CN206221170U - Concrete towers cartridge module - Google Patents

Concrete towers cartridge module Download PDF

Info

Publication number
CN206221170U
CN206221170U CN201621109236.XU CN201621109236U CN206221170U CN 206221170 U CN206221170 U CN 206221170U CN 201621109236 U CN201621109236 U CN 201621109236U CN 206221170 U CN206221170 U CN 206221170U
Authority
CN
China
Prior art keywords
tower segments
tower
prestressing force
cartridge module
force sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621109236.XU
Other languages
Chinese (zh)
Inventor
郑家宁
李亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Fengling new energy Co.,Ltd.
Original Assignee
Huoerguosi Amperex Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huoerguosi Amperex Technology Ltd filed Critical Huoerguosi Amperex Technology Ltd
Priority to CN201621109236.XU priority Critical patent/CN206221170U/en
Application granted granted Critical
Publication of CN206221170U publication Critical patent/CN206221170U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of concrete towers cartridge module, the concrete towers cartridge module includes the first tower segments, the second tower segments and prestressing force sleeve.Locating dowel is provided with the top of first tower segments, the bottom of the second tower segments is provided with the first detent coordinated with locating dowel, tack coat is provided between first tower segments and the second tower segments, it is equipped with first tower segments and the second tower segments through the duct of height, prestressing force sleeve is respectively provided in duct, the upper end of each prestressing force sleeve is less than the lower end in corresponding duct so as to form the second detent positioned at the duct of the bottom of prestressing force sleeve higher than the upper end and its lower end in corresponding duct, and the upper end of prestressing force sleeve coordinates in corresponding second detent.According to concrete towers cartridge module of the present utility model, when two neighboring tower segments carry out level docking, conveniently dock and merging precision is high, efficiency of construction can be improved, it is ensured that construction quality, and cause that the operation of level docking is simple.

Description

Concrete towers cartridge module
Technical field
The utility model is related to technical field of wind power generation, more particularly, to a kind of concrete towers cartridge module.
Background technology
With the increase of power generation efficiency, length of blade is more and more long, the height of matching blower fan tower barrel and cuts Face size is also continuously increased.Steel construction tower due to relatively costly, transport difficult, therefore, it is difficult to meet building for heavy in section tower high Make requirement.And precast concrete tower can economically build Large-scale Wind Turbines, therefore obtain extensive concern.Due to fortune Defeated condition and prefabricated processing conditions are limited, and complete concrete tower is often formed by multiple single tower Assemblings.
In correlation technique, during concrete towers cartridge module is assembled, the horizontal joint of single tower and other towers The problems such as connection faces merging precision difference, and complex procedures, low construction efficiency.
Utility model content
The utility model is intended at least solve to a certain extent one of technical problem in correlation technique.Therefore, this reality With a kind of concrete towers cartridge module of new proposition, the concrete towers cartridge module has that horizontal merging precision is high, operation is simple, construction The advantage of efficiency high.
Concrete towers cartridge module according to the utility model embodiment, including:First tower segments and positioned at first tower The second tower segments above cylinder section, are provided with locating dowel at the top of first tower segments, the bottom of second tower segments is provided with First detent, the locating dowel coordinates with first detent, first tower segments and second tower segments Between be provided with tack coat, be equipped with through the duct of height in first tower segments and second tower segments;Pre-stress cover Cylinder, the prestressing force sleeve is respectively provided in the duct of the duct of first tower segments and second tower segments, each institute The upper end of the upper end higher than the corresponding duct of prestressing force sleeve is stated, the lower end of each prestressing force sleeve is less than corresponding The lower end in the duct so as to form the second detent positioned at the duct of the bottom of the prestressing force sleeve, positioned at described first The upper end of the prestressing force sleeve in tower segments coordinates in second detent in second tower segments.
Concrete towers cartridge module according to the utility model embodiment, by two tower segments in neighbouring connection it Between by the cooperation of locating dowel and the first locating slot, when two neighboring tower segments carry out level and dock, convenient docking and dock High precision, while being coordinated the second of the tower segments being positioned above by the upper end of the prestressing force sleeve that will be located in tower segments In locating slot, such that it is able to make the prestressing force sleeve being located in each tower segments quickly and accurately be connected in the vertical direction, can Further to improve merging precision when concrete towers cartridge module level is docked, and efficiency of construction can be improved, it is ensured that apply Working medium amount, and cause that the operation of level docking is simple.
According to some embodiments of the present utility model, the tack coat is thixotroping mortar or epoxy resin.
According to some embodiments of the present utility model, multiple levelling pads are additionally provided with the top of first tower segments, it is many The individual levelling pad is spaced apart around the center of first tower segments and sets.
According to some embodiments of the present utility model, leveling groove, the leveling are provided with the top of first tower segments Pad coordinates in the leveling groove.
According to some embodiments of the present utility model, the upper table of the upper surface of the levelling pad and first tower segments Height between face is not less than 10mm.
According to some embodiments of the present utility model, the upper surface of the prestressing force sleeve is consistently higher than the tack coat Upper surface.
Additional aspect of the present utility model and advantage will be set forth in part in the description, partly by from following description In become obvious, or by it is of the present utility model practice recognize.
Brief description of the drawings
Of the present utility model above-mentioned and/or additional aspect and advantage will from description of the accompanying drawings below to embodiment is combined Become substantially and be readily appreciated that, wherein:
Fig. 1 is the schematic diagram of the concrete towers cartridge module according to the utility model embodiment;
Fig. 2 is the schematic diagram of the tower segments of the concrete towers cartridge module according to the utility model embodiment;
Fig. 3 is the enlarged diagram at A in Fig. 2;
Fig. 4 is the enlarged diagram at B in Fig. 2;
Fig. 5 is the part-structure schematic diagram of the tower segments of the concrete towers cartridge module according to the utility model embodiment, its Middle locating dowel coordinates in positioning screw, and levelling pad coordinates in leveling groove.
Reference:
Concrete towers cartridge module 100,
Basis 1,
Tower body 2, tower segments 21, prestressing force sleeve 22, locating dowel 23, positioning screw 24, head 241, bar portion 242, First detent 25, the second detent 26, leveling groove 27, levelling pad 28.
Adapter 3.
Specific embodiment
Embodiment of the present utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein ad initio Same or similar element or element with same or like function are represented to same or similar label eventually.Below by ginseng The embodiment for examining Description of Drawings is exemplary, is only used for explaining the utility model, and it is not intended that to of the present utility model Limitation.
In description of the present utility model, it is to be understood that term " " center ", " length ", " width ", " thickness ", " on ", D score, " vertical ", " level ", " top ", " bottom ", " interior ", " outward ", " clockwise ", the orientation or position of the instruction such as " counterclockwise " The relation of putting is, based on orientation shown in the drawings or position relationship, to be for only for ease of description the utility model and simplify description, and Be not indicate or imply meaning device or element must have specific orientation, with specific azimuth configuration and operation, therefore It is not intended that to limitation of the present utility model.Additionally, term " first ", " second " are only used for describing purpose, without being understood that To indicate or implying relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", One or more this feature can be expressed or be implicitly included to the feature of " second ".In description of the present utility model, " multiple " is meant that two or more, unless otherwise expressly limited specifically.
, it is necessary to explanation, unless otherwise clearly defined and limited, term " is pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly Connection;Can mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Can be two element internals connection or two interaction relationships of element.For one of ordinary skill in the art Speech, can as the case may be understand concrete meaning of the above-mentioned term in the utility model.
The concrete towers cartridge module 100 according to the utility model embodiment is described below with reference to Fig. 1-Fig. 5.
As Figure 1-Figure 5, the concrete towers cartridge module 100 according to the utility model embodiment, including:First tower Section, the second tower segments and prestressing force sleeve 22.
Specifically, the second tower segments are located at the first tower segments top, and locating dowel 23 is provided with the top of the first tower segments, the The bottom of two tower segments is provided with the first detent 25, and locating dowel 23 coordinates with the first detent 25.Thus, by the first tower Cooperation between first locating slot of the tower segments of locating dowel 23 and second of cylinder section, can make the second tower segments accurately and rapidly The top of the first tower segments is positioned at, positioning precision and speed is significantly increased.Alternatively, the top of the first tower segments is set Locating dowel 23 can for multiple, for example locating dowel 23 can be four, multiple locating dowels 23 are equal along the ring of the first tower segments Even arrangement, correspondingly, the bottom of the second tower segments is provided with the first detent 25 of equal number, such that it is able to improve positioning Precision.
Alternatively, the shape of the first locating slot can be formed as cone barrel, and the first locating slot cross section from it is lower to On direction on be gradually reduced.Now, locating dowel 23 can be formed as cylinder, it is also possible to be formed as truncated cone-shaped.Thus, it is convenient The cooperation of the locating slot of locating dowel 23 and first, can improve locating speed and with sum velocity.
In a specific embodiment of the present utility model, reference picture 3 and Fig. 5, it is fixed to be embedded with the top of the first tower segments Position screw rod 24, positioning screw 24 includes head 241 and the bar portion 242 being connected with head 241, in the head 241 of positioning screw 24 Internal thread is provided with, the lower end of locating dowel 23 is provided with external screw thread.In on the external screw thread in locating dowel 23 and positioning screw 24 The engagement of screw thread, can be by the reliable and stable top for being connected to the first tower segments of locating dowel 23, so as to facilitate locating dowel 23 With the connection of the first tower segments.And the quantity of above-mentioned positioning screw 24 can be more than the quantity setting of locating dowel 23, positioning screw 24 can be used for lifting tower segments 21 uses.Specifically, will can be screwed in positioning screw 24 with externally threaded suspension ring, from And tower segments 21 are conveniently lifted into combination.
Tack coat is provided between first tower segments and the second tower segments, can be led between the first tower segments and the second tower segments Adhesive linkage connection is crossed, the horizontal joint between the first tower segments and the second tower segments uniformly, is densely filled in by adhesive linkage It is interior, it is ensured that the bonding strength between the first tower segments and the second tower segments, so as to ensure the whole of concrete towers cartridge module 100 Body intensity and quality.Alternatively, tack coat can be thixotroping mortar or epoxy resin.
It is equipped with first tower segments and the second tower segments through the duct of height, prestressing force sleeve 22 is respectively provided at first In the duct of the duct of tower segments and the second tower segments, prestressing force sleeve 22 is used to wear presstressed reinforcing steel, to improve the first tower Bonding strength between section and the second tower segments, it is possible to improve the structural strength and stabilization of whole concrete towers cartridge module 100 Property.
For example, referring to Fig. 2, duct can be multiple (such as duct is 40), and multiple ducts are segmented into some groups (such as 40 ducts are segmented into ten groups), some groups of ducts can be set along the ring uniform intervals of tower segments 21, every group Duct can include multiple ducts (such as every group duct can include four) and the neighbouring setting in the plurality of duct.Correspondingly, in advance Stress sleeve 22 is identical with the quantity in duct and is located in corresponding duct.Thus, it is possible to further improve concrete tower The structural strength and stability of component 100.
Higher than the upper end in corresponding duct, the lower end of each prestressing force sleeve 22 is less than for the upper end of each prestressing force sleeve 22 The lower end in corresponding duct so as to form the second detent 26 positioned at the duct of the bottom of prestressing force sleeve 22, positioned at the first tower The upper end of the prestressing force sleeve 22 in cylinder section coordinates in the second detent 26 in the second tower segments.Thus, inciting somebody to action Second tower segments are lifted on when in the first tower segments, are coordinated the by by the upper end of the prestressing force sleeve 22 in the first tower segments In the second detent 26 in two tower segments, the pre- of the tower segments of prestressing force sleeve 22 and second being easy in the first tower segments should Accurately and rapidly linking between power sleeve 22, it is ensured that later stage presstressed reinforcing steel wears smoothly and can ensure concrete tower The final molding quality of component 100.
Wherein, the upper surface of prestressing force sleeve 22 is consistently higher than the upper surface of tack coat.Thus, it is possible to prevent adhesive linkage from blocking up The upper port of plug prestressing force sleeve 22, it is ensured that the smoothness connected between the first tower segments and the second tower segments.
Alternatively, the shape of the second locating slot can be formed as cone barrel, and the second locating slot cross section from it is lower to On direction on be gradually reduced.Thus, the upper end of prestressing force sleeve 22 and the cooperation of corresponding second locating slot, Ke Yiti are facilitated Locating speed high and with sum velocity.
Need to illustrate herein, concrete towers cartridge module 100 of the present utility model is upper by multiple tower segments 21 Lower section is connected in sequence upwards, wherein, above-mentioned first tower segments are located at lower section in can referring to neighbouring two tower segments 21 Tower segments 21, above-mentioned second tower segments can refer to tower segments 21 above in neighbouring two tower segments 21.It is optional Ground, tower segments 21 can be formed by connecting by multiple arcs tower piece, and tower segments 21 can also be an annular column piece for entirety.
Concrete towers cartridge module 100 according to the utility model embodiment, by two towers in neighbouring connection It is convenient when two neighboring tower segments 21 carry out level docking by the cooperation of the locating slot of locating dowel 23 and first between section 21 Dock and merging precision is high, while coordinated by the upper end of the prestressing force sleeve 22 that will be located in tower segments 21 being positioned above Tower segments 21 the second locating slot in, such that it is able to make the prestressing force sleeve 22 being located in each tower segments 21 in above-below direction On be quickly and accurately connected, can further improve the merging precision when level of concrete towers cartridge module 100 is docked, and can To improve efficiency of construction, it is ensured that construction quality, and cause that the operation of level docking is simple.
The concrete towers cartridge module 100 according to the utility model embodiment is described in detail referring to Fig. 1-Fig. 5.
Reference picture 1, concrete towers cartridge module 100 include be suitable to be located at below ground basis 1, be located at basis 1 on tower Cylinder body 2 and the adapter 3 being located at the top of tower body 2.Wherein, tower body 2 includes above-mentioned the first tower segments and the Two tower segments.The connection of the bottom and basis 1 of tower body 2 is referred to the connection between the first tower segments and the second tower segments Mode is attached.The attachment structure between the first tower segments and the second tower segments is further described below.
Reference picture 2, Fig. 3 and Fig. 5, are additionally provided with multiple levelling pads 28, multiple levelling pads 28 at the top of the first tower segments It is spaced apart around the center of the first tower segments and is set.Thus, by the multiple levelling pads 28 for setting, and by multiple levelling pads 28 upper surface is adjusted to same level highly, when the second tower segments to be lifted the top to the first tower segments, can make The bottom of two tower segments is supported directly on the upper surface of multiple levelling pads 28, thereby may be ensured that the second tower segments level is put Put, prevent the inclination of whole concrete towers cartridge module 100, improve the Forming Quality of concrete towers cartridge module 100.Alternatively, often Individual levelling pad 28 can be made up of different-thickness pad, to facilitate adjustment.The thickness of such as pad can for 0.5mm, 1mm, 2mm, 5mm, 10mm etc..Alternatively, levelling pad 28 is steel part.
Further, reference picture 2, Fig. 3 and Fig. 5, are provided with leveling groove 27 at the top of the first tower segments, levelling pad 28 is matched somebody with somebody Close in leveling groove 27.Thus, facilitate the setting of levelling pad 28 and multiple levelling pads 28 can be made to be positioned at setting Position, can conveniently realize the leveling between adjacent tower segments 21.For example, being provided with four tune at the top of the first tower segments Flat grooves 27, four leveling grooves 27 arrange that each leveling groove 27 may be located at along the ring uniform intervals of tower segments 21 State between two adjacent groups duct, so that concrete towers cartridge module 100 is rational in infrastructure.Alternatively, the depth of leveling groove 27 Degree can be 5mm, the half of the upper surface width for being no more than the first tower segments wide of leveling groove 27, the length of leveling groove 27 Can be 1.5 times of the upper surface width of the first tower segments.Thus, levelling effect can have both been ensured and levelling pad can have been increased 28 and the second contact area between tower segments so that the second tower segments are smoothly placed in the top of the first tower segments.Need solution Release, " width " refers to the size in the radial direction in tower segments 21, " length " refers in tower segments 21 Size in circumferential direction.
In some embodiments of the present utility model, between the upper surface of the upper surface of levelling pad 28 and the first tower segments Height be not less than 10mm.Thus, it is possible to be not less than the thickness of the adhesive linkage between the first tower segments and the second tower segments 10mm such that it is able to the thickness of the adhesive linkage between the first tower segments and the second tower segments can be ensured to ensure bonding strength. It is to be understood that " thickness of adhesive linkage " refers to adhesive linkage size in the vertical direction.
The bonding of the above-mentioned concrete towers cartridge module 100 according to the utility model embodiment is described referring to Fig. 1-Fig. 5 Method.
The adhering method of the above-mentioned concrete towers cartridge module 100 according to the utility model embodiment, comprises the following steps:
S10, ring baffle is provided with the outside of the upper end of the first tower segments, the upper end of ring baffle is more than the first tower segments Upper end.By the ring baffle for setting, can prevent the adhesive linkage of follow-up smearing from being overflowed to the outside of tower segments 21, keep tower It is smooth on the outside of section 21, while operation can be simplified, improve efficiency of construction.Alternatively, ring baffle is elastic component, for example annular Baffle plate can be flexible foam part.Thus, it is possible to make ring baffle be fitted tightly on the lateral surface of tower segments 21, can be with Barrier adhesion layer such as thixotroping mortar outwards overflows well.
For the height of ring baffle, can be determined according to the thickness of adhesive linkage.For example, the thickness in adhesive linkage is set to During 10mm, the height of ring baffle could be arranged to 20mm.
S20, the upper surface smearing tack coat in the first tower segments, for example, smear thixotroping ash in the upper surface of the first tower segments Slurry or epoxy resin.The thickness of tack coat thus it can be prevented that tack coat is blocked and in advance should no more than the upper end of prestressing force sleeve 22 The upper port of power sleeve 22.
S30, the upper end that the second tower segments are lifted on the first tower segments and utilization tack coat are to the first tower segments and second Tower segments are bonded.Thus, by the bonding effect of adhesive linkage, the first tower segments and the second tower segments can be connected Connect.
Thus, when adhesive linkage is smeared by the cooperation of ring baffle, the adhesive linkage that makes that can be uniform, closely knit is filled in the In horizontal joint between one tower segments and the second tower segments, while having mechanical strength higher.
The adhering method of the above-mentioned concrete towers cartridge module 100 according to the utility model embodiment, by neighbouring Adhesive linkage is smeared at two horizontal joints of tower segments 21 of connection, so as to be connected between two tower segments 21 of adjacent connection steady Gu, and ring baffle is set in the outside of horizontal joint, such that it is able to prevent the adhesive linkage at horizontal joint from outwards overflowing, protect The Forming Quality and aesthetic property of card concrete towers cartridge module 100, while operation can be simplified, improve efficiency of construction.
In some embodiments of the present utility model, also include after step S30:S40, to the first tower segments and the second tower The tack coat overflow content of the internal face of cylinder section is struck off.It is understood that the workbench of operating personnel is generally located in The inner side of concrete towers cartridge module 100, therefore employ the outer wall of above-mentioned ring baffle, the first tower segments and the second tower segments Face need not carry out striking off operation.And the tack coat overflow content of the internal face of the first tower segments and the second tower segments, by striking off Operation, can remove unnecessary material, it is ensured that the quality and aesthetic property of concrete towers cartridge module 100.
Below to the concrete towers according to a specific embodiment of the present utility model so that adhesive linkage is thixotroping mortar as an example The adhering method of cartridge module 100 is described in detail.
Reference picture 1- Fig. 5, concrete towers cartridge module 100 includes:First tower segments, the second tower segments and prestressing force sleeve 22.It is embedded with the top of first tower segments and leveling groove 27 is provided with the top of positioning screw 24, and the first tower segments, the second tower The bottom of section is provided with the first detent 25.Prestressing force sleeve 22 is set in the duct of the first tower segments and the second tower segments, And the upper end of 22 sets of prestressing force sleeve, higher than the upper end in corresponding duct, the bottom of the second tower segments is provided with the second detent 26。
First, by placing levelling pad 28 in each leveling groove 27 so that the leveling in each leveling groove 27 The upper surface of pad 28 is located at sustained height, and makes the upper surface of levelling pad 28 higher than the upper surface 10mm of the first tower segments, It is possible thereby to the height for making the horizontal joint between the first tower segments and the second tower segments is 10mm.Meanwhile, locating dowel 23 is revolved Enter in corresponding positioning screw 24, and ring baffle is set in the upper end of the first tower segments and makes the upper end that ring baffle covers high In the upper end of the first tower segments.
Then, thixotroping mortar is applied to the upper surface of the first tower segments to form adhesive linkage, and causes the upper of adhesive linkage End face is consistently lower than the upper surface of 22 sets of prestressing force sleeve.The thixotroping mortar of smearing can be with slightly excessive, and thixotroping mortar can be higher than The about 5-10mm of levelling pad 28, but levelling pad 28 is not covered, the bottom of such second tower segments can be located immediately at leveling pad The upper surface of piece 28, it is ensured that thixotroping mortar fills whole horizontal joint.Additionally, in view of leakage situation may occur, being touched smearing Before becoming mortar, it is ensured that there are enough thixotroping mortar to fill whole seams on workbench.Rule of thumb, 25% can be had Extra thixotroping mortar for standby.
After the thixotroping mortar smearing of adhesive linkage is finished, thixotroping mortar suitably extends in the top surface of the first tower segments, So that thixotroping mortar is sufficient filling with space.In order to ensure the adhesive strength of adhesive linkage, the thickness of adhesive linkage is verified enough and continuously Gap/space, especially around prestressing force sleeve 22 and levelling pad 28, and ensures the upper surface of each levelling pad 28 Cleaning is clean.
Second tower segments are lifted on the upper end of the first tower segments, during the second tower segments are lifted, in the second tower When cylinder section is higher than the first tower segments about 50cm, it is ensured that the second tower segments are just right with the first tower segments.Then, the second tower segments are slow The top of the first tower segments is placed on, and causes that the locating dowel 23 at the top of the first tower segments coordinates in the second tower segments first In detent 25, while the upper end of the prestressing force sleeve 22 of the first tower segments coordinates the second positioning in the second tower segments recessed In groove 26, such that it is able to make the second tower segments accurately and fast position.Now, the bottom of the second tower segments and levelling pad 28 Upper surface stop to, and simultaneously thixotroping mortar under the extruding of the second tower segments, the sky that will can be likely to occur in horizontal joint Gap is fully filled with, and makes joint surface even uniform.
When the second tower segments it is totally stationary in the first tower segments when, unnecessary thixotroping mortar should be removed, such as to overflow Thixotroping mortar to the first tower segments and the internal face of the second tower segments is struck off.Also, going through in horizontal joint is It is no to there is gap, particularly in prestressing force sleeve 22 and the near zone of levelling pad 28, if finding any shortage grouting phenomenon, Excess stock can be removed from joint surface and reuse thixotroping mortar using mud shovel and fill up space, make joint surface smooth Uniformly.Carry out the lifting of next tower segments 21 by the thixotroping mortar of adhesive linkage is conserved to appropriate intensity.
It should be noted that in the process of above-mentioned construction, mixing and pouring thixotroping mortar and the top in the first tower segments The time interval between the second tower segments is placed, this time interval is commonly referred to as open assembly time (or process time).It is generally above-mentioned Open assembly time should be less than 25 minutes.In order to realize this purpose, before mixing grouting starts, next tower should be just got out Duan Yibei is lifted, and correct placement levelling pad 28, locating dowel 23 and ring baffle etc..
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ", The description of " example ", " specific example " or " some examples " etc. means to combine specific features, the knot that the embodiment or example are described Structure, material or feature are contained at least one embodiment of the present utility model or example.In this manual, to above-mentioned art The schematic representation of language is not necessarily referring to identical embodiment or example.And, the specific features of description, structure, material or Person's feature can in an appropriate manner be combined in one or more any embodiments or example.
While there has been shown and described that embodiment of the present utility model, it will be understood by those skilled in the art that: In the case where principle of the present utility model and objective is not departed from various changes, modification, replacement can be carried out to these embodiments And modification, scope of the present utility model limits by claim and its equivalent.

Claims (6)

1. a kind of concrete towers cartridge module, it is characterised in that including:
First tower segments and the second tower segments above first tower segments, are provided with fixed at the top of first tower segments Position post, the bottom of second tower segments is provided with the first detent, and the locating dowel coordinates with first detent, institute State and tack coat is provided between the first tower segments and second tower segments, in first tower segments and second tower segments It is provided with through the duct of height;
Prestressing force sleeve, the prestressing force sleeve is respectively provided at the duct of first tower segments and the hole of second tower segments In road, the upper end of the upper end higher than the corresponding duct of each prestressing force sleeve, under each described prestressing force sleeve End is less than the lower end in the corresponding duct so as to form the second detent positioned at the duct of the bottom of the prestressing force sleeve, The upper end of the prestressing force sleeve in first tower segments coordinates in described the in second tower segments In two detents.
2. concrete towers cartridge module according to claim 1, it is characterised in that the tack coat is thixotroping mortar or epoxy Resin.
3. concrete towers cartridge module according to claim 1, it is characterised in that be additionally provided with the top of first tower segments Multiple levelling pads, multiple levelling pads are spaced apart around the center of first tower segments and set.
4. concrete towers cartridge module according to claim 3, it is characterised in that be provided with tune at the top of first tower segments Flat grooves, the levelling pad coordinates in the leveling groove.
5. concrete towers cartridge module according to claim 3, it is characterised in that the upper surface of the levelling pad with it is described Height between the upper surface of the first tower segments is not less than 10mm.
6. concrete towers cartridge module according to claim 1, it is characterised in that the upper surface of the prestressing force sleeve is all the time Higher than the upper surface of the tack coat.
CN201621109236.XU 2016-10-08 2016-10-08 Concrete towers cartridge module Active CN206221170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621109236.XU CN206221170U (en) 2016-10-08 2016-10-08 Concrete towers cartridge module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621109236.XU CN206221170U (en) 2016-10-08 2016-10-08 Concrete towers cartridge module

Publications (1)

Publication Number Publication Date
CN206221170U true CN206221170U (en) 2017-06-06

Family

ID=58782482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621109236.XU Active CN206221170U (en) 2016-10-08 2016-10-08 Concrete towers cartridge module

Country Status (1)

Country Link
CN (1) CN206221170U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640542A (en) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 Concrete tower cylinder module and bonding method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640542A (en) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 Concrete tower cylinder module and bonding method thereof

Similar Documents

Publication Publication Date Title
CN104400898B (en) The vertical integrally forming mould in precast concrete section of jurisdiction and forming method
CN106088530A (en) Large area method for constructing terrace
CN102587265B (en) Auxiliary component and concrete slab for roadbed construction and method for roadbed construction
CN106438215A (en) Tower drum used for wind driven generator
CN207159789U (en) A kind of beam prefabricated anti-collision wall structure of unit construction bridge
CN106438214A (en) Tower drum used for wind driven generator
CN206221170U (en) Concrete towers cartridge module
CN206221163U (en) For the tower of wind-driven generator
CN201826511U (en) Elevation control system for pouring construction of concrete floors
CN106640542A (en) Concrete tower cylinder module and bonding method thereof
CN107965124A (en) A kind of adjustable resin connector and its construction method
CN108214824A (en) Tower method for manufacturing component, tower component and the method for building tower
CN108331330A (en) A kind of building template
CN206221162U (en) For the concrete tower of wind-driven generator
CN207727622U (en) A kind of connector and Prefabricated block for Prefabricated block connects composition
CN202577123U (en) Auxiliary component and concrete slab for road surface construction
CN206308965U (en) The built on stilts prepackage slip casting consolidated structures of stone material terrace
CN207812958U (en) A kind of adjustable resin connector
CN110536992A (en) The method of the false conjugation precast concrete unit of production
CN207775870U (en) Waterproof root key applied to steel wall root key combination stake
CN206554510U (en) Bolt assembly for improving architectural engineering concrete seam quality
CN106626048A (en) Grouting mold and method for wind driven generator tower drum and foundation
CN108286335A (en) A kind of construction through-flooring sleeve fixing device and its fixing means
CN206408889U (en) Stone material terrace makes somebody a mere figurehead pre- assembling structure
CN214497232U (en) Novel public road bridge roof beam foundation pile is consolidated device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211221

Address after: 200021 room 1001, 10th floor, 138 Huaihai Middle Road, Huangpu District, Shanghai

Patentee after: Shanghai Fengling new energy Co.,Ltd.

Address before: 835099 room 332-3, building 11, European classic community, Karasu River, Horgos port, Ili Prefecture, Ili Kazak Autonomous Prefecture, Xinjiang Uygur Autonomous Region

Patentee before: KHORGAS XINGUOJIN NEW ENERGY TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right