CN203569487U - Embedded part for installation of bridge pier hanging basket - Google Patents

Embedded part for installation of bridge pier hanging basket Download PDF

Info

Publication number
CN203569487U
CN203569487U CN201320734596.9U CN201320734596U CN203569487U CN 203569487 U CN203569487 U CN 203569487U CN 201320734596 U CN201320734596 U CN 201320734596U CN 203569487 U CN203569487 U CN 203569487U
Authority
CN
China
Prior art keywords
hanging basket
bridge pier
installation
sleeve
embedded part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320734596.9U
Other languages
Chinese (zh)
Inventor
赵宇
乔志兵
王祥玉
吴建春
杨永兴
朱清伟
李瑜
汪勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201320734596.9U priority Critical patent/CN203569487U/en
Application granted granted Critical
Publication of CN203569487U publication Critical patent/CN203569487U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a device for installation of a bridge pier hanging basket, particularly relates to an embedded part for the installation of the bridge pier hanging basket. The embedded part for the installation of the bridge pier hanging basket comprises a U-shaped connection part, two sleeved tubes with inner threads. A thread is arranged on each end portion of two parallel sections of the U-shaped connection part, and the two sleeved tubes are connected with the end portion of the U-shaped connection part in a threaded mode respectively. Based on a traditional U-shaped bolt, the improvement that a sleeved tube structure is added, the two sleeved tubes are embedded in the process of arranging a hanging basket, and openings of the two sleeved tubes are level with a pier body concrete surface, so that stability of a support template is assured, the embedded part can be fixed easily, slurry leakage can be avoided, the pier body is smooth after a formwork is removed and the hanging basket can be mounted conveniently.

Description

Bridge pier hanging basket is installed built-in fitting
Technical field
The utility model relates to bridge pier hanging basket erecting tools, is specifically related to a kind of bridge pier hanging basket built-in fitting is installed.
Background technology
In modern bridge pier hanging basket installation process, adopt in a large number pre-buried U bolt, because the U bolt that extends in template outside has certain length, in the process of construction, caused some inconvenience, and pre-buried U bolt indwelling hole in template in advance, reserving hole is too small cannot form removal, and reserving hole is excessive, there will be spillage phenomenon during concreting, concrete surface out-of-flatness after stripping, presentation quality is poor, working procedure complexity, and security risk is large.
Summary of the invention
For addressing the above problem, the utility model provides a kind of bridge pier hanging basket that built-in fitting is installed, the spillage in the time of can preventing fluid concrete, and facilitate support and the dismounting of template.
The bridge pier hanging basket that the utility model provides is installed built-in fitting, comprises U-shaped connector, also comprises that two are with female sleeve, and U-shaped connector two parallel-segment ends are provided with screw thread, and sleeve and U-shaped connector end are spirally connected.Built-in fitting after U-shaped connector and sleeve combination is preferably dimensioned to be the consistent size with former U-bolt.During construction, orient in advance in template the position of sleeve, punch and polish, when support template, sleeve nozzle is mutually neat with pier shaft concrete surface, screws in bolt outside hole, pours into a mould after blocking hole, can mortar leakage prevention.Before form removable, first take out bolt, the bolt of again screwing on after form removal, prevents that sleeve from being stopped up by foreign material.When hanging basket is installed, take off bolt and directly adopt screw rod that hanging basket is supported together with angle steel is tightened in sleeve, play the effect of supporting hanging basket.
Sleeve lining is can part threaded, and for meeting various pre-buried dimensional requirements, preferred, described sleeve lining total length is threaded.According to the pre-buried degree of depth, adjust U-shaped connector screw-in depth.
Preferably, described sleeve is identical with U-shaped connector material, can select Q235 steel to make.
The utility model improves on original U-bolt basis, increase tube-in-tube structure, embedded sleeve barrel in hanging basket is installed, sleeve nozzle is mutually neat with pier shaft concrete surface, guarantees the stability of support template, easily fixing, can effectively avoid spillage phenomenon, after stripping, pier shaft is smooth, and has facilitated hanging basket installation.
Accompanying drawing explanation
Fig. 1 is the structural representation of original U-bolt;
Fig. 2 is structural representation of the present utility model;
In figure, 1, U-shaped connector, 2, sleeve.
The specific embodiment
A kind of bridge pier hanging basket is installed built-in fitting, as shown in Figure 2, comprises a U-shaped connector 1 and two sleeves 2, and 1 liang of parallel-segment end of U-shaped connector is provided with screw thread, and sleeve 2 inwall total lengths are with internal thread, and sleeve 2 is spirally connected with U-shaped connector 1 end.Sleeve 2 and U-shaped connector 1 all adopt Q235 steel to make.
U-shaped connector can be prefabricated in advance, and sleeve can be bought finished product, U-shaped connector opening size 30cm, and two parallel-segment length are 19cm, length sleeve is 12cm.
Hanging basket installation process:
1, installation of embedded parts
Hanging basket is as erection of precast beams and run the job platform that process Bridge checks in the future, and the security reliability of its requirement is self-evident.Bridge pier hanging basket is all arranging along line direction both sides, and hanging basket adopts pre-buried this device to be fixed on pier cap, and the every side of each bridge pier arranges 5 φ 20 built-in fittings.
2, sleeve location
According to design drawing, on steel form, accurately orient the position of built-in fitting, with gas cutting, in template, blow out the hole that is slightly larger than screw diameter, its diameter must not be greater than the external diameter of sleeve, then with sanding machine, template inwall is polished flat, and removes the burr of preformed hole surrounding.A M20 bolt is firmly tightened in template outside in each hole during construction, tries one's best and hole center superposition in the center of nut.
3, built-in fitting and hanging basket is connected
Mold plate for pier cap is torn the front bolt that first takes out open, and the bolt of again screwing on after after form removal, prevents that sleeve from being stopped up by foreign material.When hanging basket is installed, take off bolt and directly adopt screw rod that hanging basket is supported together with angle steel is tightened in U-shaped sleeve.

Claims (3)

1. bridge pier hanging basket is installed a built-in fitting, comprises U-shaped connector (1), it is characterized in that: also comprise that two are with female sleeve (2), U-shaped connector (1) two parallel-segment end is provided with screw thread, and sleeve (2) is spirally connected with U-shaped connector (1) end.
2. bridge pier hanging basket according to claim 1 is installed built-in fitting, it is characterized in that: described sleeve (2) inwall total length is threaded.
3. bridge pier hanging basket according to claim 2 is installed built-in fitting, it is characterized in that: described sleeve (2) is identical with U-shaped connector (1) material.
CN201320734596.9U 2013-11-20 2013-11-20 Embedded part for installation of bridge pier hanging basket Expired - Fee Related CN203569487U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320734596.9U CN203569487U (en) 2013-11-20 2013-11-20 Embedded part for installation of bridge pier hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320734596.9U CN203569487U (en) 2013-11-20 2013-11-20 Embedded part for installation of bridge pier hanging basket

Publications (1)

Publication Number Publication Date
CN203569487U true CN203569487U (en) 2014-04-30

Family

ID=50537227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320734596.9U Expired - Fee Related CN203569487U (en) 2013-11-20 2013-11-20 Embedded part for installation of bridge pier hanging basket

Country Status (1)

Country Link
CN (1) CN203569487U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958199A (en) * 2017-03-03 2017-07-18 安徽华骅桥梁设备制造有限公司 One kind is used for railway vase pier pier cap embedded U-shaped disassembling bolts structure
CN108193779A (en) * 2017-12-25 2018-06-22 上海二十冶建设有限公司 Breathe out the pre-buried auxiliary device of fragrant slot and its application method
CN109235286A (en) * 2018-09-26 2019-01-18 中铁二院工程集团有限责任公司 A kind of non-maintaining quick-assembling bridge pier hanging basket
CN110158452A (en) * 2019-06-28 2019-08-23 中国电力工程顾问集团西北电力设计院有限公司 A kind of built-in fitting and its construction method for the laying of cable bridge
CN113404645A (en) * 2021-06-15 2021-09-17 中铁上海设计院集团有限公司 Wind power hybrid tower prefabricated tower cylinder connected by bolt U rings and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958199A (en) * 2017-03-03 2017-07-18 安徽华骅桥梁设备制造有限公司 One kind is used for railway vase pier pier cap embedded U-shaped disassembling bolts structure
CN108193779A (en) * 2017-12-25 2018-06-22 上海二十冶建设有限公司 Breathe out the pre-buried auxiliary device of fragrant slot and its application method
CN109235286A (en) * 2018-09-26 2019-01-18 中铁二院工程集团有限责任公司 A kind of non-maintaining quick-assembling bridge pier hanging basket
CN110158452A (en) * 2019-06-28 2019-08-23 中国电力工程顾问集团西北电力设计院有限公司 A kind of built-in fitting and its construction method for the laying of cable bridge
CN113404645A (en) * 2021-06-15 2021-09-17 中铁上海设计院集团有限公司 Wind power hybrid tower prefabricated tower cylinder connected by bolt U rings and construction method thereof
CN113404645B (en) * 2021-06-15 2024-04-02 中铁上海设计院集团有限公司 Wind power mixing tower prefabricated tower barrel connected by adopting bolt U-rings and construction method thereof

Similar Documents

Publication Publication Date Title
CN203569487U (en) Embedded part for installation of bridge pier hanging basket
CN201588403U (en) Core mould used for concrete pore construction
CN208430530U (en) A kind of pre-buried suspension hook of combined type applied in pipe gallery concrete structure
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN202187556U (en) Tool-type hole reserving mould
CN203729498U (en) Vertical reinforcement-steel sleeve but joint connection structure of assembled wall
CN107237493A (en) Quickly remove formula and reserve device in concrete floor hole
CN105113790A (en) Bare-concrete corner floating window steel formwork structure body device
CN204081445U (en) To encorbelment i iron anchor device
CN107762135B (en) Construction method of scaffold wall connecting piece of building outer wall
CN102979183B (en) Embedded cylindrical nut anchor bed and use method thereof
CN204139578U (en) The pre-buried assembling wall attaching parts of scaffold
CN203891468U (en) Fixing device for pouring building pipeline embedded part
CN206928526U (en) A kind of half grout sleeve of bar connecting
CN104863353A (en) Construction template system
CN208966008U (en) A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN106522545A (en) Self-disassembled adjustable opposite-pull screw device and assembling and disassembling method thereof
CN204960322U (en) Water -stopping screw rod
CN202359815U (en) Plugging piece for big steel die through-wall bolt hole for building construction
CN208518334U (en) Detachable Three-section water stop screw rod
CN204174910U (en) A kind of wall-connecting device of scaffold
CN203010028U (en) Sleeve for embedding floorslab penetrating pipeline in floorslab
CN206607753U (en) After pour beam steel anchor
CN208763396U (en) A kind of horizontal construction joint reinforcing bolt

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140430

Termination date: 20161120

CF01 Termination of patent right due to non-payment of annual fee