CN204301742U - 10kV electric pole group founds chassis orientator - Google Patents

10kV electric pole group founds chassis orientator Download PDF

Info

Publication number
CN204301742U
CN204301742U CN201420797836.4U CN201420797836U CN204301742U CN 204301742 U CN204301742 U CN 204301742U CN 201420797836 U CN201420797836 U CN 201420797836U CN 204301742 U CN204301742 U CN 204301742U
Authority
CN
China
Prior art keywords
chassis
support rod
chute
arm
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420797836.4U
Other languages
Chinese (zh)
Inventor
张龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Net Jing County Hebei Electric Co Of State
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Net Jing County Hebei Electric Co Of State
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Net Jing County Hebei Electric Co Of State, State Grid Hebei Electric Power Co Ltd, Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Net Jing County Hebei Electric Co Of State
Priority to CN201420797836.4U priority Critical patent/CN204301742U/en
Application granted granted Critical
Publication of CN204301742U publication Critical patent/CN204301742U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a kind of 10kV electric pole group and found chassis orientator, be made up of underframe, the support arm being positioned at underframe top and the measurement pendant box that is arranged on support arm two ends; Underframe comprises the first support bar and the second support bar, is provided with screw rod bottom the first support bar, and the second support bar is the trough type waiting trough rim, and support arm is symmetrical about body central, the cursor slide that support arm comprises chute and matches with chute; Be fixed with top cover on chute top, top cover top is provided with surveyor's staff; Be provided with messenger wire in measurement pendant box inside, messenger wire is fixedly connected with circular cone; This orientator can carry out Quick Measurement to the electric pole chassis below the ground level in power construction.

Description

10kV电杆组立底盘定位仪10kV Pole Assembly Chassis Locator

技术领域 technical field

本实用新型属于电网施工测量领域,具体涉及一种10kV电杆组立底盘定位仪。 The utility model belongs to the field of grid construction measurement, in particular to a 10kV electric pole assembly chassis locator.

背景技术 Background technique

目前,在10kV农业电网工程施工建设中,线路架设和变压器安装施工是电网建设的最重要部分,按照国家电网公司对农业电网工程建设标准化的要求,为了防止高空设备下沉,10kV杆基的基础必须安装80×80×20cm左右的底盘,尤其是全分式配电变压器杆基两个基础底盘之间的距离为2.5米左右,不在同一个基础平面上,为使基础底盘达到规定的技术规范要求,施工时,通常对基础底盘的定位采用绳子和尺子在地下的两个坑中反复进行测量,需要3名工作人员耗时费力、爬上爬下,用经纬仪进行测量定位,找准底盘中心点等工作,且很难严格达到标准要求,对操作人员水平要求也较高。 At present, in the construction of 10kV agricultural power grid projects, line erection and transformer installation and construction are the most important parts of power grid construction. A chassis of about 80×80×20cm must be installed, especially the distance between the two foundation chassis of the fully split distribution transformer pole foundation is about 2.5 meters, which are not on the same foundation plane. In order to make the foundation chassis meet the specified technical specifications Requirements, during construction, the positioning of the foundation chassis is usually measured repeatedly in two underground pits with ropes and rulers. It takes 3 workers time-consuming and laborious to climb up and down, use theodolite to measure and position, and find the center of the chassis point and other work, and it is difficult to strictly meet the standard requirements, and the requirements for the level of operators are also high.

改进10kV杆基的基础施工测量方法和设备,提供高效、方便的施工测量技术设备仪器,是目前施工现场的实际需要,本实用新型是针对上述问题而设计的便携式定位仪。 Improving the foundation construction measurement method and equipment of 10kV pole foundation and providing efficient and convenient construction measurement technology equipment and instruments are the actual needs of the current construction site. The utility model is a portable locator designed for the above problems.

实用新型内容 Utility model content

本实用新型的目的是提供一种适合在农业电网工程施工建设中,用于10kV杆基的基础施工准确测量定位。 The purpose of the utility model is to provide an accurate measurement and positioning suitable for the foundation construction of a 10kV pole foundation in the construction of an agricultural power grid project.

为达到上述目的,本10kV电杆组立底盘定位仪,包括底架(1)和位于底架(1)上部的支臂(2);所述底架(1)包括第一支撑杆(11)和第二支撑杆(14),所述第一支撑杆(11)底部设有螺杆(12),第二支撑杆(14)为等槽边的长槽形;所述支臂(2)关于本体中心对称,支臂(2)包括滑槽(22)和与滑槽(22)相配合的滑臂(23);所述滑槽(22)上部固定有顶盖(24),顶盖(24)上部设有水平尺(21),稳固水平尺(21)的凸块(25);所述滑臂(23)一端延伸到滑槽(22)内部,另一端固定安装有测量吊坠盒(3),在测量吊坠盒(3)内部设有吊线(33),吊线(33)与圆锥(34)固定连接。 In order to achieve the above purpose, this 10kV electric pole assembly chassis locator includes an underframe (1) and a support arm (2) located on the upper part of the underframe (1); the underframe (1) includes a first support rod (11 ) and the second support rod (14), the bottom of the first support rod (11) is provided with a screw rod (12), and the second support rod (14) is a long groove shape with equal groove sides; the support arm (2) Symmetrical about the center of the body, the support arm (2) includes a slide groove (22) and a slide arm (23) matched with the slide groove (22); a top cover (24) is fixed on the top of the slide groove (22), and the top cover (24) The upper part is provided with a level (21), and the protrusion (25) of the level (21) is stabilized; one end of the sliding arm (23) extends to the inside of the chute (22), and the other end is fixedly installed with a measuring pendant box (3), the inside of the measuring pendant box (3) is provided with a suspension wire (33), and the suspension wire (33) is fixedly connected with the cone (34).

进一步的,所述测量吊坠盒(3)用铆钉固定在滑臂(23)两端,其内部还设有与吊线(33)相连接的滚轴(32),所述吊线(33)缠绕在滚轴(32)的外表面,所述测量吊坠盒(3)外部还设有与滚轴(32)固定连接的摇杆(31)。 Further, the measuring pendant box (3) is fixed on both ends of the sliding arm (23) with rivets, and a roller (32) connected with a suspension wire (33) is arranged inside it, and the suspension wire (33) is wound around On the outer surface of the roller (32), a rocking bar (31) fixedly connected to the roller (32) is also provided outside the measurement pendant box (3).

进一步的,所述螺杆(12)和第二支撑杆(14)底端部还设有三个圆形底盘(13)。 Further, three circular chassis (13) are provided at the bottom of the screw rod (12) and the second support rod (14).

进一步的,所述滑臂(23)与滑槽(22)可拆卸安装,滑臂(23)和滑槽(22)上设有定位标线。 Further, the sliding arm (23) and the chute (22) are detachably installed, and positioning marks are provided on the sliding arm (23) and the chute (22).

进一步的,所述第一支撑杆(11)与螺杆(12)为螺纹连接,螺杆(12)延伸至第一支撑杆(11)内部。 Further, the first support rod (11) is threadedly connected to the screw rod (12), and the screw rod (12) extends to the inside of the first support rod (11).

进一步的,所述第二支撑杆(14)与底架(1)通过端头带螺纹的螺杆紧固,组成活动连接。 Further, the second support rod (14) is fastened to the bottom frame (1) through a threaded screw at the end to form a flexible connection.

本实用新型的技术效果和优点:由于本10kV电杆组立底盘定位仪使用时,安放在大地平面上,通过螺杆(12)和第二支撑杆(14)底端部的三个圆形底盘(13)将仪器水平放置、利用其自身的水平尺找平,确定了变压器设备的基础准平面,再利用测量吊坠盒对两边的基础底盘测量定位,使整体定位系统科学、准确且简捷可靠,极大地提高了测量精度和测量效率,避免了员工爬上爬下的不安全因素。 The technical effects and advantages of the present utility model: when the 10kV pole assembly chassis locator is used, it is placed on the ground plane, and passes through the three circular chassis at the bottom of the screw rod (12) and the second support rod (14). (13) Place the instrument horizontally, level it with its own level ruler, determine the basic quasi-plane of the transformer equipment, and then use the measurement pendant box to measure and position the basic chassis on both sides, so that the overall positioning system is scientific, accurate, simple and reliable, and extremely The measurement accuracy and measurement efficiency are greatly improved, and the unsafe factors of employees climbing up and down are avoided.

附图说明 Description of drawings

图1为本实用新型主视图; Fig. 1 is a front view of the utility model;

图2是本实用新型测量吊坠盒结构示意图; Fig. 2 is a structural schematic diagram of the utility model measuring pendant box;

图中:1、底架;2、支臂;3、测量吊坠盒;11、第一支撑杆;12、螺杆;13、底盘;14、第二支撑杆;21、水平尺;22、滑槽;23、滑臂;24、顶盖;25、凸块;31、摇杆;32、滚轴;33、吊线;34、圆锥;35、下按钮;36、上按钮。  In the figure: 1. Underframe; 2. Support arm; 3. Measuring pendant box; 11. First support rod; 12. Screw rod; 13. Chassis; 14. Second support rod; 21. Level ruler; 22. Chute ; 23, sliding arm; 24, top cover; 25, bump; 31, rocking bar; the

具体实施方式 Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。 The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

如图1和图2所示的10kV电杆组立底盘定位仪,包括底架1和位于底架1上部的支臂2;所述底架1包括第一支撑杆11和第二支撑杆14;所述第一支撑杆11底部设有螺杆12;采用螺杆可以用来调整水平高度,第二支撑杆14为等槽边长槽型,第一、第二两个支撑杆的三个支撑点组成检测平面;所述支臂2关于本体中心对称,支臂2包括滑槽22和与滑槽22相配合的滑臂23;所述滑槽22上部固定有顶盖24,在顶盖24上部设有水平尺21,水平尺21两端设有凸块25,用于稳固水平尺21;所述滑臂23一端延伸到滑槽22内部,另一端固定安装有测量吊坠盒3;在测量吊坠盒3内部设有吊线33,吊线33与圆锥34固定连接;所述测量吊坠盒3外部设有上按钮36和下按钮35。 The 10kV pole assembly chassis locator shown in Figure 1 and Figure 2 includes a chassis 1 and a support arm 2 positioned on the top of the chassis 1; the chassis 1 includes a first support rod 11 and a second support rod 14 ; The bottom of the first support rod 11 is provided with a screw rod 12; the screw rod can be used to adjust the level height, and the second support rod 14 is an equal groove side long groove type, and the three support points of the first and second two support rods The detection plane is composed; the support arm 2 is symmetrical about the center of the body, and the support arm 2 includes a slide groove 22 and a slide arm 23 matched with the slide groove 22; a top cover 24 is fixed on the top of the slide groove 22, and A level 21 is provided, and the two ends of the level 21 are provided with projections 25 for stabilizing the level 21; one end of the sliding arm 23 extends to the inside of the chute 22, and the other end is fixedly installed with a measuring pendant box 3; A suspension wire 33 is provided inside the box 3, and the suspension wire 33 is fixedly connected with the cone 34; an upper button 36 and a lower button 35 are arranged outside the measuring pendant box 3 .

测量吊坠盒3可采用铆钉固定在滑臂23两端,可防止测量过程中测量吊坠盒3脱落,其内部还设有与吊线33相连接的滚轴32,所述吊线33缠绕在滚轴32的外表面,在测量吊坠盒3外部还设有与滚轴32固定连接的摇杆31,转动摇杆32,吊线33连接的圆锥34会根据 转动的方向,向上或向下移动,上按钮36用于锁定和放开摇杆31所用;下按钮35用于锁定和放开吊线33所用,在吊线33上分别标有1900mm、2200mm、2700mm的印记,用于测量10m、12m、15m不同电杆杆坑深度;所述底架1和滑槽22均为不锈钢管材,所述滑臂23为不锈钢板材,滑臂23置于滑槽22中,滑槽22内设有挡板,用于确定插深刻度,所述滑槽22与滑臂23可拆卸安装,方便携带;所述第一支撑杆11与螺杆12为螺纹连接,所述螺杆12延伸至第一支撑杆11内部,旋转螺杆12,本体的一侧上升或下降,可以方便水平尺调节本体处于水平;所述第二支撑杆14与底架1通过端头带螺纹的螺杆紧固,组成活动连接,第二支撑杆14可由长度大小相同的竖杆与一横杆焊接组成或整体加工,使用本定位仪检测时,第一支撑杆11与第二支撑杆14的两个竖杆支撑本体,底部呈等边三角形,使本体更加稳固;所述螺杆12和第二支撑杆14底部还设有三个圆形底盘13,确保定位仪平稳,在圆锥下落的过程中底架1不会滑动从而降低了误差。 The measurement pendant box 3 can be fixed on both ends of the sliding arm 23 by rivets, which can prevent the measurement pendant box 3 from falling off during the measurement process, and a roller 32 connected with a suspension wire 33 is also provided inside it, and the suspension wire 33 is wound on the roller shaft 32 The outer surface of the measuring pendant box 3 is also provided with a rocker 31 fixedly connected to the roller 32. When the rocker 32 is rotated, the cone 34 connected to the suspension wire 33 will move up or down according to the direction of rotation, and the upper button 36 It is used for locking and releasing the rocker 31; the lower button 35 is used for locking and releasing the hanging wire 33, and the markings of 1900mm, 2200mm, and 2700mm are marked on the hanging wire 33 respectively, and are used to measure different poles of 10m, 12m, and 15m Rod pit depth; the base frame 1 and the chute 22 are stainless steel pipes, the sliding arm 23 is a stainless steel plate, the sliding arm 23 is placed in the chute 22, and a baffle plate is provided in the chute 22 to determine the insertion Depth, the chute 22 and the sliding arm 23 are detachable and easy to carry; the first support rod 11 and the screw rod 12 are threaded, the screw rod 12 extends to the inside of the first support rod 11, and the screw rod 12 is rotated. One side of the body rises or falls, which is convenient for the level to adjust the body to be horizontal; the second support rod 14 is fastened with the underframe 1 by a threaded screw at the end to form a flexible connection, and the second support rod 14 can be adjusted by the length The same vertical rod and a horizontal rod are welded or processed as a whole. When using this locator to detect, the two vertical rods of the first support rod 11 and the second support rod 14 support the body, and the bottom is an equilateral triangle, making the body more stable ; The screw 12 and the bottom of the second support rod 14 are also provided with three circular chassis 13 to ensure that the locator is stable, and the underframe 1 will not slide during the falling of the cone, thereby reducing the error.

具体原理及工作过程:先将可拆卸的两滑臂安装在滑槽中,将水平尺放置在支臂的中心位置,将本体放置在两个变压器底盘的中心地面位置,旋转螺杆可调节水平尺,使水平尺内部的气泡位与中心位置,将圆锥吊坠按标准线放开,垂直进入坑中,将底盘中心调至圆锥吊坠的底端。 The specific principle and working process: first install the two detachable sliding arms in the chute, place the level at the center of the arm, place the body at the center of the two transformer chassis, and turn the screw to adjust the level , so that the air bubble position and the center position inside the spirit level, release the cone pendant according to the standard line, enter the pit vertically, and adjust the center of the chassis to the bottom end of the cone pendant.

最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。 Finally, it should be noted that: the above is only a preferred embodiment of the utility model, and is not intended to limit the utility model, although the utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art , it can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements on some of the technical features. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model, All should be included within the protection scope of the present utility model.

Claims (6)

1.一种10kV电杆组立底盘定位仪,包括底架(1)和位于底架(1)上部的支臂(2);其特征在于:所述底架(1)包括第一支撑杆(11)和第二支撑杆(14),所述第一支撑杆(11)底部设有螺杆(12),第二支撑杆(14)为等槽边的长槽型;所述支臂(2)关于本体中心对称,支臂(2)包括滑槽(22)和与滑槽(22)相配合的滑臂(23);所述滑槽(22)上部固定有顶盖(24),顶盖(24)上部设有水平尺(21),稳固水平尺(21)的凸块(25);所述滑臂(23)一端延伸到滑槽(22)内部,另一端固定安装有测量吊坠盒(3),在测量吊坠盒(3)内部设有吊线(33),吊线(33)与圆锥(34)固定连接。 1. A 10kV pole assembly chassis locator, comprising an underframe (1) and a support arm (2) positioned at the top of the underframe (1); it is characterized in that: the underframe (1) includes a first support rod (11) and the second support rod (14), described first support rod (11) bottom is provided with screw rod (12), and the second support rod (14) is the long groove type of equal groove edge; Described support arm ( 2) Symmetrical about the center of the body, the support arm (2) includes a sliding slot (22) and a sliding arm (23) matched with the sliding slot (22); the upper part of the sliding slot (22) is fixed with a top cover (24), The top cover (24) is provided with a level (21), and the projection (25) of the level (21) is stabilized; one end of the sliding arm (23) extends to the inside of the chute (22), and the other end is fixedly installed with a measuring The pendant box (3) is provided with a suspension wire (33) inside the measurement pendant box (3), and the suspension wire (33) is fixedly connected with the cone (34). 2.根据权利要求1所述的10kV电杆组立底盘定位仪,其特征在于:所述测量吊坠盒(3)用铆钉固定在滑臂(23)两端,其内部还设有与吊线(33)相连接的滚轴(32),所述吊线(33)缠绕在滚轴(32)的外表面,所述测量吊坠盒(3)外部还设有与滚轴(32)固定连接的摇杆(31)。 2. The 10kV electric pole assembly chassis locator according to claim 1 is characterized in that: the measurement pendant box (3) is fixed on the two ends of the sliding arm (23) with rivets, and the interior is also provided with a suspension wire ( 33) a connected roller (32), the suspension wire (33) is wound on the outer surface of the roller (32), and the outside of the measuring pendant box (3) is also provided with a rocker fixedly connected to the roller (32). rod (31). 3.根据权利要求1所述的10kV电杆组立底盘定位仪,其特征在于:所述螺杆(12)和第二支撑杆(14)底端部还设有三个圆形底盘(13)。 3. The chassis locator for 10kV pole assembly according to claim 1, characterized in that three circular chassis (13) are provided at the bottom of the screw (12) and the second support rod (14). 4.根据权利要求1所述的10kV电杆组立底盘定位仪,其特征在于:所述滑臂(23)与滑槽(22)可拆卸安装,滑臂(23)和滑槽(22)上设有定位标线。 4. The 10kV electric pole assembly chassis locator according to claim 1, characterized in that: the sliding arm (23) and the chute (22) are detachably installed, and the sliding arm (23) and the chute (22) There are positioning markings on it. 5.根据权利要求1所述的10kV电杆组立底盘定位仪,其特征在于:所述第一支撑杆(11)与螺杆(12)为螺纹连接,螺杆(12)延伸至第一支撑杆(11)内部。 5. The 10kV pole assembly chassis locator according to claim 1, characterized in that: the first support rod (11) is threadedly connected to the screw rod (12), and the screw rod (12) extends to the first support rod (11) INTERNAL. 6.根据权利要求1所述的10kV电杆组立底盘定位仪,其特征在于:所述第二支撑杆(14)与底架(1)通过端头带螺纹的螺杆紧固,组成活动连接。 6. The 10kV pole assembly chassis locator according to claim 1, characterized in that: the second support rod (14) and the chassis (1) are fastened by a threaded screw at the end to form a movable connection .
CN201420797836.4U 2014-12-16 2014-12-16 10kV electric pole group founds chassis orientator Expired - Fee Related CN204301742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420797836.4U CN204301742U (en) 2014-12-16 2014-12-16 10kV electric pole group founds chassis orientator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420797836.4U CN204301742U (en) 2014-12-16 2014-12-16 10kV electric pole group founds chassis orientator

Publications (1)

Publication Number Publication Date
CN204301742U true CN204301742U (en) 2015-04-29

Family

ID=53107275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420797836.4U Expired - Fee Related CN204301742U (en) 2014-12-16 2014-12-16 10kV electric pole group founds chassis orientator

Country Status (1)

Country Link
CN (1) CN204301742U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105387849A (en) * 2015-11-20 2016-03-09 国网山东潍坊市寒亭区供电公司 Straight double-rack rod tower positioning device and construction positioning method of straight double-rack rod tower
CN109470227A (en) * 2018-10-23 2019-03-15 刘景岳 A kind of wire sinker for building construction based on substrate quantification technology
CN110146064A (en) * 2019-06-20 2019-08-20 中建新疆建工集团第五建筑工程有限公司 A Portable Formwork Perpendicularity Measurement Tool

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105387849A (en) * 2015-11-20 2016-03-09 国网山东潍坊市寒亭区供电公司 Straight double-rack rod tower positioning device and construction positioning method of straight double-rack rod tower
CN109470227A (en) * 2018-10-23 2019-03-15 刘景岳 A kind of wire sinker for building construction based on substrate quantification technology
CN109470227B (en) * 2018-10-23 2020-12-25 广州番禺职业技术学院 Line weight for construction based on base plate accurate measurement technique
CN110146064A (en) * 2019-06-20 2019-08-20 中建新疆建工集团第五建筑工程有限公司 A Portable Formwork Perpendicularity Measurement Tool

Similar Documents

Publication Publication Date Title
CN204301742U (en) 10kV electric pole group founds chassis orientator
CN203772198U (en) Wall template verticality detector
CN202853617U (en) Telescopic and convenient plumb bob scale
CN210719192U (en) Template straightness check device that hangs down based on BIM
CN104006794A (en) Automatic box staff straightening device and use method thereof
CN215524629U (en) A measuring device for construction engineering management
CN203310337U (en) Quick range finder for electric pole root spacing
CN207907886U (en) A kind of novel pole and tower foundation divides hole instrument
CN104154900A (en) Hand-held horizontal verticality measuring tool
CN203083498U (en) Rapid electric pole burial depth measuring ruler
CN202834604U (en) Universal regulating compass triangular frame
CN206440276U (en) Automatic keep vertically engineering survey sighting rod
CN207448776U (en) A kind of high ferro box beam catenary mast built-in fitting calibrating installation
CN210221101U (en) A kind of electric power tower foundation pit splitting equipment
CN208564865U (en) A kind of constructing structure of concrete tower alignment
CN201583272U (en) Slope measuring scale of supporting column of electric contact network
CN202630862U (en) Portable measurement instrument for measuring height of conducting wire
CN203323746U (en) Electric meter box leveling positioner
CN203364827U (en) Plumb positioning measurement device for high-rise building
CN207317791U (en) A kind of geographical mapping fixing device
CN201293638Y (en) Portable distance measuring apparatus for side conductor
CN106546148A (en) Large Deployable radial rib antenna major-minor rib node vertical height measuring system
CN207798098U (en) Engineering survey actinobacillus device
CN204461421U (en) Novel steel column slope measurement instrument
CN204854726U (en) Engineering measuring apparatu is used on slope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20181216

CF01 Termination of patent right due to non-payment of annual fee