CN110593101A - 一种组合梁斜拉桥的快速拼装施工方法 - Google Patents
一种组合梁斜拉桥的快速拼装施工方法 Download PDFInfo
- Publication number
- CN110593101A CN110593101A CN201910760753.5A CN201910760753A CN110593101A CN 110593101 A CN110593101 A CN 110593101A CN 201910760753 A CN201910760753 A CN 201910760753A CN 110593101 A CN110593101 A CN 110593101A
- Authority
- CN
- China
- Prior art keywords
- segment
- cable
- bridge
- section
- bridge deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种组合梁斜拉桥的快速拼装施工方法,包括以下步骤:将与主节段相邻的两个待拼装节段称为一号节段,与一号节段相邻的待拼装节段称为二号节段;拼装一号节段的边主梁、横梁和小纵梁;计算一号节段的张拉力并进行张拉;铺设一号节段的桥面板;拼装二号节段的边主梁、横梁和小纵梁;计算二号节段的张拉力并进行张拉;铺设二号节段的桥面板;浇筑相邻桥面板之间的湿接缝;再次张拉一号节段及二号节段的斜拉索,完成一号节段及二号节段的拼装,并与主节段形成新的主节段;重复以上步骤直至主梁合龙。涉及桥梁工程施工领域。本发明降低了斜拉索的张拉次数及湿接缝的浇筑次数,大大缩短了主梁施工工期,降低了施工成本。
Description
技术领域
本发明涉及桥梁工程施工技术领域,具体是涉及一种组合梁斜拉桥的快速拼装施工方法。
背景技术
当前,随着经济高速发展,交通基础设施的便利性显得尤为重要,世界各地均在修建越来越多的跨河跨江跨海大桥,斜拉桥凭借其优越的跨越能力及较好的结构刚度,成为了千米级大桥的首选;而综合考虑到经济性和耐久性设计,组合梁斜拉桥则是其中较优的选择。
组合梁斜拉桥经济性较好,其混凝土桥面板可以承受大部分的主梁压力,而其主梁、横梁和预制板都可采用便于运输的小构件钢梁。与全混凝土主梁斜拉桥相比,组合梁斜拉桥所需要的起重设备较小,且桥面板之间采用湿接缝连接,相较于干接缝,主桥跨径可以更大,满足更多场景的实际跨度需求;与全钢结构主梁斜拉桥相比,组合梁斜拉桥用钢量少,对运输条件的要求较低。
然而,由于组合梁斜拉桥的施工工艺较复杂,其桥面板易开裂,实际施工较为困难。目前广泛采用的组合梁斜拉桥拼装工艺为分节段施工,拼装每一个节段需要张拉两次斜拉索、浇筑一次湿接缝,完成一个标准节段的施工需要15天左右的时间,一座20节段的斜拉桥需要10个月时间才能合龙,整体施工时间过长;整个施工过程中,斜拉索张拉40余次,斜拉索张拉、湿接缝浇筑的次数过多,施工成本较高。
发明内容
本发明的目的是为了克服上述背景技术的不足,提供一种可缩短施工时间,降低施工成本的组合梁斜拉桥的快速拼装施工方法。
本发明提供一种组合梁斜拉桥的快速拼装施工方法,包括以下步骤:
a、将与主节段相邻的两个待拼装节段称为一号节段,与所述一号节段相邻的待拼装节段称为二号节段;
b、拼装一号节段的边主梁、横梁和小纵梁;
c、计算确定一号节段的斜拉索的张拉力并以该张拉力进行所述斜拉索的张拉;
d、铺设一号节段的桥面板;
e、拼装二号节段的边主梁、横梁和小纵梁;
f、计算确定二号节段的斜拉索的张拉力并以该张拉力进行所述斜拉索张拉;
g、铺设二号节段的桥面板;
h、浇筑所有相邻桥面板之间的湿接缝;
i、再次张拉一号节段及二号节段的斜拉索,完成一号节段及二号节段的拼装,并与主节段形成新的主节段;
j、重复步骤a-i直至主梁合龙。
在上述技术方案的基础上,所述步骤j之后,还包括如下步骤:
k、张拉所有所述桥面板内的预应力钢绞线,完成组合梁斜拉桥的拼装。
在上述技术方案的基础上,所述拼装边主梁、横梁和小纵梁时,其高程偏差和轴线偏差要满足设计要求。
在上述技术方案的基础上,所述计算确定斜拉索的张拉力中,通过正装迭代法基于有限元计算确定斜拉索的张拉力。
在上述技术方案的基础上,所述铺设桥面板中,采用桥面吊机进行桥面板的铺设,所述桥面吊机可沿桥面移动以吊装不同节段处的桥面板。
在上述技术方案的基础上,所述浇筑所有相邻桥面板之间的湿接缝后,待湿接缝的混凝土养护完成,再进行步骤i。
在上述技术方案的基础上,所述铺设桥面板时,沿斜拉桥的纵桥向,由靠近斜拉桥中心的一侧向远离斜拉桥中心的一侧依次拼装。
与现有技术相比,本发明的优点如下:
本发明的组合梁斜拉桥的快速拼装施工方法调整了施工步骤,一号节段与二号节段整体施工,实现大跨度斜拉桥快速悬臂拼装,降低了斜拉索的张拉次数及湿接缝的浇筑次数,大大缩短了主梁施工工期,降低了施工成本;且一号节段的组合梁在二号节段施工过程中整体参与受力,使桥面板可承受的应力更大,通过计算确定斜拉索两次张拉的张拉力,采用斜拉索的张拉力调整施工偏差,整个施工过程中,以边主梁拼装线性控制为主,斜拉索张拉力控制为辅,改善了结构整体受力性能,受力情况明确。
附图说明
图1是本发明实施例进行一号节段施工过程中的桥梁结构俯视图;
图2是本发明实施例进行二号节段施工过程中的的桥梁结构俯视图;
图3是本发明实施例的组合梁斜拉桥施工完成后的桥梁结构主视图。
附图标记:1—边主梁,2—横梁,3—小纵梁,4—斜拉索,5—桥面板,6—钢绞线。
具体实施方式
下面结合附图及具体实施例对本发明作进一步的详细描述。
参见图1至图2所示,本发明实施例提供一种组合梁斜拉桥的快速拼装施工方法,包括以下步骤:
a、将与主节段相邻的两个待拼装节段称为一号节段,与所述一号节段相邻的待拼装节段称为二号节段;
b、拼装一号节段的边主梁1、横梁2和小纵梁3;
c、计算确定一号节段的斜拉索4的张拉力并以该张拉力进行所述斜拉索4的张拉;
d、铺设一号节段的桥面板5;
e、拼装二号节段的边主梁1、横梁2和小纵梁3;
f、计算确定二号节段的斜拉索4的张拉力并以该张拉力进行所述斜拉索4张拉;
g、铺设二号节段的桥面板5;
h、浇筑所有相邻桥面板5之间的湿接缝;
i、再次张拉一号节段及二号节段的斜拉索4,完成一号节段及二号节段的拼装,并与主节段形成新的主节段;
j、重复步骤a-i直至主梁合龙。
本发明的组合梁斜拉桥的施工过程中,由主塔位置处已拼装的主节段开始,沿斜拉桥的纵向向桥梁两侧进行施工;待一号节段与二号节段施工完成后,将一号节段、二号节段与主节段形成新的主节段,并以新的主节段开始,确定新的一号节段与二号节段,重复施工步骤,直至主梁合龙。
本发明的组合梁斜拉桥的快速拼装施工方法调整了施工步骤,一号节段与二号节段整体施工,实现大跨度斜拉桥快速悬臂拼装,降低了斜拉索4的张拉次数及湿接缝的浇筑次数,大大缩短了主梁施工工期,降低了施工成本;且一号节段的组合梁在二号节段施工过程中整体参与受力,使桥面板5可承受的应力更大,通过计算确定斜拉索4两次张拉的张拉力,采用斜拉索4的张拉力调整施工偏差,整个施工过程中,以边主梁1拼装线性控制为主,斜拉索4张拉力控制为辅,改善了结构整体受力性能,受力情况明确。
参见图3所示,在本实施例中,优选的,所述步骤j之后,还包括如下步骤:
k、张拉所有所述桥面板5内的预应力钢绞线6,完成组合梁斜拉桥的拼装;重复两个节段整体施工的步骤,完成主梁的合龙,最后张拉桥面板5内的预应力钢绞线6,进一步缩短工期,实现大跨度斜拉桥快速悬臂拼装。
在本实施例中,优选的,所述拼装边主梁1、横梁2和小纵梁3时,其高程偏差和轴线偏差要满足设计要求;高程偏差也称比高或高差,即两点间的高程之差,更具体地说,是通过两点的两个水准面间的差距,通常用水准测量、三角高程测量或气压高程测量等方法测定;保证高程偏差和轴线偏差满足设计要求,使桥梁具有良好的整体结构性能。
在本实施例中,优选的,所述计算确定斜拉索4的张拉力中,通过正装迭代法基于有限元计算确定斜拉索4的张拉力;通过正装迭代法反复优化斜拉索索力,满足结构受力要求,严格控制斜拉索4两次张拉的张拉力,通过张拉力及时调整施工偏差。
在本实施例中,优选的,所述铺设桥面板5中,采用桥面吊机进行桥面板5的铺设,所述桥面吊机可沿桥面移动以吊装不同节段处的桥面板5;桥面吊机适用于桥梁上各位置的桥面板5吊装,降低了施工难度,节省了施工时间。
在本实施例中,优选的,所述浇筑所有相邻桥面板5之间的湿接缝后,待湿接缝的混凝土养护完成,再进行步骤i。
在本实施例中,优选的,所述铺设桥面板5时,沿斜拉桥的纵桥向,由靠近斜拉桥中心的一侧向远离斜拉桥中心的一侧依次拼装;改善了桥面板5的受力情况,使其可承受的应力更大。
本领域的技术人员可以对本发明实施例进行各种修改和变型,倘若这些修改和变型在本发明权利要求及其等同技术的范围之内,则这些修改和变型也在本发明的保护范围之内。
说明书中未详细描述的内容为本领域技术人员公知的现有技术。
Claims (7)
1.一种组合梁斜拉桥的快速拼装施工方法,其特征在于,包括以下步骤:
a、将与主节段相邻的两个待拼装节段称为一号节段,与所述一号节段相邻的待拼装节段称为二号节段;
b、拼装一号节段的边主梁(1)、横梁(2)和小纵梁(3);
c、计算确定一号节段的斜拉索(4)的张拉力并以该张拉力进行所述斜拉索(4)的张拉;
d、铺设一号节段的桥面板(5);
e、拼装二号节段的边主梁(1)、横梁(2)和小纵梁(3);
f、计算确定二号节段的斜拉索(4)的张拉力并以该张拉力进行所述斜拉索(4)张拉;
g、铺设二号节段的桥面板(5);
h、浇筑所有相邻桥面板(5)之间的湿接缝;
i、再次张拉一号节段及二号节段的斜拉索(4),完成一号节段及二号节段的拼装,并与主节段形成新的主节段;
j、重复步骤a-i直至主梁合龙。
2.如权利要求1所述的组合梁斜拉桥的快速拼装施工方法,其特征在于,所述步骤j之后,还包括如下步骤:
k、张拉所有所述桥面板(5)内的预应力钢绞线(6),完成组合梁斜拉桥的拼装。
3.如权利要求1所述的组合梁斜拉桥的快速拼装施工方法,其特征在于:所述拼装边主梁(1)、横梁(2)和小纵梁(3)时,其高程偏差和轴线偏差要满足设计要求。
4.如权利要求1所述的组合梁斜拉桥的快速拼装施工方法,其特征在于:所述计算确定斜拉索(4)的张拉力中,通过正装迭代法基于有限元计算确定斜拉索(4)的张拉力。
5.如权利要求1所述的组合梁斜拉桥的快速拼装施工方法,其特征在于:所述铺设桥面板(5)中,采用桥面吊机进行桥面板(5)的铺设,所述桥面吊机可沿桥面移动以吊装不同节段处的桥面板(5)。
6.如权利要求5所述的组合梁斜拉桥的快速拼装施工方法,其特征在于:所述浇筑所有相邻桥面板(5)之间的湿接缝后,待湿接缝的混凝土养护完成,再进行步骤i。
7.如权利要求1所述的组合梁斜拉桥的快速拼装施工方法,其特征在于:所述铺设桥面板(5)时,沿斜拉桥的纵桥向,由靠近斜拉桥中心的一侧向远离斜拉桥中心的一侧依次拼装。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910760753.5A CN110593101A (zh) | 2019-08-16 | 2019-08-16 | 一种组合梁斜拉桥的快速拼装施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910760753.5A CN110593101A (zh) | 2019-08-16 | 2019-08-16 | 一种组合梁斜拉桥的快速拼装施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110593101A true CN110593101A (zh) | 2019-12-20 |
Family
ID=68854637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910760753.5A Pending CN110593101A (zh) | 2019-08-16 | 2019-08-16 | 一种组合梁斜拉桥的快速拼装施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110593101A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111424556A (zh) * | 2020-04-21 | 2020-07-17 | 中铁大桥局第七工程有限公司 | 一种斜拉桥主梁的架设方法和斜拉桥主梁 |
CN111455862A (zh) * | 2020-04-30 | 2020-07-28 | 中铁大桥科学研究院有限公司 | 一种连续加劲梁悬索桥的施工方法 |
CN111764283A (zh) * | 2020-05-26 | 2020-10-13 | 中交路桥建设有限公司 | 一种叠合梁斜拉桥上部结构快速循环施工方法 |
CN113403945A (zh) * | 2020-12-29 | 2021-09-17 | 长沙理工大学 | 一种钢-混叠合梁斜拉桥施工方法 |
CN113605214A (zh) * | 2021-08-23 | 2021-11-05 | 中铁大桥勘测设计院集团有限公司 | 一种纵横结合梁的变宽主梁 |
CN115652812A (zh) * | 2022-12-27 | 2023-01-31 | 湖南省交通规划勘察设计院有限公司 | 一种pk型断面组合梁斜拉桥的异步施工方法 |
CN116341073A (zh) * | 2023-03-25 | 2023-06-27 | 中交第二公路勘察设计研究院有限公司 | 一种钢-uhpc组合梁斜拉桥主跨跨中桥面板的预压应力施加设计方法及其实施方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170014821A (ko) * | 2015-07-31 | 2017-02-08 | 대림산업 주식회사 | 프리캐스트 코어를 이용한 상부구조물을 가지는 사장교의 시공방법 및 그에 의해 시공되는 사장교 |
CN108004924A (zh) * | 2017-11-29 | 2018-05-08 | 中交路桥华南工程有限公司 | 双塔双索面混合式钢-混叠合梁斜拉桥的中跨段的合拢方法 |
CN108999088A (zh) * | 2018-08-14 | 2018-12-14 | 张家港市欧微自动化研发有限公司 | 一种斜拉桥的施工方法 |
CN109505243A (zh) * | 2018-11-14 | 2019-03-22 | 浙江省交通规划设计研究院有限公司 | 斜拉桥组合梁桥面抗裂方法 |
CN109972517A (zh) * | 2017-12-27 | 2019-07-05 | 中交第二航务工程局有限公司 | 一种钢混结合梁斜拉桥主梁的施工方法 |
CN110042768A (zh) * | 2019-06-03 | 2019-07-23 | 四川公路桥梁建设集团有限公司 | 一种组合梁斜拉桥主梁双节段循环施工方法 |
-
2019
- 2019-08-16 CN CN201910760753.5A patent/CN110593101A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170014821A (ko) * | 2015-07-31 | 2017-02-08 | 대림산업 주식회사 | 프리캐스트 코어를 이용한 상부구조물을 가지는 사장교의 시공방법 및 그에 의해 시공되는 사장교 |
CN108004924A (zh) * | 2017-11-29 | 2018-05-08 | 中交路桥华南工程有限公司 | 双塔双索面混合式钢-混叠合梁斜拉桥的中跨段的合拢方法 |
CN109972517A (zh) * | 2017-12-27 | 2019-07-05 | 中交第二航务工程局有限公司 | 一种钢混结合梁斜拉桥主梁的施工方法 |
CN108999088A (zh) * | 2018-08-14 | 2018-12-14 | 张家港市欧微自动化研发有限公司 | 一种斜拉桥的施工方法 |
CN109505243A (zh) * | 2018-11-14 | 2019-03-22 | 浙江省交通规划设计研究院有限公司 | 斜拉桥组合梁桥面抗裂方法 |
CN110042768A (zh) * | 2019-06-03 | 2019-07-23 | 四川公路桥梁建设集团有限公司 | 一种组合梁斜拉桥主梁双节段循环施工方法 |
Non-Patent Citations (4)
Title |
---|
涂兵: "《桥梁施工》", 31 August 2010, 西南交通大学出版社 * |
罗世东等: "《铁路钢箱梁混合组合梁斜拉桥》", 31 March 2017, 中国铁道出版社 * |
陈明宪: "《斜拉桥建造技术》", 30 June 2003, 人民交通出版社 * |
陈明德等: "《市政公路工程风险管理与应用》", 30 June 2015, 同济大学出版社 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111424556A (zh) * | 2020-04-21 | 2020-07-17 | 中铁大桥局第七工程有限公司 | 一种斜拉桥主梁的架设方法和斜拉桥主梁 |
CN111455862A (zh) * | 2020-04-30 | 2020-07-28 | 中铁大桥科学研究院有限公司 | 一种连续加劲梁悬索桥的施工方法 |
CN111764283A (zh) * | 2020-05-26 | 2020-10-13 | 中交路桥建设有限公司 | 一种叠合梁斜拉桥上部结构快速循环施工方法 |
CN111764283B (zh) * | 2020-05-26 | 2021-08-13 | 中交路桥建设有限公司 | 一种叠合梁斜拉桥上部结构快速循环施工方法 |
CN113403945A (zh) * | 2020-12-29 | 2021-09-17 | 长沙理工大学 | 一种钢-混叠合梁斜拉桥施工方法 |
CN113605214A (zh) * | 2021-08-23 | 2021-11-05 | 中铁大桥勘测设计院集团有限公司 | 一种纵横结合梁的变宽主梁 |
CN113605214B (zh) * | 2021-08-23 | 2022-11-18 | 中铁大桥勘测设计院集团有限公司 | 一种纵横结合梁的变宽主梁 |
CN115652812A (zh) * | 2022-12-27 | 2023-01-31 | 湖南省交通规划勘察设计院有限公司 | 一种pk型断面组合梁斜拉桥的异步施工方法 |
CN116341073A (zh) * | 2023-03-25 | 2023-06-27 | 中交第二公路勘察设计研究院有限公司 | 一种钢-uhpc组合梁斜拉桥主跨跨中桥面板的预压应力施加设计方法及其实施方法 |
CN116341073B (zh) * | 2023-03-25 | 2024-04-02 | 中交第二公路勘察设计研究院有限公司 | 一种钢-uhpc组合梁斜拉桥主跨跨中桥面板的预压应力施加设计方法及其实施方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110593101A (zh) | 一种组合梁斜拉桥的快速拼装施工方法 | |
Tanaka et al. | The innovation and application of UHPFRC bridges in Japan | |
CN102146658B (zh) | 局部不组合的悬索桥钢-混凝土组合桥面系及其施工方法 | |
US20110278752A1 (en) | Method for constructing precast coping for bridge | |
CN103215886B (zh) | 一种新型的短节段钢箱-混凝土组合梁 | |
CN103046463B (zh) | 装配式马鞍壳形底板连续箱梁桥及其建造方法 | |
CN204185755U (zh) | 一种波形钢腹板后张法预应力混凝土t梁 | |
CN109958049B (zh) | 一种模块化钢-混组合小箱梁简支连续桥及其施工方法 | |
CN104762871A (zh) | 一种预应力混凝土-钢槽梁结合梁连续梁桥 | |
CN103556565B (zh) | 一种不同性能混凝土梁的连接构造 | |
CN109338896B (zh) | 一种宽幅混凝土pk箱梁支架体系施工方法 | |
KR20130141276A (ko) | 매립형 거푸집을 이용한 강합성 교량의 상부슬래브 압출가설용 압출가설 장치 | |
CN109112961B (zh) | 一种超薄桥面结构、桁架桥及桁架桥的构建方法 | |
KR20160150155A (ko) | 고강도 경량콘크리트의 분할타설에 의한 fcm 교량시공방법 | |
CN104389261A (zh) | 预制超高性能混凝土π形梁单元、桥梁结构及其施工方法 | |
KR20160150154A (ko) | 분할타설에 의한 fcm 교량시공방법 | |
CN205617227U (zh) | 可快速架设的全预制轻型组合桥梁结构 | |
CN108316164B (zh) | 一种利用新梁加固旧装配式空心板梁桥构造及施工方法 | |
CN105019350A (zh) | 一种预制t型梁及用其建造连续梁桥的方法 | |
CN212404773U (zh) | 一种uhpc-nc混合箱梁和大跨刚构桥 | |
CN113106845A (zh) | 装配式拉筋矩形钢管混凝土桁架组合梁及其施工方法 | |
CN204151663U (zh) | 一种混合梁无背索矮塔斜拉桥 | |
CN111778835A (zh) | 钢材、普通混凝土和超高性能混凝土的组合梁及施工方法 | |
CN208362941U (zh) | 一种通过实腹现浇板加固单孔旧空心板桥构造 | |
CN105648898A (zh) | 预制超高性能混凝土中承式梁单元、桥梁结构及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191220 |