CN110549083A - 工字梁拼装设备及工字梁制造方法 - Google Patents
工字梁拼装设备及工字梁制造方法 Download PDFInfo
- Publication number
- CN110549083A CN110549083A CN201810558862.4A CN201810558862A CN110549083A CN 110549083 A CN110549083 A CN 110549083A CN 201810558862 A CN201810558862 A CN 201810558862A CN 110549083 A CN110549083 A CN 110549083A
- Authority
- CN
- China
- Prior art keywords
- wing plate
- upper wing
- lower wing
- web
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 25
- 238000003825 pressing Methods 0.000 claims abstract description 175
- 230000007246 mechanism Effects 0.000 claims abstract description 90
- 238000003466 welding Methods 0.000 claims description 48
- 238000005096 rolling process Methods 0.000 claims description 32
- 238000000034 method Methods 0.000 claims description 12
- 238000005452 bending Methods 0.000 claims description 4
- 238000000465 moulding Methods 0.000 claims description 3
- 230000000903 blocking effect Effects 0.000 claims description 2
- 230000033001 locomotion Effects 0.000 description 6
- 230000008569 process Effects 0.000 description 6
- 230000008901 benefit Effects 0.000 description 4
- 239000004484 Briquette Substances 0.000 description 3
- 244000261422 Lysimachia clethroides Species 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000007599 discharging Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 241000192308 Agrostis hyemalis Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000033764 rhythmic process Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000007723 transport mechanism Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
- B23K37/0443—Jigs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Automatic Assembly (AREA)
Abstract
Description
Claims (21)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810558862.4A CN110549083A (zh) | 2018-06-01 | 2018-06-01 | 工字梁拼装设备及工字梁制造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810558862.4A CN110549083A (zh) | 2018-06-01 | 2018-06-01 | 工字梁拼装设备及工字梁制造方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110549083A true CN110549083A (zh) | 2019-12-10 |
Family
ID=68734888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810558862.4A Pending CN110549083A (zh) | 2018-06-01 | 2018-06-01 | 工字梁拼装设备及工字梁制造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110549083A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111229882A (zh) * | 2020-02-21 | 2020-06-05 | 辽宁忠旺机械设备制造有限公司 | 大鹅颈集装箱运输半挂车纵梁压弯组对工装设备及方法 |
CN111408823A (zh) * | 2020-05-07 | 2020-07-14 | 福建省闽铝轻量化汽车制造有限公司 | 一种用于铝合金半挂车主纵梁的自清洁焊接装置及方法 |
CN111644797A (zh) * | 2020-07-22 | 2020-09-11 | 王蒙蒙 | 一种钢结构自动化拼装焊接夹具 |
CN112008310A (zh) * | 2020-06-30 | 2020-12-01 | 湖北锦翔能源工程有限公司 | 一种大型储罐拱顶梁一体化组焊系统及方法 |
CN114012294A (zh) * | 2021-11-23 | 2022-02-08 | 福建省闽铝轻量化汽车制造有限公司 | 一种铝合金半挂车主纵梁下压式焊接装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1229000A1 (ru) * | 1981-03-27 | 1986-05-07 | Предприятие П/Я А-1897 | Автоматизированна поточна лини дл сборки и сварки колес из двух заготовок |
CN101745764A (zh) * | 2008-12-01 | 2010-06-23 | 中国国际海运集装箱(集团)股份有限公司 | 变截面工字梁焊接成型设备 |
CN102848108A (zh) * | 2012-09-27 | 2013-01-02 | 湖北弘毅钢结构工程有限公司 | 波纹腹板h型钢在线自动组立设备 |
CN208450977U (zh) * | 2018-06-01 | 2019-02-01 | 扬州中集通华专用车有限公司 | 工字梁拼装设备 |
-
2018
- 2018-06-01 CN CN201810558862.4A patent/CN110549083A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1229000A1 (ru) * | 1981-03-27 | 1986-05-07 | Предприятие П/Я А-1897 | Автоматизированна поточна лини дл сборки и сварки колес из двух заготовок |
CN101745764A (zh) * | 2008-12-01 | 2010-06-23 | 中国国际海运集装箱(集团)股份有限公司 | 变截面工字梁焊接成型设备 |
CN102848108A (zh) * | 2012-09-27 | 2013-01-02 | 湖北弘毅钢结构工程有限公司 | 波纹腹板h型钢在线自动组立设备 |
CN208450977U (zh) * | 2018-06-01 | 2019-02-01 | 扬州中集通华专用车有限公司 | 工字梁拼装设备 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111229882A (zh) * | 2020-02-21 | 2020-06-05 | 辽宁忠旺机械设备制造有限公司 | 大鹅颈集装箱运输半挂车纵梁压弯组对工装设备及方法 |
CN111408823A (zh) * | 2020-05-07 | 2020-07-14 | 福建省闽铝轻量化汽车制造有限公司 | 一种用于铝合金半挂车主纵梁的自清洁焊接装置及方法 |
CN112008310A (zh) * | 2020-06-30 | 2020-12-01 | 湖北锦翔能源工程有限公司 | 一种大型储罐拱顶梁一体化组焊系统及方法 |
CN111644797A (zh) * | 2020-07-22 | 2020-09-11 | 王蒙蒙 | 一种钢结构自动化拼装焊接夹具 |
CN111644797B (zh) * | 2020-07-22 | 2021-12-14 | 徐州恒智钢构制造有限公司 | 一种钢结构自动化拼装焊接夹具 |
CN114012294A (zh) * | 2021-11-23 | 2022-02-08 | 福建省闽铝轻量化汽车制造有限公司 | 一种铝合金半挂车主纵梁下压式焊接装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110549083A (zh) | 工字梁拼装设备及工字梁制造方法 | |
CN111604622A (zh) | 焊接h型钢卧式数字化组焊技术的应用方法 | |
CN110091175B (zh) | 一种方桩端板折弯焊接一体成型装置 | |
CN107262572B (zh) | 一种数控工字钢冷弯机 | |
CN107498163A (zh) | 一种钢板墙构件的生产工艺和生产设备 | |
CN111702487A (zh) | 自动立柱骨架生产设备 | |
CN208450977U (zh) | 工字梁拼装设备 | |
CN114043147A (zh) | 一种大型侧梁组成组装胎 | |
CN211638827U (zh) | 一种角钢焊接定位装置及使用该定位装置的焊接设备 | |
CN115319325B (zh) | 一种钢箱底板生产线 | |
CN115365631A (zh) | 一种h型钢自动点固系统 | |
CN216541578U (zh) | 一种大型侧梁组成组装胎 | |
CN214489421U (zh) | 一种三维可调装置 | |
CN113601082B (zh) | 一种多功能钢结构组焊流水线平台 | |
CN111761122B (zh) | 汽车高强度大梁用波腹板h型钢自动焊接生产线 | |
CN212286503U (zh) | 一种大型储罐拱顶梁焊接组对平台 | |
CN214109343U (zh) | 一种钢筋桁架定位装置 | |
CN211919947U (zh) | 铅蓄电池专用动力轨道 | |
CN108326398B (zh) | 一种用于薄板拼接埋弧焊机的压力架 | |
CN209773832U (zh) | 一种大型箱梁盖板柔性组对装置 | |
CN218517900U (zh) | 一种h型钢自动点固系统 | |
CN112008309A (zh) | 一种大型储罐拱顶梁焊接组对平台 | |
CN111055065A (zh) | 角钢焊接定位装置及使用该定位装置的焊接设备 | |
CN221209440U (zh) | 直缝整形机 | |
CN113618291B (zh) | 一种箱式变电站电器支撑框架的自动化焊接装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
CB02 | Change of applicant information |
Address after: 225009 No. 139 middle Yangzi Road, Jiangsu, Yangzhou Applicant after: YANGZHOU CIMC TONGHUA SPECIAL VEHICLES Co.,Ltd. Applicant after: Zhongji Vehicle (Group) Co.,Ltd. Applicant after: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. Address before: 225009 No. 139 middle Yangzi Road, Jiangsu, Yangzhou Applicant before: YANGZHOU CIMC TONGHUA SPECIAL VEHICLES Co.,Ltd. Applicant before: CIMC vehicle (Group) Co.,Ltd. Applicant before: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201218 Address after: 225009 No. 139 middle Yangzi Road, Jiangsu, Yangzhou Applicant after: YANGZHOU CIMC TONGHUA SPECIAL VEHICLES Co.,Ltd. Applicant after: Zhongji Vehicle (Group) Co.,Ltd. Address before: 225009 No. 139 middle Yangzi Road, Jiangsu, Yangzhou Applicant before: YANGZHOU CIMC TONGHUA SPECIAL VEHICLES Co.,Ltd. Applicant before: Zhongji Vehicle (Group) Co.,Ltd. Applicant before: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. |
|
TA01 | Transfer of patent application right | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |