CN207448776U - A kind of high ferro box beam catenary mast built-in fitting calibrating installation - Google Patents
A kind of high ferro box beam catenary mast built-in fitting calibrating installation Download PDFInfo
- Publication number
- CN207448776U CN207448776U CN201721418183.4U CN201721418183U CN207448776U CN 207448776 U CN207448776 U CN 207448776U CN 201721418183 U CN201721418183 U CN 201721418183U CN 207448776 U CN207448776 U CN 207448776U
- Authority
- CN
- China
- Prior art keywords
- stent
- built
- high ferro
- steel plate
- box beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- 238000009415 formwork Methods 0.000 claims abstract description 9
- 238000010276 construction Methods 0.000 abstract description 7
- 238000001514 detection method Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Abstract
The utility model is related to a kind of high ferro box beam catenary mast built-in fitting calibrating installations, calibration steel plate including being mounted on overhead contact built-in part top, stent is provided on the calibration steel plate, the stent is L-shaped, one side of the stent is fixed on the lower face of calibration steel plate, the another side of the stent extends straight down to be fixed with box girder formwork, the utility model device is simple, it is easy to operate, construction site is suitble to use, it can be effective, quickly calibrated overhead contact built-in part, solves the difficulty of overhead contact built-in part off-design position, be conducive to improve construction speed.
Description
Technical field
The utility model is related to high ferro prefabricated box -beam engineering fields, and in particular to a kind of high ferro box beam catenary mast is pre-buried
Part calibrating installation.
Background technology
High ferro is in construction, to realize that power supply needs to set catenary mast built-in fitting in box beam, then pre-
Bracket is hung on embedded part, sets up conducting wire, can facilitate and be powered to high ferro locomotive.High ferro prefabricated box -beam overhead contact built-in part tradition at present
Way be that construction personnel measures by ruler, fix its position, not only complicated for operation, process is various, and operator is difficult to
Hand often after the good size casting concrete of measurement and positioning out of position, is brought very to the installation of later stage catenary mast
Big construction hidden danger, is not easy to the installation of railway electrification system.
Utility model content
The purpose of this utility model is to provide a kind of high ferro box beam catenary mast built-in fitting calibrating installation, can effectively by
The technical issues of exhausted overhead contact built-in part installations of Ei deviate.
To achieve the above object, the utility model adopts the following technical solution:
High ferro box beam catenary mast built-in fitting calibrating installation, the calibration steel including being mounted on overhead contact built-in part top
Plate, described calibrate are provided with stent on steel plate, and the stent is L-shaped, and one side of the stent is fixed under calibration steel plate
Plate face, the another side of the stent extends straight down to be fixed with box girder formwork.
The utility model feature also resides in:
The upper face of the calibration steel plate is provided with multiple square level meters, and the multiple square level meter is located at school respectively
Four corners arrangement of quasi- steel plate.
The stent extends downwardly end and is provided with fixed plate to be fixed with box girder formwork.
The stent extends downwardly end and is provided with extension edge, and the fixed plate is fixed on by fastening bolt on extension edge.
8 circular holes are offered on the calibration steel plate.
The stent is angle steel.
Compared with prior art, the technique effect that the utility model possesses is:The utility model device is simple, operation letter
Just, be suitble to construction site use, can effective, quickly calibrated overhead contact built-in part, solve overhead contact built-in part off-design position
The difficulty put is conducive to improve construction speed.
Description of the drawings
Fig. 1 is the front view of high ferro box beam catenary mast built-in fitting calibrating installation;
Fig. 2 is the top view of high ferro box beam catenary mast built-in fitting calibrating installation.
Specific embodiment
With reference to Fig. 1 and Fig. 2, the utility model is further described:
High ferro box beam catenary mast built-in fitting calibrating installation, the calibration steel plate including being mounted on overhead contact built-in part top
10, described calibrate is provided with stent 20 on steel plate 10, and the stent 20 is L-shaped, and one side of the stent 20 is fixed on calibration
The lower face of steel plate 10, the another side of the stent 20 extends straight down to be fixed with box girder formwork;
With reference to shown in Fig. 1, above-mentioned " L " shape stent 20 is welded as a whole with calibration steel plate 10, is mixed in high ferro box beam
Before solidifying soil pours, calibration steel plate 10 is mounted on the top of overhead contact built-in part, field technician carries out spacing detection, detection
Completion with the another side of after-poppet 20 is extended and is fixed with box girder formwork straight down, finally allows overhead contact built-in part, calibration steel plate
10th, stent 20 forms an entirety, it is ensured that overhead contact built-in part does not deviate by design position when concreting.
As the preferred embodiment of the utility model, the upper face of the calibration steel plate 10 is provided with multiple square level meters
30, the multiple square level meter 30 is located at four corners arrangement of calibration steel plate 10 respectively;
Square level meter 30 is installed in four corners of calibration steel plate 10 can the convenient working personal observations calibration steel plate 10
Whether locate in the horizontal plane, realization to be facilitated to carry out horizontal alignment to installation, which can be bubble and scale.
It is fixed for convenience of realizing with box girder formwork, the stent 20 extends downwardly end and is provided with fixed plate 21 and box girder formwork
It is fixed;
Above-mentioned fixed plate 21 is supported using gusset, and realization is facilitated to be fixed with box girder formwork.
Specifically, the stent 20 extends downwardly end and is provided with extension edge 22, and the fixed plate 21 passes through fastening bolt 23
It is fixed on extension edge 22;
Above-mentioned fixed plate 21 be 63 × 63 × 5mm of ∠ angle steel, a diameter of 16mm of above-mentioned fastening bolt 23.
More specifically, with reference to shown in Fig. 2,8 circular holes 81 are offered on the calibration steel plate 10;The calibration steel plate
Using long 580mm, width 630mm, thickness 10mm steel plate, circular hole 81 is the hole of diameter 40mm, and 81 transverse pitch of adjacent circular holes is
430mm, longitudinal pitch 160mm.
The angle steel that the stent 20 is, and the size of angle steel is 63 × 63 × 5mm of ∠.
For those skilled in the art, it is clear that the utility model is not limited to the details of above-mentioned exemplary embodiment, Er Qie
Without departing substantially from the utility model spirit or essential attributes in the case of, can realize the utility model in other specific forms.
Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, the utility model
Scope be indicated by the appended claims rather than the foregoing description, it is intended that meaning in the equivalent requirements of the claims will be fallen
It is embraced therein with all changes in scope.Any reference numeral in claim should not be considered as to limitation institute
The claim being related to.
Moreover, it will be appreciated that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
Using specification as an entirety, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (6)
1. a kind of high ferro box beam catenary mast built-in fitting calibrating installation, it is characterised in that:Including being mounted on overhead contact built-in part
The calibration steel plate (10) on top, described calibrate are provided with stent (20) on steel plate (10), and the stent (20) is L-shaped, described
One side of stent (20) is fixed on the lower face of calibration steel plate (10), and the another side of the stent (20) extends straight down and case
Beam forms is fixed.
2. high ferro box beam catenary mast built-in fitting calibrating installation according to claim 1, it is characterised in that:The calibration
The upper face of steel plate (10) is provided with multiple square level meters (30), and the multiple square level meter (30) is located at calibration steel respectively
Four corners arrangement of plate (10).
3. high ferro box beam catenary mast built-in fitting calibrating installation according to claim 1, it is characterised in that:The stent
(20) extend downwardly end and be provided with fixed plate (21) and fixed with box girder formwork.
4. high ferro box beam catenary mast built-in fitting calibrating installation according to claim 3, it is characterised in that:The stent
(20) extend downwardly end and be provided with extension edge (22), the fixed plate (21) is fixed on extension edge (22) by fastening bolt (23)
On.
5. high ferro box beam catenary mast built-in fitting calibrating installation according to claim 1, it is characterised in that:The calibration
8 circular holes (81) are offered on steel plate (10).
6. high ferro box beam catenary mast built-in fitting calibrating installation according to claim 1, it is characterised in that:The stent
(20) it is angle steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721418183.4U CN207448776U (en) | 2017-10-30 | 2017-10-30 | A kind of high ferro box beam catenary mast built-in fitting calibrating installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721418183.4U CN207448776U (en) | 2017-10-30 | 2017-10-30 | A kind of high ferro box beam catenary mast built-in fitting calibrating installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207448776U true CN207448776U (en) | 2018-06-05 |
Family
ID=62282616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721418183.4U Expired - Fee Related CN207448776U (en) | 2017-10-30 | 2017-10-30 | A kind of high ferro box beam catenary mast built-in fitting calibrating installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207448776U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914229A (en) * | 2021-11-12 | 2022-01-11 | 衡阳市新德力交通材料有限公司 | High-speed railway simply supported case roof beam contact net built-in fitting positioner |
-
2017
- 2017-10-30 CN CN201721418183.4U patent/CN207448776U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914229A (en) * | 2021-11-12 | 2022-01-11 | 衡阳市新德力交通材料有限公司 | High-speed railway simply supported case roof beam contact net built-in fitting positioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090775A (en) | A kind of full framing space beam-ends cable guide pipe construction localization method | |
CN207448776U (en) | A kind of high ferro box beam catenary mast built-in fitting calibrating installation | |
CN103255947B (en) | Standard transformer rack upright tube centralizer | |
CN204301742U (en) | 10kV electric pole group founds chassis orientator | |
CN209588891U (en) | A kind of measuring scale based on quick precise measurement high iron catenary | |
CN203858373U (en) | Fixing device of transient coil | |
CN204115726U (en) | Building template detection rule for verticality | |
CN202255398U (en) | Verticality measuring device of templates of walls and columns | |
CN204694251U (en) | A kind of level meter for building | |
CN205209408U (en) | Bridge crane wiping line installation NULL utensil | |
CN203981100U (en) | A kind of installation reinforcement type track gauge of lift guide rail | |
CN204212441U (en) | Structure checked and approved by a kind of pre-buried bar planting formula guiding ruler | |
CN103175492B (en) | A kind of transmission line of electricity drainage thread length measurment device and measuring method | |
CN206113928U (en) | Special detection instrument of template | |
CN203657810U (en) | Special perpendicularity detection device for frame column and shear wall | |
CN203837707U (en) | Construction measurement device for super high-rise building core tube | |
CN205421871U (en) | On --spot elevation measuring tool of construction | |
CN203964914U (en) | A kind of total powerstation support for metro automatic monitoring | |
CN202849565U (en) | Measuring pocket ruler used in pole changing process of large prebaked electrolytic cell | |
CN214996105U (en) | Novel thick control tool of concrete slab | |
CN202869423U (en) | Detection ruler | |
CN217032517U (en) | Device for detecting perpendicularity of wall column wood formwork | |
CN203174509U (en) | Bridge installation positioning device | |
CN204881465U (en) | Building decoration interval measuring device | |
CN211346626U (en) | Thickness measurement device during concrete pouring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180605 |