CN105257003A - Tool for rapidly fixing grout sleeve and using method of tool - Google Patents
Tool for rapidly fixing grout sleeve and using method of tool Download PDFInfo
- Publication number
- CN105257003A CN105257003A CN201510728192.2A CN201510728192A CN105257003A CN 105257003 A CN105257003 A CN 105257003A CN 201510728192 A CN201510728192 A CN 201510728192A CN 105257003 A CN105257003 A CN 105257003A
- Authority
- CN
- China
- Prior art keywords
- grout sleeve
- bolt
- fixing
- spring part
- frock tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a tool for rapidly fixing a grout sleeve. The tool comprises a bolt with a tolled thread, and is characterized in that a handle is mounted at the top end of the bolt; an adjusting nut is downwards arranged on the bolt along the handle; the bolt at the lower end of the adjusting nut is sleeved with a spring part; a template is arranged on the bolt at the lower end of the spring part; a waist-shaped thread head is arranged at the bottom of the bolt; after the waist-shaped thread head is sleeved with a fixing clamp plate, a fastening nut is used for fixing; the waist-shaped thread head is pushed through a steel bar insertion end at the bottom of the grout sleeve; the handle is rotated to drive the fixing clamp plate rotationally reach to a clamp point in the grout sleeve; after the handle is released, the bottom surface of the grout sleeve clings to the surface of the template under the reset pressure of the spring part. The tool has the advantages that the operation process is very coherent, no very complex working procedure is needed, the positioning is precise and efficient, the own structure is simple, the manufacturing cost is low, and the use is convenient.
Description
[technical field]
The present invention relates to a kind of frock tool and using method thereof of fixing grout sleeve fast.
[background technology]
Along with the propelling of China's housing industrialization, prefabrication rises, and a large amount of engineering adopts prefabricated costruction, needs to use a large amount of grout sleeves in precast shear wall and prefabricated post.The reinforcing bar be cast in concrete with the concrete acting in conjunction of solidifying, can form firm reinforced concrete structure, and using the grout sleeve longitudinal reinforcement carried out between prefabricated units to connect is current research direction preferably.
Grout sleeve realizes being connected by concrete perfusion with reinforcing bar, but grout sleeve needs to install to be fixed, and current method for tooling, just have employed traditional instrument to realize, and traditional instrument, complicated operation, inconvenient.
Above defect, is worth improving.
[summary of the invention]
In order to overcome the deficiency of existing technology, the invention provides a kind of frock tool and using method thereof of fixing grout sleeve fast.
Technical solution of the present invention is as described below:
A kind of frock tool of fixing grout sleeve fast, comprise the bolt being provided with rolled thread, it is characterized in that, the top of described bolt is provided with handle, is provided with regulating nut along on described handle described bolt down, and on the described bolt of described regulating nut lower end, cover has spring part, the described bolt of described spring part lower end is provided with template, described stud base is provided with kidney-shaped silk head, on described kidney-shaped silk headgear after fixing chuck plate, re-uses fastening nut and fixes.
According to the present invention of said structure, it is characterized in that, the described bolt of described regulating nut lower end is provided with finger ring set.
According to the present invention of said structure, it is characterized in that, between described fixing chuck plate and described fastening nut, be provided with the first spring shim.
According to the present invention of said structure, it is characterized in that, between described spring part and described template, be provided with the second spring shim, as the pad that the described spring part of support moves or slides on described bolt.
According to the present invention of said structure, it is characterized in that, between described spring part bottom and described bolt, also overlap the limited location collar.
According to the present invention of said structure, it is characterized in that, described spacing collar lower end outside is provided with the outer spacing ring of protrusion, the pad that described outer spacing ring moves as the described spring part of support or slides on described bolt.
According to the present invention of said structure, it is characterized in that, described fixing chuck plate center is provided with the connecting hole matched with described kidney-shaped silk head.
According to the present invention of said structure, it is characterized in that, it is protruding that described fixing chuck plate is provided with at least one screens.
Present invention also offers a kind of using method of the frock tool of fixing grout sleeve fast, it is characterized in that, described kidney-shaped silk head is advanced by the reinforcing bar insertion end bottom grout sleeve, rotate described handle, make described fixing chuck plate in grout sleeve, rotate to screens point, after loosing one's grip, under the reseat pressure of described spring part, the surface of described template is close in the bottom surface of grout sleeve.
Further, rotate described regulating nut, described regulating nut moves or slides on described bolt, and then changes the force value of described spring part.
According to the present invention of said structure, its beneficial effect is, the incompatible realization of the matching form bottom fixing chuck plate and grout sleeve is utilized to be rotationally connected, utilize the point of the screens in fixing chuck plate and grout sleeve to realize rotational positioning, then utilize the spring pressure of spring part that the bottom of the grout sleeve clamp that is fixed can template tightly be clamped, thus realize locating fixing and carrying out frock, whole operating process is very coherent, there is no very complicated operation, accurate positioning is efficient, and this body structure of instrument is simple, cost of manufacture is cheap, easy to use.
[accompanying drawing explanation]
Fig. 1 is the structural representation of grout sleeve.
Fig. 2 is the structural representation of present pre-ferred embodiments 1.
Fig. 3 is the structural representation (another visual angle) of present pre-ferred embodiments 1.
Fig. 4 is the structural representation of the described fixing chuck plate of present pre-ferred embodiments 1.
Fig. 5 is the structure side view of present pre-ferred embodiments 1.
Fig. 6 is the sectional drawing of present pre-ferred embodiments 1.
Fig. 7 is the installation constructed profile of present pre-ferred embodiments 1.
Fig. 8 is the installation constructed profile of present pre-ferred embodiments 2.
In the drawings, 1, grout sleeve; 2, reinforcing bar insertion end; 3, screens point; 4, bolt; 5, handle; 6, regulating nut; 7, spring part; 8, template; 9, kidney-shaped silk head; 10, fixing chuck plate; 11, fastening nut; 12, spacing ring set; 13, outer spacing ring; 14, connecting hole; 15, screens is protruding.
[detailed description of the invention]
Below in conjunction with accompanying drawing and embodiment, the present invention is conducted further description:
As shown in Figure 1, be the structure chart of grout sleeve 1, the bottom of grout sleeve 1 is reinforcing bar insertion end 2, and inside is provided with screens point 3.
embodiment 1
As shown in Figures 2 to 7, a kind of frock tool of fixing grout sleeve fast, comprise the bolt 4 being provided with rolled thread, it is characterized in that, the top of bolt 4 is provided with handle 5, regulating nut 6 is provided with along on handle 5 bolt 4 down, on the bolt 4 of regulating nut 6 lower end, cover has spring part 7, and the bolt 4 of spring part 7 lower end is provided with template 8, is provided with kidney-shaped silk 9 bottom bolt 4, after kidney-shaped silk 9 puts fixing chuck plate 10, re-use fastening nut 11 and fix.
The first spring shim (invisible in figure) is provided with between fixing chuck plate 10 and fastening nut 11.
The limited location collar 12 is also overlapped between spring part 7 bottom and bolt 4.The spacing collar 12 lower end outside is provided with the outer spacing ring 13 of protrusion, the pad that outer spacing ring 13 moves as support spring part 7 or slides on bolt 4.
Fixing chuck plate 10 center is provided with and kidney-shaped silk 9 connecting hole matched 14.Fixing chuck plate 10 is provided with at least one screens projection 15.For the ease of being rotationally connected, the opening shape of the profile of fixing chuck plate 10 and the bottom of grout sleeve 1 matches.
embodiment 2
As shown in Figure 8, a kind of frock tool of fixing grout sleeve fast, comprise the bolt 4 ' being provided with rolled thread, it is characterized in that, the top of bolt 4 ' is provided with handle 5 ', regulating nut 6 ' is provided with along on handle 5 ' bolt 4 ' down, the upper cover of bolt 4 ' of regulating nut 6 ' lower end has spring part 7 ', the bolt 4 ' of spring part 7 ' lower end is provided with template 8 ', bolt 4 ' bottom is provided with kidney-shaped silk 9 ', after kidney-shaped silk 9 ' puts fixing chuck plate 10 ', re-use fastening nut 11 ' and fix.
The second spring shim 16 ' is provided with, as support spring part 7 ' at the upper pad moving or slide of bolt 4 ' between spring part 7 ' and template 8 '.
In addition, in order to prevent spring tong in work progress, finger ring set can be provided with on the described bolt of described regulating nut lower end.
In above embodiment, the such as vocabulary such as " first ", " second ", is only the parts distinguishing diverse location, without sequencing implication, hereby illustrates.
As illustrated in the schematic views of figures 7 and 8, after the frock tool assembling of a kind of fixing grout sleeve fast provided by the invention, kidney-shaped silk head is advanced by the reinforcing bar insertion end bottom grout sleeve, described handle, make fixing chuck plate in grout sleeve, rotate to screens point, after loosing one's grip, under the reseat pressure of spring part, the surface of template is close in the bottom surface of grout sleeve.The spring pressure of spring part makes the bottom of the grout sleeve clamp that is fixed template tightly to clamp.
In installation process, can rotate regulating nut, regulating nut moves or slides on bolt, and then changes the force value of spring part, is convenient to frock tool to be applied to different grout sleeves like this.
Should be understood that, for those of ordinary skills, can be improved according to the above description or convert, and all these improve and convert the protection domain that all should belong to claims of the present invention.
By reference to the accompanying drawings exemplary description is carried out to patent of the present invention above; the realization of obvious patent of the present invention is not subject to the restrictions described above; as long as have employed the various improvement that method is conceived and technical scheme is carried out of patent of the present invention; or the design of patent of the present invention and technical scheme directly applied to other occasion, all in protection scope of the present invention without to improve.
Claims (10)
1. fix the frock tool of grout sleeve fast for one kind, comprise the bolt being provided with rolled thread, it is characterized in that, the top of described bolt is provided with handle, is provided with regulating nut along on described handle described bolt down, and on the described bolt of described regulating nut lower end, cover has spring part, the described bolt of described spring part lower end is provided with template, described stud base is provided with kidney-shaped silk head, on described kidney-shaped silk headgear after fixing chuck plate, re-uses fastening nut and fixes.
2. the frock tool of fixing grout sleeve fast according to claim 1, is characterized in that, the described bolt of described regulating nut lower end is provided with finger ring set.
3. the frock tool of fixing grout sleeve fast according to claim 1, is characterized in that, be provided with the first spring shim between described fixing chuck plate and described fastening nut.
4. the frock tool of fixing grout sleeve fast according to claim 1, is characterized in that, be provided with the second spring shim between described spring part and described template, as the pad that the described spring part of support moves or slides on described bolt.
5. the frock tool of fixing grout sleeve fast according to claim 1, is characterized in that, also overlap the limited location collar between described spring part bottom and described bolt.
6. the frock tool of fixing grout sleeve fast according to claim 5, it is characterized in that, described spacing collar lower end outside is provided with the outer spacing ring of protrusion, the pad that described outer spacing ring moves as the described spring part of support or slides on described bolt.
7. the frock tool of fixing grout sleeve fast according to claim 1, it is characterized in that, described fixing chuck plate center is provided with the connecting hole matched with described kidney-shaped silk head.
8. the frock tool of fixing grout sleeve fast according to claim 1, it is characterized in that, it is protruding that described fixing chuck plate is provided with at least one screens.
9. the using method of the frock tool of fixing grout sleeve fast as claimed in claim 1, is characterized in that,
Described kidney-shaped silk head is advanced by the reinforcing bar insertion end bottom grout sleeve, rotate described handle, make described fixing chuck plate in grout sleeve, rotate to screens point, after loosing one's grip, under the reseat pressure of described spring part, the surface of described template is close in the bottom surface of grout sleeve.
10. the using method of the frock tool of fixing grout sleeve fast according to claim 8, it is characterized in that, rotate described regulating nut, described regulating nut moves or slides on described bolt, and then changes the force value of described spring part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510728192.2A CN105257003B (en) | 2015-11-02 | 2015-11-02 | A kind of frock tool and its application method of quick fixed grout sleeve |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510728192.2A CN105257003B (en) | 2015-11-02 | 2015-11-02 | A kind of frock tool and its application method of quick fixed grout sleeve |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105257003A true CN105257003A (en) | 2016-01-20 |
CN105257003B CN105257003B (en) | 2018-01-02 |
Family
ID=55096905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510728192.2A Active CN105257003B (en) | 2015-11-02 | 2015-11-02 | A kind of frock tool and its application method of quick fixed grout sleeve |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105257003B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672582A (en) * | 2016-04-01 | 2016-06-15 | 安徽宇辉新型建筑材料有限公司 | Quick locator for grouting sleeves |
CN107654069A (en) * | 2017-09-22 | 2018-02-02 | 中建八局第二建设有限公司 | A kind of wall guard board for being easy to assembly and disassembly |
CN112049458A (en) * | 2020-09-09 | 2020-12-08 | 广东博智林机器人有限公司 | Grouting device and grouting system |
CN114776025A (en) * | 2022-05-20 | 2022-07-22 | 中建三局集团有限公司 | Positioning technology of prefabricated shear wall bottom steel bar sleeve in component production |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10610A (en) * | 1996-06-14 | 1998-01-06 | Toyo Purekon Kogyo Kk | Jig for positioning sleeve in concrete block |
CN202097831U (en) * | 2011-04-21 | 2012-01-04 | 昆明铁路轨枕有限责任公司 | Concrete sleeper embedded parts positioning device |
CN103144190A (en) * | 2013-02-28 | 2013-06-12 | 中铁八局集团桥梁工程有限责任公司 | Plastic sleeve pipe positioning method for double-block sleeper |
CN203004049U (en) * | 2012-12-07 | 2013-06-19 | 中国建筑第八工程局有限公司 | Demoulding device |
CN203805129U (en) * | 2013-12-12 | 2014-09-03 | 上海住总工程材料有限公司 | Fixing device for concrete sleeve |
CN203863807U (en) * | 2014-04-11 | 2014-10-08 | 沈阳卫德住宅工业化科技有限公司 | Grouting sleeve locating device for housing industrialization pre-cast concrete component |
CN104533022A (en) * | 2014-12-12 | 2015-04-22 | 广西科技大学 | Reinforcement sleeve and template connecting structure |
CN204566331U (en) * | 2015-03-24 | 2015-08-19 | 湖南省三新建筑工业股份有限公司 | A kind of sleeve barrel fixing device for building, syndeton, prefabricated board die structure and prefabricated board |
CN204585530U (en) * | 2015-02-11 | 2015-08-26 | 北京市燕通建筑构件有限公司 | A kind of precast concrete mould exposed steel bar and grout sleeve fixture |
CN205134962U (en) * | 2015-11-02 | 2016-04-06 | 深圳市现代营造科技有限公司 | Quick fixed grout sleeve's frock instrument |
-
2015
- 2015-11-02 CN CN201510728192.2A patent/CN105257003B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10610A (en) * | 1996-06-14 | 1998-01-06 | Toyo Purekon Kogyo Kk | Jig for positioning sleeve in concrete block |
CN202097831U (en) * | 2011-04-21 | 2012-01-04 | 昆明铁路轨枕有限责任公司 | Concrete sleeper embedded parts positioning device |
CN203004049U (en) * | 2012-12-07 | 2013-06-19 | 中国建筑第八工程局有限公司 | Demoulding device |
CN103144190A (en) * | 2013-02-28 | 2013-06-12 | 中铁八局集团桥梁工程有限责任公司 | Plastic sleeve pipe positioning method for double-block sleeper |
CN203805129U (en) * | 2013-12-12 | 2014-09-03 | 上海住总工程材料有限公司 | Fixing device for concrete sleeve |
CN203863807U (en) * | 2014-04-11 | 2014-10-08 | 沈阳卫德住宅工业化科技有限公司 | Grouting sleeve locating device for housing industrialization pre-cast concrete component |
CN104533022A (en) * | 2014-12-12 | 2015-04-22 | 广西科技大学 | Reinforcement sleeve and template connecting structure |
CN204585530U (en) * | 2015-02-11 | 2015-08-26 | 北京市燕通建筑构件有限公司 | A kind of precast concrete mould exposed steel bar and grout sleeve fixture |
CN204566331U (en) * | 2015-03-24 | 2015-08-19 | 湖南省三新建筑工业股份有限公司 | A kind of sleeve barrel fixing device for building, syndeton, prefabricated board die structure and prefabricated board |
CN205134962U (en) * | 2015-11-02 | 2016-04-06 | 深圳市现代营造科技有限公司 | Quick fixed grout sleeve's frock instrument |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672582A (en) * | 2016-04-01 | 2016-06-15 | 安徽宇辉新型建筑材料有限公司 | Quick locator for grouting sleeves |
CN105672582B (en) * | 2016-04-01 | 2017-09-12 | 安徽宇辉新型建筑材料有限公司 | A kind of grout sleeve quick positioner |
CN107654069A (en) * | 2017-09-22 | 2018-02-02 | 中建八局第二建设有限公司 | A kind of wall guard board for being easy to assembly and disassembly |
CN107654069B (en) * | 2017-09-22 | 2023-10-20 | 中建八局第二建设有限公司 | Wall body backplate convenient to equipment is dismantled |
CN112049458A (en) * | 2020-09-09 | 2020-12-08 | 广东博智林机器人有限公司 | Grouting device and grouting system |
CN112049458B (en) * | 2020-09-09 | 2022-02-01 | 广东博智林机器人有限公司 | Grouting device and grouting system |
CN114776025A (en) * | 2022-05-20 | 2022-07-22 | 中建三局集团有限公司 | Positioning technology of prefabricated shear wall bottom steel bar sleeve in component production |
Also Published As
Publication number | Publication date |
---|---|
CN105257003B (en) | 2018-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105257003A (en) | Tool for rapidly fixing grout sleeve and using method of tool | |
CN205134962U (en) | Quick fixed grout sleeve's frock instrument | |
CN205309677U (en) | Multifunctional welding support | |
CN103273260A (en) | Method for controlling size precision of three-dimensional-space-shaped pipe frame | |
CN201650319U (en) | Angle installer for anchor bolt | |
CN201519935U (en) | Assembling tool for automobile instrument board | |
CN205314534U (en) | Frame post can't harm drawknot steel form structure | |
CN201326380Y (en) | Drill cushion block suitable for component with circular surface | |
CN210967107U (en) | Steel structural part drilling device | |
CN206732598U (en) | One kind is exclusively used in hinge and bores milling unitary clip | |
CN210732706U (en) | Construction equipment is used in construction of high accuracy wood system furniture installation | |
CN210307654U (en) | Quick nail nipping device for construction site | |
CN202539990U (en) | Novel drilling fixture employing rotational positioning | |
CN212772355U (en) | Auxiliary centering device for static pressure precast tubular pile construction | |
CN207469216U (en) | A kind of highway engineering sampler | |
CN205438429U (en) | Valve seat mounting device | |
CN215969467U (en) | High-efficient perforating device suitable for electromechanical installation | |
CN205077859U (en) | Fixture are consolidated to post template | |
CN218823294U (en) | Horizontal type soil pushing device | |
CN213358952U (en) | Connecting device for prefabricated part with high-strength assembling function | |
CN202214964U (en) | Lever type electric hammer support | |
CN219912197U (en) | Boiler auxiliary engine steel member pipeline erects device | |
CN216196622U (en) | Accurate positioning device for embedded sleeve | |
CN211287629U (en) | A mark device for water conservancy construction punches | |
CN206405468U (en) | A kind of perforating auxiliary device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |