CN110373987A - A kind of box beam fast installs composite structure and its installation method - Google Patents

A kind of box beam fast installs composite structure and its installation method Download PDF

Info

Publication number
CN110373987A
CN110373987A CN201910671381.9A CN201910671381A CN110373987A CN 110373987 A CN110373987 A CN 110373987A CN 201910671381 A CN201910671381 A CN 201910671381A CN 110373987 A CN110373987 A CN 110373987A
Authority
CN
China
Prior art keywords
pin
box girder
steel box
hole
concrete roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910671381.9A
Other languages
Chinese (zh)
Other versions
CN110373987B (en
Inventor
汪平
韩立国
李进
汪岳健
刘骁
郎三富
张燕
周波
刘明东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING TRANSPORTATION CONSTRUCTION (GROUP) Co Ltd
Original Assignee
CHONGQING TRANSPORTATION CONSTRUCTION (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING TRANSPORTATION CONSTRUCTION (GROUP) Co Ltd filed Critical CHONGQING TRANSPORTATION CONSTRUCTION (GROUP) Co Ltd
Priority to CN201910671381.9A priority Critical patent/CN110373987B/en
Publication of CN110373987A publication Critical patent/CN110373987A/en
Application granted granted Critical
Publication of CN110373987B publication Critical patent/CN110373987B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The present invention provides a kind of box beams fast to install composite structure and its installation method, including multiple steel box girder segments and fastener to be installed, it is equipped with inside the concrete roof side of steel box girder segment to be installed and extends in outer deformed bar, internal cavity is arranged in opposite side;Fastener is made of L-type positioning plate, pin, pin plate, L-type positioning plate horizontal sides are bonded with the concrete roof top surface of two neighboring steel box girder segment to be installed, vertical edge is bonded with side, pin is vertically fixedly connected in L-type positioning plate horizontal sides, and the side wall ring of the remotely located plate one end of pin is circumferentially with the first locked groove;Pin plate is the sheet metal that flexible deformation occurs under external force, and pin plate side is equipped with the wedged hole of perforation;The position that pin is corresponded on the concrete roof of steel box girder segment to be installed opens up the first positioning hole of perforation.Installation composite structure of the invention and installation method simplify site operation step, shorten the construction time, improve construction efficiency.

Description

A kind of box beam fast installs composite structure and its installation method
Technical field
The present invention relates to steel structure technology fields, fast install composite structure and its installation side more particularly, to a kind of box beam Method.
Background technique
Steel box-girder is one of the primary structure form of current large-span steel bridge girder, is by the upper and lower edge of a wing with longitudinal and transverse rib With the box structure of web composition.More box beam steel bridges are to be connected by multiple steel box-girders by crossbeam.The tradition of crossbeam and cabinet is even The mode of connecing is full welding or bolt-weld joint, site welding, increases difficulty of construction, and weldquality is easy existing defects, Under carload effect, easily causes the cracking of steel, bring serious security problem.
Summary of the invention
The object of the present invention is to provide a kind of box beams fast to install composite structure and its installation method, to solve existing skill The above problem present in art.
In order to achieve the above object, the invention provides the following technical scheme:
A kind of box beam fast installs composite structure, including multiple steel box girder segments to be installed, the steel box girder segment packet Include concrete roof, Wavelike steel webplate and concrete floor interconnected;The concrete roof one of steel box girder segment to be installed Several deformed bars extended in outside concrete roof are equipped with inside side, if the side opposite with deformed bar is correspondingly arranged Dry internal cavity;
It further include fastener, the fastener is made of L-type positioning plate, at least two pins, pin plate, the L-type positioning Plate horizontal sides are bonded with the concrete roof top surface of two neighboring steel box girder segment to be installed, vertical edge and concrete roof side Fitting, the pin is vertically fixedly connected in the L-type positioning plate horizontal sides, and two neighboring steel box girder segment pair to be installed At least one pin, side wall ring week of the pin far from described positioning plate one end are fixedly installed on the L-type positioning plate part answered To equipped with the first locked groove;The pin plate is the sheet metal that flexible deformation occurs under external force, and the pin plate side is equipped with The wedged hole of perforation;The position that pin is corresponded on the concrete roof of two neighboring steel box girder segment to be installed opens up the of perforation A positioning hole.
Further, the side on the pin plate far from wedged hole opens up several second location holes, with second positioning The third location hole of perforation is opened up on the concrete roof of corresponding two steel box girder segments to be installed in hole;It further include reinforcing vertically Muscle, the vertical reinforcing rib run through the second location hole and third location hole.
Further, the internal cavity is connected with the third location hole.
Further, between the vertical reinforcing rib and the second location hole and the hole wall of third location hole, and it is pre- Grouting seam is respectively formed between stress reinforcing bar and the cavity wall of internal cavity.
Further, the concrete top of the width of the vertical edge of the L-type positioning plate and the steel box girder segment to be installed Plate thickness is identical.
The present invention also provides the installation methods that a kind of box beam fast installs composite structure, comprising:
(1) prefabricated steel box girder segment: concrete roof, Wavelike steel webplate and the concrete floor of steel box girder segment carry out pre- Type, the prefabricated several deformed bars extended in outside concrete roof inside the side of concrete roof, with prestress steel are made The opposite side of muscle corresponds to prefabricated several internal cavities;
(2) by the deformed bar of any one in two neighboring steel box girder segment to be installed interior sky corresponding with another Chamber carries out grafting, makes two neighboring steel box girder segment pre-connection to be installed;
(3) L-type positioning plate horizontal sides are bonded with the concrete roof top surface of two neighboring steel box girder segment to be installed, are erected Straight flange is bonded with concrete roof side, and makes pin through the first positioning hole;
(4) the larger end cap of the wedged hole of pin plate is entered into pin, and pushes pin plate along the gradually smaller direction of wedged hole, The small end and first locked groove for making wedged hole cooperate, and lock to the first locked groove of pin;
(5) when first locked groove of the pin plate to pin locks, the second location hole and third position of positioning hole are corresponding, Make vertical reinforcing rib through the second location hole and third location hole;
(6) note in the grouting seam formed between Xiang Shuzhi reinforcing rib and the second location hole and the hole wall of third location hole Enter concrete grouting material, completes the concreting of vertical reinforcing rib and deformed bar.
A kind of box beam of the invention fast installs composite structure and its installation method, overcome traditional crossbeam and cabinet it Between welding or bolt-weld joint, and site welding, the defect that difficulty of construction is big entirely, and avoid weldquality and be easy to exist and lack It falls into, under carload effect, the case where easily causing the cracking of steel, bring serious security problem.Installation group of the invention It closes structure and installation method simplifies site operation step, shorten the construction time, improve construction efficiency.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is that a kind of box beam of the invention fast installs combining structure schematic diagram;
Fig. 2 is steel box girder segment structural schematic diagram to be installed of the invention;
Fig. 3 is the face A-A schematic cross-sectional view in Fig. 1;
Fig. 4 is pin plate structural schematic diagram of the invention.
Specific embodiment
Below in conjunction with attached drawing of the invention, technical solution of the present invention is clearly and completely described, it is clear that institute The embodiment of description is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, Every other embodiment obtained by those of ordinary skill in the art without making creative efforts, belongs to this hair The range of bright protection.
According to Fig. 1-4, a kind of box beam fast installs composite structure, including multiple steel box girder segments to be installed, institute Stating steel box girder segment includes concrete roof 1, Wavelike steel webplate 2 and concrete floor 3 interconnected;Steel box girder section to be installed Several deformed bars 8 extended in outside concrete roof 1 are equipped with inside 1 side of concrete roof of section, with deformed bar 8 Opposite side is correspondingly arranged several internal cavities 801, as shown in Figure 2;
It further include fastener, as shown in Figure 1, the fastener is by L-type positioning plate 4, at least two pins 5,6 structure of pin plate At 4 horizontal sides of L-type positioning plate are bonded with 1 top surface of concrete roof of two neighboring steel box girder segment to be installed, vertical edge It is bonded with 1 side of concrete roof, the pin 5 is vertically fixedly connected in 4 horizontal sides of L-type positioning plate, and adjacent two At least one pin 5 is fixedly installed on corresponding 4 part of L-type positioning plate in a steel box girder segment to be installed, and the pin 5 is far from institute The side wall ring for stating positioning plate one end is circumferentially with the first locked groove;The pin plate 6 is the gold that flexible deformation occurs under external force Metal thin plate, 6 side of pin plate are equipped with the wedged hole 601 of perforation, as shown in Figure 4;Two neighboring steel box girder segment to be installed The position that pin 5 is corresponded on concrete roof 1 opens up the first positioning hole 501 of perforation.
In present embodiment, steel box girder segment to be installed is connected with each other by the deformed bar 8 on concrete roof 1, On this basis, it is further connected by fastener, fastener includes L-type positioning plate 4, pin 5 and pin plate 6, is set on pin plate 6 Wedged hole 601 is set, when being fixed, the larger end cap of the wedged hole 601 of pin plate 6 is entered into pin 5, and along wedged hole 601 Gradually smaller direction pushes pin plate 6, cooperates the small end of wedged hole 601 and first locked groove, to the first lock of pin 5 Slot 502 is locked, while during this, and based on the Curvature varying of pin plate 6, pin plate 6 is voluntarily locked by elastic force.The present invention changes The connection type for becoming traditional site welding avoids the problem of soldered quality is easy existing defects, and it is steady to improve combination connection While solidity, the construction time of shortening, construction efficiency is improved.
In a preferred embodiment, the side on the pin plate 6 far from wedged hole 601 opens up several second positioning Hole 602 opens up perforation on the concrete roof 1 of two steel box girder segments to be installed corresponding with the second location hole 602 Third location hole 701;It further include vertical reinforcing rib 7, as shown in figure 3, the vertical reinforcing rib 7 runs through the second location hole 602 and third location hole 701.In present embodiment, after pin plate 6 and pin 5 are locked, run through second by vertical reinforcing rib 7 Location hole 602 and third location hole 701, are fixed pin plate 6, and then are locked to pin 5.
In a preferred embodiment, the internal cavity 801 is connected with the third location hole 701.Prefabricated In the process, convenient for positioning, consequently facilitating production.
In a preferred embodiment, the vertical reinforcing rib 7 and the second location hole 602 and third location hole Grouting seam is respectively formed between 701 hole wall and between deformed bar 8 and the cavity wall of internal cavity 801.Present embodiment In, on the basis of internal cavity 801 is connected with the third location hole 701, reserve grouting seam, can after the assembly is completed, from Filling concrete is carried out at the grouting seam of third location hole 701 on concrete roof 1, and positions concrete slurry from third The grouting seam in hole 701 flows into internal cavity 801, and from vertical reinforcing rib 7 and deformed bar 8 are fixed, to make whole A installation composite structure is firm.
In a preferred embodiment, the width of the vertical edge of the L-type positioning plate 4 and the steel box-girder to be installed 1 thickness of concrete roof of segment is identical.
A kind of box beam of the invention fast installs the installation method of composite structure, comprising:
(1) prefabricated steel box girder segment: concrete roof 1, Wavelike steel webplate 2 and the concrete floor 3 of steel box girder segment into Row is pre-formed, the prefabricated several deformed bars 8 extended in outside concrete roof 1 inside the side of concrete roof 1, and pre- The opposite side of stress reinforcing bar 8 corresponds to prefabricated several internal cavities 801;
(2) deformed bar 8 of any one in two neighboring steel box girder segment to be installed is corresponding with another interior Cavity 801 carries out grafting, makes two neighboring steel box girder segment pre-connection to be installed;
(3) 4 horizontal sides of L-type positioning plate are bonded with 1 top surface of concrete roof of two neighboring steel box girder segment to be installed, Vertical edge is bonded with 1 side of concrete roof, and makes pin 5 through the first positioning hole 501;
(4) the larger end cap of the wedged hole 601 of pin plate 6 is entered into pin 5, and along the gradually smaller direction of wedged hole 601 Pin plate 6 is pushed, cooperates the small end of wedged hole 601 and first locked groove 502, the first locked groove 502 of pin 5 is locked It is fixed;
(5) when first locked groove 502 of the pin plate 6 to pin 5 locks, the second location hole 602 and third location hole 701 Position is corresponding, makes vertical reinforcing rib 7 through the second location hole 602 and third location hole 701;
(6) filling formed between Xiang Shuzhi reinforcing rib 7 and the second location hole 602 and the hole wall of third location hole 701 Concrete grouting material is injected in slurry seam, completes the concreting of vertical reinforcing rib 7 and deformed bar 8.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (6)

1. a kind of box beam fast installs composite structure, it is characterised in that: including multiple steel box girder segments to be installed, the steel case Girder segment includes concrete roof, Wavelike steel webplate and concrete floor interconnected;The coagulation of steel box girder segment to be installed Several deformed bars extended in outside concrete roof, the side pair opposite with deformed bar are equipped with inside native top plate side Several internal cavities should be set;
It further include fastener, the fastener is made of L-type positioning plate, at least two pins, pin plate, the L-type positioning plate water Pingbian is bonded with the concrete roof top surface of two neighboring steel box girder segment to be installed, and vertical edge and concrete roof side are pasted It closes, the pin is vertically fixedly connected in the L-type positioning plate horizontal sides, and two neighboring steel box girder segment to be installed is corresponding L-type positioning plate part on be fixedly installed at least one pin, side wall ring of the pin far from described positioning plate one end is circumferential Equipped with the first locked groove;The pin plate is the sheet metal that flexible deformation occurs under external force, and the pin plate side is equipped with and passes through Logical wedged hole;The position that pin is corresponded on the concrete roof of two neighboring steel box girder segment to be installed opens up the first of perforation Location hole.
2. a kind of box beam according to claim 1 fast installs composite structure, it is characterised in that: far from wedge on the pin plate The side in shape hole opens up several second location holes, the coagulation of two steel box girder segments to be installed corresponding with the second location hole The third location hole of perforation is opened up on native top plate;It further include vertical reinforcing rib, the vertical reinforcing rib is through second positioning Hole and third location hole.
3. a kind of box beam according to claim 2 fast installs composite structure, it is characterised in that: the internal cavity with it is described Third location hole is connected.
4. a kind of box beam according to claim 3 fast installs composite structure, it is characterised in that: the vertical reinforcing rib with It is respectively formed between the second location hole and the hole wall of third location hole and between deformed bar and the cavity wall of internal cavity Grouting seam.
5. a kind of box beam according to claim 1,2,3 or 4 fast installs composite structure, it is characterised in that: the L-type is fixed The width of the vertical edge of position plate is identical as the concrete roof thickness of the steel box girder segment to be installed.
6. a kind of a kind of box beam such as described in any one of claim 1 to 5 fast installs the installation method of composite structure, feature Be include:
(1) prefabricated steel box girder segment: concrete roof, Wavelike steel webplate and the concrete floor of steel box girder segment are prefabricated into Type, the prefabricated several deformed bars extended in outside concrete roof in side inside of concrete roof, with deformed bar phase Pair side correspond to prefabricated several internal cavities;
(2) by the deformed bar of any one in two neighboring steel box girder segment to be installed internal cavity corresponding with another into Row grafting makes two neighboring steel box girder segment pre-connection to be installed;
(3) L-type positioning plate horizontal sides are bonded with the concrete roof top surface of two neighboring steel box girder segment to be installed, vertical edge It is bonded with concrete roof side, and makes pin through the first positioning hole;
(4) the larger end cap of the wedged hole of pin plate is entered into pin, and pushes pin plate along the gradually smaller direction of wedged hole, make wedge The small end in shape hole and first locked groove cooperate, and lock to the first locked groove of pin;
(5) when first locked groove of the pin plate to pin locks, the second location hole and third position of positioning hole are corresponding, make to erect Straight reinforcing rib runs through the second location hole and third location hole;
(6) injection is mixed in the grouting seam formed between Xiang Shuzhi reinforcing rib and the second location hole and the hole wall of third location hole Solidifying soil grouting material, completes the concreting of vertical reinforcing rib and deformed bar.
CN201910671381.9A 2019-07-24 2019-07-24 Box girder rapid installation combination structure and installation method thereof Active CN110373987B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910671381.9A CN110373987B (en) 2019-07-24 2019-07-24 Box girder rapid installation combination structure and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910671381.9A CN110373987B (en) 2019-07-24 2019-07-24 Box girder rapid installation combination structure and installation method thereof

Publications (2)

Publication Number Publication Date
CN110373987A true CN110373987A (en) 2019-10-25
CN110373987B CN110373987B (en) 2021-08-03

Family

ID=68255455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910671381.9A Active CN110373987B (en) 2019-07-24 2019-07-24 Box girder rapid installation combination structure and installation method thereof

Country Status (1)

Country Link
CN (1) CN110373987B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820515A (en) * 2019-11-18 2020-02-21 重庆交通建设(集团)有限责任公司 Steel box girder structure convenient for positioning girder section and construction method thereof
CN111438816A (en) * 2020-03-27 2020-07-24 苏交科集团股份有限公司 Construction method of concrete combined box girder integral prefabricated wall type guardrail
CN111720099A (en) * 2020-07-20 2020-09-29 成都鑫泽机械有限公司 Beam pumping unit beam structure convenient to install and installation and maintenance method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080099556A (en) * 2007-05-09 2008-11-13 이용호 Sectional concrete synthesis lightweight deck plate
KR100938573B1 (en) * 2009-08-31 2010-01-26 산이건설 주식회사 Upper plate combination structure for construction bridge
JP2011069064A (en) * 2009-09-24 2011-04-07 Taisei Corp Joint structure of precast member, and construction method of the same
CN202359508U (en) * 2012-02-10 2012-08-01 中铁七局集团武汉工程有限公司 Flange plate formwork for curved bridge with adjustable line type
CN102635067A (en) * 2012-05-15 2012-08-15 江苏赛特钢结构有限公司 Combined beam plate structure based on U-shaped channel steel
CN104612030A (en) * 2014-12-17 2015-05-13 邢台路桥交通设施有限公司 Small-span steel mixed composite bridge plate and construction technology thereof
CN204571092U (en) * 2015-02-10 2015-08-19 同济大学 Prefabricated composite girder segment syndeton and the compound beam containing syndeton
CN204589793U (en) * 2015-04-27 2015-08-26 中南大学 A kind of bridge pad
CN205421044U (en) * 2016-03-15 2016-08-03 广东工业大学 FRP board, muscle mix consolidates festival segmentation dry joint seam T web structure
CN207739402U (en) * 2017-12-22 2018-08-17 广州市芳村建筑工程有限公司 Assembly concrete connection structure
CN109629421A (en) * 2018-11-20 2019-04-16 同济大学 A kind of subsection beam construction method for adding steel pipe and horizontal distribution reinforcing bar

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080099556A (en) * 2007-05-09 2008-11-13 이용호 Sectional concrete synthesis lightweight deck plate
KR100938573B1 (en) * 2009-08-31 2010-01-26 산이건설 주식회사 Upper plate combination structure for construction bridge
JP2011069064A (en) * 2009-09-24 2011-04-07 Taisei Corp Joint structure of precast member, and construction method of the same
CN202359508U (en) * 2012-02-10 2012-08-01 中铁七局集团武汉工程有限公司 Flange plate formwork for curved bridge with adjustable line type
CN102635067A (en) * 2012-05-15 2012-08-15 江苏赛特钢结构有限公司 Combined beam plate structure based on U-shaped channel steel
CN104612030A (en) * 2014-12-17 2015-05-13 邢台路桥交通设施有限公司 Small-span steel mixed composite bridge plate and construction technology thereof
CN204571092U (en) * 2015-02-10 2015-08-19 同济大学 Prefabricated composite girder segment syndeton and the compound beam containing syndeton
CN204589793U (en) * 2015-04-27 2015-08-26 中南大学 A kind of bridge pad
CN205421044U (en) * 2016-03-15 2016-08-03 广东工业大学 FRP board, muscle mix consolidates festival segmentation dry joint seam T web structure
CN207739402U (en) * 2017-12-22 2018-08-17 广州市芳村建筑工程有限公司 Assembly concrete connection structure
CN109629421A (en) * 2018-11-20 2019-04-16 同济大学 A kind of subsection beam construction method for adding steel pipe and horizontal distribution reinforcing bar

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820515A (en) * 2019-11-18 2020-02-21 重庆交通建设(集团)有限责任公司 Steel box girder structure convenient for positioning girder section and construction method thereof
CN111438816A (en) * 2020-03-27 2020-07-24 苏交科集团股份有限公司 Construction method of concrete combined box girder integral prefabricated wall type guardrail
CN111720099A (en) * 2020-07-20 2020-09-29 成都鑫泽机械有限公司 Beam pumping unit beam structure convenient to install and installation and maintenance method

Also Published As

Publication number Publication date
CN110373987B (en) 2021-08-03

Similar Documents

Publication Publication Date Title
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
CN110373987A (en) A kind of box beam fast installs composite structure and its installation method
CN104947803B (en) A kind of prefabricated sheet-pile mortise and tenon type connecting node and installation method
CN104532953B (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN106049691A (en) Fully-prefabricated assembling type steel tube constraint frame node
CN113123524A (en) Assembled reinforced concrete frame beam column node connection structure
CN111074775A (en) Assembled suspension bridge tower
CN106121049A (en) Compound shear wall is connected energy dissipation node and preparation method thereof with steel bar girder combination beam
CN110863427A (en) Connecting structure for assembled bridge pier column and bearing platform and construction method thereof
CN111101715A (en) Concrete windowsill coping combined construction method and structure
CN110374014A (en) Big span continuous beam UHPC column construction method
CN114319065A (en) Main beam unit with UHPC (ultra high performance polycarbonate) formwork structure, main beam structure and construction method of main beam structure
CN108252222A (en) Steel-concrete combined structure formula simple supported-to-continuous girder bridge method
CN205742550U (en) Novel fabricated building connects node
KR101625995B1 (en) Precast deck and slab having the same
CN209556195U (en) Fabricated Beam-Slab connection structure
CN109610707A (en) A kind of design and rapid constructing method of prefabricated girder steel and floor fit flush
CN211312485U (en) Profile steel connection type prefabricated underground continuous wall
CN210658403U (en) Prefabricated manger plate bank segment and from wall drainage structures
CN108999287B (en) A kind of assembled square steel tube concrete beam Column border node connection type
CN106638255B (en) A kind of modern bamboo figure's row cantilever glider bridge
CN114263093A (en) Fully-prefabricated assembled bridge and construction method
CN110512514A (en) A kind of assembled bridge pier
CN110904824A (en) Connecting structure for assembled bridge pier column and bearing platform
CN219671051U (en) Superstructure of box bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant