CN202323914U - Center fixed type sedimentation plate - Google Patents

Center fixed type sedimentation plate Download PDF

Info

Publication number
CN202323914U
CN202323914U CN201120439008XU CN201120439008U CN202323914U CN 202323914 U CN202323914 U CN 202323914U CN 201120439008X U CN201120439008X U CN 201120439008XU CN 201120439008 U CN201120439008 U CN 201120439008U CN 202323914 U CN202323914 U CN 202323914U
Authority
CN
China
Prior art keywords
sedimentation
bar
rod
dish
center fixation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120439008XU
Other languages
Chinese (zh)
Inventor
宋俊强
曲贝贝
胡晓聪
赵伏山
吴金勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
CCCC TDC Binhai Environmental Channel Dredging Co Ltd
CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
CCCC TDC Environmental Engineering Co Ltd
Original Assignee
CCCC Tianjin Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Harbour Engineering Co Ltd filed Critical CCCC Tianjin Harbour Engineering Co Ltd
Priority to CN201120439008XU priority Critical patent/CN202323914U/en
Application granted granted Critical
Publication of CN202323914U publication Critical patent/CN202323914U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to a center fixed type sedimentation plate, which comprises a round sedimentation plate, a sedimentation rod and a center fixed rod, wherein the uppermost end of the sedimentation rod is a measurement rod; and measurement marking parts, marking lines and marking rods are arranged on the measurement rod. The center fixed type sedimentation plate is characterized in that: the sedimentation rod has a tubular structure and is formed by assembling a plurality of sections of sedimentation rod bodies; every adjacent sedimentation rod bodies are connected with each other through a screw nut; the measurement rod is screwed on the upper part of the sedimentation rod body on the top; a central hole corresponding to a central hole of the sedimentation rod is formed in the sedimentation plate; the center fixed rod is inserted into the central holes of the sedimentation plate and the sedimentation rod and is formed by assembling a plurality of sections of center fixed rod bodies; and every adjacent center fixed rod bodies are connected with each other through a second screw nut. The center fixed type structure is adopted; compared with the conventional method, the discharging method of the sedimentation plate in a blowing region has the advantages that: the survival rate is relatively high, the observation error is relatively low and the like; according to the method, the sedimentation plate is stabilized, and the sedimentation plate can sediment successfully; and the operability is high.

Description

A kind of center fixation formula sedimentation dish
Technical field
The utility model belongs to dredging hydraulic reclamation technical field, particularly relates to a kind of center fixation formula sedimentation dish.
Background technology
Along with China's rapid development of economy, the coastal area has begun the work of reclaiming fields from the sea on a large scale.In the hydraulic reclamation process of carrying out of being correlated with therewith, be to understand the sedimentation situation of hydraulic reclamation district behind the original mud face of different phase bearing load, need carry out settlement observation to the hydraulic reclamation district.All adopt the sedimentation dish to observe to the hydraulic reclamation district at present, traditional sedimentation dish structure generally comprises circular sedimentation dish, is fixed on the sedimentation bar in the circular sedimentation disk center; The top of sedimentation bar is a measuring staff, and said measuring staff is provided with the sign portion of measuring, and is coated with sign line red and white in the said measurement sign portion; The two ends up and down of measuring sign portion are provided with and the vertically disposed sign bar of measuring staff; When discharging, directly place it on the mud face, but owing to receive the shock effect of barged-in fill in the hydraulic reclamation district and current, the sedimentation dish tilts easily; Therefore traditional sedimentation dish application method survival rate is lower, and the observation effect error is bigger.
Summary of the invention
The utility model provides a kind of survival rate higher for solving the technical problem that exists in the known technology, and observation error is less, can the stable settlement dish, do not hinder the sedimentation of sedimentation dish again, workable center fixation formula sedimentation dish.
The technical scheme that the utility model is taked for the technical problem that exists in the solution known technology is:
A kind of center fixation formula sedimentation dish comprises circular sedimentation dish, is fixed on the sedimentation bar in the circular sedimentation disk center; The top of sedimentation bar is a measuring staff, and said measuring staff is provided with the sign portion of measuring, and is coated with sign line red and white in the said measurement sign portion; The two ends up and down of measuring sign portion are provided with and the vertically disposed sign bar of measuring staff; It is characterized in that: said sedimentation bar is a tubular structure, and said sedimentation bar is assembled by the several sections sedimentation bodies of rod, connects through swivel nut between every section sedimentation body of rod; Said measuring staff spiral shell is contained in the sedimentation body of rod top of top, and said sedimentation dish is provided with and the corresponding centre bore of sedimentation bar centre bore; Said sedimentation dish structure also comprises the center fixation bar, and said center fixation bar is installed in the centre bore of sedimentation dish and sedimentation bar, and said center fixation bar is assembled by the several sections center fixation bodies of rod, connects through swivel nut between said every section center fixation body of rod.
The utility model can also adopt following technical measures:
The said sedimentation bar that is fixed together with the sedimentation dish is provided with stiffener on every side, and said stiffener welds together with sedimentation dish and sedimentation bar respectively.
Advantage and the good effect that the utlity model has are: because the utility model adopts technique scheme; Promptly adopt center fixation formula structure, the dispensing of hydraulic reclamation district sedimentation dish is compared with conventional method, and survival rate is higher; And observation error is less; And the method can the stable settlement dish, does not hinder the sedimentation of sedimentation dish again, advantage such as workable.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is an A-A sectional view among Fig. 1;
Fig. 3 is a center fixation bar structural representation.
Among the figure: 1, circular sedimentation dish; 2, sedimentation bar; 2-1, the sedimentation body of rod; 3, measuring staff; 3-1, measurement sign portion; 3-2, sign line; 3-3, sign bar; 4, swivel nut; 5, center fixation bar; 5-1, the center fixation body of rod; 6, swivel nut; 7, stiffener.
The specific embodiment
For further understanding summary of the invention, characteristics and the effect of the utility model, the following examples of giving an example now, and conjunction with figs. specifies as follows:
See also Fig. 1 to Fig. 3, a kind of center fixation formula sedimentation dish comprises circular sedimentation dish 1; Be fixed on circular sedimentation dish 1 supercentral sedimentation bar 2; The top of sedimentation bar 2 is a measuring staff 3, and said measuring staff 3 is provided with measures the sign 3-1 of portion, is coated with sign line 3-2 red and white in the said measurement sign portion; The two ends up and down of measuring the sign 3-1 of portion are provided with and the vertically disposed sign bar of measuring staff 3-3; Said sedimentation bar 2 is a tubular structure, and said sedimentation bar 2 is assembled by several sections sedimentation body of rod 2-1, connects through swivel nut 4 between every section sedimentation body of rod 2-1; Said measuring staff 3 spiral shells are contained in the sedimentation body of rod top of top, and said sedimentation dish 1 is provided with and the corresponding centre bore of sedimentation bar centre bore; Said sedimentation dish structure also comprises center fixation bar 5; Said center fixation bar 5 is installed in the centre bore of sedimentation dish 1 and sedimentation bar 2; Said center fixation bar 5 is assembled by several sections center fixation body of rod 5-1, connects through swivel nut 6 between said every section center fixation body of rod 5-1.
For improving the intensity of sedimentation dish, the said sedimentation bar that is fixed together with the sedimentation dish is provided with stiffener 7 on every side, and said stiffener welds together with sedimentation dish and sedimentation bar respectively.
The utility model method for using,
Lay: after at first the center fixation bar being delivered to the setting-out position through tender, the accommodation is lived in following front and back two grapplings.The dispensing personnel are slowly pounded the center fixation bar the mud face with iron hammer from ship one side, and the not open close swivel nut spreading center fixation bar of crossing can't make it continue downwards until iron hammer., this process need to adjust the verticality of center fixation bar when noting at any time.Discharge the sedimentation dish then, operating personnel discharge the sedimentation dish immediately from ship one side, sedimentation rim center fixation bar is penetrated; The sedimentation dish is seated on the former mud face; Continuous then spreading sedimentation bar exceeds about water surface 2m until measuring sign portion, and the dispensing of sedimentation dish is accomplished; To detect its verticality after the dispensing of sedimentation dish is accomplished, in time adjust if any tilt condition.
Calibration: because that the soil property in hydraulic reclamation district distributes is more even, in the works area in the cofferdam 300 meters along the line every at a distance from about 500 meters sedimentation bars of laying.After sedimentation bar assembled on site is accomplished, use steel ruler to measure Vertical right angle observation and be tagged to the height of bottom surface and carry out respective record.
The sedimentation dish is laid and is required:
(1) lays in strict accordance with design attitude;
(2) the sedimentation dish should keep vertically sinking putting;
(3) measuring staff segmentation connection should be enough firm.
Use RTK GPS to measure its exact position after the sedimentation bar is laid and accomplished, and on the sedimentation bar, numbering is set, also can use the checkmark field of different colours to distinguish at masthead.For the ease of measuring the angle of inclination of sedimentation bar, two intersection measurement marks up and down are set on the sedimentation bar, the mark discrepancy in elevation is 1m up and down.
Observation:, therefore should accomplish 24 hours sedimentation bars and can carry out level measurement first after stable laying because the former mud face in hydraulic reclamation district belongs to subgrade.The distance that is tagged to sedimentation bar chassis according to observation can be extrapolated the absolute altitude of sedimentation bar bottom, and calculates the initial settlement amount that the deadweight of sedimentation bar causes with reference to original mud face height gauge.
Preceding 3 months observation cycles are weekly during the dredge fill, and observation in every month once can be encrypted observation in case of necessity after 3 months.Observe operation in strict accordance with the time interval of agreement in the observation cycle; On each operating point, establish the station respectively during each observation; Observe the vertical angle of each sedimentation bar measurement markers nearby; All be as the criterion with sedimentation bar marked, simultaneously observed result charged to the observational record form, the technical requirements of survey station each item is carried out according to the regulation of " marine traffic engineering specifications of surveys " (JTJ 203-2001).
Because the sedimentation bar receives the influence of barged-in fill and current, very easily causes the inclination of the body of rod.For this tilt quantity is measured, the method that one time every month use angle crosses during settlement observation is measured and is observed the plane coordinates of mark up and down, and calculates the angle of inclination of sedimentation bar in view of the above.

Claims (2)

1. a center fixation formula sedimentation dish comprises circular sedimentation dish, is fixed on the sedimentation bar in the circular sedimentation disk center; The top of sedimentation bar is a measuring staff, and said measuring staff is provided with the sign portion of measuring, and is coated with sign line red and white in the said measurement sign portion; The two ends up and down of measuring sign portion are provided with and the vertically disposed sign bar of measuring staff; It is characterized in that: said sedimentation bar is a tubular structure, and said sedimentation bar is assembled by the several sections sedimentation bodies of rod, connects through swivel nut between every section sedimentation bar; Said measuring staff spiral shell is contained in the sedimentation bar top of top, and said sedimentation dish is provided with and the corresponding centre bore of sedimentation bar centre bore; Said sedimentation dish structure also comprises the center fixation bar, and said center fixation bar is installed in the centre bore of sedimentation dish and sedimentation bar, and said center fixation bar is assembled by the several sections center fixation bodies of rod, connects through swivel nut between said every section center fixation body of rod.
2. center fixation formula sedimentation dish according to claim 1 is characterized in that: the said sedimentation bar that is fixed together with the sedimentation dish is provided with stiffener on every side, and said stiffener welds together with sedimentation dish and sedimentation bar respectively.
CN201120439008XU 2011-11-08 2011-11-08 Center fixed type sedimentation plate Expired - Lifetime CN202323914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120439008XU CN202323914U (en) 2011-11-08 2011-11-08 Center fixed type sedimentation plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120439008XU CN202323914U (en) 2011-11-08 2011-11-08 Center fixed type sedimentation plate

Publications (1)

Publication Number Publication Date
CN202323914U true CN202323914U (en) 2012-07-11

Family

ID=46435897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120439008XU Expired - Lifetime CN202323914U (en) 2011-11-08 2011-11-08 Center fixed type sedimentation plate

Country Status (1)

Country Link
CN (1) CN202323914U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507226A (en) * 2016-01-28 2016-04-20 铁道第三勘察设计院集团有限公司 Method for eliminating impacts of dowel bar bending on accuracy of spiral plate load test and displacement detector used in same
CN105804041A (en) * 2016-04-27 2016-07-27 浙江广川工程咨询有限公司 Large-area ultra-soft foundation settlement monitoring device and method
CN110219297A (en) * 2019-07-04 2019-09-10 青岛理工大学 Real-time measuring device for soil thickness

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507226A (en) * 2016-01-28 2016-04-20 铁道第三勘察设计院集团有限公司 Method for eliminating impacts of dowel bar bending on accuracy of spiral plate load test and displacement detector used in same
CN105804041A (en) * 2016-04-27 2016-07-27 浙江广川工程咨询有限公司 Large-area ultra-soft foundation settlement monitoring device and method
CN110219297A (en) * 2019-07-04 2019-09-10 青岛理工大学 Real-time measuring device for soil thickness

Similar Documents

Publication Publication Date Title
CN103243747B (en) Deviation rectifying method of prestressed concrete pipe pile foundation
CN202562406U (en) Mining fissure monitoring device
CN104296721A (en) Satellite positioning and static leveling-based layered settlement monitoring system and method
CN102268871B (en) Construction method of turnover platform for underwater pile foundation of bridge
CN102767176A (en) Hoisting positioning construction method of pile foundation steel reinforcement cage
CN202323914U (en) Center fixed type sedimentation plate
KR20110024937A (en) An earth surface subsidence board which is used at a subsidence measuring
CN107063196A (en) Seabed sand waves migration observation device and method based on pressure gauge
CN206670617U (en) Settlement monitoring device is used in a kind of Underground Engineering Excavation construction
CN111042109A (en) Pile sinking process for land overlength PHS inclined pile
CN102966254B (en) Arrangement method for measuring tower used for construction of stub matching method
CN110068303A (en) A kind of automatic static level apparatus for measuring vertical displacement based on laser measurement
CN208187393U (en) A kind of magnetic foot pin and measuring device for urban surface settlement deformation survey
CN209605800U (en) A kind of automatic static level apparatus for measuring vertical displacement based on laser measurement
CN202745027U (en) Settlement observation marker for hydraulic fill field
CN104596477A (en) Transformer substation foundation settlement monitoring method
CN204530660U (en) A kind of hydraulic reclamation district foundation settlement observation dish
CN201397153Y (en) Root and stone detector
CN107063178B (en) Concrete leveling markstone with displacement sensor and elevation observation and calculation method thereof
CN207423212U (en) Inclinometer pipe datum mark school geodesic structure
CN206847612U (en) A kind of miniature tide register erecting device of offshore
CN203310412U (en) GNSS (global navigation satellite system) observation pillar for reducing multipath effect
CN205825948U (en) Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness
CN201738286U (en) Tetrapod pier type structure
CN210216374U (en) Novel subside board and bury fixedly underground device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CCCC TIANJIN DREDGING CO., LTD. CCCC TDC ENVIRONME

Effective date: 20150427

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 300450 BINHAI NEW DISTRICT, TIANJIN TO: 300450 TANGGU, TIANJIN

TR01 Transfer of patent right

Effective date of registration: 20150427

Address after: 300450 Xingang Road, Tanggu District, No. 57, No.

Patentee after: China Traffic Tianjin Dredging Harbour Construction Engineering Co., Ltd.

Patentee after: CCCC Tianjin Dredging Co., Ltd.

Patentee after: CCCC-TDC ENVIRONMENTAL ENGINEERING CO., LTD.

Patentee after: CCCC-TDC Binhai Environmental Channel Dredging Co., Ltd.

Patentee after: Cccc-TDC Yantai Environmental Protection Dredging Co., Ltd.

Patentee after: Tianjin Pore Avigation Survey and Design Research Co., Ltd. of China Communications Construction Co.

Address before: 300450 No. 57 Xingang Road, Binhai New Area, Tianjin, Tanggu, China

Patentee before: China Traffic Tianjin Dredging Harbour Construction Engineering Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20120711

CX01 Expiry of patent term