CN110345910A - A kind of settlement observation point mounting structure and method - Google Patents

A kind of settlement observation point mounting structure and method Download PDF

Info

Publication number
CN110345910A
CN110345910A CN201910707495.4A CN201910707495A CN110345910A CN 110345910 A CN110345910 A CN 110345910A CN 201910707495 A CN201910707495 A CN 201910707495A CN 110345910 A CN110345910 A CN 110345910A
Authority
CN
China
Prior art keywords
plastic base
bar
screw
observation point
screw thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910707495.4A
Other languages
Chinese (zh)
Inventor
黄波
张世平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201910707495.4A priority Critical patent/CN110345910A/en
Publication of CN110345910A publication Critical patent/CN110345910A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Architecture (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of settlement observation point mounting structure and method, settlement observation point mounting structure includes steel plate, pre-buried plastic base, screw thread observation bar, screw shell, steel plate is fixed on the pre-buried plastic base, pre-buried plastic base is weldingly fixed on steel reinforcement cage by steel plate, the screw shell is fixed in pre-buried plastic base, for the screw thread observation bar by being screwed in screw shell, the external of the pre-buried plastic base is poured concrete.Compared with prior art, the beneficial effects of the present invention are: a kind of settlement observation point structure and installation and application, use plastics as installation matrix, it is easy drilling, easy for construction, the installed height mark for observing bar is easier to be controlled, it stretches out, hides when not in use, and can replace when observing bar use.

Description

A kind of settlement observation point mounting structure and method
Technical field
The present invention relates to technical field of building construction more particularly to a kind of settlement observation point mounting structure and methods.
Background technique
Settlement observation point, which refers to, changes observation point used in carried out measurement to the elevation for being observed object.It is existing Settlement observation point in building mostly uses rod-like structure, is fixed in wall for a long time, non-dismountable.And in construction, usually It is to drill in concrete after being cast, is then fixedly mounted.Settlement observation is the observation work of a long-term system, can not The observation bar of dismounting and change, it is beautiful that long-time wind and weather is easy old influence exterior wall.In addition, concrete drill hole difficulty of construction compared with Greatly, observation bar installed height mark precision is limited.
Summary of the invention
The object of the present invention is to provide a kind of settlement observation point mounting structure and methods, use plastics as installation matrix, hold Easily drilling, easy for construction, the installed height mark for observing bar is easier to be controlled, and stretches out when observing bar use, hides when not in use, and It can replace.
In order to achieve the above object, the present invention is implemented with the following technical solutions:
A kind of settlement observation point mounting structure, including steel plate, pre-buried plastic base, screw thread observe bar, screw shell, described Steel plate is fixed on pre-buried plastic base, pre-buried plastic base is weldingly fixed on steel reinforcement cage by steel plate, the screw shell It is fixed in pre-buried plastic base, the screw thread observation bar is by being screwed in screw shell, the pre-buried plastic base External be poured concrete.
The screw thread observation bar includes screw rod, end cap, retaining ring, length mark, and the screw rod is screwed in screw shell, end Lid is fixed on one end of screw rod, and the retaining ring is hinged on end cap, and length mark is additionally provided on screw rod.
The length mark is 115mm-125mm with end cap distance L.
The depth of the screw shell is identical as spiro rod length or is greater than spiro rod length.
A kind of construction method of settlement observation point mounting structure, specifically includes:
1) before building concrete casting, pre-buried plastic base is weldingly fixed on by steel plate according to drawings marked position On steel reinforcement cage;
2) after the completion of building concrete casting and constructing, according to the absolute altitude of settlement observation point, wall is being exposed to by electric drill It drills, screw shell is adhesively fixed in the drilling of pre-buried plastic base on the pre-buried plastic base of body;
3) screw thread observation bar is screwed into screw shell, when needing to observe, is screwed out screw thread observation bar by retaining ring Come, screw rod extension elongation is the length at length mark;
4) when not needing observation, screw thread observation bar is screwable into screw shell by retaining ring.
Compared with prior art, the beneficial effects of the present invention are:
A kind of settlement observation point mounting structure and method use plastics as installation matrix, are easy drilling, easy for construction, see The installed height mark of measuring staff is easier to be controlled, and stretches out, hides when not in use, and can replace when observing bar use.
Detailed description of the invention
Fig. 1 is working condition when screw thread observation bar stretches out in the present invention;
Fig. 2 is working condition when screw thread observation bar retracts in the present invention;
Fig. 3 is the partial enlarged view of settlement observation point structure of the invention;
Fig. 4 is the main view of cover board.
In figure: the pre-buried plastic base of 1-, 2- screw thread observation bar, 3- steel plate, 4- concrete, 5- sleeve fixed glue, 6- length Label, 7- end cap, 8- retaining ring, 9- screw shell, 10- steel reinforcement cage, 11- screw rod.
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing:
See Fig. 1-Fig. 4, a kind of settlement observation point mounting structure, including steel plate 3, pre-buried plastic base 1, screw thread observation bar 2, Screw shell 9, steel plate 3 is fixed on the pre-buried plastic base 1, and pre-buried plastic base 1 is weldingly fixed on reinforcing bar by steel plate 3 On cage 10, the screw shell 9 is fixed in pre-buried plastic base 1, and the screw thread observation bar 2 is by being screwed in thread bush In cylinder 9, the external of the pre-buried plastic base 1 is poured concrete 4.
The screw thread observation bar 2 includes screw rod 2, end cap 7, retaining ring 8, length mark 6, and the screw rod 2 is screwed in thread bush In cylinder 9, end cap 7 is fixed on one end of screw rod 2, and the retaining ring 8 is hinged on end cap 7, and length mark 6 is additionally provided on screw rod 2. The outer of cover board 7 can be made chamfering, when cover board 7 is buckled on metope, can play the role of the outside water conservancy diversion of rainwater.
The length mark 6 is 115mm-125mm with 7 distance L of end cap.Length mark 6 can be existed using colored paint The mode painted on screw rod 11.
The depth of the screw shell 9 is identical as 11 length of screw rod or is greater than 11 length of screw rod.Cover board 7 it is outer diametrically big In the diameter of screw shell 9, when screw rod 11 is screwed into screw shell 9, cover board 7 is buckled on wall face.
A kind of construction method of settlement observation point mounting structure, specifically includes:
1) before building concrete casting, pre-buried plastic base 1 is welded and fixed by steel plate 3 according to drawings marked position On steel reinforcement cage 10;Template is normally built according to Construction Design Schemes, and carries out concrete casting, pre-buried plastic base 1 is pre- It is embedded in the wall of the casting of concrete 4.
2) after the completion of building concrete casting and constructing, according to the absolute altitude of settlement observation point, wall is being exposed to by electric drill It drills, screw shell 9 is adhesively fixed in the drilling of pre-buried plastic base 1 on the pre-buried plastic base 1 of body;Screw shell 9 2 accessory processing of bar can be observed with screw thread, be directly mounted in the drilling of pre-buried plastic base 1.
3) screw thread observation bar 2 is screwed into screw shell 9, when needing to observe, is revolved screw thread observation bar 2 by retaining ring 8 Back-out and, 11 extension elongation of screw rod is the length at length mark 6;It, can be to screw thread when discovery screw rod 11, which has, gets rusty sign Observation bar 2 is timely replaced.
4) when not needing observation, screw thread observation bar 2 is screwable into screw shell 9 by retaining ring 8.

Claims (5)

1. a kind of settlement observation point mounting structure, which is characterized in that observe bar, screw thread including steel plate, pre-buried plastic base, screw thread Sleeve is fixed with steel plate on the pre-buried plastic base, and pre-buried plastic base is weldingly fixed on steel reinforcement cage by steel plate, described Screw shell is fixed in pre-buried plastic base, and the screw thread observation bar is described pre-buried by being screwed in screw shell The external of plastic base is poured concrete.
2. a kind of settlement observation point mounting structure according to claim 1, which is characterized in that the screw thread observes bar and includes Screw rod, end cap, retaining ring, length mark, the screw rod are screwed in screw shell, and end cap is fixed on one end of screw rod, the button Ring is hinged on end cap, and length mark is additionally provided on screw rod.
3. a kind of settlement observation point mounting structure according to claim 2, which is characterized in that the length mark and end cap Distance L be 115mm-125mm.
4. a kind of settlement observation point mounting structure according to claim 2, which is characterized in that the depth of the screw shell It is identical as spiro rod length or be greater than spiro rod length.
5. it is a kind of claim 1-4 its any one of as described in settlement observation point mounting structure construction method, feature It is, specifically includes:
1) before building concrete casting, pre-buried plastic base is weldingly fixed on reinforcing bar by steel plate according to drawings marked position On cage;
2) after the completion of building concrete casting and constructing, according to the absolute altitude of settlement observation point, wall is being exposed to by electric drill It drills, screw shell is adhesively fixed in the drilling of pre-buried plastic base on pre-buried plastic base;
3) screw thread observation bar is screwed into screw shell, when needing to observe, is screwed out screw thread observation bar come spiral shell by retaining ring Bar extension elongation is the length at length mark;
4) when not needing observation, screw thread observation bar is screwable into screw shell by retaining ring.
CN201910707495.4A 2019-08-01 2019-08-01 A kind of settlement observation point mounting structure and method Pending CN110345910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910707495.4A CN110345910A (en) 2019-08-01 2019-08-01 A kind of settlement observation point mounting structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910707495.4A CN110345910A (en) 2019-08-01 2019-08-01 A kind of settlement observation point mounting structure and method

Publications (1)

Publication Number Publication Date
CN110345910A true CN110345910A (en) 2019-10-18

Family

ID=68183602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910707495.4A Pending CN110345910A (en) 2019-08-01 2019-08-01 A kind of settlement observation point mounting structure and method

Country Status (1)

Country Link
CN (1) CN110345910A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545271A (en) * 2009-03-21 2009-09-30 标力建设集团有限公司 Telescopic type settlement observer
US20110192111A1 (en) * 2010-02-05 2011-08-11 Sam White Cast-in Shear Wall Anchor
CN202255397U (en) * 2011-10-31 2012-05-30 河北建设集团有限公司 Level mark for settlement observation
CN102721414A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Embedded part on settlement observation point and application method thereof
CN104631644A (en) * 2015-01-09 2015-05-20 上海大学 Novel connection node structure
CN205246081U (en) * 2015-10-29 2016-05-18 山东科技大学 Hidden stainless steel settlement observation point marks piece
CN208501905U (en) * 2018-07-07 2019-02-15 上海宝冶集团有限公司 A kind of building safety guard rail built-in type component
CN210221061U (en) * 2019-08-01 2020-03-31 中国三冶集团有限公司 Settlement observation point mounting structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545271A (en) * 2009-03-21 2009-09-30 标力建设集团有限公司 Telescopic type settlement observer
US20110192111A1 (en) * 2010-02-05 2011-08-11 Sam White Cast-in Shear Wall Anchor
CN202255397U (en) * 2011-10-31 2012-05-30 河北建设集团有限公司 Level mark for settlement observation
CN102721414A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Embedded part on settlement observation point and application method thereof
CN104631644A (en) * 2015-01-09 2015-05-20 上海大学 Novel connection node structure
CN205246081U (en) * 2015-10-29 2016-05-18 山东科技大学 Hidden stainless steel settlement observation point marks piece
CN208501905U (en) * 2018-07-07 2019-02-15 上海宝冶集团有限公司 A kind of building safety guard rail built-in type component
CN210221061U (en) * 2019-08-01 2020-03-31 中国三冶集团有限公司 Settlement observation point mounting structure

Similar Documents

Publication Publication Date Title
CN102721414A (en) Embedded part on settlement observation point and application method thereof
CN102493471A (en) Suspending installation construction process method of structural foot margin anchor bolt
CN110345910A (en) A kind of settlement observation point mounting structure and method
CN210221061U (en) Settlement observation point mounting structure
CN202041208U (en) Stable direct-buried GPS (global positioning system) observation sign
CN105257003A (en) Tool for rapidly fixing grout sleeve and using method of tool
CN208996103U (en) A kind of cast-in-place concrete pile hole bottom slurry pick-up
CN202734828U (en) Novel settlement observation point embedded element
CN201561729U (en) Concrete pole buried depth measuring device
CN204356712U (en) Tourist attractions road indicator
CN201280821Y (en) Ruler for examining thickness of cast-in-situ reinforced concrete slab
CN102778225B (en) Lift type deformation observing device
CN210922582U (en) Level mark
CN204142254U (en) A kind of interior decoration surveying setting-out device
CN204212319U (en) A kind of screw-in greenhouse pillar
CN201397139Y (en) Expansion type settlement observation device
CN203274731U (en) Telescopic settlement observation device
CN203430034U (en) Fixing tool for locating pre-buried sleeve of cast-in-place slab
CN207763714U (en) Construction and lifting wire device for supervision
CN207582978U (en) A kind of floorslab thickness control device
CN205766087U (en) A kind of hole drilling positioning fixture
CN211421897U (en) Building engineering datum line pay-off
CN214121204U (en) Surveying and mapping marker post for engineering
CN211904143U (en) Be fit for hoist and mount wall components of a whole that can function independently settlement monitoring mark
CN201126358Y (en) Settlement observation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination