CN110482397A - 木门吊装工装 - Google Patents
木门吊装工装 Download PDFInfo
- Publication number
- CN110482397A CN110482397A CN201910804984.1A CN201910804984A CN110482397A CN 110482397 A CN110482397 A CN 110482397A CN 201910804984 A CN201910804984 A CN 201910804984A CN 110482397 A CN110482397 A CN 110482397A
- Authority
- CN
- China
- Prior art keywords
- timber
- strip
- mounting rack
- hook
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
- B66C1/34—Crane hooks
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
本发明属于工装领域,具体涉及一种木门吊装工装,包括安装架和挂钩,还包括拉环、固定钩、螺母和连接绳,所述安装架上多个条形孔,所述固定钩设于条形孔内,所述固定钩的上部设有与螺纹匹配的螺纹,且固定钩通过螺母固定在安装架上,所述拉环固定在安装架上,所述连接绳连接在拉环之间,所述挂钩固定在连接绳上。条形孔设置有多个,可以进行多个木门的同步吊装,挂钩是通过螺母固定在安装架上的,可随时调整位置,以适用于不同尺寸的木门。与传统的木门吊装工装相比,本方案操作简单,可实现多个木门的同时吊装。
Description
技术领域
本发明属于工装领域,具体涉及一种木门吊装工装。
背景技术
木门是木材加工行业的重要终端产品。随着我国房地产业的高速发展和城镇化步伐的加快,对木门的需求量也越来越大,而消费者对木门的性能要求也越来越高。
木门在半成品完成后,或者加工好后,都需要对其进行移动。而移动的过程中,则必须用到吊装设备。现有的木门吊装工装通常包括吊装架和捆绑绳,吊装架上设有挂钩,在吊装时,将木门捆绑在吊装架上,然后即可对其实现吊装。
然而,现有的木门吊装工装,通过捆绑的方式操作起来比较麻烦,而且每次只能捆绑少量的木门,不太适用于多个木门的吊装。因此,需要一种操作简单,且可同时进行多个木门吊运的工装。
发明内容
本发明的目的在于提供一种木门吊装工装,以实现多个木门的同时吊装。
为了达到上述目的,本方案提供一种木门吊装工装,包括安装架和挂钩,还包括拉环、固定钩、螺母和连接绳,所述安装架上多个条形孔,所述固定钩设于条形孔内,所述固定钩的上部设有与螺纹匹配的螺纹,且固定钩通过螺母固定在安装架上,所述拉环固定在安装架上,所述连接绳连接在拉环之间,所述挂钩固定在连接绳上。
本方案的原理在于:
当需要移动木门时,根据木门的尺寸调整好固定钩在条形孔上的位置,锁紧螺母。然后将固定钩挂在木门上,即可将木门固定。之后,通过挂钩就可以将木门吊起,从而移动到其他地方进行下一步操作。
本方案的有益效果在于:条形孔设置有多个,可以进行多个木门的同步吊装,挂钩是通过螺母固定在安装架上的,可随时调整位置,以适用于不同尺寸的木门。与传统的木门吊装工装相比,本方案操作简单,可实现多个木门的同时吊装。
进一步,所述拉环的数量为四个,分别位于安装架的四个角落,所述连接绳的数量为两根,且连接绳连接在对角的拉环上。这样设置,安装架的四个角都受力,更加稳定。
进一步,每个条形孔内设有两个固定钩,且固定钩相对设置。两个固定钩分别挂在木门的两个挂孔上,更加稳定。
进一步,还包括挡板组、拉条、第一防撞条和第二防撞条,所述挡板组固定在安装架的下方,每组挡板组包括两个形状相同的挡板,挡板上设有槽口,所述拉条上设有限位环;所述安装架上设有线孔,所述拉条的一端穿过线孔固定在连接绳上,另一端位于挡板之间;所述第一防撞条和第二防撞条的一端均铰接在挡板上,中部均穿过限位环,另一端均与槽口的位置相匹配,所述第一防撞条与第二防撞条以拉条对称设置。
在实际吊装过程中,由于只是通过固定钩对木门的一端进行固定,因此木门会有一定的晃动。而通过本方案,当拉动挂钩时,连接绳也会被向上拉动进而带动拉条向上移动;此时,拉条拉动第一防撞条和第二防撞条,使其伸出挡板,进而抵紧木门,有效的降低了其晃动的程度。
进一步,所述第一防撞条和第二防撞条均为橡胶条。橡胶条具有良好的抗压性和缓冲性,防撞和固定效果好。
进一步,所述连接绳为钢绳。钢绳的强度高,使用寿命长。
进一步,还包括配重块,所述配重块固定在拉条的自由端。配重块的设置,可在没吊装木门的时候拉紧拉条,进而使得第一防撞条和第二防撞条均处于最低的位置,避免第一防撞条和第二防撞条在木门还没固定在固定钩前时阻挡木门。
附图说明
图1为本发明实施例木门吊装工装的结构示意图。
图2为本发明实施例木门吊装工装的结构示意图。
图3为本发明实施例木门吊装工装的结构示意图。
图4为本发明实施例木门吊装工装的结构示意图。
图5为本发明实施例木门吊装工装的原理简化示意图。
图6为本发明实施例木门吊装工装的原理简化示意图。
具体实施方式
下面通过具体实施方式进一步详细说明:
说明书附图中的附图标记包括:安装架10、线孔11、拉环21、连接绳22、挂钩23、固定钩31、螺母32、挡板41、第一防撞条42、第二防撞条43、拉条44。
如图1、图2、图3和图4所示,本实施例中的木门吊装工装,主体部分为安装架10,安装架10呈矩形,且安装架10上开有七个条形孔。每个条形孔上对应有一组固定钩31,固定钩31分别位于条形孔的两端,并两者相对设置。当然,固定钩31是位置是可以调整的:固定钩31的上部为螺杆,螺杆的直径小于条形孔的宽度,配合着螺母32,即可实现根据不同尺寸的目标而调整固定钩31的位置。
安装架10的顶部四个角落分别设有拉环21。对角线的两个拉环21各连接有一个连接绳22,连接绳22采用高强度的钢绳,而连接绳22之间则焊接上一个挂钩23,用以吊起整个安装架10。
安装架10上还开有六个线孔11,拉条44的上端穿过线孔11固定在连接绳22上,中部固定设置有一个限位环,下端则设置有一个配重块(未画出)。对应的,安装架10的下方设有六组挡板41组。每组挡板41组包括两个形状相同的挡板41,具体形状呈H形。
第一防撞条42和第二防撞条43则相互对称的设置。具体以第一防撞条42为例,如图4所示,第一防撞条42的左端铰接在挡板41上,中部穿过限位环,右端则位于另一边的挡板41处(最好不要超出挡板41外,以免会阻挡木门挂上固定钩31)。第二防撞条43则是一样的设置。其中,第一防撞条42和第二防撞条43均采用橡胶条,橡胶条具有良好的抗压性和缓冲性,防撞和固定效果好。
具体吊装时,首先根据木门的尺寸调整好固定钩31在条形孔上的位置,锁紧螺母32。然后将固定钩31挂在木门上,即可将木门固定。当拉动挂钩23时,连接绳22也会被向上拉动进而带动拉条44向上移动;此时,拉条44拉动第一防撞条42和第二防撞条43,使其伸出挡板41,进而抵紧木门,有效的降低了其晃动的程度。而在取下木门时,在配重块的作用下,进而使得第一防撞条42和第二防撞条43均处于最低的位置,避免第一防撞条42和第二防撞条43在木门还没固定在固定钩31前时阻挡木门。
与传统的木门吊装工装相比,本方案操作简单,可实现多个木门的同时吊装。
需要提前说明的是,在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定” 等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。
以上所述的仅是本发明的实施例,方案中公知的具体结构及特性等常识在此未作过多描述。应当指出,对于本领域的技术人员来说,在不脱离本发明结构的前提下,还可以作出若干变形和改进,这些也应该视为本发明的保护范围,这些都不会影响本发明实施的效果和专利的实用性。本申请要求的保护范围应当以其权利要求的内容为准,说明书中的具体实施方式等记载可以用于解释权利要求的内容。
Claims (7)
1.木门吊装工装,包括安装架和挂钩,其特征在于:还包括拉环、固定钩、螺母和连接绳,所述安装架上多个条形孔,所述固定钩设于条形孔内,所述固定钩的上部设有与螺纹匹配的螺纹,且固定钩通过螺母固定在安装架上,所述拉环固定在安装架上,所述连接绳连接在拉环之间,所述挂钩固定在连接绳上,还包括挡板组、拉条、第一防撞条和第二防撞条,所述挡板组固定在安装架的下方,每组挡板组包括两个形状相同的挡板,挡板上设有槽口,所述拉条上设有限位环;所述安装架上设有线孔,所述拉条的一端穿过线孔固定在连接绳上,另一端位于挡板之间;所述第一防撞条和第二防撞条的一端均铰接在挡板上,中部均穿过限位环,另一端均与槽口的位置相匹配,所述第一防撞条与第二防撞条以拉条对称设置。
2.根据权利要求1所述的木门吊装工装,其特征在于:所述拉环的数量为四个,分别位于安装架的四个角落,所述连接绳的数量为两根,且连接绳连接在对角的拉环上。
3.根据权利要求2所述的木门吊装工装,其特征在于:每个条形孔内设有两个固定钩,且固定钩相对设置。
4.根据权利要求1所述的木门吊装工装,其特征在于:所述第一防撞条和第二防撞条均为橡胶条。
5.根据权利要求1所述的木门吊装工装,其特征在于:所述连接绳为钢绳。
6.根据权利要求1所述的木门吊装工装,其特征在于:还包括配重块,所述配重块固定在拉条的自由端。
7.根据权利要求1所述的木门吊装工装,其特征在于:所述挡板呈H形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910804984.1A CN110482397A (zh) | 2019-08-29 | 2019-08-29 | 木门吊装工装 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910804984.1A CN110482397A (zh) | 2019-08-29 | 2019-08-29 | 木门吊装工装 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110482397A true CN110482397A (zh) | 2019-11-22 |
Family
ID=68553697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910804984.1A Pending CN110482397A (zh) | 2019-08-29 | 2019-08-29 | 木门吊装工装 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110482397A (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4320344C1 (de) * | 1993-06-18 | 1994-08-18 | Bundesrep Deutschland | Verfahren zum Entfalten und Zusammenfalten eines dem Bau einer Festbrücke dienenden Brückenabschnittes und hierzu ausgebildetes Lastgeschirr |
CN102642767A (zh) * | 2012-05-03 | 2012-08-22 | 湖南华信有色金属有限公司 | 一种用于电解铅阳极片吊运组装的专用装置 |
CN203513080U (zh) * | 2013-10-15 | 2014-04-02 | 内蒙古一机集团林峰特种铸造有限公司 | 一种平衡吊具 |
CN204823678U (zh) * | 2015-08-07 | 2015-12-02 | 河南省矿山起重机有限公司 | 一种起重机端梁镗孔用吊具 |
CN205802763U (zh) * | 2016-07-18 | 2016-12-14 | 中国建筑第五工程局有限公司深圳分公司 | 一种活动吊装水平板状物的桁架 |
JP6215422B1 (ja) * | 2016-09-09 | 2017-10-18 | 株式会社セキヤ | 連節ブロック用吊り具 |
CN207658933U (zh) * | 2017-10-25 | 2018-07-27 | 合肥常青机械股份有限公司 | 一种新型摆臂电泳吊具 |
CN208585947U (zh) * | 2018-08-13 | 2019-03-08 | 北京北排膜科技有限公司 | 一种具有自动定位及自锁功能的吊具 |
CN209009979U (zh) * | 2018-10-19 | 2019-06-21 | 苏州利来钢铁有限公司 | 一种钢卷吊装机构 |
-
2019
- 2019-08-29 CN CN201910804984.1A patent/CN110482397A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4320344C1 (de) * | 1993-06-18 | 1994-08-18 | Bundesrep Deutschland | Verfahren zum Entfalten und Zusammenfalten eines dem Bau einer Festbrücke dienenden Brückenabschnittes und hierzu ausgebildetes Lastgeschirr |
CN102642767A (zh) * | 2012-05-03 | 2012-08-22 | 湖南华信有色金属有限公司 | 一种用于电解铅阳极片吊运组装的专用装置 |
CN203513080U (zh) * | 2013-10-15 | 2014-04-02 | 内蒙古一机集团林峰特种铸造有限公司 | 一种平衡吊具 |
CN204823678U (zh) * | 2015-08-07 | 2015-12-02 | 河南省矿山起重机有限公司 | 一种起重机端梁镗孔用吊具 |
CN205802763U (zh) * | 2016-07-18 | 2016-12-14 | 中国建筑第五工程局有限公司深圳分公司 | 一种活动吊装水平板状物的桁架 |
JP6215422B1 (ja) * | 2016-09-09 | 2017-10-18 | 株式会社セキヤ | 連節ブロック用吊り具 |
CN207658933U (zh) * | 2017-10-25 | 2018-07-27 | 合肥常青机械股份有限公司 | 一种新型摆臂电泳吊具 |
CN208585947U (zh) * | 2018-08-13 | 2019-03-08 | 北京北排膜科技有限公司 | 一种具有自动定位及自锁功能的吊具 |
CN209009979U (zh) * | 2018-10-19 | 2019-06-21 | 苏州利来钢铁有限公司 | 一种钢卷吊装机构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201961961U (zh) | 高压柱塞泵曲轴吊装工具 | |
CN208135749U (zh) | 桥梁施工龙门吊 | |
CN110482397A (zh) | 木门吊装工装 | |
CN207581223U (zh) | 吊运装置 | |
CN206680061U (zh) | 一种重力式板材吊运架 | |
CN107069533B (zh) | 一种超特高压架空输电线路直线塔地线提升工具 | |
CN107711605A (zh) | 一种用于蜜蜂养殖的蜂箱托架 | |
CN207658957U (zh) | 一种吊车用的吊钩锁止装置 | |
CN201358764Y (zh) | 一种立式抽油机的配重结构 | |
CN108406973A (zh) | 一种木材加工的夹持机构 | |
CN2782513Y (zh) | 自行车挂架 | |
CN211812888U (zh) | 用于限速器现场校验的杠杆式松绳装置及提绳结构 | |
CN107090980B (zh) | 一种建筑泥浆吊接装置 | |
CN208166512U (zh) | 一种用于大直径超长钢筋笼安装的下放架 | |
CN202200244U (zh) | 波纹管连接装置 | |
CN207574424U (zh) | 金华火腿的晾晒装置 | |
CN207713306U (zh) | 一种建筑吊机用防护装置 | |
CN205708886U (zh) | 自动扯砖展开架 | |
CN220578703U (zh) | 一种顶部吊装器 | |
CN211504708U (zh) | 一种便携式可拆卸样方框 | |
CN204057649U (zh) | 建筑用吊装筐 | |
CN202838891U (zh) | 一种广告横幅悬挂装置 | |
CN210187486U (zh) | 一种用于型材的挂具 | |
CN208963332U (zh) | 一种固定翼无人机拦截回收系统 | |
CN221070642U (zh) | 一种钢筋竖直吊装装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191122 |