CN103273260A - Method for controlling size precision of three-dimensional-space-shaped pipe frame - Google Patents
Method for controlling size precision of three-dimensional-space-shaped pipe frame Download PDFInfo
- Publication number
- CN103273260A CN103273260A CN201210449267XA CN201210449267A CN103273260A CN 103273260 A CN103273260 A CN 103273260A CN 201210449267X A CN201210449267X A CN 201210449267XA CN 201210449267 A CN201210449267 A CN 201210449267A CN 103273260 A CN103273260 A CN 103273260A
- Authority
- CN
- China
- Prior art keywords
- assembling
- mark
- pipe
- steel
- carry out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention relates to a method for controlling size precision, and discloses a method for controlling size precision of a three-dimensional-space-shaped pipe frame. When materials are blanked, machining allowance of a part and important locating points of a penetration opening are considered, drawing steel is used for marking a datum point and a locating point of each pipe, a marking pen is used for marking the position of steel processing, and the highest point, the lowest point and string courses on the two sides of the penetration opening are marked at the position of the penetration opening of each steel pipe. The method has rapidity of construction, spatial positions are accurately located, and the method is beneficial to improving working efficiency and reducing cost.
Description
Technical field:
The present invention relates to a kind of dimensional accuracy control method, be specifically related to the method for three dimensions shape pipe support dimensional accuracy control.
Background technology:
Along with the continuous development of society, the moulding of building is more and more peculiar, and the structure of three dimensions shape more and more obtains praising highly, and three dimensions shape tubular construction is more conducive to crooked and moulding processing, good looking appearance.For tubular structure, in order to keep handsome in appearance, a lot of designers hanker after adopting Guan Guanxiang to pass through, and employing is weldingly connected, but high-altitude welding procedure difficulty is big, and danger coefficient is also higher.Owing to be the three-D space structure location, sometimes very little dimensional discrepancy all may cause the member dress to unmatch, and need repair again structure, has both strengthened the difficulty of construction, can incur loss through delay the duration of whole construction simultaneously.
Summary of the invention:
The method that the purpose of this invention is to provide the control of three dimensions shape pipe support dimensional accuracy, it has the rapidity of construction and the accurate location of locus, it is the comprehensive utilization of ground sample method and computer setting-out, template, be easy in practice grasp, operate, can accurately carry out the angle of tubulose, the control of dimensional accuracy, farthest guarantee to design desired size, occupied ground is few when making construction simultaneously, being convenient to member can cut the waste, and is beneficial to and increases work efficiency and reduce cost.
In order to solve the existing problem of background technology, the present invention is by the following technical solutions: its operating procedure is as follows:
1, when the material blanking, considers the allowance of part and the important anchor point of intersecting mouth, and perform the datum mark of every pipe fitting and the mark of anchor point with steel drift, and indicate the position of steel drift seal with marking pen;
2, in the place of steel pipe intersecting mouth (the bending point that refers to the bearing diagonal that passes through mutually with steel pipe column) marks the highs and lows of intersecting mouth and the stringcourse of both sides;
3, be the place of angular cut on the steel pipe top, mark the highs and lows of otch and stringcourse and the anglec of rotation of both sides, mark out these anchor points simultaneously at the relative position of steel pipe opposite side;
4, be the place of straight cut at the steel pipe two ends, mark 4 Along ents (4 separated time) at two ends, when this body has the anglec of rotation, go out position of rotation at connection end plate subscript;
5, the bolt hole above the adpting flange is drilled through according to standard component.Determine earlier good bore position and assembling cross centre line, mark 4 Along ents, finish according to flange machining main points book then, and with marking pen to the flange marker number;
6, with H section steel manufacture assembling moulding bed base, carry out levelling with level meter, amplify sample at H shaped steel after the levelling, the ground line-transect is the assembly center line;
7, will be arranged on the H shaped steel datum level by scribing position as the pipe holder of moulding bed, as locating support, assembling and positioning frame point is welded on the mounting plate, with bolt adpting flange is connected laggard luggage with alignment pin with locating support and joins;
8, assemble straight-tube portion at moulding bed, the flange between the straight tube is located and is connected the enterprising luggage of platform with bolt with alignment pin join;
9, carrying out the assembling of bending tube at moulding bed, amplify earlier sample, is benchmark with the anchor point at two ends on the steel pipe column, and the bend pipe position is installed earlier, checks the angle of bend pipe with ground sample and model;
10, carry out the assembling of multiple tube at moulding bed, earlier straight tube assembling adjustment is finished, assemble oblique supporting leg, determine the rigging position of oblique supporting leg with the anchor point on the oblique supporting leg and the anchor point on the straight tube;
11, the group of carrying out brace is stood, and adopts the assembling of alignment pin location, guarantees pitch-row, prevents that connecting plate from twisting;
12, assembling each as requested independently behind the integrated member, carry out the pre-assembly unit of integral body in factory, check whether member can be installed smoothly, pre-assembly unit is taked horizontally to carry out assembly unit by big end piecemeal to small end, bottom segmentation installing conduit saddle plate, dress is welded on the support and with theodolite smooths.
The present invention is the dimensional accuracy control method of tubular construction when blanking, making, assembling, welding of research and experiment three dimensions shape, adopt three dimensions pipe pipe connected structure, being connected of tubing string base plate and built-in fitting, post column sectional connect and are flange bolt and connect, connection between the pipe support also adopts the pipe diagonal brace to add the connecting plate Bolt Connection, require punching rate will reach more than 99%, realization site operation zero is got angry.With stage of assembling and positioning skill upgrading of three-D space structure.
The present invention has the rapidity of construction and the accurate location of locus, it is the comprehensive utilization of ground sample method and computer setting-out, template, be easy in practice grasp, operate, can accurately carry out the angle of tubulose, the control of dimensional accuracy, farthest guarantee to design desired size, occupied ground is few when making construction simultaneously, and being convenient to member can cut the waste, and is beneficial to and increases work efficiency and reduce cost.
Description of drawings:
Fig. 1 is the schematic diagram of operating procedure 1 of the present invention;
Fig. 2 is the schematic diagram of operating procedure 2 of the present invention;
Fig. 3 is the schematic diagram of operating procedure 3 of the present invention;
Fig. 4 is the schematic diagram of operating procedure 5 of the present invention;
Fig. 5 is the schematic diagram of operating procedure 6 of the present invention;
Fig. 6 is the schematic diagram of operating procedure 7 of the present invention;
Fig. 7 is the schematic diagram of operating procedure 8 of the present invention;
Fig. 8 is the schematic diagram of operating procedure 9 of the present invention;
Fig. 9 is the schematic diagram of operating procedure 10 of the present invention;
Figure 10 is the schematic diagram of operating procedure 11 of the present invention;
Figure 11 is the schematic diagram of operating procedure 12 of the present invention.
The specific embodiment:
Referring to figs. 1 through Figure 11, this concrete enforcement by the following technical solutions: its operating procedure is as follows:
1, consider the allowance of part and the important anchor point of intersecting mouth when the material blanking, in strict accordance with technological requirement, perform the datum mark of every pipe fitting and the mark of anchor point, it is clear to print mark with steel drift, and indicates the position of steel drift seal with marking pen.All steel pipes are all established an anchor point datum level, and other each point is that benchmark is made with this datum level all.Stamp " JZ " mark at this some place with steel seal, as Fig. 1;
2, be cut with the place (the bending point that refers to the bearing diagonal that passes through mutually with steel pipe column) of intersecting mouth at steel pipe, mark the highs and lows of intersecting mouth and the stringcourse of both sides, as Fig. 2;
3, on the steel pipe top be the place of angular cut, mark the highs and lows of otch and stringcourse and the gyration of both sides, when marking out the angle of the stringcourse of the highs and lows of otch and both sides and rotation simultaneously at the relative position of steel pipe opposite side, as Fig. 3;
When 4, the steel pipe two ends are straight cut, mark 4 Along ents (4 separated time) at two ends, when this body has the anglec of rotation, go out position of rotation at connection end plate subscript.
5, the bolt hole above the flange is holed.Carry out mechanical drawing earlier according to standard component, indicate the required precision of hole and machined surface, process according to drawing and technology main points book then.Before machining, should mark 4 Along ents and charge and attack in its surface with the ocean as the flange face of end plate, as the telltale mark point.After machinery is finished with marking pen to the flange marker number, as Fig. 4;
6, in order to ensure the fitted position precision of member, with H section steel manufacture assembling moulding bed base, carry out levelling with level meter earlier, integral level degree deviation allows for 1mm, amplifies sample at H shaped steel after the levelling, and the ground line-transect is the assembly center line.All locate with the cylindrical of steel pipe the location of all steel pipes on moulding bed, as Fig. 5;
7, will be arranged on the H shaped steel datum level, as locating support by scribing position as the pipe holder of moulding bed.Mark orthogonal two datum lines at mounting plate, stamp foreign dotting punch, as the benchmark bus.Assembling and positioning frame point is welded on the mounting plate, the flange on tubing string flange in the bottom or the straight tube and tubing string are assembled at moulding bed, after assembling was finished, passed examination spot welding was fixed, and base plate or flange are connected with alignment pin with the assembling and positioning frame, as Fig. 6;
8, assemble straight-tube portion at moulding bed, the flange between the straight tube is located and is connected the enterprising luggage of platform with bolt with alignment pin join, as Fig. 7;
9, carry out the assembling of bending tube at moulding bed.Amplifying sample at moulding bed, is benchmark with the anchor point at two ends on the steel pipe column, and the bend pipe position is installed, and checks the angle of bend pipe with ground sample and model.The butt joint inside of tearing bend pipe open the pipe of taking to add the cushions carries out, if spacer tube is equipped with difficulty, can divide several sections fitted lining backing plates, can take cutting or polishing to remove when plate thickness direction and outer tube wall are collided, and guarantees the applying of liner plate and inwall, as Fig. 8;
10, straight tube assembling adjustment finishes, and assembles oblique supporting leg, determines the rigging position of oblique supporting leg with the anchor point on the oblique supporting leg and the anchor point on the straight tube, with position and the angle of ground sample and the oblique supporting leg of anchor point inspection, as Fig. 9;
11, the group of brace is upright, adopts the assembling of alignment pin location, guarantees pitch-row, prevents the connecting plate distortion, as Figure 10;
12, because pipe support installation at the scene all be Bolt Connection, for guaranteeing field erected accuracy, assembling each as requested independently behind the integrated member, carry out integral body assembly unit in advance in factory, whether the inspection member can be installed smoothly.Pre-assembly unit is taked horizontally to carry out assembly unit by big end piecemeal to small end.Bottom segmentation installing conduit saddle plate, dress is welded on the support and with theodolite and smooths, as Figure 11.
This concrete enforcement is the dimensional accuracy control method of tubular construction when blanking, making, assembling, welding of research and experiment three dimensions shape, adopt three dimensions pipe pipe connected structure, being connected of tubing string base plate and built-in fitting, post column sectional connect and are flange bolt and connect, connection between the pipe support also adopts the pipe diagonal brace to add the connecting plate Bolt Connection, require punching rate will reach more than 99%, realization site operation zero is got angry.With stage of assembling and positioning skill upgrading of three-D space structure.
This concrete enforcement has the rapidity of construction and the accurate location of locus, it is the comprehensive utilization of ground sample method and computer setting-out, template, be easy in practice grasp, operate, can accurately carry out the angle of tubulose, the control of dimensional accuracy, farthest guarantee to design desired size, occupied ground is few when making construction simultaneously, and being convenient to member can cut the waste, and is beneficial to and increases work efficiency and reduce cost.
Claims (1)
1. the method for three dimensions shape pipe support dimensional accuracy control, the operating procedure that it is characterized in that it is as follows: (1), the allowance of considering part when the material blanking and the important anchor point of intersecting mouth, and perform the datum mark of every pipe fitting and the mark of anchor point with steel drift, and indicate the position of steel drift seal with marking pen;
(2), in the place of steel pipe intersecting mouth, mark the highs and lows of intersecting mouth and the stringcourse of both sides;
(3), be the place of angular cut on the steel pipe top, mark the highs and lows of otch and stringcourse and the anglec of rotation of both sides, mark out these anchor points simultaneously at the relative position of steel pipe opposite side;
(4), be the place of straight cut at the steel pipe two ends, mark 4 Along ents at two ends, when this body has the anglec of rotation, go out position of rotation connecting the end plate subscript;
(5), the bolt hole above the adpting flange is drilled through according to standard component, determine good bore position and assembling cross centre line earlier, mark 4 Along ents, finish according to flange machining main points book then, and with marking pen to the flange marker number;
(6), with H section steel manufacture assembling moulding bed base, carry out levelling with level meter, amplify sample at H shaped steel after the levelling, the ground line-transect is the assembly center line;
(7), will be arranged on the H shaped steel datum level by scribing position as the pipe holder of moulding bed, as locating support, assembling and positioning frame point is welded on the mounting plate, with bolt adpting flange is connected laggard luggage with alignment pin with locating support and joins;
(8), assemble straight-tube portion at moulding bed, with the flange between the straight tube with the alignment pin location and be connected the enterprising luggage of platform with bolt and join;
(9), carry out the assembling of bending tube at moulding bed, amplifying sample earlier, is benchmark with the anchor point at two ends on the steel pipe column, and the bend pipe position is installed earlier, checks the angle of bend pipe with ground sample and model;
(10), carry out the assembling of multiple tube at moulding bed, the straight tube assembling is adjusted finished earlier, assemble oblique supporting leg, determine the rigging position of oblique supporting leg with the anchor point on the oblique supporting leg and the anchor point on the straight tube;
(11), the group of carrying out brace is upright, adopts the assembling of alignment pin location, guarantees pitch-row, prevents the connecting plate distortion;
(12), assembling each as requested independently behind the integrated member, carry out the pre-assembly unit of integral body in factory, check whether member can be installed smoothly, pre-assembly unit is taked horizontally to carry out assembly unit by big end piecemeal to small end, bottom segmentation installing conduit saddle plate, dress is welded on the support and with theodolite smooths.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210449267XA CN103273260A (en) | 2012-11-10 | 2012-11-10 | Method for controlling size precision of three-dimensional-space-shaped pipe frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210449267XA CN103273260A (en) | 2012-11-10 | 2012-11-10 | Method for controlling size precision of three-dimensional-space-shaped pipe frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103273260A true CN103273260A (en) | 2013-09-04 |
Family
ID=49055937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210449267XA Pending CN103273260A (en) | 2012-11-10 | 2012-11-10 | Method for controlling size precision of three-dimensional-space-shaped pipe frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103273260A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103978343A (en) * | 2014-04-17 | 2014-08-13 | 中信重工机械股份有限公司 | Method for processing material-feeding bent pipe for large grinder |
CN105382491A (en) * | 2015-11-26 | 2016-03-09 | 上海建工(江苏)钢结构有限公司 | Machining, manufacturing and inspection method of arc-shaped steel pipe column |
CN106363280A (en) * | 2015-07-22 | 2017-02-01 | 中国二冶集团有限公司 | Manufacturing method for tower frame base |
CN106853577A (en) * | 2016-12-23 | 2017-06-16 | 中国二冶集团有限公司 | A kind of assembly method of roofing rigid tie bar |
CN108772818A (en) * | 2018-06-06 | 2018-11-09 | 中铁宝桥集团有限公司 | A kind of device for the quick accurate integral marking of transverse and longitudinal beam |
CN113536427A (en) * | 2021-07-15 | 2021-10-22 | 中国二十二冶集团有限公司 | Large-caliber bending steel pipe column splicing method |
CN113958141A (en) * | 2021-10-30 | 2022-01-21 | 中冶(上海)钢结构科技有限公司 | Spatial position positioning method for special-shaped bracket of tubular column |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59125231A (en) * | 1982-12-29 | 1984-07-19 | Tachikawa Spring Co Ltd | Forming method of pipe frame |
CN2734400Y (en) * | 2004-07-21 | 2005-10-19 | 陆孝源 | Straight pipe and elbow pipe flange weld positioning device |
CN101556471A (en) * | 2009-05-14 | 2009-10-14 | 上海交通大学 | CAM system of space pipe frame |
CN201752827U (en) * | 2009-12-07 | 2011-03-02 | 天津二十冶建设有限公司 | Assembly jig for assembling pipe trusses |
CN201931231U (en) * | 2010-12-31 | 2011-08-17 | 江苏翔宇电力装备制造有限公司 | Assembling and welding tooling for steel pipes and flanges |
CN102689142A (en) * | 2012-05-30 | 2012-09-26 | 河北二十冶工程技术有限公司 | Tube truss manufacture process |
-
2012
- 2012-11-10 CN CN201210449267XA patent/CN103273260A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59125231A (en) * | 1982-12-29 | 1984-07-19 | Tachikawa Spring Co Ltd | Forming method of pipe frame |
CN2734400Y (en) * | 2004-07-21 | 2005-10-19 | 陆孝源 | Straight pipe and elbow pipe flange weld positioning device |
CN101556471A (en) * | 2009-05-14 | 2009-10-14 | 上海交通大学 | CAM system of space pipe frame |
CN201752827U (en) * | 2009-12-07 | 2011-03-02 | 天津二十冶建设有限公司 | Assembly jig for assembling pipe trusses |
CN201931231U (en) * | 2010-12-31 | 2011-08-17 | 江苏翔宇电力装备制造有限公司 | Assembling and welding tooling for steel pipes and flanges |
CN102689142A (en) * | 2012-05-30 | 2012-09-26 | 河北二十冶工程技术有限公司 | Tube truss manufacture process |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103978343A (en) * | 2014-04-17 | 2014-08-13 | 中信重工机械股份有限公司 | Method for processing material-feeding bent pipe for large grinder |
CN103978343B (en) * | 2014-04-17 | 2016-08-24 | 中信重工机械股份有限公司 | A kind of processing method of large-sized grinder feed bend pipe |
CN106363280A (en) * | 2015-07-22 | 2017-02-01 | 中国二冶集团有限公司 | Manufacturing method for tower frame base |
CN105382491A (en) * | 2015-11-26 | 2016-03-09 | 上海建工(江苏)钢结构有限公司 | Machining, manufacturing and inspection method of arc-shaped steel pipe column |
CN105382491B (en) * | 2015-11-26 | 2017-05-31 | 上海建工(江苏)钢结构有限公司 | The processing and fabricating and the method for inspection of arc-shaped steel tubing string |
CN106853577A (en) * | 2016-12-23 | 2017-06-16 | 中国二冶集团有限公司 | A kind of assembly method of roofing rigid tie bar |
CN108772818A (en) * | 2018-06-06 | 2018-11-09 | 中铁宝桥集团有限公司 | A kind of device for the quick accurate integral marking of transverse and longitudinal beam |
CN113536427A (en) * | 2021-07-15 | 2021-10-22 | 中国二十二冶集团有限公司 | Large-caliber bending steel pipe column splicing method |
CN113536427B (en) * | 2021-07-15 | 2022-09-27 | 中国二十二冶集团有限公司 | Large-caliber bending-twisting steel pipe column splicing method |
CN113958141A (en) * | 2021-10-30 | 2022-01-21 | 中冶(上海)钢结构科技有限公司 | Spatial position positioning method for special-shaped bracket of tubular column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103273260A (en) | Method for controlling size precision of three-dimensional-space-shaped pipe frame | |
CN100579712C (en) | Firstly hole drilling construction method in girder steel hole-drilling | |
CN104002377B (en) | A kind of prefabricated case beam reinforcing bar binding and bellows positioning device | |
CN100356016C (en) | Concrete building reinforcing-bar precision positioning system and its construction method | |
CN209040434U (en) | A kind of conversion layer side column joint bar accurate positioning device | |
CN104895082A (en) | Precise large-diameter steel casing deviation rectifying device and method | |
CN201486579U (en) | Drilling anchor rod hole positioning device | |
CN107165317A (en) | It is a kind of to be used for the steel disc shape node component and application process of special-shaped Curtain wall frame | |
CN201872163U (en) | Drilling positioner for connecting steel plates of arch steel frame | |
CN204212442U (en) | A kind of hi-Fix guiding device | |
CN201377173Y (en) | Foundation bolt positioning template of steel-structure building | |
CN106853577A (en) | A kind of assembly method of roofing rigid tie bar | |
CN207123231U (en) | A kind of positioning rule of embedded sleeve barrel and reserving hole channel after being used for prefabricated part hanging | |
CN203145481U (en) | Manufacturing and positioning device of variable-angle steel pipe column splicing ear plate | |
CN201326380Y (en) | Drill cushion block suitable for component with circular surface | |
CN205369296U (en) | Steel column basis is buried bolt positioner in advance | |
CN202324202U (en) | Adjustable device for connecting steel vertical component with steel horizontal component | |
CN214400365U (en) | Coal gas lower spray pipe embedding and fixing structure in coke oven foundation top plate | |
CN205343431U (en) | Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar | |
CN104196153A (en) | Thick L-shaped steel plate shear wall column and manufacturing method thereof | |
CN204919581U (en) | Accurate rag bolt locating rack in location | |
CN207686220U (en) | A kind of welding process hole for elevator shaft installation | |
CN206393512U (en) | A kind of assembly mould of steel structural plant roof tie-rod | |
CN205100224U (en) | Integrated configuration of pre -buried steel sheet and steel reinforcement cage | |
CN206667286U (en) | A kind of high precision large-sized bolt sleeve bottom positioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130904 |