CN202255397U - Level mark for settlement observation - Google Patents

Level mark for settlement observation Download PDF

Info

Publication number
CN202255397U
CN202255397U CN2011204208212U CN201120420821U CN202255397U CN 202255397 U CN202255397 U CN 202255397U CN 2011204208212 U CN2011204208212 U CN 2011204208212U CN 201120420821 U CN201120420821 U CN 201120420821U CN 202255397 U CN202255397 U CN 202255397U
Authority
CN
China
Prior art keywords
embedded
sleeve
settlement observation
flag
observation
Prior art date
Application number
CN2011204208212U
Other languages
Chinese (zh)
Inventor
何海龙
刘兴月
刘建斌
孙献豪
李会杰
杨永春
Original Assignee
河北建设集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 河北建设集团有限公司 filed Critical 河北建设集团有限公司
Priority to CN2011204208212U priority Critical patent/CN202255397U/en
Application granted granted Critical
Publication of CN202255397U publication Critical patent/CN202255397U/en

Links

Abstract

The utility model discloses a level mark for settlement observation, comprising an embedded sleeve, a lengthening rod, a mark head, plastic caps and a decorative piece, wherein the embedded sleeve is buried in structural concrete, and the outer end of the embedded sleeve is level to the surface of the structural concrete; the lengthening rod is in threaded matching with the embedded sleeve, and one end of the lengthening rod is screwed into the embedded sleeve; the mark head is in threaded matching with the outer end of the lengthening rod; one plastic cap is in threaded matching with the inner end of the embedded sleeve, and the other plastic cap is in threaded matching with the outer end of the embedded sleeve after the observation is finished; and the decorative piece is sheathed on the lengthening rod and is positioned at the outer side of the decorative layer for decoration. The level mark is beneficial to protecting a finished product, ensures the measurement accuracy, and simultaneously is convenient in installation and attractive in effect.

Description

沉降观测水准标志 Settlement observation level mark

技术领域 FIELD

[0001] 本实用新型涉及建筑技术领域,更具体地说,涉及一种沉降观测水准标志。 [0001] The present invention relates to the field of building technology, and more particularly, to a marker level observed sedimentation. 背景技术 Background technique

[0002] 为了保证建筑物等大型构筑物的安全,在建筑物施工及使用过程中定期检测其沉降情况是否在允许范围内是非常重要的,根据国家工程测量规范的要求,在建筑物周围的墙体上分布埋设有几个至几十个用于检测其沉降情况的永久性标志-建筑物沉降观测点水准标志。 [0002] In order to ensure the safety of large structures such as buildings, building construction and in the course of regular testing to settle the case is within the allowable range is very important, according to the national standard requirements engineering survey, the wall around the building body buried on the distribution of several to several tens permanent signs for the settlement of cases detected - building settlement observation point level mark.

[0003] 目前,建筑物沉降观测点水准标志一般采用钢筋自制或简单的成品,直接埋入结构内。 [0003] Currently, standard building settlement observation point flag is generally made of reinforced or simple finished, embedded directly within the structure. 在埋植完成后不利于成品的保护,主体施工过程中易因碰撞移位造成观测数据的偏差。 Is not conducive to the protection of the finished product after the completion of implantation, the main construction process is easy to shift due to collision caused the deviation of the observed data. 工程竣工以后,由于水准标志的外露尺寸和外墙面装修做法不匹配致使水准标志不能伸出外饰面,而不能进行观测;或即便外漏,由于是预埋,外墙饰面处理起来较难,且不美观。 After completion of the project, due to the size of the exposed standard logo and the outer wall decoration practice does not match the result flag can not extend outside the standard of finish, but can not be observed; or even leakage, because it is embedded, it is more difficult to deal with external finishes and not beautiful.

[0004] 如何利于沉降观测水准标志的保护,成为本领域技术人员亟待解决的重要技术问题。 [0004] How conducive to the settlement level of protection observed signs has become an important technical problem to those skilled solved.

实用新型内容 SUMMARY

[0005] 有鉴于此,本实用新型提供了一种沉降观测水准标志,以利于沉降观测水准标志的保护。 [0005] Accordingly, the present invention provides a sign of settlement observation level, the observed level of protection in order to facilitate the settlement flag.

[0006] 为实现上述目的,本实用新型提供如下技术方案: [0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] 一种沉降观测水准标志,包括: [0007] A settlement observation standard marker, comprising:

[0008] 预埋套筒,其埋设于结构混凝土内,且其外端与所述结构混凝土的表面齐平; [0008] embedded sleeve embedded in the concrete structure, and the outer end surface of the structure is flush with the concrete;

[0009] 接长杆,其与所述预埋套筒螺纹配合,其一端旋入所述预埋套筒内; [0009] access pole, embedded with the mating threaded sleeve, which is screwed into one end of the inner sleeve embedded;

[0010] 标志头,其与所述接长杆的外端螺纹配合; [0010] marker head, cooperating with said threaded outer end connected to the mast;

[0011] 塑料帽,其为两个,其中一个所述塑料帽与所述预埋套筒的内端螺纹配合,另一个所述塑料帽在观测完成后与所述预埋套筒的外端螺纹配合; [0011] The plastic cap, which is two, wherein one of the plastic cap and the inner end of the embedded sleeve threadably engaging the other of the plastic cap after completion of the observation of the outer end of the sleeve embedded threaded engagement;

[0012] 装饰片,其套设于所述接长杆上,且位于装修装饰层外侧。 [0012] The decorative sheet, which is provided on the contact sleeve on the mast, and is located outside the decoration layer.

[0013] 优选地,在上述沉降观测水准标志中,所述预埋套筒的内孔具有通螺纹,外侧为20mm宽,2mm深的凹槽。 [0013] Preferably, in the settlement observation standard flag, the embedded through bore having a threaded sleeve, the outer width of 20mm, 2mm deep grooves.

[0014] 优选地,在上述沉降观测水准标志中,所述凹槽为多个,且沿所述预埋套筒的轴向均勻布置。 [0014] Preferably, in the settlement observation standard flag, said plurality of grooves, and uniformly arranged in the axial sleeve embedded.

[0015] 优选地,在上述沉降观测水准标志中,相邻两个所述凹槽之间的距离为20mm。 [0015] Preferably, in the settlement observation standard flag, the distance between two adjacent recesses is 20mm.

[0016] 优选地,在上述沉降观测水准标志中,所述接长杆的外侧上下为通螺纹,两侧为平面。 [0016] Preferably, in the settlement observation standard flag, then the outer vertical mast is threaded through both sides of the plane.

[0017] 优选地,在上述沉降观测水准标志中,所述标志头为不锈钢标志头。 [0017] Preferably, in the settlement observation standard flag, the first flag is a flag stainless steel head.

[0018] 优选地,在上述沉降观测水准标志中,所述预埋套筒和所述结构混凝土之间涂覆植筋胶层。 [0018] Preferably, in the settlement observation standard flag, the embedded anchorage coated adhesive layer between the sleeve and the concrete structure.

[0019] 从上述的技术方案可以看出,本实用新型提供的沉降观测水准标志,根据沉降观测的观测周期要求,在完成主体结构(观测点安装位置的结构)后,采用与植筋相同的工艺埋植预埋套筒,预埋套筒外侧与结构面平,并用塑料帽保护。 [0019] As can be seen from the above technical solutions, settlement observation standard marker provided in the present invention, in accordance with the requirements of settlement observation observation period, after the completion of the main structure (mounting structure observation point position), using the same anchorage process implants embedded sleeve, the outer sleeve is embedded with the flat surface structure, and protected with a plastic cap. 施工过程中每次观测时,采用接长杆将水准点标志头与预埋套筒连接进行观测,观测完成后拆除标志头和接长杆,用塑料帽保护。 During each observation construction, using the standard access point flag pole head and sleeve coupler embedded for observation after observation and then to complete the removal flag pole head, a protective plastic cap. 外装修过程中在观测点位置留洞,洞口要求小于装饰片的直径,同时用与装修厚度相匹配的接长杆与标志头连接进行观测。 Decoration holes left during the observation point position, a diameter smaller than the hole required decorative sheet, while the thickness of the decoration with the matched contact with the mast head connected observation flag. 工程施工全部工序完成后将接长杆与标志头连接,同时安装装饰片,成为永久观测点标志,在工程竣工后的观测周期中继续使用。 After completion of all the processes of construction and the flag pole connector contact, install decorative sheet, a permanent observation point flag, continue to use the observation period after the completion of the project. 这样达到工程施工过程中有效保护和竣工后的美观和实用。 Achieved in the construction process works effectively beauty and utility protection and after completion. 本实用新型提供的沉降观测水准标志有利于成品保护,保证测量精度,同时安装方便,效果美观。 The present invention provides settlement observation standard product protection flag beneficial to ensure accuracy, and easy installation, aesthetic effect.

附图说明 BRIEF DESCRIPTION

[0020] 图1为本实用新型实施例提供的沉降观测水准标志的施工中观测时安装图; FIG mounting construction settlement observation standard marker [0020] FIG. 1 embodiment the present invention provides the observer;

[0021] 图2为本实用新型实施例提供的沉降观测水准标志的外装修完成后安装图; Installation decoration view of settlement observation standard marker [0021] FIG. 2 provides an embodiment of the present invention is completed;

[0022] 图3为本实用新型实施例提供的沉降观测水准标志的施工观测周期内安装图; FIG mounted within the working standard observation period settlement observation marker [0022] FIG. 3 embodiment of the present invention provides;

[0023] 图4为本实用新型实施例提供的预埋套筒的结构示意图; Structure [0023] FIG. 4 embodiment the present invention provides a schematic of the embedded sleeve;

[0024] 图5为图4的侧视图; [0024] FIG. 5 is a side view of Figure 4;

[0025] 图6为本实用新型实施例提供的接长杆的结构示意图; Schematic structural diagram of [0025] FIG. 6 embodiment the present invention provides access mast;

[0026] 图7为图6的侧视图。 [0026] FIG. 7 is a side view of FIG.

具体实施方式 Detailed ways

[0027] 本实用新型公开了一种沉降观测水准标志,以利于沉降观测水准标志的保护。 [0027] The present invention discloses a sign of settlement observation level, the observed level of protection in order to facilitate the settlement flag.

[0028] 下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。 [0028] below with reference to the present invention, the embodiment of the drawings, the present invention embodiment of the technical solution will be clearly and completely described, obviously, the described embodiments are merely embodiments of the present invention a part, rather than all embodiments. 基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。 Based on the embodiments of the present invention, all other embodiments of ordinary skill in the art without any creative effort shall fall within the scope of protection of the present invention.

[0029] 请参阅图1-图7,图1为本实用新型实施例提供的沉降观测水准标志的施工中观测时安装图;图2为本实用新型实施例提供的沉降观测水准标志的外装修完成后安装图; 图3为本实用新型实施例提供的沉降观测水准标志的施工观测周期内安装图;图4为本实用新型实施例提供的预埋套筒的结构示意图;图5为图4的侧视图;图6为本实用新型实施例提供的接长杆的结构示意图;图7为图6的侧视图。 [0029] Please refer to FIGS. 1-7, the construction of the installation of FIG settlement observation standard flag new observations provided by the embodiment of FIG. 1 in the present practical; new settlement observation standard flag provided in the embodiment of FIG. 2 is a practical decoration after completion of the installation diagram; FIG mounted within the working standard observation period settlement observation embodiments provide a novel marker of the present utility FIG. 3; FIG. 4 is a schematic structural embodiment of the invention provides a sleeve embedded present; FIG. 5 is 4 side view; FIG. 6 is a schematic structural bonding mast disclosure provided by the embodiment; FIG. 7 is a side view of FIG.

[0030] 本实用新型实施例提供的沉降观测水准标志,包括预埋套筒2、接长杆3、标志头5、塑料帽8和装饰片6。 Settlement observation standard flag [0030] embodiment of the present invention is provided, comprising a sleeve embedded 2, 3 pole connection, signs head 5, the plastic cap and the decorative sheet 8 6. 其中,预埋套筒2埋设于结构混凝土1内,且其外端与结构混凝土1的表面齐平,接长杆3与预埋套筒2螺纹配合,其一端旋入预埋套筒2内。 Wherein the sleeve 2 are embedded in the embedded concrete structure 1, and the surface of the concrete structure 1 and the outer end is flush with the embedded contact sleeve 3 pole with the second screw, which is screwed into one end of the sleeve 2 embedded . 标志头5与接长杆3的外端螺纹配合,塑料帽8为两个,其中一个塑料帽8与预埋套筒2的内端螺纹配合,另一个塑料帽8在观测完成后与预埋套筒2的外端螺纹配合。 Flag pole head 5 and connected with an outer end of the screw, the plastic cap 3 two 8, wherein a plastic cap 8 and the embedded end screwed sleeve 2, another plastic cap 8 after completion of the observation with embedded 2 the outer end of the threaded sleeve fitting. 装饰片6套设于接长杆3上,且位于装修装饰层7外侧。 6 decorative sheet sleeved on the access pole 3 and 7 of the outer decorative layer is located in the decoration.

[0031] 本实用新型提供的沉降观测水准标志,根据沉降观测的观测周期要求,在完成主体结构(观测点安装位置的结构)后,采用与植筋相同的工艺埋植预埋套筒2,预埋套筒2外侧与结构混凝土1的结构面平,并用塑料帽8保护。 [0031] The present invention settlement observation standard flags provided, in accordance with the requirements of settlement observation observation period, after the completion of the main structure (mounting structure observation point position), using the same process as the implants embedded anchorage sleeve 2, embedded structure of the sleeve 2 and the outer flat surface of the concrete structure 1, 8 and protected with a plastic cap. 施工过程中每次观测时,采用接长杆3将标志头5与预埋套筒2连接进行观测,观测完成后拆除标志头5和接长杆3,用塑料帽8保护。 During each observation construction, then using a flag pole 3 and head 5 of the sleeve 2 connected to the embedded for observation after observation completion flag removal head 5 and the ground pole 3, 8 with a protective plastic cap. 外装修过程中在观测点位置留洞,洞口要求小于装饰片6的直径,同时用与装修厚度相匹配的接长杆3与标志头5连接进行观测。 Decoration holes left during the observation point position, a diameter smaller than the hole required decorative sheet 6, while the thickness of the decoration with the matched contact 3 and the observation pole connector 5 flags. 工程施工全部工序完成后将将接长杆3与标志头5连接,同时安装装饰片6,成为永久观测点标志,在工程竣工后的观测周期中继续使用。 After the entire construction process is finished flag and the access pole 3 connected to head 5, installed decorative sheet 6, a permanent observation point flag, continue to use the observation period after the completion of the project. 这样达到工程施工过程中有效保护和竣工后的美观和实用。 Achieved in the construction process works effectively beauty and utility protection and after completion. 本实用新型提供的沉降观测水准标志有利于成品保护,保证测量精度,同时安装方便,效果美观。 The present invention provides settlement observation standard product protection flag beneficial to ensure accuracy, and easy installation, aesthetic effect.

[0032] 预埋套筒2的内孔具有通螺纹,外侧为20mm宽,2mm深的凹槽,预埋套筒2采用Q235钢材制作,镀锌防腐。 [0032] embedded within the bore through the sleeve 2 has a threaded outer width of 20mm, 2mm deep grooves, the sleeve 2 using the embedded steel production Q235, be galvanized. 凹槽可为多个,且沿预埋套筒2的轴向均勻布置,相邻两个凹槽之间的距离为20mm。 May be a plurality of grooves, disposed axially and uniformly embedded in the sleeve 2, the distance between two adjacent grooves is 20mm.

[0033] 接长杆3的外侧上下为通螺纹,两侧为平面,接长杆3采用Q235钢材制作,镀锌防腐。 [0033] Take pole outside thread 3 through the upper and lower sides, on both sides of the plane, then using the pole 3 Q235 steel production, be galvanized. 标志头5为不锈钢标志头,塑料帽8采用硬质塑料,带螺纹,在观测周期内保护预埋套筒2不进入杂物。 Flag for the first signs of stainless steel head 5, the plastic cap 8 with hard plastic, threaded, embedded protective sleeve 2 does not enter the observation period debris. 装饰片6材质不锈钢,表面作沉降观测标志,竣工时安装,起装饰和标识作用。 6 decorative sheet material of stainless steel, the surface flag for settlement observation, when the completion of the installation, identification and decorative effect. 预埋套筒2和结构混凝土1之间涂覆植筋胶层4。 The sleeve 2 and the embedded concrete structure between an adhesive layer 4 coated anchorage.

[0034] 如图3所示,在需要预埋沉降观测点的位置采用植筋技术,在结构完成后植入预埋套筒2,植入过程要保证预埋套筒2的水平,可配合使用接长杆3和水平尺,确保水平后进行固定,并安装塑料帽8保护。 [0034] As shown in FIG 3 in use need to be laid settlement observation point location bar technique, the structure of the implant after embedded in the sleeve 2 is completed, the implant process to ensure that the level of embedded sleeve 2, can be used with use cheater bars 3 and foot level, to ensure that the fixed level, and the protection cap 8 of plastic is attached. 如图1所示,在需要进行沉降观测时,取下塑料帽8,安装接长杆3和标志头5,进行观测,观测完成后拆除,再用塑料5保护。 1, when the settlement observation is required, remove the plastic cap 8, then the installation flag pole 3 and head 5, observation, observation after completion of removal, and then the protective material 5.

[0035] 如图2所示,外装修完成后,根据装修做法厚度确定加长杆的长度并进行现场切割安装,同时安装不锈钢装饰片和标志头。 [0035] As shown in FIG 2, after the decoration is completed, it is determined according to the length of the extension bar and the thickness of the decoration practice cutting installation site, while the decorative sheet and stainless steel mounting head flag. 为保证安装牢固,在安装接长杆和标志头时,在丝扣表面适量抹AB胶粘接。 To ensure securely mounted, when the installation flag and access pole head, the threaded surface of the applicator amount AB adhesive connection.

[0036] 本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其它实施例的不同之处,各个实施例之间相同相似部分互相参见即可。 [0036] In the present specification, the various embodiments described in a progressive manner, differences from the embodiment described with other embodiments focus each embodiment, the same or similar portions between the various embodiments refer to each other.

[0037] 对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本实用新型。 [0037] The above description of the disclosed embodiments enables those skilled in the art to make or use the present invention. 对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本实用新型的精神或范围的情况下,在其它实施例中实现。 Various modifications to these professionals skilled in the art of the present embodiments will be apparent, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit of the present invention or range. 因此,本实用新型将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。 Accordingly, the present invention will not be limited to the embodiments shown herein but is to be accorded herein consistent with the principles and novel features disclosed widest scope.

5 5

Claims (7)

1. 一种沉降观测水准标志,其特征在于,包括:预埋套筒O),其埋设于结构混凝土(1)内,且其外端与所述结构混凝土(1)的表面齐平;接长杆(3),其与所述预埋套筒(¾螺纹配合,其一端旋入所述预埋套筒O)内; 标志头(5),其与所述接长杆(3)的外端螺纹配合;塑料帽(8),其为两个,其中一个所述塑料帽(8)与所述预埋套筒(¾的内端螺纹配合, 另一个所述塑料帽(8)在观测完成后与所述预埋套筒O)的外端螺纹配合; 装饰片(6),其套设于所述接长杆C3)上,且位于装修装饰层(7)外侧。 A settlement observation standard flag, wherein, comprising: a sleeve embedded O), which is embedded in the concrete structure (1), and the outer end surface of said concrete structure (1) flush; then mast (3), with the embedded sleeve (¾ threaded engagement, one end of which is screwed into the sleeve embedded O) inside; flag head (5), which is connected with the mast (3) mating threaded outer end; the plastic cap (8), which is two, wherein one of said plastic cap (8) with the embedded sleeve (¾ of the inner end of the threaded fitting, the other of said plastic cap (8) after completion of observation of the embedded sleeve O) threadedly engaged with an outer end; decorative sheet (6), which is connected to the pole sleeve disposed C3) and corresponding to the decoration layer (7) outside.
2.根据权利要求1所述的沉降观测水准标志,其特征在于,所述预埋套筒(2)的内孔具有通螺纹,外侧为20mm宽,2mm深的凹槽。 The settlement observation level flag according to claim 1, wherein said embedded inner bore of the sleeve (2) has a through threaded outer width of 20mm, 2mm deep grooves.
3.根据权利要求2所述的沉降观测水准标志,其特征在于,所述凹槽为多个,且沿所述预埋套筒O)的轴向均勻布置。 The settlement observation standard marker according to claim 2, wherein said plurality of grooves, and uniformly disposed along the sleeve embedded O) in the axial direction.
4.根据权利要求3所述的沉降观测水准标志,其特征在于,相邻两个所述凹槽之间的距离为20mm。 The settlement observation standard marker according to claim 3, characterized in that the distance between two adjacent grooves is 20mm.
5.根据权利要求1所述的沉降观测水准标志,其特征在于,所述接长杆(3)的外侧上下为通螺纹,两侧为平面。 The settlement observation level flag according to claim 1, wherein said outer pole connection (3) is threaded through the upper and lower sides, on both sides of the plane.
6.根据权利要求1所述的沉降观测水准标志,其特征在于,所述标志头(5)为不锈钢标志头ο The settlement observation level flag according to claim 1, wherein the marker head (5) is a stainless steel head flag ο
7.根据权利要求1-6任一项所述的沉降观测水准标志,其特征在于,所述预埋套筒O) 和所述结构混凝土(1)之间涂覆植筋胶层G)。 7. The settlement observation standard marker according to any one of claims 1-6, wherein said sleeve is embedded O), and the structural concrete (subbing layer coated anchorage between G 1)).
CN2011204208212U 2011-10-31 2011-10-31 Level mark for settlement observation CN202255397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204208212U CN202255397U (en) 2011-10-31 2011-10-31 Level mark for settlement observation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204208212U CN202255397U (en) 2011-10-31 2011-10-31 Level mark for settlement observation

Publications (1)

Publication Number Publication Date
CN202255397U true CN202255397U (en) 2012-05-30

Family

ID=46116624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204208212U CN202255397U (en) 2011-10-31 2011-10-31 Level mark for settlement observation

Country Status (1)

Country Link
CN (1) CN202255397U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102721414A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Embedded part on settlement observation point and application method thereof
CN103557850A (en) * 2013-11-07 2014-02-05 大连市勘察测绘研究院有限公司 Markstone
US8998168B2 (en) 2009-06-03 2015-04-07 S.P.M. Flow Control, Inc. Plug valve indicator
US9103448B2 (en) 2012-08-16 2015-08-11 S.P.M. Flow Control, Inc. Plug valve having preloaded seal segments
US9273543B2 (en) 2012-08-17 2016-03-01 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US9322243B2 (en) 2012-08-17 2016-04-26 S.P.M. Flow Control, Inc. Automated relief valve control system and method
CN106524994A (en) * 2016-10-29 2017-03-22 中国十七冶集团有限公司 Embedded part, observation part, settlement observation point component for settlement observation and observation method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8998168B2 (en) 2009-06-03 2015-04-07 S.P.M. Flow Control, Inc. Plug valve indicator
CN102721414A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Embedded part on settlement observation point and application method thereof
US9638337B2 (en) 2012-08-16 2017-05-02 S.P.M. Flow Control, Inc. Plug valve having preloaded seal segments
US9103448B2 (en) 2012-08-16 2015-08-11 S.P.M. Flow Control, Inc. Plug valve having preloaded seal segments
US9273543B2 (en) 2012-08-17 2016-03-01 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US9322243B2 (en) 2012-08-17 2016-04-26 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US9857807B2 (en) 2012-08-17 2018-01-02 S.P.M. Flow Control, Inc. Automated relief valve control system and method
CN103557850A (en) * 2013-11-07 2014-02-05 大连市勘察测绘研究院有限公司 Markstone
CN106524994A (en) * 2016-10-29 2017-03-22 中国十七冶集团有限公司 Embedded part, observation part, settlement observation point component for settlement observation and observation method
CN106524994B (en) * 2016-10-29 2019-01-04 中国十七冶集团有限公司 Settlement observation built-in fitting, settlement observation point component

Similar Documents

Publication Publication Date Title
CL2008001145A1 (en) Article setting with face of fibrous matrix comprising the 1st set core and fibrous matrix polymer fibers or mineral and hydrophobic termination, contact core setting, in one of its surfaces; process for preparing cured article; and process for preparing cured article resistant to water.
DE60113153D1 (en) A method of measuring the orientation of a substrate with respect to a reference alignment mark
AT411433T (en) Method for the production of a concrete bond and formwork panel to be used therefor
WO2011088312A3 (en) Drilling machine and method
EP2231945A4 (en) Profile for the facade of a multi-storey building and a multi-storey building with such a facade
IL222679D0 (en) Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same
WO2009137179A3 (en) Rtci cable and method
WO2012174414A3 (en) Fiber reinforced concrete
PL1970344T3 (en) Boom for the distribution of concrete for work vehicles and relative production method
DK2351163T3 (en) Angular connector with a shield and method of making the shield of the angle connector
EP2148956A4 (en) Scaffold arrangement and method for repairing the edge structure of a concrete bridge
CN202672592U (en) Stone anchoring structure
CN202970116U (en) Vibration sensing optical fiber erecting device
SG177084A1 (en) Optical body, wall member, fitting, solar shading device, and building
DE502005004042D1 (en) Method for the production of a bandful high temperature super plaster with csd super secondary coating
CN202899531U (en) Wall brick dry hanging anchor device
CN203924104U (en) Wind turbine generator foundation
CN201817958U (en) Plastic brick with pipe/line groove
AU300600S (en) Faceplate for volatile actives dispenser
RU2011101653A (en) Screw anchor bolt for concrete and stones
AU337066S (en) Seismic expansion sleeve for suspended ceilings
CN202595739U (en) Anchor rod suitable for soft soil layer
CN202991777U (en) Three-eccentric combination bolt
JO2862B1 (en) Facing element for use in a stabilized soil structure
CN201358571Y (en) Fluorescent escape ground tile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
CP03