CN201826262U CN2010205780172U CN201020578017U CN201826262U CN 201826262 U CN201826262 U CN 201826262U CN 2010205780172 U CN2010205780172 U CN 2010205780172U CN 201020578017 U CN201020578017 U CN 201020578017U CN 201826262 U CN201826262 U CN 201826262U
Authority
CN
China
Prior art keywords
trolley
construction
stretch
prestress tensioning
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205780172U
Other languages
Chinese (zh)
Inventor
刘金山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN2010205780172U priority Critical patent/CN201826262U/en
Application granted granted Critical
Publication of CN201826262U publication Critical patent/CN201826262U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a prestress tensioning trolley, belonging to the technical field of the bridging. The prestress tensioning trolley is characterized in that four steel skeletons form a trolley vertical support, the tops of the steel skeletons are provided with a block, the middle of the trolley vertical support is provided with a tensioning work table, the bottom of the trolley vertical support is provided with a winch, the tensioning work table is matched with the trolley vertical stand through a fixed pulley in an up-and-down sliding way, and the outer sides of the steel skeletons are provided with energy-absorbing plates. The prestress tensioning trolley has the benefits that the project cost is greatly saved, the construction is quickened, simultaneously, the inconvenience of the prestress tensioning jack is improved, the connection is simple, the operation is simple, the construction is convenient, and the control is easier during the construction.

Description

A kind of prestressed stretch-draw chassis
Technical field
The utility model belongs to the bridging technical field.
Background technology
When bridging, consider that the pipeline prestressed stretch-draw is to the stressed importance of beam body, weight owing to jack in stretching process weighs more than the 280KG, artificially can't handle, install by present artificial or non-special-purpose machinery, damage of components easily takes place in the installation process, phenomenon such as stripped thread, fracture of wire takes place sometimes and the casualties that produces in the stretching process.Simultaneously, waste of manpower, efficient is not high.
Summary of the invention
The purpose of this utility model is: a kind of prestressed stretch-draw chassis is provided, it can to stretch-draw with jack carry out fast, effectively connection.
The technical solution of the utility model is: constitute the chassis stand by four steel frames, at the steel frame top hoist is installed, at chassis stand middle part the stretch-draw workbench is installed, in chassis stand bottom hoist engine is installed, the stretch-draw workbench slides up and down with the chassis stand by fixed pulley and cooperates, and in the steel frame outside energy-absorbing plate is installed.
The beneficial effects of the utility model are: saved engineering cost greatly, when having accelerated construction, improved the inconvenience that the prestressed stretch-draw jack is installed, connected simply, handled easily is convenient to construction, makes the easier control of work progress.
Description of drawings
Fig. 1 is the utility model front view;
Fig. 2 is the utility model lateral view.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further:
As shown in the figure, the 1st, hoist, the 2nd, rain-proof shelter, the 3rd, angle steel and round steel skeleton, the 4th, stretch-draw workbench, the 5th, energy-absorbing plate, the 6th, fixed pulley, the 7th, road wheel, the 8th, hoist engine.
Road wheel 6 mainly makes things convenient for chassis to carry moving in the stretching process, hoist 1 and hoist engine 8 are chief components of chassis, cooperate the front and back of fixed pulleys 6 control stretch-draw jack and move up and down by hoist 1 and hoist engine 8, energy-absorbing plate 5 and rain-proof shelter 2 main protectors, steel strand fracture of wire produce power absorbed when energy-absorbing plate 5 was mainly used in jack tension, angle steel and round steel skeleton 3 mainly are the load-carrying members of chassis, mainly bear and be used to hang hoist 1 and hoist engine 8 and fixed pulley 6, set up workbench 4, workbench 4 provides interim operating platform for construction.
Its course of work is:
Carry out steel strand tension work with the stretch-draw chassis after preparation of construction is finished, concrete steps are as follows:
A. clear up the mortar of backing plate and steel strand surface;
B., ground tackle is installed, intermediate plate;
C. by hoist and hoist engine that jack is in place, the instrument anchor hole position on the jack is arranged with the position, hole of component ends work anchor and is wanted consistent;
E. the moveable anchor intermediate plate is urgent, and intermediate plate is evenly urgent and expose unanimity;
F. oil pump feed is given the jack tension oil cylinder, and checks the deviation of stretch value and calculated value at any time.
G. stretch-draw is held lotus and is reviewed stretch value behind the regulation oil pressure, and anchoring is implemented in qualified back;
H. jack piston backhaul;
I. remove jack;
J. excise unnecessary steel strand.

Claims (1)

1. prestressed stretch-draw chassis, it is characterized in that: constitute the chassis stand by four steel frames, at the steel frame top hoist is installed, at chassis stand middle part the stretch-draw workbench is installed, in chassis stand bottom hoist engine is installed, the stretch-draw workbench slides up and down with the chassis stand by fixed pulley and cooperates, and in the steel frame outside energy-absorbing plate is installed.
CN2010205780172U 2010-10-26 2010-10-26 Prestress tensioning trolley Expired - Fee Related CN201826262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205780172U CN201826262U (en) 2010-10-26 2010-10-26 Prestress tensioning trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205780172U CN201826262U (en) 2010-10-26 2010-10-26 Prestress tensioning trolley

Publications (1)

Publication Number Publication Date
CN201826262U true CN201826262U (en) 2011-05-11

Family

ID=43964809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205780172U Expired - Fee Related CN201826262U (en) 2010-10-26 2010-10-26 Prestress tensioning trolley

Country Status (1)

Country Link
CN (1) CN201826262U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661050A (en) * 2012-05-29 2012-09-12 中国水利水电第十四工程局有限公司 Prestressed tension auxiliary construction stage device
CN105839544A (en) * 2016-05-10 2016-08-10 云南建工集团有限公司 Hogging moment stretching-drawing trolley capable of working aloft in narrow space
CN109811658A (en) * 2019-01-25 2019-05-28 北京国铁科技有限公司 A kind of bridge prestress tensioning trolley
CN110409302A (en) * 2019-06-14 2019-11-05 湖南交通国际经济工程合作有限公司 A kind of Box-girder Bridges vertical prestressing steel strand tension construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661050A (en) * 2012-05-29 2012-09-12 中国水利水电第十四工程局有限公司 Prestressed tension auxiliary construction stage device
CN105839544A (en) * 2016-05-10 2016-08-10 云南建工集团有限公司 Hogging moment stretching-drawing trolley capable of working aloft in narrow space
CN109811658A (en) * 2019-01-25 2019-05-28 北京国铁科技有限公司 A kind of bridge prestress tensioning trolley
CN110409302A (en) * 2019-06-14 2019-11-05 湖南交通国际经济工程合作有限公司 A kind of Box-girder Bridges vertical prestressing steel strand tension construction method

Similar Documents

Publication Publication Date Title
CN204249072U (en) For stretch-draw and the baffle plate integrating device of precast beam stretch-draw
CN201826262U (en) Prestress tensioning trolley
CN102501056A (en) Pin assembling and disassembling device
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN103072513A (en) Multifunctional construction vehicle for high-tension line construction
CN204897280U (en) Movable hoist height adjustable portable crane
CN203461720U (en) Simple cantilever hoisting machine
CN203866006U (en) Stacker crane lifting device used in concrete member production system
CN203613464U (en) Slip form construction cargo transportation device
CN203255902U (en) Multi-pulley-block four-winch linkage derrick lifting platform
CN204920175U (en) Elevating gear reaches lift scaffold that contains continuous elevating gear in succession
CN202248826U (en) Lifting scaffold hoisting mechanism
CN202829424U (en) Indoor movable type hoisting tool
CN204138202U (en) Cantilever crane simple and easy hoisting device
CN202787930U (en) Hanging basket for high-place operations
CN203781713U (en) High slope support material transport device
CN201924604U (en) Pulling device for prestressed steel strands
CN203307713U (en) Curb form removal machine
CN210013125U (en) Stretch-draw regularization operation platform
CN202296886U (en) Hoisting device for installing oversized radial gate of hydropower station
CN102733612B (en) Mounting method of electric hoist orbit
CN202011709U (en) Installation work platform for wind turbine generator set
CN207192655U (en) A kind of transformer assembling and disassembling device
CN201665821U (en) Crown block used for bridge erecting machine
CN201670370U (en) Universal lifting frame for bundler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY 13TH BUREAU GROUP ELECTRICAL SERVICE

Free format text: FORMER OWNER: CHINA RAILWAY 13TH BUREAU GROUP CO., LTD.

Effective date: 20110722

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 130033 DEPARTMENT OF TECHNOLOGY, CHINA RAILWAY 13RD BUREAU, NO. 2138, LINGDONG ROAD, CHANGCHUN CITY, JILIN PROVINCE TO: 300011 ROOM 1201, GUANFU BUILDING, NO. 46, XINKAI ROAD, HEDONG DISTRICT, TIANJIN CITY

TR01 Transfer of patent right

Effective date of registration: 20110722

Address after: Hedong District of Tianjin City, 300011 open 46 new Guanfu building room 1201

Patentee after: CR13G Electric Engineering Co., Ltd.

Address before: 130033 science and Technology Department, China Railway thirteen Bureau, No. 2138 East Ling Road, Jilin, Changchun

Patentee before: China Railway 13th Bureau Group Co., Ltd.

C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING GROU

Free format text: FORMER NAME: CHINA RAILWAY 13TH BUREAU GROUP ELECTRICAL SERVICE ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Hedong District of Tianjin City, 300011 open 46 new Guanfu building room 1201

Patentee after: CR13G ELECTRIC ENGINEERING CO., LTD.

Address before: Hedong District of Tianjin City, 300011 open 46 new Guanfu building room 1201

Patentee before: CR13G Electric Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110511

Termination date: 20161026