CN110374214A - Finished product post-cast strip - Google Patents

Finished product post-cast strip Download PDF

Info

Publication number
CN110374214A
CN110374214A CN201910687520.7A CN201910687520A CN110374214A CN 110374214 A CN110374214 A CN 110374214A CN 201910687520 A CN201910687520 A CN 201910687520A CN 110374214 A CN110374214 A CN 110374214A
Authority
CN
China
Prior art keywords
groove body
finished product
cast strip
reinforcing bar
semiclosed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910687520.7A
Other languages
Chinese (zh)
Inventor
熊宗镇
李小东
李彪
熊宗明
熊国全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Guojin Construction Group Co Ltd
Original Assignee
Jiangxi Guojin Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Guojin Construction Group Co Ltd filed Critical Jiangxi Guojin Construction Group Co Ltd
Priority to CN201910687520.7A priority Critical patent/CN110374214A/en
Publication of CN110374214A publication Critical patent/CN110374214A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6803Joint covers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Abstract

Finished product post-cast strip, including the semiclosed groove body formed is fully welded through argon arc welding by stainless steel, reinforcing bar in floor plates, reinforcing bar under floor plates, rubber fastening band and concrete shrinkage compensate angle, wherein, both ends are respectively arranged with outwardly extending end at the top of semiclosed groove body, semiclosed groove body bottom both ends are respectively arranged with concrete shrinkage compensation angle, and semiclosed groove body height is equal with floor plate thickness, and inserting hole is provided in semiclosed groove body, after reinforcing bar is symmetrically interspersed in semiclosed groove body by inserting hole under reinforcing bar in floor plates and floor plates, rubber fastening band is blocked on inserting hole;The present invention is suitable for the construction of the positions such as bottom plate, top plate, floor, shear wall, it can effectively solve the problems, such as that traditional post empiricism exists, it draws materials, is easy to process, lathe continuous productive process standard, install convenient, all common quality defects of traditional post-cast strip can effectively be prevented, while can effectively reduce operating expenses.

Description

Finished product post-cast strip
Technical field
The present invention relates to technical field of building construction more particularly to a kind of finished product post-cast strips.
Background technique
The construction of the positions such as traditional post-casting zone bottom plate, top plate, floor, shear wall has the disadvantage that
1, working procedure is cumbersome, and screwing steel bars, steel fabric sheet are time-consuming, while cooperating journey to corresponding teams and groups during the installation process Degree requires high;
2, the positions such as traditional post-casting zone bottom plate, top plate, floor, shear wall construction after the completion of it is secondary chisel it is time-consuming, and waste A large amount of manpowers, financial resources;
3, traditional post-cast strip needs secondary formwork at positions such as top plate, floor, shear walls after reaching age, wastes material, people Power.
Summary of the invention
Technical problem solved by the invention is to provide a kind of finished product post-cast strip, to solve asking in above-mentioned background technique Topic.
Technical problem solved by the invention is realized using following technical scheme:
Beam finished product post-cast strip, including being fully welded the semiclosed groove body formed through argon arc welding by stainless steel, reinforcing bar, floor in floor plates Reinforcing bar, rubber fastening band and concrete shrinkage compensate angle under plate, wherein both ends are respectively arranged with outward at the top of semiclosed groove body The end of extension, semiclosed groove body bottom both ends are respectively arranged with concrete shrinkage compensation angle, and semiclosed groove body height It is equal with floor plate thickness, and it is provided with inserting hole in semiclosed groove body, to reinforcing bar under reinforcing bar in floor plates and floor plates After being symmetrically interspersed in semiclosed groove body by inserting hole, rubber fastening band is blocked on inserting hole;
Inserting hole is symmetricly set on the stainless steel of semiclosed groove body;
Concrete shrinkage compensates angle and extends outwardly 20cm in semiclosed groove body bottom, and concrete shrinkage compensation angle be 30 °~ 45°;
The installation method of beam finished product post-cast strip, the specific steps are as follows:
1) after drawing joint examination to be onstructed passes through, according to drawing requirement, it is thick that post-cast strip width, post-cast strip length, floor plate face are measured Spacing, the specification of arrangement of reinforcement in degree, floor plates, processing preparation is stand-by, and inserting hole increases 2mm diameter according to drawing arrangement of reinforcement size and beats Hole, in spacing same area construction drawing;
2) after floor plates template is installed, check and accept that top plate is very poor, flatness, it is qualified after according to drawing position unwrapping wire, according still further to Unwrapping wire position is first plugged joist, installs first piece of bottom finished product post-cast strip, makes sure to keep in mind surface stainless steel towards upstream face, puts on exterior wall level Muscle hangs vertical and is welded and fixed with auxiliary such as steel pipes, then installs second piece, until 50cm composition below top plate face is semiclosed recessed Groove body is installed according to line of ink marker position and is fixed before upper floor plates reinforcing bar, and argon arc welding overlap joint must be fully welded, after welding, being installed It carries out an acceptance inspection;
3) after acceptance(check), then reinforcing bar under reinforcing bar in floor plates and floor plates is symmetrically interspersed in semiclosed groove by inserting hole On body and reinforcing bar binding is carried out, if the duration catches up with, interspersed construction can be carried out, but the good finished product being welded and fixed cannot be disturbed;
4) rubber fastening band must be used on the inside of finished product post-cast strip before reinforcing bar and reinforcing bar concealment acceptance under floor plates in floor plates Interspersed hole plug is closely knit, forbid concrete mud water to flow into finished product post-cast strip, formwork is using independent on the inside of finished product post-cast strip Formwork reinforcement (avoids secondary dismounting), and concealment acceptance is qualified, and top template covers tight;
5) attention sequence when pouring, conditions permit then pours post-cast strip two sides simultaneously, and vibrating spear and finished product post-cast strip holding 300 ~ The safe distance of 500cm, under the premise of guaranteeing vibration compacting, worker when preventing disturbance finished product post-cast strip, while paying attention to pouring Capping template, special messenger guard cannot be trampled;
6) after maintenance reaches age, floor plates template is removed, post-cast strip returns back to top, and rear branch is first torn open, and it first props up and tears open afterwards, with tearing open with top, Away from same form erection plan spacing, only need both sides' wood that jacking is added to shore without template closely knit;
7) after reaching post-cast strip design age, capping template is opened, the rubber water-proof tape erasure that will have been expanded removes a face Liang Qiang Template is rinsed well, acceptance(check), can be poured.
Bottom plate finished product post-cast strip, including being fully welded the semiclosed groove body formed through argon arc welding by stainless steel, steel in floor plates Reinforcing bar, rubber fastening band and concrete shrinkage compensate angle under muscle, floor plates, wherein both ends are set respectively at the top of semiclosed groove body It is equipped with outwardly extending end, semiclosed groove body bottom both ends are respectively arranged with concrete shrinkage compensation angle, and semiclosed recessed Groove body height is equal with design plate thickness, and is provided with inserting hole in semiclosed groove body, to reinforcing bar in floor plates and floor After reinforcing bar is symmetrically interspersed in semiclosed groove body by inserting hole under plate, rubber fastening band is blocked on inserting hole;
Inserting hole is symmetricly set on the stainless steel of semiclosed groove body;
Concrete shrinkage compensates angle and extends outwardly 20cm in semiclosed groove body bottom, and concrete shrinkage compensation angle be 30 °~ 45°;
The installation method of bottom plate finished product post-cast strip, the specific steps are as follows:
1) after drawing joint examination to be onstructed passes through, according to drawing requirement, it is thick that post-cast strip width, post-cast strip length, floor plate face are measured Spacing, the specification of arrangement of reinforcement in degree, floor plates, processing preparation is stand-by, and inserting hole increases 2mm diameter according to drawing arrangement of reinforcement size and beats Hole, in spacing same area construction drawing;
2) according to drawing position unwrapping wire after bottom cushion waterproof completion self-test is qualified, it is first plugged joist according still further to unwrapping wire position, is pacified If first piece of finished product post-cast strip, surface stainless steel is made sure to keep in mind towards upstream face, puts on exterior wall horizontal bar, hang vertical and assisted with steel pipe etc. It is welded and fixed, then installs second piece, until 50cm below top plate face forms semiclosed groove body, before upper floor plates reinforcing bar, According to line of ink marker position install fix, argon arc welding overlap joint must be fully welded, weld, be installed after carry out an acceptance inspection;
3) after acceptance(check), then reinforcing bar under reinforcing bar in floor plates and floor plates is symmetrically interspersed in semiclosed groove by inserting hole On body and reinforcing bar binding is carried out, if the duration catches up with, interspersed construction can be carried out, but the good finished product being welded and fixed cannot be disturbed;
4) rubber fastening band must be used on the inside of finished product post-cast strip before reinforcing bar and reinforcing bar concealment acceptance under floor plates in floor plates Interspersed hole plug is closely knit, forbid concrete mud water to flow into finished product post-cast strip, formwork is using independent on the inside of finished product post-cast strip Formwork reinforcement (avoids secondary dismounting), and concealment acceptance is qualified, is covered tightly at the top of finished product post-cast strip with template;
5) attention sequence when pouring, conditions permit then pours post-cast strip two sides simultaneously, and vibrating spear and finished product post-cast strip holding 300 ~ The safe distance of 500cm, under the premise of guaranteeing vibration compacting, worker when preventing disturbance finished product post-cast strip, while paying attention to pouring Capping template, special messenger guard cannot be trampled;
6) after reaching post-cast strip design age, capping template is opened, the rubber fastening band 4 expanded is removed, removes a face beam Wall form is rinsed well, acceptance(check), can be poured.
Exterior wall finished product post-cast strip, including being fully welded the semiclosed groove body formed through argon arc welding by stainless steel, steel on shear wall Reinforcing bar, rubber fastening band and concrete shrinkage compensate angle under muscle, shear wall, wherein both ends are set respectively at the top of semiclosed groove body It is equipped with outwardly extending end, semiclosed groove body bottom both ends are respectively arranged with concrete shrinkage compensation angle, and semiclosed recessed Groove body height is equal with shear wall's thickness, and is provided with inserting hole in semiclosed groove body, to reinforcing bar on shear wall and shearing After reinforcing bar is symmetrically interspersed in semiclosed groove body by inserting hole under wall, rubber fastening band is blocked on inserting hole;
Inserting hole is symmetricly set on the stainless steel of semiclosed groove body;
Concrete shrinkage compensates angle and extends outwardly 20cm in semiclosed groove body bottom, and concrete shrinkage compensation angle be 30 °~ 45°;
The installation method of exterior wall finished product post-cast strip, the specific steps are as follows:
1) after drawing joint examination to be onstructed passes through, according to drawing requirement, it is thick that post-cast strip width, post-cast strip length, floor plate face are measured Spacing, the specification of arrangement of reinforcement in degree, floor plates, processing preparation is stand-by, and inserting hole increases 2mm diameter according to drawing arrangement of reinforcement size and beats Hole, in spacing same area construction drawing;
2) according to drawing position unwrapping wire after base plate steel bar binding completion self-test is qualified, exterior wall steel is first plugged according still further to unwrapping wire position Muscle, mounting finished product post-cast strip, meets water and faces outwardly from bottom to top, installs first piece of bottom finished product post-cast strip, puts on exterior wall horizontal bar, It hangs vertical and is welded and fixed with auxiliary such as steel pipes, then install second piece, until 50cm below top plate face forms semiclosed groove Body, before upper shear wall, according to line of ink marker position install fix, argon arc welding overlap joint must be fully welded, weld, be installed after tested It receives;
3) after acceptance(check), then reinforcing bar under reinforcing bar on shear wall and shear wall is symmetrically interspersed in semiclosed groove by inserting hole On body and reinforcing bar binding is carried out, if the duration catches up with, interspersed construction can be carried out, but the good finished product being welded and fixed cannot be disturbed;
4) rubber fastening band must be used on the inside of finished product post-cast strip before reinforcing bar and reinforcing bar concealment acceptance under shear wall on shear wall Interspersed hole plug is closely knit, forbid concrete mud water to flow into finished product post-cast strip, formwork is using independent on the inside of finished product post-cast strip Formwork reinforcement (avoids secondary dismounting), and concealment acceptance is qualified, and top template covers tight;
5) attention sequence when pouring, conditions permit then pours post-cast strip two sides simultaneously, and vibrating spear and finished product post-cast strip holding 300 ~ The safe distance of 500cm, under the premise of guaranteeing vibration compacting, worker when preventing disturbance finished product post-cast strip, while paying attention to pouring Capping template, special messenger guard cannot be trampled;
6) it after reaching post-cast strip design age, opens and covers template, the rubber water-proof tape erasure that will have been expanded, and to capping template It reinforces, acceptance(check) can pour.
Internal shear force wall finished product post-cast strip is formed including being fully welded by stainless steel through argon arc welding ] [ groove body, is worn rubber fastening band Reinforcing bar under reinforcing bar and shear wall on jack, shear wall, wherein ] [ both ends of groove body top and bottom, which are respectively arranged with, to extend outwardly End, and [ groove body height is equal with shear wall's thickness, and ] inserting hole is provided on groove body, to reinforcing bar on shear wall with Reinforcing bar is symmetrically interspersed in by inserting hole under shear wall ] [ after on groove body, rubber fastening band is blocked on inserting hole;
Inserting hole is symmetricly set on ] [ on the stainless steel of groove body.
The utility model has the advantages that
1) present invention is suitable for the construction of the positions such as bottom plate, top plate, floor, shear wall, can effectively solve traditional post empiricism There are the problem of;
2) present invention materials, easy to process, lathe continuous productive process standard, install convenient can effectively prevent the one of traditional post-cast strip Cut common quality defect;
3) operating expenses is effectively reduced in the present invention compared with traditional post-cast strip, reduces 5~10 yuan/meter of installation fee, chisels cleaning expense 35~45 yuan/meter, secondary formwork take 30~40 yuan/meter;
4) present invention is used for the advantage one of top board construction: on-site consolidation welding is fast, does not need the excessive cooperation of other teams and groups, only needs It wants template to be installed examination both may be used;Advantage two: it does not need to chisel steel wire and cleaning rubbish, advantage three: reaches design age Afterwards, it only needs to return back to top and pour in place, do not need secondary die-filling;Advantage four: there is no fried net spillages, the quality such as get rusty, leak Hidden danger;
5) present invention is used for the advantage one of construction of bottom plates: on-site consolidation welding is fast, does not need the excessive cooperation of other teams and groups, only needs Waterproof slab, which is completed to check and accept, both may be used;Advantage two: it does not need to chisel steel wire and cleaning rubbish;Advantage three: there is no fried net spillage, The hidden danger of quality such as get rusty, leak;
6) present invention is used for the advantage one of external wall construction: on-site consolidation welding is fast, does not need the excessive cooperation of other teams and groups, only needs Exterior wall reinforcing bar standing portion is wanted both may be used;Advantage two: it does not need to chisel steel wire and cleaning rubbish;Advantage three: there is no fried net leakages The hidden danger of quality such as starch, get rusty, leaking;Advantage four: can accelerate the propulsion and backfill of external wall waterproof construction, and waterproof coiled material is placed directly against Stainless steel upstream face.
Detailed description of the invention
Fig. 1 is the beam finished product post-cast strip schematic elevation view in presently preferred embodiments of the present invention.
Fig. 2 is the beam finished product post-cast strip schematic side view in presently preferred embodiments of the present invention.
Fig. 3 is the beam finished product post-cast strip schematic cross-sectional view in presently preferred embodiments of the present invention.
Fig. 4 is the bottom plate finished product post-cast strip schematic elevation view in presently preferred embodiments of the present invention.
Fig. 5 is the bottom plate finished product post-cast strip schematic side view in presently preferred embodiments of the present invention.
Fig. 6 is the bottom plate finished product Ater-casting rubber waterstop structural schematic diagram in presently preferred embodiments of the present invention.
Fig. 7 is the exterior wall finished product post-cast strip schematic elevation view in presently preferred embodiments of the present invention.
Fig. 8 is the exterior wall finished product post-cast strip side elevation schematic diagram in presently preferred embodiments of the present invention.
Fig. 9 is the finished product post-cast strip scheme of installation in presently preferred embodiments of the present invention.
Figure 10 is the beam finished product post-cast strip installation procedure figure in presently preferred embodiments of the present invention.
Figure 11 is the bottom plate finished product post-cast strip installation procedure figure in presently preferred embodiments of the present invention.
Figure 12 is the exterior wall finished product post-cast strip installation procedure figure in presently preferred embodiments of the present invention.
Figure 13 is the internal shear force wall finished product post-cast strip schematic elevation view in presently preferred embodiments of the present invention.
Figure 14 is the internal shear force wall finished product post-cast strip side elevation schematic diagram in presently preferred embodiments of the present invention.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Conjunction is specifically illustrating, and the present invention is further explained.
Embodiment 1
Referring to the beam finished product post-cast strip of Fig. 1~3, including the semiclosed groove body formed, floor are fully welded through argon arc welding by stainless steel 1 Reinforcing bar 3, rubber fastening band 4, concrete shrinkage compensate angle 5 and inserting hole 6 under reinforcing bar 2, floor plates on plate, wherein semiclosed recessed Both ends are respectively arranged with outwardly extending end at the top of groove body, and semiclosed groove body bottom both ends are respectively arranged with concrete shrinkage Angle 5 is compensated, and semiclosed groove body height is equal with floor plate thickness, and inserting hole 6 is provided in semiclosed groove body, to After reinforcing bar 2 is symmetrically interspersed in semiclosed groove body with reinforcing bar 3 under floor plates by inserting hole 6 in floor plates, by rubber water-proof Band 4 blocks on inserting hole 6;
Inserting hole 6 is symmetricly set on the stainless steel 1 of semiclosed groove body;
Concrete shrinkage compensates angle 5 and extends outwardly 20cm in semiclosed groove body bottom, and concrete shrinkage compensation angle 5 is 30 ° ~45 °;
The installation method of beam finished product post-cast strip, as shown in Figure 10, the specific steps are as follows:
1) after drawing joint examination to be onstructed passes through, according to drawing requirement, it is thick that post-cast strip width, post-cast strip length, floor plate face are measured Spacing, the specification of arrangement of reinforcement in degree, floor plates, processing preparation is stand-by, is preferably made 2 meters ~ 3 meters/block, inserting hole 6 is matched according to drawing Muscle size increases the punching of 2mm diameter, in spacing same area construction drawing;
2) after floor plates template is installed, check and accept that top plate is very poor, flatness, it is qualified after according to drawing position unwrapping wire, according still further to Unwrapping wire position is first plugged joist, installs first piece of bottom finished product post-cast strip, makes sure to keep in mind stainless steel 1 and face upstream face, put on exterior wall water Flat muscle hangs vertical and is welded and fixed with auxiliary such as steel pipes, then installs second piece, until 50cm composition below top plate face is semiclosed Groove body (can be fixed with all-purpose adhesive or iron nail according to the installation fixation of line of ink marker position before upper floor plates reinforcing bar, forbid drawing Iron wire), pay attention to argon arc welding overlapped that length (20 ~ 30cm) must be fully welded, weld, be installed after carry out an acceptance inspection;
3) after acceptance(check), then reinforcing bar 2 in floor plates is symmetrically interspersed in reinforcing bar 3 under floor plates by inserting hole semiclosed recessed On groove body and reinforcing bar binding is carried out, if the duration catches up with, interspersed construction can be carried out, but the good finished product being welded and fixed cannot be disturbed;
4) rubber water-proof must be used on the inside of finished product post-cast strip before reinforcing bar 2 and 3 concealment acceptance of reinforcing bar under floor plates in floor plates Band 4 blocks inserting hole 6 closely knit, forbids concrete mud water to flow into finished product post-cast strip, formwork uses on the inside of finished product post-cast strip Independent formwork reinforcement (avoiding secondary dismounting), concealment acceptance is qualified, top template (being proposed with complete old template) capping Tightly;
5) attention sequence when pouring, conditions permit then pours post-cast strip two sides simultaneously, and vibrating spear and finished product post-cast strip holding 300 ~ The safe distance of 500cm, under the premise of guaranteeing vibration compacting, worker when preventing disturbance finished product post-cast strip, while paying attention to pouring Capping template, special messenger guard cannot be trampled;
6) after maintenance reaches age, floor plates template is removed, post-cast strip returns back to top, and rear branch is first torn open, and it first props up and tears open afterwards, with tearing open with top, Away from same form erection plan spacing, only need both sides' wood that jacking is added to shore without template closely knit;
7) after reaching post-cast strip design age, capping template is opened, whether the rubber fastening band 4 expanded removing (is removed;Depending on Depending on situation), a face beam wall form is removed, rinses well, acceptance(check), can pour;
Structure after installation is as shown in figure 9, finished product post-cast strip 91, cast-in-situ beam slab 92, stainless steel plate 93, jacking 94, adjustable supports Seat 95, wheel buckle scaffold 96, bottom plate 97, adjustable base 98, pillar 99 and flitch 100, the insertion of 91 both ends of finished product post-cast strip are cast-in-place In beam slab 92,91 bottom of finished product post-cast strip is seated on stainless steel plate 93, and stainless steel plate 93 is placed on flitch 100, and flitch 100 is logical It crosses jacking 94 and pillar 99 is fixed, adjustable support seat 95 and wheel buckle scaffold 96 are installed, 99 bottom of pillar passes through on pillar 99 Adjustable base 98 is fixed on bottom plate 97.
Embodiment 2
Bottom plate finished product post-cast strip referring to fig. 4~6, including being fully welded the semiclosed groove body formed, building through argon arc welding by stainless steel 1 Reinforcing bar 3, rubber fastening band 4, concrete shrinkage compensate angle 5 and inserting hole 6 under reinforcing bar 2, floor plates on laminate, wherein semiclosed Both ends are respectively arranged with outwardly extending end at the top of groove body, and semiclosed groove body bottom both ends are respectively arranged with concrete receipts Truncate repays angle 5, and semiclosed groove body height is equal with design plate thickness, and inserting hole 6 is provided in semiclosed groove body, After reinforcing bar 3 is symmetrically interspersed in semiclosed groove body by inserting hole 6 under reinforcing bar 2 in floor plates and floor plates, rubber is stopped Water band 4 blocks on inserting hole 6;
Inserting hole 6 is symmetricly set on the stainless steel 1 of semiclosed groove body;
Concrete shrinkage compensates angle 5 and extends outwardly 20cm in semiclosed groove body bottom, and concrete shrinkage compensation angle 5 is 30 ° ~45 °;
The installation method of bottom plate finished product post-cast strip, as shown in figure 11, the specific steps are as follows:
1) after drawing joint examination to be onstructed passes through, according to drawing requirement, it is thick that post-cast strip width, post-cast strip length, floor plate face are measured Spacing, the specification of arrangement of reinforcement in degree, floor plates, processing preparation is stand-by, is preferably made 2 meters ~ 3 meters/block, inserting hole is according to drawing arrangement of reinforcement Size increases the punching of 2mm diameter, in spacing same area construction drawing;
2) according to drawing position unwrapping wire after bottom cushion waterproof completion self-test is qualified, it is first plugged joist according still further to unwrapping wire position, is pacified If first piece of finished product post-cast strip makes sure to keep in mind stainless steel 1 and face upstream face, put on exterior wall horizontal bar, hang vertical and auxiliary with steel pipe etc. Help and be welded and fixed, then install second piece, until 50cm below top plate face forms semiclosed groove body, upper floor plates reinforcing bar it Before, fixed (can be fixed with all-purpose adhesive or iron nail, forbid bracing wire) is installed according to line of ink marker position, pays attention to argon arc welding overlapped to grow Degree (20 ~ 30cm) must be fully welded, weld, be installed after carry out an acceptance inspection;
3) after acceptance(check), then reinforcing bar 2 in floor plates is symmetrically interspersed in reinforcing bar 3 under floor plates by inserting hole semiclosed recessed On groove body and reinforcing bar binding is carried out, if the duration catches up with, interspersed construction can be carried out, but the good finished product being welded and fixed cannot be disturbed;
4) rubber water-proof must be used on the inside of finished product post-cast strip before reinforcing bar 2 and 3 concealment acceptance of reinforcing bar under floor plates in floor plates Band 4 blocks inserting hole 6 closely knit, forbids concrete mud water to flow into finished product post-cast strip, formwork uses on the inside of finished product post-cast strip Independent formwork reinforcement (avoiding secondary dismounting), concealment acceptance is qualified, (is proposed with complete old at the top of finished product post-cast strip with template Template) capping is tightly;
5) attention sequence when pouring, conditions permit then pours post-cast strip two sides simultaneously, and vibrating spear and finished product post-cast strip holding 300 ~ The safe distance of 500cm, under the premise of guaranteeing vibration compacting, worker when preventing disturbance finished product post-cast strip, while paying attention to pouring Capping template, special messenger guard cannot be trampled;
6) after reaching post-cast strip design age, capping template is opened, whether the rubber fastening band 4 expanded removing (is removed;Depending on Depending on situation), a face beam wall form is removed, rinses well, acceptance(check), can pour.
Embodiment 3
Referring to the exterior wall finished product post-cast strip of Fig. 7~8, including the semiclosed groove body formed, rubber are fully welded through argon arc welding by stainless steel 1 Glue waterstop 4, concrete shrinkage compensation angle 5, inserting hole 6, reinforcing bar 8 under reinforcing bar 7 and shear wall on shear wall, wherein semiclosed Both ends are respectively arranged with outwardly extending end at the top of groove body, and semiclosed groove body bottom both ends are respectively arranged with concrete receipts Truncate repays angle 5, and semiclosed groove body height is equal with shear wall's thickness, and inserting hole 6 is provided in semiclosed groove body, After reinforcing bar 8 is symmetrically interspersed in semiclosed groove body by inserting hole 6 under reinforcing bar 7 on shear wall and shear wall, rubber is stopped Water band 4 blocks on inserting hole 6;
Inserting hole 6 is symmetricly set on the stainless steel 1 of semiclosed groove body;
Concrete shrinkage compensates angle 5 and extends outwardly 20cm in semiclosed groove body bottom, and concrete shrinkage compensation angle 5 is 30 ° ~45 °;
The installation method of exterior wall finished product post-cast strip, as shown in figure 12, the specific steps are as follows:
1) after drawing joint examination to be onstructed passes through, according to drawing requirement, it is thick that post-cast strip width, post-cast strip length, floor plate face are measured Spacing, the specification of arrangement of reinforcement in degree, floor plates, processing preparation is stand-by, is preferably made 2 meters ~ 3 meters/block, inserting hole 6 is matched according to drawing Muscle size increases the punching of 2mm diameter, in spacing same area construction drawing;
2) according to drawing position unwrapping wire after base plate steel bar binding completion self-test is qualified, exterior wall steel is first plugged according still further to unwrapping wire position Muscle, mounting finished product post-cast strip, meets water and faces outwardly from bottom to top, installs first piece of bottom finished product post-cast strip, puts on exterior wall horizontal bar, It hangs vertical and is welded and fixed with auxiliary such as steel pipes, then install second piece, until 50cm below top plate face forms semiclosed groove Body is installed fixed (can be fixed with all-purpose adhesive or iron nail, forbid bracing wire) before upper shear wall according to line of ink marker position, note Anticipating, overlapped that length (20 ~ 30cm) must be fully welded for argon arc welding, weld, be installed after carry out an acceptance inspection;
3) after acceptance(check), then reinforcing bar 7 on shear wall is symmetrically interspersed in reinforcing bar 8 under shear wall by inserting hole semiclosed recessed On groove body and reinforcing bar binding is carried out, if the duration catches up with, interspersed construction can be carried out, but the good finished product being welded and fixed cannot be disturbed;
4) rubber water-proof must be used on the inside of finished product post-cast strip before reinforcing bar 7 and 8 concealment acceptance of reinforcing bar under shear wall on shear wall Band 4 blocks inserting hole 6 closely knit, forbids concrete mud water to flow into finished product post-cast strip, formwork uses on the inside of finished product post-cast strip Independent formwork reinforcement (avoiding secondary dismounting), concealment acceptance is qualified, top template (being proposed with complete old template) capping Tightly;
5) attention sequence when pouring, conditions permit then pours post-cast strip two sides simultaneously, and vibrating spear and finished product post-cast strip holding 300 ~ The safe distance of 500cm, under the premise of guaranteeing vibration compacting, worker when preventing disturbance finished product post-cast strip, while paying attention to pouring Capping template, special messenger guard cannot be trampled;
6) after reaching post-cast strip design age, capping template is opened, whether the rubber fastening band 4 expanded removing (is removed;Depending on Depending on situation), and to capping formwork reinforcement, acceptance(check) can pour.
Embodiment 4
Referring to the internal shear force wall finished product post-cast strip of Figure 13~14, formed including being fully welded by stainless steel 1 through argon arc welding [ groove body, rubber Glue waterstop 4, inserting hole 6, reinforcing bar 8 under reinforcing bar 7 and shear wall on shear wall, wherein ] [ the both ends of groove body top and bottom point It is not provided with outwardly extending end, and groove body height is equal with shear wall's thickness, and [ inserting hole is provided on groove body 6, be symmetrically interspersed in by inserting hole 6 after reinforcing bar 8 under reinforcing bar 7 on shear wall and shear wall [ after on groove body, by rubber fastening band 4 It blocks on inserting hole 6;
Inserting hole 6 is symmetricly set on ] [ on the stainless steel 1 of groove body.

Claims (10)

1. finished product post-cast strip, including being fully welded the semiclosed groove body formed through argon arc welding by stainless steel, which is characterized in that semiclosed Both ends are respectively arranged with outwardly extending end at the top of groove body, and semiclosed groove body bottom both ends are respectively arranged with concrete receipts Truncate repays angle, and semiclosed groove body height is equal with floor plate thickness, and is provided in semiclosed groove body for floor The inserting hole that reinforcing bar symmetrically interts with reinforcing bar under floor plates on plate.
2. finished product post-cast strip according to claim 1, which is characterized in that be applied in bottom plate, poured after the bottom plate finished product The semiclosed groove body height of band is equal with design plate thickness.
3. finished product post-cast strip according to claim 1, which is characterized in that be applied in exterior wall, poured after the exterior wall finished product The semiclosed groove body height of band is equal with shear wall's thickness.
4. described in any item finished product post-cast strips according to claim 1~3, which is characterized in that inserting hole is symmetricly set on half envelope It closes on the stainless steel of groove body.
5. described in any item finished product post-cast strips according to claim 1~3, which is characterized in that concrete shrinkage compensates angle half Closed pockets body bottom extends outwardly 20cm.
6. described in any item finished product post-cast strips according to claim 1~3, which is characterized in that it is 30 ° that concrete shrinkage, which compensates angle, ~45 °.
7. described in any item finished product post-cast strips according to claim 1~3, which is characterized in that blocking on inserting hole has rubber to stop Water band.
8. finished product post-cast strip according to claim 1, which is characterized in that be applied in internal shear force wall, the internal shear force wall The semiclosed groove body of finished product post-cast strip is ] trough body structure, and [ both ends of groove body top and bottom are respectively arranged with to extension The end stretched, and [ groove body height is equal with shear wall's thickness, and ] [ be provided on shear wall reinforcing bar and cut on groove body The inserting hole that reinforcing bar symmetrically interts under power wall.
9. finished product post-cast strip according to claim 8, which is characterized in that inserting hole is symmetricly set on ] [ the stainless steel of groove body On.
10. finished product post-cast strip according to claim 8, which is characterized in that blocking on inserting hole has rubber fastening band.
CN201910687520.7A 2019-07-29 2019-07-29 Finished product post-cast strip Pending CN110374214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910687520.7A CN110374214A (en) 2019-07-29 2019-07-29 Finished product post-cast strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910687520.7A CN110374214A (en) 2019-07-29 2019-07-29 Finished product post-cast strip

Publications (1)

Publication Number Publication Date
CN110374214A true CN110374214A (en) 2019-10-25

Family

ID=68256754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910687520.7A Pending CN110374214A (en) 2019-07-29 2019-07-29 Finished product post-cast strip

Country Status (1)

Country Link
CN (1) CN110374214A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160430A (en) * 2020-09-03 2021-01-01 中建三局集团有限公司 Novel water-blocking formwork-free post-cast strip system and construction method thereof
CN115030585A (en) * 2022-06-30 2022-09-09 成都建工第二建筑工程有限公司 Construction structure and method for initiating seam of ultra-long water pool structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006193985A (en) * 2005-01-14 2006-07-27 Fujita Corp Concrete construction joint method
JP2010094914A (en) * 2008-10-17 2010-04-30 Fujita Corp Formwork for precast concrete member integrating beam and column-beam joint section and production process of precast concrete member integrating beam and column-beam joint section using the formwork
CN104631513A (en) * 2014-12-26 2015-05-20 中誉远发国际建设集团有限公司 Construction method for closing basement exterior wall post-cast strip
CN204626467U (en) * 2015-05-12 2015-09-09 中建三局第二建设工程有限责任公司 The steel form the complete sets of equipment that a kind of ater-casting is closed in advance
CN105822060A (en) * 2016-03-24 2016-08-03 中国五冶集团有限公司 Post-cast strip support framework
CN106284427A (en) * 2016-08-31 2017-01-04 中国冶集团有限公司 A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN106760496A (en) * 2016-12-21 2017-05-31 中国建筑第四工程局有限公司 A kind of floor beam plate post-cast strip template support system and its construction method
CN109610657A (en) * 2018-11-22 2019-04-12 中耕耘成建筑科技(江苏)有限公司 A kind of environment-friendly type concrete prefabricated components piece waterproof construction
CN210562705U (en) * 2019-07-29 2020-05-19 江西国金建设集团有限公司 Finished post-pouring belt

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006193985A (en) * 2005-01-14 2006-07-27 Fujita Corp Concrete construction joint method
JP2010094914A (en) * 2008-10-17 2010-04-30 Fujita Corp Formwork for precast concrete member integrating beam and column-beam joint section and production process of precast concrete member integrating beam and column-beam joint section using the formwork
CN104631513A (en) * 2014-12-26 2015-05-20 中誉远发国际建设集团有限公司 Construction method for closing basement exterior wall post-cast strip
CN204626467U (en) * 2015-05-12 2015-09-09 中建三局第二建设工程有限责任公司 The steel form the complete sets of equipment that a kind of ater-casting is closed in advance
CN105822060A (en) * 2016-03-24 2016-08-03 中国五冶集团有限公司 Post-cast strip support framework
CN106284427A (en) * 2016-08-31 2017-01-04 中国冶集团有限公司 A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN106760496A (en) * 2016-12-21 2017-05-31 中国建筑第四工程局有限公司 A kind of floor beam plate post-cast strip template support system and its construction method
CN109610657A (en) * 2018-11-22 2019-04-12 中耕耘成建筑科技(江苏)有限公司 A kind of environment-friendly type concrete prefabricated components piece waterproof construction
CN210562705U (en) * 2019-07-29 2020-05-19 江西国金建设集团有限公司 Finished post-pouring belt

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160430A (en) * 2020-09-03 2021-01-01 中建三局集团有限公司 Novel water-blocking formwork-free post-cast strip system and construction method thereof
CN115030585A (en) * 2022-06-30 2022-09-09 成都建工第二建筑工程有限公司 Construction structure and method for initiating seam of ultra-long water pool structure

Similar Documents

Publication Publication Date Title
CN106284427A (en) A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN107327050B (en) Disassembly-free basement exterior wall flanging unilateral formwork supporting device and construction method
CN106988440B (en) Waterproof structure for main body and auxiliary interface of subway station and construction method of waterproof structure
CN110374214A (en) Finished product post-cast strip
CN111636677A (en) Construction process of assembly type building laminated slab post-cast plate strip support-free system
CN110439265A (en) Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint
CN211201162U (en) Post-cast strip cast-in-place concrete intercepting device
CN206625234U (en) The adaptability connecting node of concrete assembled shaped steel mixing purlin and fender post
CN208934013U (en) A kind of basement bottom board pouring after settlement structure
CN111549826A (en) Interception construction method for post-cast strip prefabricated formwork in raft of main building
CN108104281A (en) It is a kind of to be used for side form way of the fabricated construction exterior wall without tongue and groove composite beam
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN209456992U (en) Low damage unilateral formwork supporting structure under campshed support system
CN210562705U (en) Finished post-pouring belt
CN209040550U (en) A kind of positioning device for concrete column template bottom
CN110593320A (en) Early sealing structure for outer wall post-cast strip and construction method thereof
CN110295630A (en) The late poured band structure of multilayer constraint antiseep
CN213979911U (en) Basement outer wall post-cast strip template structure
CN205839811U (en) A kind of post-cast strip exterior wall advanced water-stopping processes structure
CN211646488U (en) A device that is used for subway lid to dig reverse construction method construction joint water repellent
CN212478639U (en) Quick plugging structure of existing underground station roof access & exit
CN212689574U (en) Plugging structure of cast-in-place concrete wall column template scavenge port
CN109680722B (en) Construction method for directly reserving external building access port on basement outer wall
CN211395768U (en) Outer wall post-cast strip is enclosed construction in advance
CN107299596A (en) Support beam template system and its construction method under concrete support trestle plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination