CN110397287A - A kind of fast hoisting technique of module-type steel structure component - Google Patents

A kind of fast hoisting technique of module-type steel structure component Download PDF

Info

Publication number
CN110397287A
CN110397287A CN201910424052.4A CN201910424052A CN110397287A CN 110397287 A CN110397287 A CN 110397287A CN 201910424052 A CN201910424052 A CN 201910424052A CN 110397287 A CN110397287 A CN 110397287A
Authority
CN
China
Prior art keywords
steel structure
structure component
hanging device
mast
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910424052.4A
Other languages
Chinese (zh)
Inventor
曹雁冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Original Assignee
ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd filed Critical ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Priority to CN201910424052.4A priority Critical patent/CN110397287A/en
Publication of CN110397287A publication Critical patent/CN110397287A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Abstract

The present invention relates to steel structure lifting component technical fields, and disclose a kind of fast hoisting technique of module-type steel structure component, include the following steps, step 1, in construction site, addressing constructs hanging device pedestal, and hanging device is installed, by preset steel structure component conveying to construction site and according to practical lifting requirements, mast-up is installed on steel structure component, step 2, after mast-up installation, overturning positioning is carried out to steel structure component using lifting appliance, the upper mast-up of hanging device and steel structure component is attached after positioning, step 3, steel structure component certain distance is sling in advance, ancillary equipment is installed on ground, and ancillary equipment and mast-up are attached, lifting appliance carries out overturning positioning to next steel structure component at this time, ancillary equipment is used according to demand.The fast hoisting technique of the module-type steel structure component, the lifting steel structure component that can quickly consolidate can also can adjust the angle of steel structure component in lifting.

Description

A kind of fast hoisting technique of module-type steel structure component
Technical field
The present invention relates to steel structure lifting component technical field, specially a kind of fast hoisting work of module-type steel structure component Skill.
Background technique
The structure that steel construction is made of steel material is one of main building construction types.Structure is mainly by fashioned iron With the components composition such as joist steel, steel column, steel truss made of steel plate etc., and using silanization, pure manganese phosphatization, washing drying, zinc-plated Equal derusting rust-proofings technique.Weld seam, bolt or rivet interlacement are generallyd use between each component or component.Because its self weight is lighter, and apply Work is easy, is widely used in the fields such as large-sized workshop, venue, Super High.The characteristics of steel is that intensity is high, rigid from heavy and light, entirety Spend, deformability it is strong, therefore for building large span and the building of superelevation, superduty is particularly suitable, material homogeneity and each It is good to the same sex, belong to perfect elastic body, is best suitable for the basic assumption of common engineering mechanics, material plasticity, good toughness there can be larger change Shape can bear dynamic load well, and construction period is short, and industrialization degree is high, can carry out the high specialization of mechanization degree Production.
Currently, steel structure component in lifting, is generally lifted using tower crane or crane, but in lifting, steel structure Component stable can not be bonded with hanging device, and be lifted to needing worker to transpose when installing station, and work is strong Degree is big, and speed is slow, and the shackle structure in lifting on steel structure component is fixed, and is not easy to remove after installing.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of fast hoisting technique of module-type steel structure component, have and hang The advantages that filling highly-safe, assembling speed block, being conveniently adjusted setting angle, solve steel structure component stable can not set with lifting It is standby to be bonded, and lift and need worker to transpose when station is extremely installed, great work intensity, and speed is slow, and Shackle structure when lifting on steel structure component is fixed, and is not easy the problem of removing after installing.
(2) technical solution
In order to achieve the above object, the invention provides the following technical scheme: a kind of fast hoisting work of module-type steel structure component Skill, comprising the following steps:
Step 1: in construction site, addressing constructs hanging device pedestal, and installs hanging device, extremely by preset steel structure component conveying Construction site and according to practical lifting requirements, installs mast-up on steel structure component;
Step 2: mast-up installation after, overturning positioning is carried out to steel structure component using lifting appliance, after positioning by hanging device with The upper mast-up of steel structure component is attached;
Step 3: slinging steel structure component certain distance in advance, installs ancillary equipment on ground, and by ancillary equipment and mast-up into Row connection, lifting appliance carries out overturning positioning to next steel structure component at this time;
Step 4: while starting hanging device and ancillary equipment, and flat in hanging device operating platform and auxiliary device operational Real-time communication platform is established between platform;
Step 5: it when reaching predetermined installation station, completes to hang with installation station manipulation platform and hanging device operating platform Adjustment position releases ancillary equipment after accurate positioning;
Step 6: the mast-up on disassembly steel structure component is lifted next steel structure component, is set according to demand using auxiliary It is standby.
Preferably, the hanging device pedestal is reinforced concrete structure, and is in same with construction site building Horizontal plane reserves connector, continuing use to entire project installation after hanging device installation terminates, engineering when building pedestal After remove hanging device, the built-in fitting of installation position is handled, without removing lifting pedestal, when building site hardened ground is straight Capping is connect, steel structure component need to assemble drawing pre-assembly before installing mast-up according to construction, and the mast-up is stiff rod steel The connection frame of structure, connection frame is telescopic, and is equipped with manual hydraulic device and is locked steel structure component, and mast-up is set with lifting Lifting is realized using the mode of steel strand wires cooperation pulley between standby, and uses the suspension hook with self-locking device.
Preferably, the lifting appliance fork truck good using mobility, fork truck arm assemble preventing rubber equipment, avoid hurting And the paint layer on steel structure component, the main element of steel structure component is lifted using fork truck first, by mounting plate pre-assembly attachment, Supporting element and connecting hinge part component bind movable part using bandage, adjust mast-up, connect with the main element of steel structure component Mast-up connect with hanging device after fixed and fixes limit by installation.
Preferably, the ancillary equipment is ground elevator machine equipment, using two elevator machine equipments, and is established with a roll of Machine control platform is raised, the steel strand wires of hoist engine and suspension hook are mounted on mast-up, hoist engine pulling steel structure component is in after installation It is skewed, and it is mounted remotely from according to symmetrical position the position of hanging device, set the lifting point of hanging device and auxiliary Standby auxiliary magnet acts on steel structure component at three different directions, is cooperated using communication apparatus and completes to hang jointly to rise Journey.
Preferably, when reaching predetermined installation station, hanging device continues to keep the position of steel structure component motionless, lifting positioning In the process, accuse that platform instructs the hanging device platform and ancillary equipment platform on ground by wireless device in the air, wherein auxiliary Equipment report control platform realizes the angle rotation of adjustment steel structure component, hanging device platform by the folding and unfolding of two hoist engines of control By adjusting the installation site of hoisting height adjustment steel structure component.
Preferably, it when ancillary equipment is installed, is installed according to installation site using detachable lifting lug, lifting lug is adopted when installing It is fixed on steel structure component with the mode and mating protection device that spiral is fixed, disassembly in time after being installed.
Preferably, after the completion of steel structure lifting component, by remaining attachment consolidated shipment, when handling, is hung using steel wire net-belt carrying Fortune.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of fast hoisting technique of module-type steel structure component, having following has Beneficial effect:
1, the fast hoisting technique of the module-type steel structure component, passes through the pedestal being arranged on the face of construction site, hanging device Continuing use to entire project installation after installation terminates, and hanging device is removed after engineering, carries out to the built-in fitting of installation position Processing, without removing lifting pedestal, when building site hardened ground, is directly covered, and steel structure component need to be according to construction before installing mast-up Drawing pre-assembly is assembled, the mast-up is the connection frame of stiff rod steel structure, and connection frame is telescopic, and is equipped with manual liquid Pressure device is locked steel structure component, realizes lifting using the mode of steel strand wires cooperation pulley between mast-up and hanging device, And the suspension hook with self-locking device is used, Fast Installation hanging device when being easy to lift avoids junction when handling from loosening, Increase safety when lifting.
2, the fast hoisting technique of the module-type steel structure component uses two by the ground elevator machine equipment of setting Elevator machine equipment, and same hoist engine control platform is established, the steel strand wires of hoist engine and suspension hook are mounted on mast-up, are installed Hoist engine pulls steel structure component oblique afterwards, and the position of hanging device is mounted remotely from according to symmetrical position, makes to hang The auxiliary magnet for installing standby lifting point and ancillary equipment acts on steel structure component at three different directions, uses communication apparatus A liter process is hung in the common completion that cooperates, and is effectively reduced the shaking of steel structure component during handling, is avoided shaking amplitude mistake The danger fallen greatly.
3, the fast hoisting technique of the module-type steel structure component, is accused the charge of platform in the air by on-site assembly, hung Installing is standby to be continued to keep the position of steel structure component motionless, is lifted in position fixing process, aerial to accuse that platform is instructed by wireless device The hanging device platform and ancillary equipment platform on ground, wherein the receipts that ancillary equipment report control platform passes through two hoist engines of control It puts, realizes the angle rotation of adjustment steel structure component, hanging device platform adjusts the installation of steel structure component by adjusting hoisting height Position is conducive to the installation site for quickly adjusting steel structure component, improves the installation speed of steel structure framework.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention In embodiment, this field commonly in the air accuse platform it is obtained every other without making creative work Embodiment shall fall within the protection scope of the present invention.
A kind of fast hoisting technique of module-type steel structure component, comprising the following steps:
Step 1: in construction site, addressing constructs hanging device pedestal, and installs hanging device, extremely by preset steel structure component conveying Construction site and according to practical lifting requirements, installs mast-up on steel structure component;
Step 2: mast-up installation after, overturning positioning is carried out to steel structure component using lifting appliance, after positioning by hanging device with The upper mast-up of steel structure component is attached;
Step 3: slinging steel structure component certain distance in advance, installs ancillary equipment on ground, and by ancillary equipment and mast-up into Row connection, lifting appliance carries out overturning positioning to next steel structure component at this time;
Step 4: while starting hanging device and ancillary equipment, and flat in hanging device operating platform and auxiliary device operational Real-time communication platform is established between platform;
Step 5: it when reaching predetermined installation station, completes to hang with installation station manipulation platform and hanging device operating platform Adjustment position releases ancillary equipment after accurate positioning;
Step 6: the mast-up on disassembly steel structure component is lifted next steel structure component, is set according to demand using auxiliary It is standby.
Hanging device pedestal is reinforced concrete structure, and is in peer-level face with construction site building, is being built When pedestal, connector is reserved, continuing use to entire project installation after hanging device installation terminates, and lifting is removed after engineering Equipment handles the built-in fitting of installation position, and without removing lifting pedestal, when building site hardened ground is directly covered, steel structure structure Part need to assemble drawing pre-assembly before installing mast-up according to construction, and mast-up is the connection frame of stiff rod steel structure, and connection frame is It is telescopic, and be equipped with manual hydraulic device and be locked steel structure component, matched between mast-up and hanging device using steel strand wires The mode for closing pulley realizes lifting, and uses the suspension hook with self-locking device, the lifting appliance fork truck good using mobility, fork Vehicle arm assembles preventing rubber equipment, avoids injuring the paint layer on steel structure component, lifts the main body of steel structure component using fork truck first Component binds movable part using bandage, adjustment is hung by mounting plate pre-assembly attachment, supporting element and connecting hinge part component It shelves, installation is connect with the main element of steel structure component, mast-up is connect to hanging device and fixed limit after fixed, is assisted Equipment is ground elevator machine equipment, using two elevator machine equipments, and same hoist engine control platform is established, by the steel of hoist engine Twisted wire and suspension hook are mounted on mast-up, and hoist engine pulls steel structure component oblique after installation, and according to symmetrical position It is mounted remotely from the position of hanging device, the auxiliary magnet of the lifting point and ancillary equipment that make hanging device is at three different directions It acts on steel structure component, is cooperated using communication apparatus and complete to hang a liter process jointly, when reaching predetermined installation station, lift Equipment continues to keep the position of steel structure component motionless, lifts in position fixing process, aerial to accuse that platform instructs ground by wireless device The hanging device platform and ancillary equipment platform in face, wherein ancillary equipment report control platform passes through the folding and unfolding of two hoist engines of control, Realize the angle rotation of adjustment steel structure component, hanging device platform adjusts the installation position of steel structure component by adjusting hoisting height It sets, when ancillary equipment is installed, is installed according to installation site using detachable lifting lug, fixed when lifting lug is installed using spiral Simultaneously mating protection device is fixed on steel structure component mode, disassembly in time after being installed, and after the completion of steel structure lifting component, will be remained Remaining attachment consolidated shipment carries handling using steel wire net-belt when handling.
In conclusion the fast hoisting technique of the module-type steel structure component, can continue use after hanging device installation Terminate to entire project installation, hanging device is removed after engineering, the built-in fitting of installation position is handled, is hung without removing Pedestal is filled, when building site hardened ground directly covers, and steel structure component need to assemble preparatory group of drawing according to construction before install mast-up Dress, the mast-up are the connection frame of stiff rod steel structure, and connection frame is telescopic, and is equipped with manual hydraulic device and is locked Steel structure component realizes lifting using the mode of steel strand wires cooperation pulley between mast-up and hanging device, and using with self-locking The suspension hook of device, Fast Installation hanging device when being easy to lift avoid junction when handling from loosening, when increasing lifting Safety using two elevator machine equipments, and establishes same hoist engine control platform, and the steel strand wires of hoist engine and suspension hook are installed On mast-up, hoist engine pulls steel structure component oblique after installation, and is mounted remotely from lifting according to symmetrical position The auxiliary magnet of the position of equipment, the lifting point and ancillary equipment that make hanging device acts on steel structure component at three different directions On, it is cooperated using communication apparatus and completes to hang a liter process jointly, effectively reduce the shaking of steel structure component during handling, The excessive danger fallen of shaking amplitude is avoided, hanging device continues to keep the position of steel structure component motionless, and lifting positioned Cheng Zhong, the aerial hanging device platform and ancillary equipment platform accused platform and instruct ground by wireless device, wherein auxiliary is set Standby report control platform realizes the angle rotation of adjustment steel structure component by the folding and unfolding of two hoist engines of control, and hanging device platform is logical The installation site for crossing adjustment hoisting height adjustment steel structure component is conducive to the installation site for quickly adjusting steel structure component, improves The installation speed of steel structure framework.
It should be noted that term " includes " or any other variant thereof is intended to cover non-exclusive inclusion, thus So that the process, method, article or equipment for including a series of elements not only includes those elements, but also including not clear The other element listed, or further include for elements inherent to such a process, method, article, or device.Do not having more In the case where more limitations, the element that is limited by sentence "including a ...", it is not excluded that including process, the side of the element There is also other identical elements in method, article or equipment.
Although an embodiment of the present invention has been shown and described, for the common aerial charge platform of this field, It is understood that a variety of to the progress of these embodiments can change without departing from the principles and spirit of the present invention, modify, Replacement and variant, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of fast hoisting technique of module-type steel structure component, which comprises the following steps:
Step 1: in construction site, addressing constructs hanging device pedestal, and installs hanging device, extremely by preset steel structure component conveying Construction site and according to practical lifting requirements, installs mast-up on steel structure component;
Step 2: mast-up installation after, overturning positioning is carried out to steel structure component using lifting appliance, after positioning by hanging device with The upper mast-up of steel structure component is attached;
Step 3: slinging steel structure component certain distance in advance, installs ancillary equipment on ground, and by ancillary equipment and mast-up into Row connection, lifting appliance carries out overturning positioning to next steel structure component at this time;
Step 4: while starting hanging device and ancillary equipment, and flat in hanging device operating platform and auxiliary device operational Real-time communication platform is established between platform;
Step 5: it when reaching predetermined installation station, completes to hang with installation station manipulation platform and hanging device operating platform Adjustment position releases ancillary equipment after accurate positioning;
Step 6: the mast-up on disassembly steel structure component is lifted next steel structure component, is set according to demand using auxiliary It is standby.
2. a kind of fast hoisting technique of module-type steel structure component described in step 1, feature exist according to claim 1 In: the hanging device pedestal is reinforced concrete structure, and is in peer-level face with construction site building, is being built When pedestal, connector is reserved, continuing use to entire project installation after hanging device installation terminates, and lifting is removed after engineering Equipment handles the built-in fitting of installation position, and without removing lifting pedestal, when building site hardened ground is directly covered, steel structure structure Part need to assemble drawing pre-assembly before installing mast-up according to construction, and the mast-up is the connection frame of stiff rod steel structure, even It is telescopic for connecing frame, and is equipped with manual hydraulic device and is locked steel structure component, and steel is used between mast-up and hanging device The mode of twisted wire cooperation pulley realizes lifting, and uses the suspension hook with self-locking device.
3. a kind of fast hoisting technique of module-type steel structure component described in step 2, feature exist according to claim 1 In: the lifting appliance fork truck good using mobility, fork truck arm assemble preventing rubber equipment, avoid injuring on steel structure component Paint layer, the main element of steel structure component is lifted using fork truck first, by mounting plate pre-assembly attachment, supporting element and connection Part component is cut with scissors, movable part is bound using bandage, adjusts mast-up, installation is connect with the main element of steel structure component, after fixed Mast-up is connect with hanging device and fixes limit.
4. a kind of fast hoisting technique of module-type steel structure component described in step 3, feature exist according to claim 1 In: the ancillary equipment is ground elevator machine equipment, and using two elevator machine equipments, and it is flat to establish same hoist engine control The steel strand wires of hoist engine and suspension hook are mounted on mast-up by platform, and hoist engine pulls steel structure component oblique after installation, and The position of hanging device is mounted remotely from according to symmetrical position, make hanging device lifting point and ancillary equipment auxiliary magnet at Three different directions act on steel structure component, are cooperated using communication apparatus and complete to hang a liter process jointly.
5. a kind of fast hoisting technique of module-type steel structure component described in step 5, feature exist according to claim 1 In: when reaching predetermined installation station, hanging device continues to keep the position of steel structure component motionless, lifts in position fixing process, in the air Accuse that platform instructs the hanging device platform and ancillary equipment platform on ground by wireless device, wherein ancillary equipment manipulation is flat Platform realizes the angle rotation of adjustment steel structure component, hanging device platform is by adjusting hanging by the folding and unfolding of two hoist engines of control Dress height adjusts the installation site of steel structure component.
6. a kind of fast hoisting technique of module-type steel structure component according to claim 4, it is characterised in that: installation is auxiliary It when helping equipment, is installed according to installation site using detachable lifting lug, in such a way that spiral is fixed and is matched when lifting lug is installed It closes protective device to be fixed on steel structure component, disassembly in time after being installed.
7. a kind of fast hoisting technique of module-type steel structure component described in step 6, feature exist according to claim 1 In: after the completion of steel structure lifting component, by remaining attachment consolidated shipment, handling is carried using steel wire net-belt when handling.
CN201910424052.4A 2019-05-21 2019-05-21 A kind of fast hoisting technique of module-type steel structure component Pending CN110397287A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910424052.4A CN110397287A (en) 2019-05-21 2019-05-21 A kind of fast hoisting technique of module-type steel structure component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910424052.4A CN110397287A (en) 2019-05-21 2019-05-21 A kind of fast hoisting technique of module-type steel structure component

Publications (1)

Publication Number Publication Date
CN110397287A true CN110397287A (en) 2019-11-01

Family

ID=68323100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910424052.4A Pending CN110397287A (en) 2019-05-21 2019-05-21 A kind of fast hoisting technique of module-type steel structure component

Country Status (1)

Country Link
CN (1) CN110397287A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11157774A (en) * 1997-11-25 1999-06-15 Mitsubishi Heavy Ind Ltd Crane swing preventive device
CN100443386C (en) * 2002-12-05 2008-12-17 艾森曼机械制造两合公司(无限责任股东:艾森曼-基金会) Stacker crane
CN101967887A (en) * 2009-07-28 2011-02-09 中冶成工上海五冶建设有限公司 Large-span light steel structure roof girder hoisting method
NL2004719C2 (en) * 2010-05-13 2011-11-15 Marcus Johannes Cornelis Verhoeven CONSTRUCTION STEEL MAT CLAMP.
CN102849628A (en) * 2011-06-29 2013-01-02 克朗斯股份公司 System for moving a load
CN104963521A (en) * 2015-07-28 2015-10-07 中铁大桥局集团有限公司 System and construction method used for integral hoisting and rotation of steel tower
CN105858435A (en) * 2016-04-26 2016-08-17 中国海洋石油总公司 Technology for hoisting strip-shaped inclined steel structures in place through single crane
CN106348159A (en) * 2016-08-26 2017-01-25 中投(天津)热力股份有限公司 Steel tube hanging tool

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11157774A (en) * 1997-11-25 1999-06-15 Mitsubishi Heavy Ind Ltd Crane swing preventive device
CN100443386C (en) * 2002-12-05 2008-12-17 艾森曼机械制造两合公司(无限责任股东:艾森曼-基金会) Stacker crane
CN101967887A (en) * 2009-07-28 2011-02-09 中冶成工上海五冶建设有限公司 Large-span light steel structure roof girder hoisting method
NL2004719C2 (en) * 2010-05-13 2011-11-15 Marcus Johannes Cornelis Verhoeven CONSTRUCTION STEEL MAT CLAMP.
CN102849628A (en) * 2011-06-29 2013-01-02 克朗斯股份公司 System for moving a load
CN104963521A (en) * 2015-07-28 2015-10-07 中铁大桥局集团有限公司 System and construction method used for integral hoisting and rotation of steel tower
CN105858435A (en) * 2016-04-26 2016-08-17 中国海洋石油总公司 Technology for hoisting strip-shaped inclined steel structures in place through single crane
CN106348159A (en) * 2016-08-26 2017-01-25 中投(天津)热力股份有限公司 Steel tube hanging tool

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
湖南省交通规划勘察设计院: "《公路双曲拱桥无支架施工》", 31 May 1977 *

Similar Documents

Publication Publication Date Title
CN106315389B (en) A kind of large scale prefabricated plate posture adjustment suspension bracket and its method
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN109236012A (en) A kind of dry font Guywire tower hanging method of transmission line of electricity
CN109881590A (en) Bridge steel box girder high altitude operation operating platform and building method
CN110397287A (en) A kind of fast hoisting technique of module-type steel structure component
CN208024056U (en) A kind of double flat arm ground type pole
CN201952153U (en) Portable detachable hoisting equipment
CN201826262U (en) Prestress tensioning trolley
CN110723642A (en) Device and method for horizontally lifting equipment in closed workshop in place
CN208166361U (en) A kind of overlength light-weight metal roof boarding lifting attachment device
CN107010551B (en) A kind of restricted clearance construction method for hanging
CN102587676A (en) Method for mounting internal girder structure of nuclear island at nuclear power station
CN207061738U (en) The auxiliary lifting device that a kind of anti-side is fallen
CN105152001A (en) Special lifting device and lifting method for lifting reflector unit of radiotelescope
CN215755931U (en) Large transformer hoisting equipment in factory building
CN205500619U (en) Vapour is repaiied with portable jack -up shallow
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN201825635U (en) Hoisting structure of power station boiler
CN204689351U (en) A kind of H profile steel structural elements suspender
CN210620081U (en) Cantilever crane device suitable for dismantling external scaffold of assembled high-rise residence
CN204529154U (en) Cement brick hoisting machine
CN208279171U (en) A kind of device for prefabricated components hoisting and hanging
CN205873732U (en) Building movable base formula prevents weighing down tower crane
CN205045695U (en) A special lifting device for hoisting radio telescope plane of reflection unit
CN210854980U (en) Concrete prefabricated T-shaped beam hoisting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191101