封套处插入套筒,简化了施工流程。
本发明还提供一种上述灌浆套筒结构的施工方法,技术方案如下:
一种灌浆套筒结构的施工方法,包括如下步骤:
第一步,在套筒内灌装结构胶;
第二步,灌浆套筒结构就位;
第三步,揭开溢浆口封套,将待连接钢筋从套筒封套处插入套筒,结构胶与待连接钢筋发生反应,形成固体包裹住待连接钢筋,完成待连接钢筋的连接。
本发明的一种灌浆套筒结构的施工方法,将结构胶封装于套筒中,施工时,将待连接钢筋从套筒封套处插入套筒中,套筒内的结构胶与待连接钢筋接触后可发生反应,生成凝固体,从而形成传力结构,完成构件之间的连接。
本发明的一种灌浆套筒结构的施工方法,相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,从而提高灌浆套筒的施工效率。
附图说明
图1是本发明的一种灌浆套筒结构的示意图;
图2是本发明的一种灌浆套筒结构的施工方法的示意图。
具体实施方式
以下结合附图和具体实施例对本发明作进一步详细说明。根据下面说明和权利要求书,本发明的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。
实施例1:
参考图1,本实施例的一种灌浆套筒结构,包括套筒1、设置于套筒1底部的套筒封套2、设置于套筒1筒壁顶部的溢浆孔3、设置于溢浆孔3的溢浆口处的溢浆口封套4、以及设置于套筒1内的结构胶5。
本实施例的一种灌浆套筒结构,将结构胶5封装于套筒1中,施工时,将待连接钢筋从套筒封套2处插入套筒1中,套筒1内的结构胶5与待连接钢筋接触后可发生反应,生成凝固体,从而形成传力结构,完成构件之间的连接。
本实施例的一种灌浆套筒结构,相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,从而提高灌浆套筒的施工效率。
作为较佳的实施方式,所述的灌浆套筒结构,还包括设置于套筒1顶部的连接槽6。连接槽6用于连接上部钢筋。
作为较佳的实施方式,所述的灌浆套筒结构,具体的,所述连接槽6的接口为直螺纹。
作为较佳的实施方式,所述的灌浆套筒结构,所述套筒封套2为单向封套。套筒封套2设置为单向封套后,套筒封套2从外部受到一定压力后即可打开。待连接钢筋可直接从套筒封套2处插入套筒1,简化了施工流程。
实施例2:
参考图1、图2,本实施例提供一种实施例1所述的灌浆套筒结构的施工方法,技术方案如下:
一种灌浆套筒结构的施工方法,包括如下步骤:
第一步,在套筒1内灌装结构胶5;
第二步,灌浆套筒结构就位;
第三步,揭开溢浆口封套4,将待连接钢筋从套筒封套2处插入套筒1,结构胶5与待连接钢筋发生反应,形成固体包裹住待连接钢筋,完成待连接钢筋的连接。
本实施例的一种灌浆套筒结构的施工方法,将结构胶5封装于套筒1中,施工时,将待连接钢筋从套筒封套2处插入套筒1中,套筒1内的结构胶5与待连接钢筋接触后可发生反应,生成凝固体,从而形成传力结构,完成构件之间的连接。
本实施例的一种灌浆套筒结构的施工方法,相比传统灌浆套筒施工工艺,免去了灌浆操作,简化灌浆套筒的施工工艺,从而提高灌浆套筒的施工效率。
上述描述仅是对本发明较佳实施例的描述,并非对本发明范围的任何限定,本发明领域的普通技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求书的保护范围。
Claims (5)
1.一种灌浆套筒结构,其特征在于,包括套筒(1)、设置于套筒(1)底部的套筒封套(2)、设置于套筒(1)筒壁顶部的溢浆孔(3)、设置于溢浆孔(3)的溢浆口处的溢浆口封套(4)、以及设置于套筒(1)内的结构胶(5)。
2.如权利要求1所述的灌浆套筒结构,其特征在于,还包括设置于套筒(1)顶部的连接槽(6)。
3.如权利要求2所述的灌浆套筒结构,其特征在于,所述连接槽(6)的接口为直螺纹。
4.如权利要求1所述的灌浆套筒结构,其特征在于,所述套筒封套(2)为单向封套。
5.一种如权利要求1至4的任意一种灌浆套筒结构的施工方法,其特征在于,包括如下步骤:
第一步,在套筒(1)内灌装结构胶(5);
第二步,灌浆套筒结构就位;
第三步,揭开溢浆口封套(4),将待连接钢筋从套筒封套(2)处插入套筒(1),结构胶(5)与待连接钢筋发生反应,形成固体包裹住待连接钢筋,完成待连接钢筋的连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011624898.1A CN112832465A (zh) | 2020-12-31 | 2020-12-31 | 一种灌浆套筒结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011624898.1A CN112832465A (zh) | 2020-12-31 | 2020-12-31 | 一种灌浆套筒结构及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112832465A true CN112832465A (zh) | 2021-05-25 |
Family
ID=75924446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011624898.1A Pending CN112832465A (zh) | 2020-12-31 | 2020-12-31 | 一种灌浆套筒结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112832465A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130028658A1 (en) * | 2011-07-27 | 2013-01-31 | Yee Alfred A | Splice sleeve with elliptical or compound curve cross section |
CN207739402U (zh) * | 2017-12-22 | 2018-08-17 | 广州市芳村建筑工程有限公司 | 装配式混凝土连接结构 |
CN110656734A (zh) * | 2019-10-09 | 2020-01-07 | 上海建工二建集团有限公司 | 一种预灌浆式半灌浆套筒结构及施工方法 |
CN110656733A (zh) * | 2019-10-09 | 2020-01-07 | 上海建工二建集团有限公司 | 一种预灌浆式全灌浆套筒结构及施工方法 |
US20200232207A1 (en) * | 2018-01-31 | 2020-07-23 | Hefei Construction Engineering Group Co.Ltd | Assembling structure of prefabricated concrete component |
CN111622429A (zh) * | 2020-06-17 | 2020-09-04 | 陈建全 | 提高灌浆套筒连接安全性的方法和灌浆套筒 |
-
2020
- 2020-12-31 CN CN202011624898.1A patent/CN112832465A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130028658A1 (en) * | 2011-07-27 | 2013-01-31 | Yee Alfred A | Splice sleeve with elliptical or compound curve cross section |
CN207739402U (zh) * | 2017-12-22 | 2018-08-17 | 广州市芳村建筑工程有限公司 | 装配式混凝土连接结构 |
US20200232207A1 (en) * | 2018-01-31 | 2020-07-23 | Hefei Construction Engineering Group Co.Ltd | Assembling structure of prefabricated concrete component |
CN110656734A (zh) * | 2019-10-09 | 2020-01-07 | 上海建工二建集团有限公司 | 一种预灌浆式半灌浆套筒结构及施工方法 |
CN110656733A (zh) * | 2019-10-09 | 2020-01-07 | 上海建工二建集团有限公司 | 一种预灌浆式全灌浆套筒结构及施工方法 |
CN111622429A (zh) * | 2020-06-17 | 2020-09-04 | 陈建全 | 提高灌浆套筒连接安全性的方法和灌浆套筒 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207739402U (zh) | 装配式混凝土连接结构 | |
CN105064619A (zh) | 预制装配式混凝土构件用钢筋套筒灌浆连接件及连接方法 | |
CN205935417U (zh) | 一种带螺纹连接件的半灌浆套筒 | |
CN204826423U (zh) | 一种预制装配式混凝土构件用钢筋套筒灌浆连接件 | |
CN109653245A (zh) | 一种预制拼装综合管廊企口式接头防水构造及方法 | |
CN112832465A (zh) | 一种灌浆套筒结构及施工方法 | |
CN103321420A (zh) | 伽马形预应力管道真空辅助灌浆装置及灌浆方法 | |
CN204691081U (zh) | 含带肋约束波纹管钢筋搭接连接构件 | |
CN209703838U (zh) | 钢筋连接器及预制混凝土构件间钢筋连接结构 | |
CN110656734A (zh) | 一种预灌浆式半灌浆套筒结构及施工方法 | |
CN209429263U (zh) | 一种装配式预制柱连接节点模板固定装置 | |
CN207211526U (zh) | 一种钢筋水泥灌浆连接套筒 | |
CN216553860U (zh) | 一种新型瓦斯钻孔孔外封孔装置 | |
CN211499485U (zh) | 一种预灌浆式半灌浆套筒结构 | |
CN205975996U (zh) | 浆锚搭接连接结构以及墙体 | |
CN206647386U (zh) | 一种防漏双面拉铆钉 | |
CN208702011U (zh) | 一种装配式建筑施工用灌浆套筒 | |
CN206034656U (zh) | 一种预制装配式混凝土结构钢筋新型连接节点 | |
CN210659039U (zh) | 新型装饰保温板 | |
CN219902671U (zh) | 一种预制梁循环压浆系统 | |
CN208858059U (zh) | 一种装配式混凝土构件节点钢筋连接结构 | |
CN209652746U (zh) | 一种装配式桥墩用套筒、预制立柱及承台 | |
CN209194780U (zh) | 一种模块化的非承重自保温装配式墙体 | |
CN207297464U (zh) | 一种塑料泵的上盖与机座的安装结构 | |
CN206554519U (zh) | 一种钢管混凝土顶升及转换装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20210525 |
|
WD01 | Invention patent application deemed withdrawn after publication |