CN206113946U - A repeatedly usable monitoring point device for concrete structure component - Google Patents
A repeatedly usable monitoring point device for concrete structure component Download PDFInfo
- Publication number
- CN206113946U CN206113946U CN201621181468.6U CN201621181468U CN206113946U CN 206113946 U CN206113946 U CN 206113946U CN 201621181468 U CN201621181468 U CN 201621181468U CN 206113946 U CN206113946 U CN 206113946U
- Authority
- CN
- China
- Prior art keywords
- concrete structure
- monitoring point
- point device
- fitting
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The utility model provides a repeatedly usable monitoring point device for concrete structure component, includes the concrete structure component, be provided with hollow built -in fitting in the concrete structure component, still include long threaded pole and flat board, long threaded pole one end swing joint has a metal hemisphere, open the screw hole I that has with long threaded pole looks adaptation on the flat board, the back was together fixed with the built -in fitting in the long threaded pole other end entered into the built -in fitting from I precession of screw hole, dull and stereotyped bottom surface is in same horizontal plane with the top surface of concrete structure component. Compared with the prior art, the utility model discloses not only can measure the vertical displacement of concrete structure component, can connect the horizontal displacement that the concrete structure component was measured to the total powerstation moreover, easy operation, precision are high, monitoring point device processing, convenient operation and can repeated turnover use, overcome that traditional concrete monitoring point device easy destroy and difficultly restores, horizontal displacement measuring error shortcoming such as great, with high costs especially.
Description
Technical field
This utility model is related to a kind of monitoring point device, specifically a kind of for the reusable of concrete structure member
Monitoring point device, belongs to field of measuring technique.
Background technology
At this stage either cast-in-place concrete structure or precast concrete occupy very heavy in Civil Engineering Construction
The status wanted and share, it is ensured that safety of the xoncrete structure during constructing and coming into operation is an extremely important work
Make.Therefore, safety monitoring is carried out to concrete structure member and there is extremely important practical significance.
Traditional xoncrete structure monitoring device has the disadvantages that:
(1)Measurement error is larger, and precision is relatively low.When traditional theodolite intersection is measured, point equipment is usually direct
Pre-buried steel ball, artificially to point every time it cannot be guaranteed that in same position.
(2)Monitoring point is more easily damaged and repairs cost height.Mechanically or manually during concrete structure construction seldom
Notice the position of monitoring point let alone protect in advance, once monitoring point is destroyed, repair more difficult, usually exist
Drill on concrete embedded monitoring point, not only cost is high but also can bring certain infringement to xoncrete structure.
(3)Monitoring point single use, causes the wasting of resources.Monitoring point device is laid in advance with construction, after construction is finished
It is destroyed or it is direct it is permanent stay in xoncrete structure, device not recoverable in monitoring point causes great resource
Waste.
Accordingly, it would be desirable to a kind of new reusable monitoring point device for concrete structure member is traditional to overcome
Defect, it is ensured that while monitoring accuracy is improved, will also ensure to monitor the steady in a long-term while taking into account economic input of point device.
The content of the invention
According to the deficiencies in the prior art, this utility model offer is a kind of new to be made for the repeatable of concrete structure member
Use monitoring point device, the higher electronic total station automatic measurement of service precision, simple to operate, high precision, the processing of monitoring point device,
It is easy to operate and can repeat to be used in turn.
This utility model is realized by technical scheme below:
A kind of reusable monitoring point device for concrete structure member, including concrete structure member, it is described
Hollow built-in fitting is provided with concrete structure member;Also include long threaded rod and flat board, long threaded rod one end activity
A metal hemisphere is connected with, the screwed hole I being adapted with long threaded rod, the long threaded rod other end are provided with the flat board
It is fixed together with built-in fitting after entering in built-in fitting from the precession of screwed hole I, bottom surface and the xoncrete structure structure of the flat board
The top surface of part is in same level.
Preferably, the female thread being adapted with the external screw thread on long threaded rod is provided with the built-in fitting inwall, is led to
The cooperation for crossing screw thread is fixed together both;The depth of the built-in fitting embedded concrete structure component is at least 30mm.
Preferably, also protection cap is removed during measurement is put well including a protection cap being sleeved on built-in fitting, measured
Protection cap is covered after end, prevents concrete from entering in built-in fitting.
Preferably, the material of the protection cap is the steel plate not less than 3mm.
Preferably, the diameter of the long threaded rod is not less than 10mm, and length is not less than 80mm;Long threaded rod it is pre-buried away from
From 1/3rd for whole long screw thread pole length.
Preferably, the material of the long threaded rod is rustless steel or the ferrum that one layer of anti-corrosive antirusting paint is coated with outside it
Matter.
Preferably, the flat board is that thickness is not less than 10mmPVC plastic plates not less than 2mm steel plates or thickness;It is described
The surface configuration of flat board is circle, rectangle, square or triangle.
Preferably, the central cross-section diameter of the metal hemisphere is not less than 20mm, and metal hemisphere center is provided with
Screwed hole II is adapted with long threaded rod, both are fixed together by the cooperation of screw thread.
Preferably, the material of the built-in fitting is PVC plastic material, with certain rigidity and intensity, it is ensured that
There is no destruction and moderate finite deformation when concrete structure member is poured.
This utility model beneficial effect:
(1)Certainty of measurement is greatly improved.This utility model directly can be fixedly connected with the prism of full-automatic total powerstation so that
Measurement error is greatly reduced, certainty of measurement is greatly improved.
(2)Reduce monitoring cost.The monitoring point being laid on concrete structure member is more easily damaged in the construction stage, repaiies
Multiple cost is big and causes measurement error to become big.This utility model is carried out when work is not measured using stainless steel protection lid
Protection, other operations will not be damaged when constructing to measuring point;The composable dismounting of monitoring device that this utility model is provided and can
Reuse so that monitoring cost greatly reduces.
(3)Monitoring cycle is long, does not affect the construction of xoncrete structure and uses.Because measuring point is built-in type, not only can
It is monitored in the construction stage, be even completed after coming into operation normally to be monitored to concrete structure member.
Description of the drawings
Fig. 1 is cutd open for a kind of built-in fitting of the reusable monitoring point device for concrete structure member of this utility model
Face figure;
Fig. 2 is according to a kind of reusable monitoring point device for concrete structure member of the present utility model
Preferred embodiment profile;
Fig. 3 is according to a kind of reusable monitoring point device for concrete structure member in embodiment illustrated in fig. 2
Front view;
Fig. 4 is according to a kind of reusable monitoring point device for concrete structure member in embodiment illustrated in fig. 2
Top view;
In figure:1st, concrete structure member, 2, built-in fitting, 3, long threaded rod, 4, flat board, 5, metal hemisphere, 6, female thread,
7th, protection cap.
Specific embodiment
Below in conjunction with accompanying drawing 1- accompanying drawings 4, this utility model is further described by specific embodiment.
Embodiment one:
As Figure 1-Figure 4, a kind of reusable monitoring point device for concrete structure member, including concrete
Structural elements 1, built-in fitting 2 according to design monitoring scheme be arranged in concrete structure member 1, the bottom diameter of built-in fitting 2 and
The external diameter of long threaded rod 3 is equal, concreting maintenance the stage built-in fitting is covered with protection cap 7, prevent enter concrete,
Dust;Also include long threaded rod 3 and circular steel plate, the thickness of circular steel plate is 3mm, and the length of side is 100mm, it is ensured that circular steel plate with
Total station prism base is completely attached to and contact area is sufficiently large, and circular steel plate center position is provided with screwed hole I, bottom diameter
Equal with the external diameter of long threaded rod 3, long threaded rod 3 is connected in precession built-in fitting 2 by screwed hole I with circular steel plate, circular steel
The bottom surface of plate and the top surface of concrete structure member 1 are located at same level, and the length of long threaded rod 3 is 90mm, long threaded rod 3
Predeterminable range be 30mm, it is ensured that reusable monitoring point device and the stable connection of concrete structure member 1, by rustless steel gold
Category hemisphere 5 and long threaded rod 3 be connected it is appropriate after, will carry out by the commanding elevation for surveying chi and being placed on stainless steel metal hemisphere 5
The vertical displacement measurement of concrete structure member 1;Stainless steel metal hemisphere 5 is backed out, the long threaded rod 3 of 60mm length is changed into, it is long
The external diameter of threaded rod 3 is equal with Jing in the screw thread of total station prism base, it is ensured that the length of the screw thread of total station prism base is not
Less than 30mm, circular steel plate is screwed onto into the centre position of long threaded rod 3, long threaded rod 3 is screwed in built-in fitting 2, it is ensured that circular steel
Plate and concrete structure member 1 are located in same level, and the silk mouth of total station prism base is twisted with long spire bar 3 is exposed
Tightly, the silk mouth bottom surface and circular steel plate that prism is made every time is in close contact, it is ensured that prism is every time after same position
Carry out the horizontal displacement monitoring of concrete structure member 1;The material of long threaded rod 3 is that irony and outside are coated with one layer of anti-corrosion and apply
After material, the horizontal displacement of concrete structure member 1 or vertical displacement monitoring are finished, by long threaded rod 3, circular steel plate, rustless steel
Metal hemisphere 5 is dismantled, and is covered built-in fitting 2 using irony protection cap, it is ensured that built-in fitting 2 is not destroyed.
This utility model not only can measure the vertical displacement of concrete structure member, and can connect total station survey
The horizontal displacement of concrete structure member, simple to operate, high precision, monitoring point device processing, it is easy to operate and can repeat
It is used in turn.
The above, simply one of embodiment of the present utility model, is not that this utility model is imposed any restrictions, and is owned
According to a kind of reusable monitoring point device technique, structure essence for concrete structure member of this utility model to above-mentioned
Any simple modification, change and equivalent structure change that embodiment is made, belong to this utility model a kind of for concrete
The protection domain of the reusable monitoring point device technique scheme of structural elements.
Claims (9)
1. a kind of reusable monitoring point device for concrete structure member, including concrete structure member (1), it is special
Levy and be:Hollow built-in fitting (2) is provided with the concrete structure member (1);
Also include long threaded rod (3) and flat board (4), described long threaded rod (3) one end is connected with a metal hemisphere (5),
The screwed hole I being adapted with long threaded rod (3) is provided with the flat board (4), long threaded rod (3) other end is from screwed hole I
Precession is fixed together after entering in built-in fitting (2) with built-in fitting (2), bottom surface and the xoncrete structure structure of the flat board (4)
The top surface of part (1) is in same level.
2. a kind of reusable monitoring point device for concrete structure member according to claim 1, its feature
It is:The female thread (6) being adapted with the external screw thread on long threaded rod (3) is provided with built-in fitting (2) inwall, by spiral shell
The cooperation of stricture of vagina is fixed together both;The depth of the built-in fitting (2) embedded concrete structure component (1) is at least 30mm.
3. a kind of reusable monitoring point device for concrete structure member according to claim 1 and 2, it is special
Levy and be:Also include a protection cap (7) for being sleeved on (2) on built-in fitting, protected in place with protection cap (7) when pre-buried, prevent
Concrete is entered in built-in fitting (2).
4. a kind of reusable monitoring point device for concrete structure member according to claim 3, its feature
It is:The material of the protection cap (7) is the steel plate not less than 3mm.
5. a kind of reusable monitoring point device for concrete structure member according to claim 1, its feature
It is:The diameter of the long threaded rod (3) is not less than 10mm, and length is not less than 80mm;The pre-buried distance of long threaded rod (3) is whole
/ 3rd of individual long threaded rod (3) length.
6. a kind of reusable monitoring point device for concrete structure member according to claim 1 or 5, it is special
Levy and be:The material of the long threaded rod (3) is rustless steel or the irony that one layer of anti-corrosive antirusting paint is coated with outside it.
7. a kind of reusable monitoring point device for concrete structure member according to claim 1, its feature
It is:The flat board (4) is not less than 10mmPVC plastic plates for thickness not less than 2mm steel plates or thickness;The flat board (4)
Surface configuration is circle, rectangle, square or triangle.
8. a kind of reusable monitoring point device for concrete structure member according to claim 1, its feature
It is:The central cross-section diameter of the metal hemisphere (5) is not less than 20mm, and metal hemisphere (5) center is provided with and long spiral shell
Rasp bar (3) is adapted screwed hole II, and both are fixed together by the cooperation of screw thread.
9. a kind of reusable monitoring point device for concrete structure member according to claim 1 and 2, it is special
Levy and be:The material of the built-in fitting (2) is PVC plastic material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621181468.6U CN206113946U (en) | 2016-10-27 | 2016-10-27 | A repeatedly usable monitoring point device for concrete structure component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621181468.6U CN206113946U (en) | 2016-10-27 | 2016-10-27 | A repeatedly usable monitoring point device for concrete structure component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206113946U true CN206113946U (en) | 2017-04-19 |
Family
ID=58525752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621181468.6U Expired - Fee Related CN206113946U (en) | 2016-10-27 | 2016-10-27 | A repeatedly usable monitoring point device for concrete structure component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206113946U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108458697A (en) * | 2018-03-12 | 2018-08-28 | 哈尔滨工业大学 | A kind of auxiliary device and detection method of detection bridge linear change |
-
2016
- 2016-10-27 CN CN201621181468.6U patent/CN206113946U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108458697A (en) * | 2018-03-12 | 2018-08-28 | 哈尔滨工业大学 | A kind of auxiliary device and detection method of detection bridge linear change |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206113946U (en) | A repeatedly usable monitoring point device for concrete structure component | |
CN203669332U (en) | Straight thread connection combined type steel pipe scaffold wall connecting component | |
CN204199180U (en) | A kind of bridge pad bolt integral built-in mould | |
CN204781970U (en) | Template fixing device with adjustable | |
CN205027505U (en) | Pseudo - static test device with adjustable | |
CN206930244U (en) | A kind of device for detecting thickness of concrete | |
CN204435343U (en) | Pattern foundation pit supporting structure tiltometer | |
CN204983399U (en) | Section of hanging down is transferred to testing column steel pipe | |
CN203097263U (en) | Standardized revolving scaffolding connecting tube | |
CN205619903U (en) | Deformation monitoring system | |
CN208998714U (en) | A kind of chassis stone, chuck stone bury detecting structure | |
CN210070951U (en) | Convenient measuring mark who changes | |
CN207420068U (en) | The device that the hole of measurement optical fiber is protected is equipped with to construction site | |
CN203572477U (en) | Assembled settlement observation point | |
CN206815817U (en) | A kind of architectural engineering multifunction formboard | |
CN204754254U (en) | Longmen stake with protection device | |
CN207448776U (en) | A kind of high ferro box beam catenary mast built-in fitting calibrating installation | |
CN203132551U (en) | Building wall type measuring-observing pillar | |
CN206607905U (en) | A kind of concrete drill core sampling damage revamping device | |
CN206410989U (en) | A kind of cement anchoring agent anchor force experiment simulation aperture apparatus | |
CN205063311U (en) | A connecting piece for building scaffold | |
CN207110060U (en) | A kind of novel embedded part device applied to internally climbing tower crane | |
CN205421871U (en) | Elevation measuring tool for construction site | |
CN219200233U (en) | Measuring device convenient to change | |
CN108286335A (en) | A kind of construction through-flooring sleeve fixing device and its fixing means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170419 Termination date: 20171027 |
|