CN206756170U - It is a kind of to be easy to fixed road and bridge construction measurement mark post - Google Patents

It is a kind of to be easy to fixed road and bridge construction measurement mark post Download PDF

Info

Publication number
CN206756170U
CN206756170U CN201721236314.7U CN201721236314U CN206756170U CN 206756170 U CN206756170 U CN 206756170U CN 201721236314 U CN201721236314 U CN 201721236314U CN 206756170 U CN206756170 U CN 206756170U
Authority
CN
China
Prior art keywords
extension rod
mark post
target body
easy
bolted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721236314.7U
Other languages
Chinese (zh)
Inventor
刘名扬
付晓军
张志策
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721236314.7U priority Critical patent/CN206756170U/en
Application granted granted Critical
Publication of CN206756170U publication Critical patent/CN206756170U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It is easy to fixed road and bridge construction measurement mark post the utility model discloses a kind of,Including target body,The target body centre position is socketed with locating piece,The locating piece side is bolted with release handle,The locating piece centre position, which is run through, is connected with pole,The pole side has been bolted supporting plate,The supporting plate side is hinged with cover plate,The pole lower end is welded with hook,The target body lower end is socketed with extension rod,Fastening bolt is bolted with the outside of the extension rod upper end,The extension rod lower end is connected with tapered cap,Antiskid glue sleeve is connected among the extension rod,The utility model is simple in construction,It is easily installed use,By increasing the extension rod with regulating tank,The length of convenient adjustment overcasting staff,The positioning seat connected on mark post,The eye-catching marks such as convenient installation flag,The supporting plate of lyophilized pole connection among mark post,For installing fixation measuring equipment,It is convenient for measuring data.

Description

It is a kind of to be easy to fixed road and bridge construction measurement mark post
Technical field
Technical field of construction is the utility model is related to, it is specially a kind of to be easy to fixed road and bridge construction measurement mark Bar.
Background technology
Construction survey refers to the measurement work carried out in Construction stage, is the important content of engineering survey.Including The foundation of construction control network, the setting-out of building, acceptance survey and deformation observation of construction period etc..Construction survey (survey set or Setting-out) purpose be the plan-position of the building that will be designed on drawing, on the ground of shape and elevation demarcation at the construction field (site), And the guiding construction in work progress, engineering is built in strict accordance with the requirement of design.Construction survey and topography mapping All it is the correlation that position is put on research and determination ground.Mapping is that first have some points on ground, is then measured between them Relation, and setting-out is first from the distance between worthwhile invocation point position of design drawing, direction and the discrepancy in elevation, then by measuring work point position Survey is set on ground.Therefore range measurement, angular surveying, the measurement of higher degree are equally the substances of construction survey.
When site operation measures, typically all it can be used for subsidiary as equipment carries mark post class article, but it is existing Mark post is all integral type mark post, and intensity is high, is convenient for carrying, but mark post length is fixed, and part landform is inconvenient to establish mark post.
Utility model content
The purpose of this utility model be to provide it is a kind of be easy to fixed road and bridge construction measurement mark post, with solution State the problem of being proposed in background technology.
To achieve the above object, the utility model provides following technical scheme:It is a kind of to be easy to fixed road and bridge construction Measurement mark post, including target body, the target body centre position are socketed with locating piece, and the locating piece side is bolted with Release handle, through pole is connected with, the pole side has been bolted supporting plate, described in the locating piece centre position Supporting plate side is hinged with cover plate, and the pole lower end is welded with hook, and the target body lower end is socketed with extension rod, described Fastening bolt is bolted with the outside of extension rod upper end, the extension rod lower end is connected with tapered cap, is connected among the extension rod Antiskid glue sleeve.
Preferably, the target body side is evenly distributed with the positioning hole to match with fastening bolt, the positioning hole it Between spacing it is equal.
Preferably, the extension rod lower end is provided with altitude scale, and the altitude scale is located at tapered cap upper end.
Preferably, the target body upper end has been bolted positioning seat, and the positioning seat side is provided with mounting groove.
Preferably, the target body side is provided with distance scale, and the distance scale is located at positioning seat lower end.
Preferably, it is evenly coated with rust preventive coating on the outside of the target body and extension rod.
Compared with prior art, the beneficial effects of the utility model are:The utility model is simple in construction, and being easily installed makes With by increasing the extension rod with regulating tank, conveniently the length of adjustment overcasting staff, facilitates more preferable fixed pole, mark post The positioning seat of upper connection, it is convenient that the eye-catching marks such as flag are installed, the supporting plate of pole connection is freezed among mark post, it is solid for installing Determine measuring apparatus, be convenient for measuring data.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model extension rod modular construction schematic diagram;
Fig. 3 is the utility model side structure schematic diagram.
In figure:It is 1 target body, 2 locating pieces, 3 release handles, 4 poles, 5 supporting plates, 6 cover plates, 7 hooks, 8 extension rods, 9 tight Fixing bolt, 10 tapered caps, 11 antiskid glue sleeves, 12 positioning holes, 13 altitude scales, 14 positioning seats, 15 distance scales.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:It is a kind of to be easy to fixed road and bridge construction measurement With mark post, including target body 1, the centre position of target body 1 is socketed with locating piece 2, and the side of locating piece 2 is bolted with Release handle 3, through pole 4 is connected with, the side of pole 4 has been bolted supporting plate in the centre position of locating piece 2 5, the side of supporting plate 5 is hinged with cover plate 6, and the lower end of pole 4 is welded with hook 7, and the lower end of target body 1 is socketed with Extension rod 8, the upper end of extension rod 8 outside are bolted with fastening bolt 9, and the lower end of extension rod 8 is connected with tapered cap 10, described Antiskid glue sleeve 11 is connected among extension rod 8.
Specifically, the side of target body 1 is evenly distributed with the positioning hole 12 to match with fastening bolt 9, the positioning Spacing is equal between hole 12.
Specifically, the lower end of extension rod 8 is provided with altitude scale 13, the altitude scale 13 is located at the upper end of tapered cap 10.
Specifically, the upper end of target body 1 has been bolted positioning seat 14, the side of positioning seat 14 is provided with peace Tankage.
Specifically, the side of target body 1 is provided with distance scale 15, the distance scale 15 is located under positioning seat 14 End.
Specifically, the target body 1 and the outside of extension rod 8 are evenly coated with rust preventive coating.
Operation principle:The utility model is a kind of to be easy to fixed road and bridge construction measurement mark post, will installation during use The extension rod 8 for having tapered cap 10 is inserted on the ground, then inserts target body 1 in extension rod 8, adjusts height and by tight Fixing bolt 9 fixes target body 1, and the eye-catching mark for prompting position is then installed on positioning seat 14, and supporting plate 5 is set Put and be used for fixation measuring equipment, instead of hand-held measurement so that measurement data is more accurate.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of be easy to fixed road and bridge construction measurement mark post, including target body (1), it is characterised in that:The mark Bar body (1) centre position is socketed with locating piece (2), and locating piece (2) side is bolted with release handle (3), the locating piece (2) through pole (4) is connected with, pole (4) side has been bolted supporting plate (5), the support in centre position Plate (5) side is hinged with cover plate (6), and pole (4) lower end is welded with hook (7), and target body (1) lower end is socketed with Extension rod (8), extension rod (8) the upper end outside are bolted with fastening bolt (9), and extension rod (8) lower end is connected with taper Cap (10), the extension rod (8) is middle to be connected with antiskid glue sleeve (11).
2. a kind of it is easy to fixed road and bridge construction measurement mark post according to claim 1, it is characterised in that:It is described Target body (1) side is evenly distributed with the positioning hole (12) to match with fastening bolt (9), spacing between the positioning hole (12) It is equal.
3. a kind of it is easy to fixed road and bridge construction measurement mark post according to claim 1, it is characterised in that:It is described Extension rod (8) lower end is provided with altitude scale (13), and the altitude scale (13) is located at tapered cap (10) upper end.
4. a kind of it is easy to fixed road and bridge construction measurement mark post according to claim 1, it is characterised in that:It is described Target body (1) upper end has been bolted positioning seat (14), and positioning seat (14) side is provided with mounting groove.
5. a kind of it is easy to fixed road and bridge construction measurement mark post according to claim 4, it is characterised in that:It is described Target body (1) side is provided with distance scale (15), and the distance scale (15) is located at positioning seat (14) lower end.
6. a kind of it is easy to fixed road and bridge construction measurement mark post according to claim 1, it is characterised in that:It is described Rust preventive coating is evenly coated with the outside of target body (1) and extension rod (8).
CN201721236314.7U 2017-09-26 2017-09-26 It is a kind of to be easy to fixed road and bridge construction measurement mark post Expired - Fee Related CN206756170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721236314.7U CN206756170U (en) 2017-09-26 2017-09-26 It is a kind of to be easy to fixed road and bridge construction measurement mark post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721236314.7U CN206756170U (en) 2017-09-26 2017-09-26 It is a kind of to be easy to fixed road and bridge construction measurement mark post

Publications (1)

Publication Number Publication Date
CN206756170U true CN206756170U (en) 2017-12-15

Family

ID=60622608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721236314.7U Expired - Fee Related CN206756170U (en) 2017-09-26 2017-09-26 It is a kind of to be easy to fixed road and bridge construction measurement mark post

Country Status (1)

Country Link
CN (1) CN206756170U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108827266A (en) * 2018-06-04 2018-11-16 河南工程学院 A kind of mark post of engineering survey

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108827266A (en) * 2018-06-04 2018-11-16 河南工程学院 A kind of mark post of engineering survey

Similar Documents

Publication Publication Date Title
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
CN108590202A (en) A kind of construction site top plate positions line-plotting device and top plate positions line drawing method
CN206756170U (en) It is a kind of to be easy to fixed road and bridge construction measurement mark post
CN105547266A (en) GPS monitoring instrument mounting and fixing device
CN207963877U (en) A kind of portable geolocation information surveying instrument
CN108239990A (en) A kind of construction method using second pouring streetlamp foundation
CN207280467U (en) It is a kind of position, the cross horizon rule of leveling
CN206057550U (en) Voltage transformer on-site proving platform
CN208105335U (en) A kind of self-leveling gravity platform
CN203429195U (en) Measuring auxiliary fixed device of blast furnace shell
CN203687831U (en) Measuring subassembly for measuring thickness of floor plate
CN202323914U (en) Center fixed type sedimentation plate
CN210570702U (en) Sighting rod rack for surveying and mapping
CN210127031U (en) Device for monitoring perpendicularity of tower crane in real time
CN209540419U (en) A kind of crowfoot
CN208829133U (en) A kind of large equipment single hook hauling positioning device
CN201233232Y (en) Passenger transport dedicated line railway foundation pile control network height measurement sign device
CN207907898U (en) A kind of gyroscope mounting device
CN105696615B (en) A kind of inclining tube orienting device
CN220398572U (en) Prick ground survey and drawing mark post
CN207622756U (en) A kind of cylinder pier measurement and positioning frame
CN207163464U (en) Portable integrated adjustable water level compass device
CN210513117U (en) Pole gradient measuring tool
CN202416712U (en) Concrete thickness control measurer for cast-in-place floorslab
CN106017412B (en) The additional survey method of the differential settlement difference of large-span steel girder deflection metrology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171215

Termination date: 20190926

CF01 Termination of patent right due to non-payment of annual fee