- CN205421044U CN205421044U CN201620224060.6U CN201620224060U CN205421044U CN 205421044 U CN205421044 U CN 205421044U CN 201620224060 U CN201620224060 U CN 201620224060U CN 205421044 U CN205421044 U CN 205421044U
- Authority
- CN
- China
- Prior art keywords
- strength
- frp
- muscle
- excels
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a FRP board, muscle mix consolidates festival segmentation dry joint seam T web structure belongs to bridge reinforcing apparatus field, and the not enough dry joint that reaches of web lower part tensile strength stitched the too early separation problem of key tooth when mainly a solution festival segmentation dry joint seam T joist support received the load. Main technical scheme does: through anchor steel sheet in the anchor bolt 5 that excels in, the anchor nut 6 that excels in, the FRP muscle that excels in 3, the outer anchor steel sheet 4 of the FRP muscle that excels in with 7 anchors in the FRP muscle behind the pre -tension on section web of segmentation dry joint seam T roof beam subassembly 1, paste the anchor through the anchor bolt 5 that excels in, the anchor nut 6 that excels in, the expansion bolts 10 that excels in, the U shaped steel that excels in hoop 8 on section web of segmentation dry joint seam T roof beam subassembly 1 with FRP board 9.
Description
Technical field
This utility model relates to a kind of FPP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure, belongs to bridge strengthening device field.
Background technology
External patch FRP plate, muscle are reinforced old bridge technology of endangering to have speed of application fast, to advantages such as existing traffic impact are less, are widely applied during bridge.T-shaped beam bridge is the bridge structure that China builds that comparison is many, and in recent years, labour cost increases day by day, shifts to an earlier date precast segment in factory, and the construction method of Fast Installation the most gradually occupies leading at the construction field (site).And in China, shifting to an earlier date precast segment in factory, the construction method of Fast Installation the most gradually comes into one's own at the construction field (site).Now, society, economy can be affected greatly by the interruption of traffic.How to shorten the construction period, reduce existing traffic, economy, the impact of society, be urgent problem.Prefabricated subsection formula stem grafting seam bridge, may be implemented in factory and shifts to an earlier date precast segment, at the construction field (site) Fast Installation, greatly shorten the construction period, decrease the impact on surrounding traffic.The utility model proposes a kind of FRP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure, it makes prefabricated subsection formula stem grafting seam T beam energy Fast Installation and makes structural safety be achieved.This utility model great advantage is: all component all can be prefabricated in the factory, the most at the construction field (site) Fast Installation, and improves the bearing capacity of T beam, safe and reliable.
Utility model content
The technical problems to be solved in the utility model is the defect overcoming prior art, it is provided that a kind of FRP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure, this structure force way is clear and definite, and easy construction, it is easy to industrialization Prefabrication, cost is both economical.
This utility model is achieved through the following technical solutions: FRP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure, be prefabricated in the factory the sectional type stem grafting seam T beam assembly 1 containing High-strength anchor bolt preformed hole 2, high-strength expanding bolts preformed hole 12, at the construction field (site), by stem grafting seam, sectional type stem grafting seam T beam assembly 1 is assembled into T beam.By High-strength anchor bolt 5 through High-strength anchor bolt preformed hole 2, anchor plate 3 in high-strength FRP muscle it is pasted onto on sectional type stem grafting seam T ' beam assembly 1 and ensures that High-strength anchor bolt 5 is through the prepared screw-bolt hole on anchor plate 3 in high-strength FRP muscle, the appropriate location that will be pasted onto after pre-for FRP muscle 7 stretch-draw in high-strength FRP muscle on anchor plate 3, load onto the outer anchor plate 4 of high-strength FRP muscle to be allowed to paste with FRP muscle 7, and tighten fixing with high-strength anchoring nut 6.In T beam base plate sticking FRP plate 9, more high-strength U-shaped stirrup 8 is pasted onto in FRP plate 9, high-strength expanding bolts 11 is squeezed into reinforcing in high-strength expanding bolts preformed hole 12 after the bolt hole on high-strength U-shaped stirrup 8.Position relationship and annexation between each parts be: is anchored on T beam assembly by anchor plate, High-strength anchor bolt and nut inside and outside high-strength FRP muscle after the pre-stretch-draw of FRP muscle, and FRP plate is pasted by high-strength U-shaped stirrup, high-strength expanding bolts and is anchored on T beam assembly.
The technological progress that this utility model obtains is: anchor structure is safe and reliable, easy construction, T-shaped beam bridge bearing capacity can be greatly improved.
Accompanying drawing explanation
Fig. 1 is FRP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure side view (time unassembled).
Fig. 2 is FRP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure I-I profile (time unassembled).
Fig. 3 is FRP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure side view (after assembling).
Fig. 4 is FRP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure I-I profile (after assembling).
Wherein, 1, sectional type stem grafting seam T beam assembly;2, High-strength anchor bolt preformed hole;3, anchor plate in high-strength FRP muscle;4, the outer anchor plate of high-strength FRP muscle;5, High-strength anchor bolt;6, high-strength anchoring nut;7, FRP muscle;8, high-strength U-shaped stirrup;9, FRP plate;10, high-strength expanding bolts;11, high-strength expanding bolts preformed hole.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in further details:
As shown in Figure 1, Figure 2, Figure 3, Figure 4, be prefabricated in the factory the sectional type stem grafting seam T beam assembly 1 containing High-strength anchor bolt preformed hole 2, high-strength expanding bolts preformed hole 12, at the construction field (site), by stem grafting seam, sectional type stem grafting seam T beam assembly 1 is assembled into T beam.By High-strength anchor bolt 5 through High-strength anchor bolt preformed hole 2, anchor plate 3 in high-strength FRP muscle it is pasted onto on sectional type stem grafting seam T beam assembly 1 and ensures that High-strength anchor bolt 5 is through the prepared screw-bolt hole on anchor plate 3 in high-strength FRP muscle, the appropriate location that will be pasted onto after pre-for FRP muscle 7 stretch-draw in high-strength FRP muscle on anchor plate 3, load onto the outer anchor plate 4 of high-strength FRP muscle to be allowed to paste with FRP muscle 7, and tighten fixing with high-strength anchoring nut 6.In T beam base plate sticking FRP plate 9, more high-strength U-shaped stirrup 8 is pasted onto in FRP plate 9, high-strength expanding bolts 11 is squeezed into reinforcing in high-strength expanding bolts preformed hole 12 after the bolt hole on high-strength U-shaped stirrup 8.
As it has been described above, this utility model can be realized.
Claims (1)
1. a FRP plate, muscle mixed reinforcement sectional type stem grafting seam T web structure, its structure includes: anchor plate inside and outside high-strength FRP muscle, High-strength anchor bolt and nut, FRP muscle, high-strength U-shaped stirrup, FRP plate, high-strength expanding bolts;Position relationship and annexation between each parts be: is anchored on T beam assembly by anchor plate, High-strength anchor bolt and nut inside and outside high-strength FRP muscle after the pre-stretch-draw of FRP muscle, and FRP plate is pasted by high-strength U-shaped stirrup, high-strength expanding bolts and is anchored on T beam assembly;It is characterized in that: adjacent T girder segment abdominal part uses pretensioned FRP muscle to carry out longitudinal reinforcement, by two sections of T girder segments are coupled together by the FRP muscle Shi Hanzhang being anchored on sectional type stem grafting seam T web;Paste FRP plate bottom adjacent T girder segment, and by High-strength anchor bolt, high-strength anchoring nut, high-strength U-shaped stirrup, high-strength expanding bolts, it is reinforced.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620224060.6U CN205421044U (en) | 2016-03-15 | 2016-03-15 | FRP board, muscle mix consolidates festival segmentation dry joint seam T web structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620224060.6U CN205421044U (en) | 2016-03-15 | 2016-03-15 | FRP board, muscle mix consolidates festival segmentation dry joint seam T web structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205421044U true CN205421044U (en) | 2016-08-03 |
Family
ID=56548804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620224060.6U Expired - Fee Related CN205421044U (en) | 2016-03-15 | 2016-03-15 | FRP board, muscle mix consolidates festival segmentation dry joint seam T web structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205421044U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110373987A (en) * | 2019-07-24 | 2019-10-25 | 重庆交通建设(集团)有限责任公司 | A kind of box beam fast installs composite structure and its installation method |
CN112900278A (en) * | 2021-01-26 | 2021-06-04 | 安徽省交通规划设计研究总院股份有限公司 | Segment concrete member bearing tensile or main tensile stress and connection mode thereof |
-
2016
- 2016-03-15 CN CN201620224060.6U patent/CN205421044U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110373987A (en) * | 2019-07-24 | 2019-10-25 | 重庆交通建设(集团)有限责任公司 | A kind of box beam fast installs composite structure and its installation method |
CN112900278A (en) * | 2021-01-26 | 2021-06-04 | 安徽省交通规划设计研究总院股份有限公司 | Segment concrete member bearing tensile or main tensile stress and connection mode thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735112B (en) | Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier | |
CN109610314B (en) | Prefabricated bridge deck wet joint structure and assembling method | |
CN102154992B (en) | Dislocation installation method of corrugated steel web | |
CN108049498A (en) | The prefabricated post and Prefabricated beam connection structure and method of assembled architecture frame structure | |
CN202247707U (en) | Vertical external prestress and steel plate combined reinforcing box girder structure | |
CN105275092A (en) | Energy consumption type node for connecting section steel concrete beam and steel-plate-wrapped composite shear wall | |
CN109440623B (en) | Temporary splicing structure of precast bridge of concrete segment | |
CN104453093A (en) | Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method | |
CN110792164B (en) | Transverse assembling device and method for assembled shear wall | |
CN205421045U (en) | Local reinforcing structure that mixes of festival segmentation dry joint seam T web | |
CN110004822A (en) | The wet seam of precast concrete beam connects design | |
CN111022072A (en) | Combined joint for reinforcing secondary lining of tunnel constructed by mining method and mounting method | |
CN205421044U (en) | FRP board, muscle mix consolidates festival segmentation dry joint seam T web structure | |
CN110846997A (en) | Prefabricated prestressed steel and concrete spliced continuous combination beam and construction method | |
CN109610311A (en) | Prefabrication and assembly construction L-type floorings seam construction and implementation method | |
CN109024221A (en) | A kind of Novel steel combined box beam and its application method | |
CN109555240A (en) | A kind of partial prestressing assembly of shear wall structure | |
CN103924679B (en) | Prestressed concrete beam and circular steel pipe concrete column combined joint connected with regular rebars | |
CN105951984B (en) | A kind of high ductility prefabricated integral frame mid-side node connection structure and construction method | |
CN110130485B (en) | Prefabricated assembly type beam column node with toothed plates and assembly method thereof | |
CN111719693A (en) | Prestress assembly type steel-concrete sleeved beam-column joint | |
CN111827095A (en) | Prefabricated assembled hollow pier with built-in rib plates and construction method | |
CN110952994A (en) | Bent bolt combined joint for secondary lining of mine method construction tunnel and reinforcing method | |
CN107142830B (en) | Steel pipe web prestress steel-concrete combined girder structure and construction method | |
CN212506738U (en) | Semi-rigid hinge joint with prefabricated part dry connection and hinge first and then rigid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160803 Termination date: 20170315 |
|
CF01 | Termination of patent right due to non-payment of annual fee |