CN108286335A - A kind of construction through-flooring sleeve fixing device and its fixing means - Google Patents

A kind of construction through-flooring sleeve fixing device and its fixing means Download PDF

Info

Publication number
CN108286335A
CN108286335A CN201810347511.9A CN201810347511A CN108286335A CN 108286335 A CN108286335 A CN 108286335A CN 201810347511 A CN201810347511 A CN 201810347511A CN 108286335 A CN108286335 A CN 108286335A
Authority
CN
China
Prior art keywords
flooring
cylindrical die
casing
upper layer
center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810347511.9A
Other languages
Chinese (zh)
Other versions
CN108286335B (en
Inventor
郑东
宋文学
张鑫
王春波
俞邦栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201810347511.9A priority Critical patent/CN108286335B/en
Publication of CN108286335A publication Critical patent/CN108286335A/en
Application granted granted Critical
Publication of CN108286335B publication Critical patent/CN108286335B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Abstract

The invention discloses a kind of construction through-flooring sleeve fixing devices and its fixing means, device to include:One cylindrical die, center positioning hole is equipped at the center of the cylindrical die, the outer diameter of cylindrical die be less than through-flooring casing inner diameter, cylindrical die integrally embed be set to through-flooring inside pipe casing after, the axis co-axial of the axis and through-flooring casing of the center positioning hole;One aciculiform inserted link, the aciculiform inserted link are plugged in center positioning hole;The center positioning hole of the cylindrical die and upper layer through-flooring cannula center point is corresponding;Through-flooring casing is set in fixed between cylindrical die outside cylindrical die.A kind of construction through-flooring sleeve fixing device of the present invention, utilize the central point of determining through-flooring casing, use a kind of through-flooring casing fixing mould with center positioning hole, ensure that the centralized positioning of through-flooring casing is accurate, ensure that through-flooring casing fixation, through-flooring sleeve fixing device may be reused simultaneously.

Description

A kind of construction through-flooring sleeve fixing device and its fixing means
Technical field
The present invention relates to a kind of construction through-flooring sleeve fixing devices, belong to the realm of building construction.
Background technology
In building construction process, the fixation of through-flooring casing is typically now fixed using steel wire lashing or using wearing mould Slab muscle nut is fixed.Steel wire lashing fixation is insecure, can generate displacement as reinforcing bar shakes;Wearing template reinforcing bar fixing means needs The trepanning in template destroys template, and need to go to tighten nut to template lower section, and working efficiency is not high.
Invention content
In view of the above technical problems, the present invention proposes a kind of construction through-flooring sleeve fixing device, can securely consolidate Determine through-flooring casing, and position it is convenient accurate, it is simple and efficient to handle, destruction will not be generated to template, carry through-flooring casing Head protector prevents concrete from entering in through-flooring casing, while mold can reuse.
In order to achieve the above technical purposes, the present invention adopts the following technical scheme that:
A kind of construction through-flooring sleeve fixing device, including:
One cylindrical die is equipped with center positioning hole at the axle center of the cylindrical die, and the outer diameter of cylindrical die, which is less than, to be worn Floor sleeve internal diameter, cylindrical die integrally embed be set to through-flooring inside pipe casing after, the axis of the center positioning hole and The axis co-axial of through-flooring casing;
One aciculiform inserted link, the aciculiform inserted link is plugged in center positioning hole, and can above and below be moved in center positioning hole Dynamic, center positioning hole is surrounded by engraved structure;
The fixing device determines upper layer through-flooring set when in use, based on the through-flooring casing for having poured lower-layer concrete floor The position of pipe;
The bottom of the cylindrical die has anti-displacement glue-line;
Through-flooring casing is set in outside cylindrical die, and by detachable fixing piece by through-flooring casing and cylindrical mould It is relatively fixed between tool.
The detachable fixing piece is filled in for , at least provided with arranged symmetrically on the outer wall of the cylindrical die upper end Liang Ge plug angle.
The top of the upper layer through-flooring casing is equipped with a capping, described to cover upper layer through-flooring bobbin seal.
Setting is through the through-hole of cylindrical die at the center of the cylindrical die, be equipped at the center of through-hole it is described in Heart location hole, center positioning hole are supported by the inner wall of centre bore floor and through-hole and are connected.
The present invention further discloses a kind of fixation side of the construction through-flooring sleeve fixing device described in application Method, this method comprises the following steps:
Step 1 determines the upper layer fixed position of through-flooring casing based on the through-flooring casing for having poured lower-layer concrete floor, packet It includes:
The template bottom that through-flooring cannula center point is projected to by laser zenith meter upper layer floor has been installed by lower layer first, then According to the center position projected below the template of upper layer floor, corresponding center point above the template of upper layer floor is determined It sets, and line mark of crossing at the template upper surface center position of upper layer floor;
Then cylindrical die integrated hanging is moved to the top of upper layer floor, slowly move the position of cylindrical die, is led to Whether the engraved structure observation aciculiform inserted link and the cross hairs mark for crossing center positioning hole surrounding are aligned;
After step 2, alignment, anti-displacement glue-line is pasted in the bottom of cylindrical die, then slowly by cylindrical die along vertical Direction declines, until template contacts and fixation that the bottom of cylindrical die passes through anti-displacement glue-line and upper layer floor;
Upper layer through-flooring casing is set in outside cylindrical die by step 3, by detachable fixing piece by through-flooring casing It is relatively fixed between cylindrical die;
Step 4 fills glass cement at the template contacts of through-flooring casing and upper layer floor, prevents cement mortar from injecting through-flooring set In pipe.
In step 1, when the template that through-flooring cannula center point is projected to upper layer floor has been installed by laser zenith meter by lower layer Behind bottom, saturating, line of crossing at nail hole is followed closely into incident point with wire nail.
In step 2, the anti-displacement glue-line is the shape double-sided adhesive offset plate consistent with cylindrical die base profile.
Advantageous effect:
Using a kind of construction through-flooring sleeve fixing device of the present invention, template reinforcing bar spiral shell is fixed and worn relative to steel wire lashing Female fixed method, has following advantageous effect:
The first, speed of application is fast, efficient.
The second, accurate positioning, firm position.
Third can reuse, and not damage template, material-saving environmental.
4th, easy construction does not need other tools.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of construction through-flooring sleeve fixing device of the present invention;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is aciculiform hinge pedestal structure schematic diagram;
Fig. 4 is closure construction schematic diagram;
Fig. 5 is Fig. 4 side views;
6 Wei of figure plug structure schematic diagram;
Wherein, 1 is through-flooring casing;2 be cylindrical die;Peep hole centered on 3;Hole floor centered on 4;5 Wei plug angle; 6 be double-glue bat;7 be concrete blinding;8 be aciculiform inserted link;9 be capping;10 Wei plug.
Specific implementation mode
With reference to the accompanying drawings of the specification and specific embodiment is described in further detail technical scheme of the present invention.
As shown in Fig. 1 ~ Fig. 6, a kind of construction through-flooring sleeve fixing device of the present invention, including:
One cylindrical die is equipped with center positioning hole at the center of the cylindrical die, and the outer diameter of cylindrical die, which is less than, to be worn Floor sleeve internal diameter, cylindrical die integrally embed be set to through-flooring inside pipe casing after, the axis of the center positioning hole and The axis co-axial of through-flooring casing;
One aciculiform inserted link, the aciculiform inserted link are plugged in center positioning hole;
The fixing device determines upper layer through-flooring set when in use, based on the through-flooring casing for having poured lower-layer concrete floor Fixed position is managed, by the aciculiform inserted link by the center positioning hole of the cylindrical die and casting concrete floor Through-flooring cannula center is corresponding;
The bottom of the cylindrical die has anti-skidding bed course;
Through-flooring casing is set in outside cylindrical die, by detachable fixing piece by through-flooring casing and cylindrical die Between it is fixed.
In the present embodiment, cylindrical die, outer diameter is less than through-flooring casing inner diameter 2mm, passes through double faced adhesive tape mode and building Layer concrete template bond, the through-flooring casing of engineering is then coated at mold, cylindrical die ontology is fixed, pass through by Jian cylindrical die and through-flooring casing stopper close, ensure that outer through-flooring casing is fixed from face.
As the further preferred scheme of technical solution of the present invention, cylindrical die center sets center positioning hole, uses one Root is directed at determining through-flooring cannula center point with the aciculiform inserted link that the aperture of center positioning hole is adapted, it is ensured that upper layer through-flooring Casing accurate positioning.
As the further preferred scheme of technical solution of the present invention, center positioning hole surrounding does hollow design, convenient for observation Whether aciculiform inserted link is directed at through-flooring cannula center point.
As the further preferred scheme of technical solution of the present invention, the height of cylindrical die is debugged less than through-flooring casing 10mm, through-flooring sleeve kit capping, prevents concrete from entering in through-flooring casing and mold.
As the further preferred scheme of technical solution of the present invention, the detachable fixing piece Wei plug, cylindrical mould Have and fill in angle at least provided with symmetrically arranged two on the outer wall of upper end, is just filled in .
As the further preferred scheme of technical solution of the present invention, the anti-skidding bed course is to be arranged at the bottom of cylindrical die The viscose glue bed course in portion.In the present embodiment, the viscose glue bed course is double-glue bat.
A kind of fixing means using heretofore described construction through-flooring sleeve fixing device, this method include Following steps:
Step 1 determines the upper layer fixed position of through-flooring casing based on the through-flooring casing for having poured lower-layer concrete floor, packet It includes:
The template bottom that through-flooring cannula center point is projected to by laser zenith meter upper layer floor has been installed by lower layer first, then According to the center position projected below the template of upper layer floor, corresponding center point above the template of upper layer floor is determined It sets, and line mark of crossing at the center position described in the template upper surface of upper layer floor;
Then cylindrical die integrated hanging is moved to the top of upper layer floor, slowly move the position of cylindrical die, is led to Whether the engraved structure observation aciculiform inserted link and the cross hairs mark for crossing center positioning hole surrounding are aligned;
After step 2, alignment, anti-displacement glue-line is pasted in the bottom of cylindrical die, then slowly by cylindrical die along vertical Direction declines, until the bottom of cylindrical die and template contacts and the fixation of upper layer floor, determine cylindrical die bottom and It is contacted between the template upper surface of upper layer floor secured;
Through-flooring casing is set in outside cylindrical die by step 3, by detachable fixing piece by through-flooring casing and circle It is fixed between cylindrical mold;
Step 4 is filled at template contacts of the through-flooring casing with upper layer floor with glass cement, prevents cement mortar from injecting through-flooring In casing.
As the further preferred of the method for the present invention technical solution, in step 1, lower layer installed when laser zenith meter and has been worn After floor sleeve central point is projected to the template bottom of upper layer floor, incident point wire nail is followed closely thoroughly, and then determine upper layer floor Template above corresponding center position.
As the further preferred of the method for the present invention technical solution, in step 2, the anti-displacement glue-line is shape and cylinder The consistent double-sided adhesive offset plate of shape mold bottom shape.

Claims (7)

1. a kind of construction through-flooring sleeve fixing device, which is characterized in that including:
One cylindrical die is equipped with center positioning hole at the axle center of the cylindrical die, and the outer diameter of cylindrical die, which is less than, to be worn Floor sleeve internal diameter, cylindrical die integrally embed be set to through-flooring inside pipe casing after, the axis of the center positioning hole and The axis co-axial of through-flooring casing;
One aciculiform inserted link, the aciculiform inserted link is plugged in center positioning hole, and can above and below be moved in center positioning hole Dynamic, center positioning hole is surrounded by engraved structure;
The fixing device determines upper layer through-flooring set when in use, based on the through-flooring casing for having poured lower-layer concrete floor The position of pipe;
The bottom of the cylindrical die has anti-displacement glue-line;
Through-flooring casing is set in outside cylindrical die, and by detachable fixing piece by through-flooring casing and cylindrical mould It is relatively fixed between tool.
2. construction through-flooring sleeve fixing device according to claim 1, which is characterized in that described detachable solid Determine part to fill in for , fills in angle at least provided with symmetrically arranged two on the outer wall of the cylindrical die upper end.
3. construction through-flooring sleeve fixing device according to claim 1, which is characterized in that the upper layer through-flooring The top of casing is equipped with a capping, described to cover upper layer through-flooring bobbin seal.
4. construction through-flooring sleeve fixing device according to claim 1, which is characterized in that the cylindrical die Center at setting through the through-hole of cylindrical die, the center positioning hole is equipped at the center of through-hole, center positioning hole is logical The inner wall support for crossing centre bore floor and through-hole connects.
5. a kind of fixing means using construction through-flooring sleeve fixing device described in claim 1, which is characterized in that This method comprises the following steps:
Step 1 determines the upper layer fixed position of through-flooring casing based on the through-flooring casing for having poured lower-layer concrete floor, packet It includes:
The template bottom that through-flooring cannula center point is projected to by laser zenith meter upper layer floor has been installed by lower layer first, then According to the center position projected below the template of upper layer floor, corresponding center point above the template of upper layer floor is determined It sets, and line mark of crossing at the template upper surface center position of upper layer floor;
Then cylindrical die integrated hanging is moved to the top of upper layer floor, slowly move the position of cylindrical die, is led to Whether the engraved structure observation aciculiform inserted link and the cross hairs mark for crossing center positioning hole surrounding are aligned;
After step 2, alignment, anti-displacement glue-line is pasted in the bottom of cylindrical die, then slowly by cylindrical die along vertical Direction declines, until template contacts and fixation that the bottom of cylindrical die passes through anti-displacement glue-line and upper layer floor;
Upper layer through-flooring casing is set in outside cylindrical die by step 3, by detachable fixing piece by through-flooring casing It is relatively fixed between cylindrical die;
Step 4 fills glass cement at the template contacts of through-flooring casing and upper layer floor, prevents cement mortar from injecting through-flooring set In pipe.
6. the fixing means of construction through-flooring sleeve fixing device according to claim 5, which is characterized in that step In 1, after through-flooring cannula center point has been installed by laser zenith meter by lower layer is projected to the template bottom of upper layer floor, it will project Point follows closely saturating, line of crossing at nail hole with wire nail.
7. the fixing means of construction through-flooring sleeve fixing device according to claim 6, which is characterized in that step In 2, the anti-displacement glue-line is the shape double-sided adhesive offset plate consistent with cylindrical die base profile.
CN201810347511.9A 2018-04-18 2018-04-18 Building construction floor penetrating sleeve fixing device and fixing method thereof Active CN108286335B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810347511.9A CN108286335B (en) 2018-04-18 2018-04-18 Building construction floor penetrating sleeve fixing device and fixing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810347511.9A CN108286335B (en) 2018-04-18 2018-04-18 Building construction floor penetrating sleeve fixing device and fixing method thereof

Publications (2)

Publication Number Publication Date
CN108286335A true CN108286335A (en) 2018-07-17
CN108286335B CN108286335B (en) 2023-09-01

Family

ID=62834647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810347511.9A Active CN108286335B (en) 2018-04-18 2018-04-18 Building construction floor penetrating sleeve fixing device and fixing method thereof

Country Status (1)

Country Link
CN (1) CN108286335B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309369A (en) * 2021-06-29 2021-08-27 方泽华 Accurate positioning and mounting method for building structure embedded sleeve and sleeve assembly component

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202055529U (en) * 2011-04-07 2011-11-30 刘开阳 Pipe standing device capable of completing pouring sleeves of water supply pipe and sewer pipe in one step in building construction
CN204691282U (en) * 2015-05-20 2015-10-07 河南六建建筑集团有限公司 A kind of locating wedge
CN204983657U (en) * 2015-09-17 2016-01-20 湖南六建机电安装有限责任公司 Floor buried sleeve positioner
CN205917944U (en) * 2016-06-28 2017-02-01 苏州东宇建设发展有限公司 Floor buried sleeve positioner
CN206189855U (en) * 2016-11-21 2017-05-24 青岛东捷建设工程有限公司 Reserve continuous auxiliary positioning device in entrance to a cave between concrete floor
CN208310215U (en) * 2018-04-18 2019-01-01 中建八局第三建设有限公司 A kind of construction through-flooring sleeve fixing device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202055529U (en) * 2011-04-07 2011-11-30 刘开阳 Pipe standing device capable of completing pouring sleeves of water supply pipe and sewer pipe in one step in building construction
CN204691282U (en) * 2015-05-20 2015-10-07 河南六建建筑集团有限公司 A kind of locating wedge
CN204983657U (en) * 2015-09-17 2016-01-20 湖南六建机电安装有限责任公司 Floor buried sleeve positioner
CN205917944U (en) * 2016-06-28 2017-02-01 苏州东宇建设发展有限公司 Floor buried sleeve positioner
CN206189855U (en) * 2016-11-21 2017-05-24 青岛东捷建设工程有限公司 Reserve continuous auxiliary positioning device in entrance to a cave between concrete floor
CN208310215U (en) * 2018-04-18 2019-01-01 中建八局第三建设有限公司 A kind of construction through-flooring sleeve fixing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309369A (en) * 2021-06-29 2021-08-27 方泽华 Accurate positioning and mounting method for building structure embedded sleeve and sleeve assembly component

Also Published As

Publication number Publication date
CN108286335B (en) 2023-09-01

Similar Documents

Publication Publication Date Title
CN104018422A (en) Wet joint structure for prefabrication and splicing of joint part between bridge pier column and cover beam
CN203878461U (en) Wet joint structure for prefabricating and splicing connecting portion between pier stand column and cover beam
CN110185199A (en) A kind of half grouting connection sleeve of the automatic deviation correction for prefabricated post wall
CN108286335A (en) A kind of construction through-flooring sleeve fixing device and its fixing means
CN203569487U (en) Embedded part for installation of bridge pier hanging basket
CN208310215U (en) A kind of construction through-flooring sleeve fixing device
CN208966022U (en) A kind of template poured for large-scale beam column
CN205857238U (en) A kind of underground engineering steel pipe column pilework
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN204098489U (en) A kind of mould making concrete floorslab preformed hole
CN207549035U (en) A kind of precast beam molding die
CN106522545B (en) A kind of self-unloading is adjustable Screw arbor with nut at both-ends device and its assembly and disassembly methods
CN206397154U (en) The dismounting device of the outer eaves mould of complicated concrete
CN104314179A (en) Anti-shear stud for GFRP concrete combined member and construction method thereof
CN107806243A (en) A kind of fixed structure of the pre-buried line box of aluminum alloy mould plate
CN211114435U (en) A half grout connecting sleeve of automatic rectifying for prefabricated post wall
CN206221170U (en) Concrete towers cartridge module
CN206607753U (en) After pour beam steel anchor
CN207568181U (en) A kind of fixed structure of the pre-buried wire box of aluminum alloy mould plate
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN207003245U (en) A kind of bridge fence-slab fixing device
CN206233111U (en) A kind of two-way horn mouth anchorage
CN205840329U (en) A kind of novel pipeline reserves sleeve pipe
CN206308907U (en) A kind of anchor reserved for reinforcing bar
CN206110537U (en) Cement mortar stair angle steel external corner angle bead device of marking time

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant