US20110192111A1 - Cast-in Shear Wall Anchor - Google Patents

Cast-in Shear Wall Anchor Download PDF

Info

Publication number
US20110192111A1
US20110192111A1 US12/700,749 US70074910A US2011192111A1 US 20110192111 A1 US20110192111 A1 US 20110192111A1 US 70074910 A US70074910 A US 70074910A US 2011192111 A1 US2011192111 A1 US 2011192111A1
Authority
US
United States
Prior art keywords
threaded
shear wall
plug
threaded rod
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/700,749
Inventor
Sam White
Craig Binder
Dennis Palatov
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHAINRING CONSTRUCTION PRODUCTS LLC
Original Assignee
CHAINRING CONSTRUCTION PRODUCTS LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHAINRING CONSTRUCTION PRODUCTS LLC filed Critical CHAINRING CONSTRUCTION PRODUCTS LLC
Priority to US12/700,749 priority Critical patent/US20110192111A1/en
Assigned to CHAINRING CONSTRUCTION PRODUCTS LLC reassignment CHAINRING CONSTRUCTION PRODUCTS LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BINDER, CRAIG, PALATOV, DENNIS, WHITE, SAM
Publication of US20110192111A1 publication Critical patent/US20110192111A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4114Elements with sockets
    • E04B1/4121Elements with sockets with internal threads or non-adjustable captive nuts

Definitions

  • the present invention relates to structural reinforcement in the construction of buildings and in particular to anchoring of shear walls to concrete foundations.
  • a tie down system typically consists of several threaded steel rods arranged vertically, with the lower end structurally anchored to the foundation and the upper end coupled to a structural member of a wall by means of a load bearing plate and a threaded nut.
  • the threaded rods serve to prevent movement of the wall in adverse conditions such as high winds or earthquakes.
  • the threaded rods are placed in tension and exert a clamping force between the foundation and a wall structural member, preventing or limiting the movement.
  • the footer of the shear wall is commonly coupled to the concrete foundation by means of shear bolts or similar fasteners spaced at regular intervals.
  • anchors are usually cast in place during the construction of the foundation. This is typically accomplished by placing a number of anchors into the form before concrete is poured. Most typical anchor bolts protrude above the level of the finished concrete by several inches in order to attach the sill plate after the concrete is cured. This is not desirable since the protruding anchor bolts interfere with, and can be damaged by, finishing equipment.
  • an anchor is installed by tying “J” style anchor bolts to rebar placed in the form, and leaving the straight section of the bolt protruding up above the level of the finished surface of the concrete slab. Concrete is then poured into the form and covers the lower portion of the installed anchors. After finishing and cure, the form is removed and each anchor is left above the deck for attaching the sill plate. However the finishing is made difficult and time consuming by the protruding portion of the anchors.
  • a submerged anchor is created by first attaching a base plate to the bottom of the concrete form, usually by means of common nails or screws.
  • a base plate may consist of a rectangular or round metal plate with a threaded nut welded to it.
  • a plurality of such plates are placed into the form at predetermined intervals. Segments of threaded rod are then cut to an appropriate length and threaded into the base plates.
  • a threaded coupler is then installed on each threaded rod segment, positioned at such a height that its top is just below the finished surface of the concrete.
  • a plug is then installed in each threaded coupler to prevent entry of concrete inside the coupler during the pour which covers the-installed anchors.
  • each anchor is determined by measurement or other means such as detection equipment. Concrete is then chipped away to uncover the top of the anchor and the previously installed plug is removed so that threaded rod or other fastener may be installed into the now exposed threaded coupler.
  • a primary objective of the present invention is to provide a complete and ready kit for the rapid and efficient installation of cast-in Shear Wall Anchors.
  • the kit comprises a pre-manufactured base plate, a threaded rod segment of a predetermined length, a threaded coupler and a plug with a flexible marker feature.
  • the threaded rod segment is installed into the base plate and a threaded coupler is installed onto the threaded rod segment.
  • the plug is installed into the threaded coupler and prevents entry of concrete into the coupler during the pour.
  • the plug features a flexible marker feature, intended to protrude above the poured concrete surface to aid in locating the anchor after the concrete is cured, while the rest of the assembled anchor remains below the surface.
  • the flexible nature of the marker feature prevents it from interfering with finishing equipment.
  • the threaded rod segment is of a length predetermined to position the top of the threaded coupler just below the poured concrete surface in a typical installation. A range of on-site adjustment is possible by moving the threaded coupler up or down on the threaded rod segment.
  • FIG. 1 shows the components of the Shear Wall Anchor of the present invention
  • FIG. 2 is a further illustration of a base flange
  • FIG. 3 illustrates the typical installation of the Shear Wall Anchor prior to pouring of concrete
  • FIG. 4 shows the cross-section view of a typical installation after concrete is poured.
  • the kit of the present invention comprises a base flange 100 , a threaded rod segment 200 which has been cut to a predetermined length, a threaded coupler 300 and a plug 400 .
  • the base flange 100 serves to secure the Shear Wall Anchor assembly to a form prior to pouring concrete.
  • the base flange 100 is formed from plastic or similar material by injection-molding the flange 120 with a steel flanged nut 110 molded in as an insert. Molded-in inserts are well known in the art and this commonly practiced process need not be discussed in detail herein.
  • the complete base flange 100 is preferably secured to the form by means of nails, screws or other commonly available means. It is to be noted that the purpose of the base flange is only to position and secure the Shear Wall Anchor assembly in the form prior to and while the concrete is poured and cured.
  • the flanged nut 110 serves as the means to structurally retain the threaded rod segment 200 .
  • the pull-out strength of the installed Shear Wall Anchor is provided solely by the load-bearing face 150 of the nut 110 bearing against the cured concrete.
  • the flange portion 120 of the base flange 100 plays no structural role once concrete is cured.
  • the base flange 100 is a monolithic part are possible without departing from the scope of the present invention, as long as the flange is configured to receive and structurally retain a threaded rod segment 200 , provides a load bearing face 150 and is sized sufficiently to provide stability to the Shear Wall Anchor assembly prior to and while the concrete is being poured.
  • a base flange may be a monolithic cast iron unit which is shaped and sized similar to the base flange illustrated in FIG. 2 . Many examples of such castings exist in the art.
  • FIG. 3 illustrates a complete Shear Wall Anchor assembly, supplied as a kit, installed in a form prior to pouring concrete.
  • the base flange 100 is secured to the floor of the form by means of nails, screws, or other similar means.
  • the threaded rod segment 200 is supplied in the kit of the present invention pre-cut to a predetermined length so as to create an assembly with overall installed height substantially equal to the depth of commonly used concrete forms.
  • the threaded coupler 300 provides a range of adjustment in the field, if such is found necessary, by threading up or down on the threaded rod segment.
  • the plug 400 features a flexible marker feature 410 . It serves two functions within the kit of the present invention. First, it prevents the entry of uncured concrete into the threaded coupler while the concrete is poured and subsequently compacted. A completed installation is further illustrated as a cross-sectional view in FIG. 4 .
  • the second function of the plug 400 is to aid in locating and uncovering the Shear Wall Anchor after the concrete is cured.
  • the flexible marker feature 410 by protrudes above the cured surface 610 of poured concrete 600 to aid in locating the anchor. Its flexibility prevents it from interfering with finishing equipment that is commonly used to ensure the concrete is fully settled during cure.
  • the marker feature 410 preferably consists of one or more plastic whiskers and is similar in nature to bristles on a brush.
  • the marker feature may be molded integral to the plug or installed as a secondary operation. The forming of flexible bristles is well known in constructions of brushes of various types and therefore the details of the process need not be discussed herein.
  • the installed Shear Wall Anchor is located with the aid of flexible marker feature 410 and the plug is removed exposing the threaded portion of the threaded coupler 300 .
  • a thin layer of concrete may be chipped away or otherwise removed in the process, as is commonly practiced in the art.
  • the present invention facilitates substantial savings in labor, cost and construction time as compared to currently known and practiced methods.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kit for enabling rapid and efficient installation of cast-in shear wall anchors is disclosed. The kit comprises a pre-manufactured base plate, a threaded rod segment of a predetermined length, a threaded coupler and a plug with a marker feature. The threaded rod segment is installed into the base plate and a threaded coupler is installed onto the threaded rod segment. The plug is installed into the threaded coupler. The plug features a marker feature that is preferably flexible, intended to protrude above the poured concrete surface to aid in locating the anchor after the concrete is cured, while the rest of the assembled anchor remains below the surface. The flexible nature of the marker feature prevents it from interfering with finishing equipment. The threaded rod segment is of a length predetermined to position the top of the threaded coupler just below the poured concrete surface in a typical installation. A range of on-site adjustment is possible by moving the threaded coupler up or down on the threaded rod segment.

Description

  • The present invention relates to structural reinforcement in the construction of buildings and in particular to anchoring of shear walls to concrete foundations.
  • BACKGROUND OF THE INVENTION
  • In the construction of buildings it is common practice to structurally anchor walls to post-tensioned foundations and floors. One method of doing so is by means of tie downs. A tie down system typically consists of several threaded steel rods arranged vertically, with the lower end structurally anchored to the foundation and the upper end coupled to a structural member of a wall by means of a load bearing plate and a threaded nut. The threaded rods serve to prevent movement of the wall in adverse conditions such as high winds or earthquakes. As the wall begins to move in response to wind or earthquake loads, the threaded rods are placed in tension and exert a clamping force between the foundation and a wall structural member, preventing or limiting the movement. In addition to tie downs, the footer of the shear wall is commonly coupled to the concrete foundation by means of shear bolts or similar fasteners spaced at regular intervals.
  • In order to structurally couple threaded rods and other fasteners to the foundation, anchors are usually cast in place during the construction of the foundation. This is typically accomplished by placing a number of anchors into the form before concrete is poured. Most typical anchor bolts protrude above the level of the finished concrete by several inches in order to attach the sill plate after the concrete is cured. This is not desirable since the protruding anchor bolts interfere with, and can be damaged by, finishing equipment.
  • In common practice, an anchor is installed by tying “J” style anchor bolts to rebar placed in the form, and leaving the straight section of the bolt protruding up above the level of the finished surface of the concrete slab. Concrete is then poured into the form and covers the lower portion of the installed anchors. After finishing and cure, the form is removed and each anchor is left above the deck for attaching the sill plate. However the finishing is made difficult and time consuming by the protruding portion of the anchors.
  • In a previous improvement by the authors of the present invention, a submerged anchor is created by first attaching a base plate to the bottom of the concrete form, usually by means of common nails or screws. Such a base plate may consist of a rectangular or round metal plate with a threaded nut welded to it. A plurality of such plates are placed into the form at predetermined intervals. Segments of threaded rod are then cut to an appropriate length and threaded into the base plates. A threaded coupler is then installed on each threaded rod segment, positioned at such a height that its top is just below the finished surface of the concrete. A plug is then installed in each threaded coupler to prevent entry of concrete inside the coupler during the pour which covers the-installed anchors. After finishing and cure, the form is removed and the location of each anchor is determined by measurement or other means such as detection equipment. Concrete is then chipped away to uncover the top of the anchor and the previously installed plug is removed so that threaded rod or other fastener may be installed into the now exposed threaded coupler.
  • With hundreds of anchors needed in a typical installation, the commonly practiced methods are labor intensive and inefficient. The previous improvement by the authors greatly simplifies the finishing of the poured concrete but still requires additional labor to install and subsequently locate and expose the submerged anchors. What is needed is a pre-assembled anchor system, supplied as a kit, which enables quick and efficient installation of the anchors into the concrete form as well as efficient location and access of the installed anchors after the concrete is cured, without interfering with finishing equipment. The Shear Wall Anchor of the present invention answers this need.
  • SUMMARY OF THE INVENTION
  • A primary objective of the present invention is to provide a complete and ready kit for the rapid and efficient installation of cast-in Shear Wall Anchors. The kit comprises a pre-manufactured base plate, a threaded rod segment of a predetermined length, a threaded coupler and a plug with a flexible marker feature. The threaded rod segment is installed into the base plate and a threaded coupler is installed onto the threaded rod segment. The plug is installed into the threaded coupler and prevents entry of concrete into the coupler during the pour. The plug features a flexible marker feature, intended to protrude above the poured concrete surface to aid in locating the anchor after the concrete is cured, while the rest of the assembled anchor remains below the surface. The flexible nature of the marker feature prevents it from interfering with finishing equipment. The threaded rod segment is of a length predetermined to position the top of the threaded coupler just below the poured concrete surface in a typical installation. A range of on-site adjustment is possible by moving the threaded coupler up or down on the threaded rod segment.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present invention is described herein with reference to the following drawings:
  • FIG. 1 shows the components of the Shear Wall Anchor of the present invention;
  • FIG. 2 is a further illustration of a base flange;
  • FIG. 3 illustrates the typical installation of the Shear Wall Anchor prior to pouring of concrete; and
  • FIG. 4 shows the cross-section view of a typical installation after concrete is poured.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS OF THE INVENTION
  • An embodiment of the present invention is shown in FIG. 1. In order to facilitate rapid and efficient installation of Shear Wall Anchors into a form, the kit of the present invention comprises a base flange 100, a threaded rod segment 200 which has been cut to a predetermined length, a threaded coupler 300 and a plug 400.
  • The base flange 100, further illustrated in FIG. 2, serves to secure the Shear Wall Anchor assembly to a form prior to pouring concrete. In the embodiment disclosed herein, the base flange 100 is formed from plastic or similar material by injection-molding the flange 120 with a steel flanged nut 110 molded in as an insert. Molded-in inserts are well known in the art and this commonly practiced process need not be discussed in detail herein. The complete base flange 100 is preferably secured to the form by means of nails, screws or other commonly available means. It is to be noted that the purpose of the base flange is only to position and secure the Shear Wall Anchor assembly in the form prior to and while the concrete is poured and cured. In the disclosed embodiment, the flanged nut 110 serves as the means to structurally retain the threaded rod segment 200. The pull-out strength of the installed Shear Wall Anchor is provided solely by the load-bearing face 150 of the nut 110 bearing against the cured concrete. The flange portion 120 of the base flange 100 plays no structural role once concrete is cured.
  • In addition to the injection molding method disclosed herein, many other methods of constructing the base flange 100 shall be apparent to those skilled in the art, including welding or bonding of the nut 110 or similar threaded fastener to a flange 120 made of either metallic or non-metallic material. Embodiments wherein the base flange 100 is a monolithic part are possible without departing from the scope of the present invention, as long as the flange is configured to receive and structurally retain a threaded rod segment 200, provides a load bearing face 150 and is sized sufficiently to provide stability to the Shear Wall Anchor assembly prior to and while the concrete is being poured. One example of such a base flange may be a monolithic cast iron unit which is shaped and sized similar to the base flange illustrated in FIG. 2. Many examples of such castings exist in the art.
  • FIG. 3 illustrates a complete Shear Wall Anchor assembly, supplied as a kit, installed in a form prior to pouring concrete. The base flange 100 is secured to the floor of the form by means of nails, screws, or other similar means. The threaded rod segment 200 is supplied in the kit of the present invention pre-cut to a predetermined length so as to create an assembly with overall installed height substantially equal to the depth of commonly used concrete forms. The threaded coupler 300 provides a range of adjustment in the field, if such is found necessary, by threading up or down on the threaded rod segment.
  • The plug 400 features a flexible marker feature 410. It serves two functions within the kit of the present invention. First, it prevents the entry of uncured concrete into the threaded coupler while the concrete is poured and subsequently compacted. A completed installation is further illustrated as a cross-sectional view in FIG. 4. The second function of the plug 400 is to aid in locating and uncovering the Shear Wall Anchor after the concrete is cured. The flexible marker feature 410 by protrudes above the cured surface 610 of poured concrete 600 to aid in locating the anchor. Its flexibility prevents it from interfering with finishing equipment that is commonly used to ensure the concrete is fully settled during cure. The marker feature 410 preferably consists of one or more plastic whiskers and is similar in nature to bristles on a brush. The marker feature may be molded integral to the plug or installed as a secondary operation. The forming of flexible bristles is well known in constructions of brushes of various types and therefore the details of the process need not be discussed herein.
  • After concrete 600 is cured, the installed Shear Wall Anchor is located with the aid of flexible marker feature 410 and the plug is removed exposing the threaded portion of the threaded coupler 300. A thin layer of concrete may be chipped away or otherwise removed in the process, as is commonly practiced in the art.
  • By supplying a complete, pre-configured assembly of the Shear Wall Anchor as a kit the present invention facilitates substantial savings in labor, cost and construction time as compared to currently known and practiced methods.
  • The embodiment disclosed herein is illustrative and not limiting; other embodiments shall be readily apparent to those skilled in the art based upon the disclosures made herein, without departing from the scope of the present invention.

Claims (9)

1. A Shear Wall Anchor kit, comprising:
a base plate having a means of structurally retaining a threaded rod and further having a means of being attached to the floor of a concrete form;
a threaded rod segment of a predetermined length;
a threaded coupler; and
a plug configured to be installed in said threaded coupler.
2. The Shear Wall Anchor kit of claim 1 wherein said plug comprises a marker feature.
3. The Shear Wall Anchor kit of claim 1 wherein said means of structurally retaining a threaded rod is a flange nut.
4. The Shear Wall Anchor kit of claim 3 wherein said base plate is formed from plastic by means of injection molding.
5. The Shear Wall Anchor kit of claim 2 wherein said marker feature is at least a plastic whisker.
6. The Shear Wall Anchor kit of claim 2 wherein said marker feature is a plurality of plastic whiskers.
7. A method of installing a Shear Wall Anchor comprising the steps of:
(a) positioning a threaded coupler in the concrete form entirely below the level of the finished concrete surface by means of a support,
(b) installing a plug in said threaded coupler, said plug having a marker feature, said marker feature being positioned at least in part above the level of the finished concrete surface,
(c) pouring, curing and finishing the concrete and subsequently removing the form,
(d) locating the anchor by means of said marker feature and exposing said threaded coupler for access by removing said plug.
8. The method of claim 7 wherein said support is a threaded rod section of a predetermined length, coupled to a base plate.
9. The method of claim 7 wherein said support, said threaded coupler and said plug are supplied as a kit.
US12/700,749 2010-02-05 2010-02-05 Cast-in Shear Wall Anchor Abandoned US20110192111A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/700,749 US20110192111A1 (en) 2010-02-05 2010-02-05 Cast-in Shear Wall Anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/700,749 US20110192111A1 (en) 2010-02-05 2010-02-05 Cast-in Shear Wall Anchor

Publications (1)

Publication Number Publication Date
US20110192111A1 true US20110192111A1 (en) 2011-08-11

Family

ID=44352583

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/700,749 Abandoned US20110192111A1 (en) 2010-02-05 2010-02-05 Cast-in Shear Wall Anchor

Country Status (1)

Country Link
US (1) US20110192111A1 (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012129177A1 (en) * 2011-03-18 2012-09-27 Espinosa Thomas M Concrete anchor coupling assembly and anchor rod holder
CN102774003A (en) * 2012-08-07 2012-11-14 淮北宇鑫新型材料有限公司 Manufacturing method of whisker enhancement type fiberglass full thread roof bolt
US20120297703A1 (en) * 2009-12-23 2012-11-29 Geotech Pty Ltd anchorage system
US9062452B2 (en) 2012-07-24 2015-06-23 Thomas M. Espinosa Holder for concrete anchors
US20160024741A1 (en) * 2014-07-23 2016-01-28 Franklin Brown Tower foundation guide rod nut
US9303399B2 (en) 2012-08-06 2016-04-05 Thomas M. Espinosa Holder and concrete anchor assemblies
US9394706B2 (en) 2013-10-08 2016-07-19 Simpson Strong-Tie Company, Inc. Concrete anchor
JP2016138422A (en) * 2015-01-29 2016-08-04 東日本旅客鉄道株式会社 Post-installed anchor and construction method thereof
US10100515B2 (en) * 2016-07-21 2018-10-16 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
CN109281482A (en) * 2018-09-25 2019-01-29 安徽科恩新能源有限公司 Buried vertical pipe anti-falling device
US10309103B2 (en) 2016-07-21 2019-06-04 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
US10370844B2 (en) * 2015-06-03 2019-08-06 Onguard Group Limited Securing assembly
CN110345910A (en) * 2019-08-01 2019-10-18 中国三冶集团有限公司 A kind of settlement observation point mounting structure and method
US10480178B2 (en) * 2013-05-23 2019-11-19 Cetres Holdings, Llc Reinforced building wall
US10597871B2 (en) 2016-07-21 2020-03-24 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
USD882905S1 (en) 2018-05-31 2020-04-28 Meadow Burke, Llc Lift level
US10975565B2 (en) 2015-07-26 2021-04-13 Gilman Construction Solutions, Llc Support for embedding object in concrete
USRE48981E1 (en) 2014-01-14 2022-03-22 Simpson Strong-Tie Company Inc. Thrust nut
USD990302S1 (en) * 2021-08-13 2023-06-27 Illinois Tool Works Inc. Fastener insert

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2952947A (en) * 1958-01-28 1960-09-20 White Paul Anchor bolt assembly
US3742661A (en) * 1972-02-09 1973-07-03 Superior Concrete Accessories Plug construction for a concrete anchor insert
US4017115A (en) * 1975-12-17 1977-04-12 The Burke Company Lift system for concrete slabs
US4068879A (en) * 1976-07-12 1978-01-17 The Burke Company Concrete slab hoisting apparatus
US4325575A (en) * 1977-03-28 1982-04-20 The Burke Company Hoisting coupling for concrete slabs
US4736554A (en) * 1984-10-22 1988-04-12 Tyler Kent W Bolt system
US5060436A (en) * 1990-06-25 1991-10-29 Delgado Jr David G Apparatus for positioning anchor bolts within concrete
US5384993A (en) * 1993-11-15 1995-01-31 Phillips; Belton R. Tie down for building structures
US5428936A (en) * 1993-07-28 1995-07-04 Roth; Steven A. Suspension system for concrete structures
US5966881A (en) * 1997-02-25 1999-10-19 Mitsui Home Co., Ltd. Base plate for foundation and foundation of structure
US6015138A (en) * 1996-12-12 2000-01-18 Kohlberger; Walter Newel post anchoring device
US6079179A (en) * 1998-10-08 2000-06-27 Shoemaker, Jr.; Charles S. Construction anchor bolt and retainer for poured concrete
US6367205B2 (en) * 1998-10-05 2002-04-09 Hurri-Bolt, Inc. Anchor for a structural tie-down apparatus
US20020125395A1 (en) * 1999-12-06 2002-09-12 Portable Pipe Hangers, Inc. Support base
US20050120666A1 (en) * 2003-12-05 2005-06-09 Alyea Mark D. Concrete anchor float
US20060016140A1 (en) * 2002-12-31 2006-01-26 Smith James R Anchor bolt placement protection assembly and method for aligning structural elements in a form when pouring concrete
US7150132B2 (en) * 2003-08-12 2006-12-19 Commins Alfred D Continuous hold-down system
US20080038079A1 (en) * 2006-08-14 2008-02-14 Bobon James L Adjustable concrete drop-in anchor
US7524153B2 (en) * 2003-12-03 2009-04-28 Kevin Douglas Hoy Anchoring products and methods of such products
US20090272053A1 (en) * 2008-03-19 2009-11-05 Clifford Dent Ground anchor assembly
US8037904B2 (en) * 2006-10-23 2011-10-18 Carnevali Jeffrey D Anchor mount

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2952947A (en) * 1958-01-28 1960-09-20 White Paul Anchor bolt assembly
US3742661A (en) * 1972-02-09 1973-07-03 Superior Concrete Accessories Plug construction for a concrete anchor insert
US4017115A (en) * 1975-12-17 1977-04-12 The Burke Company Lift system for concrete slabs
US4068879A (en) * 1976-07-12 1978-01-17 The Burke Company Concrete slab hoisting apparatus
US4325575A (en) * 1977-03-28 1982-04-20 The Burke Company Hoisting coupling for concrete slabs
US4736554A (en) * 1984-10-22 1988-04-12 Tyler Kent W Bolt system
US5060436A (en) * 1990-06-25 1991-10-29 Delgado Jr David G Apparatus for positioning anchor bolts within concrete
US5428936A (en) * 1993-07-28 1995-07-04 Roth; Steven A. Suspension system for concrete structures
US5384993A (en) * 1993-11-15 1995-01-31 Phillips; Belton R. Tie down for building structures
US6015138A (en) * 1996-12-12 2000-01-18 Kohlberger; Walter Newel post anchoring device
US5966881A (en) * 1997-02-25 1999-10-19 Mitsui Home Co., Ltd. Base plate for foundation and foundation of structure
US6367205B2 (en) * 1998-10-05 2002-04-09 Hurri-Bolt, Inc. Anchor for a structural tie-down apparatus
US6079179A (en) * 1998-10-08 2000-06-27 Shoemaker, Jr.; Charles S. Construction anchor bolt and retainer for poured concrete
US20020125395A1 (en) * 1999-12-06 2002-09-12 Portable Pipe Hangers, Inc. Support base
US20060016140A1 (en) * 2002-12-31 2006-01-26 Smith James R Anchor bolt placement protection assembly and method for aligning structural elements in a form when pouring concrete
US7150132B2 (en) * 2003-08-12 2006-12-19 Commins Alfred D Continuous hold-down system
US7524153B2 (en) * 2003-12-03 2009-04-28 Kevin Douglas Hoy Anchoring products and methods of such products
US20050120666A1 (en) * 2003-12-05 2005-06-09 Alyea Mark D. Concrete anchor float
US20080038079A1 (en) * 2006-08-14 2008-02-14 Bobon James L Adjustable concrete drop-in anchor
US8037904B2 (en) * 2006-10-23 2011-10-18 Carnevali Jeffrey D Anchor mount
US20090272053A1 (en) * 2008-03-19 2009-11-05 Clifford Dent Ground anchor assembly

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Chainring Construction Products LLC, www.ptanchor.com, Copyright 2009, 12/700749.pdf and 12/700749-2.pdf. *

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120297703A1 (en) * 2009-12-23 2012-11-29 Geotech Pty Ltd anchorage system
US8991109B2 (en) * 2009-12-23 2015-03-31 Geotech Pty Ltd Anchorage system
US11414855B2 (en) 2011-03-18 2022-08-16 Cetres Holdings, Llc Concrete anchor coupling assembly and anchor rod holder
WO2012129177A1 (en) * 2011-03-18 2012-09-27 Espinosa Thomas M Concrete anchor coupling assembly and anchor rod holder
US10047516B2 (en) 2011-03-18 2018-08-14 Cetres Holdings, Llc Concrete anchor coupling assembly and anchor rod holder
US10047517B2 (en) 2011-03-18 2018-08-14 Cetres Holdings, Llc Concrete anchor coupling assembly and anchor rod holder
US9222251B2 (en) * 2011-03-18 2015-12-29 Thomas M. Espinosa Concrete anchor coupling assembly and anchor rod holder
US9702139B2 (en) 2011-03-18 2017-07-11 Cetres Holdings, Llc Concrete anchor coupling assembly and anchor rod holder
US10626596B2 (en) 2011-03-18 2020-04-21 Cetres Holdings, Llc Concrete anchor coupling assembly and anchor rod holder
US20130067849A1 (en) * 2011-03-18 2013-03-21 Thomas M. Espinosa Concrete Anchor Coupling Assembly and Anchor Rod Holder
US9062452B2 (en) 2012-07-24 2015-06-23 Thomas M. Espinosa Holder for concrete anchors
US9303399B2 (en) 2012-08-06 2016-04-05 Thomas M. Espinosa Holder and concrete anchor assemblies
US10676917B2 (en) 2012-08-06 2020-06-09 Cetres Holdings, Llc Holder and concrete anchor assemblies
US11466447B2 (en) 2012-08-06 2022-10-11 Cetres Holdings, Llc Holder and concrete anchor assemblies
US10202753B2 (en) 2012-08-06 2019-02-12 Cetres Holdings, Llc Holder and concrete anchor assemblies
CN102774003A (en) * 2012-08-07 2012-11-14 淮北宇鑫新型材料有限公司 Manufacturing method of whisker enhancement type fiberglass full thread roof bolt
US10480178B2 (en) * 2013-05-23 2019-11-19 Cetres Holdings, Llc Reinforced building wall
US11268273B2 (en) * 2013-05-23 2022-03-08 Cetres Holdings, Llc Reinforced building wall
US9945115B2 (en) 2013-10-08 2018-04-17 Simpson Strong-Tie Company, Inc. Concrete anchor
US9394706B2 (en) 2013-10-08 2016-07-19 Simpson Strong-Tie Company, Inc. Concrete anchor
USRE48981E1 (en) 2014-01-14 2022-03-22 Simpson Strong-Tie Company Inc. Thrust nut
US20160024741A1 (en) * 2014-07-23 2016-01-28 Franklin Brown Tower foundation guide rod nut
JP2016138422A (en) * 2015-01-29 2016-08-04 東日本旅客鉄道株式会社 Post-installed anchor and construction method thereof
US10370844B2 (en) * 2015-06-03 2019-08-06 Onguard Group Limited Securing assembly
US10975565B2 (en) 2015-07-26 2021-04-13 Gilman Construction Solutions, Llc Support for embedding object in concrete
US10100515B2 (en) * 2016-07-21 2018-10-16 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
US10309103B2 (en) 2016-07-21 2019-06-04 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
US10597871B2 (en) 2016-07-21 2020-03-24 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
US11060284B2 (en) * 2016-07-21 2021-07-13 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
USD882905S1 (en) 2018-05-31 2020-04-28 Meadow Burke, Llc Lift level
CN109281482A (en) * 2018-09-25 2019-01-29 安徽科恩新能源有限公司 Buried vertical pipe anti-falling device
CN110345910A (en) * 2019-08-01 2019-10-18 中国三冶集团有限公司 A kind of settlement observation point mounting structure and method
USD990302S1 (en) * 2021-08-13 2023-06-27 Illinois Tool Works Inc. Fastener insert

Similar Documents

Publication Publication Date Title
US20110192111A1 (en) Cast-in Shear Wall Anchor
US3600865A (en) Elevated single column-borne house of precast concrete elements and posttensioned tendons
US7921616B2 (en) Method and apparatus for setting support columns within a foundation
US4211043A (en) Precast concrete building module form
KR101570484B1 (en) Half-PC Column using lightweight Encased Inner Form And Manufacturing Method Thereof, And Construction Method Using The Same
KR102243984B1 (en) Non-supporting formwork system for retaining wall using self-supporting form and construction method thereof
KR20090119784A (en) Method for erecting a tower
SK19395A3 (en) Element based foam and concrete modular wall construction and method and apparatus thereof
KR20110128396A (en) Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof
KR101990065B1 (en) Joint of PC column using steel block
US20180171575A1 (en) Construction method of a tower foundation
CN111364520A (en) Prefabricated multi-way cable well and construction method thereof
KR101739126B1 (en) Method for Forming Top-down-typed Underground Strucutre
CN111593888A (en) Installation control system and installation construction method for cast-in-situ concrete hollow floor system combined plastic mold box
JP2019060110A (en) Mounting structure of handrail post and method for mounting the same
KR102065623B1 (en) the improved yoke truss and the wall form structure using the same
KR20050071311A (en) Bridge inspection passage and installation method
CN212153462U (en) Prefabricated multi-pass cable shaft
CN210658418U (en) Novel prestressed anchor bolt fan foundation
US20150176276A1 (en) Post-tension concrete leave out splicing system and method
JP2000129953A (en) Fitting method of base isolation device to foundation
KR200281867Y1 (en) An iron reinforcing bar prop
CN110080456B (en) Superimposed sheet bottom plate connected by end dowel bars and construction process thereof
JP3078195U (en) Prestressed concrete structure
JPH0115763Y2 (en)

Legal Events

Date Code Title Description
AS Assignment

Owner name: CHAINRING CONSTRUCTION PRODUCTS LLC, OREGON

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WHITE, SAM;BINDER, CRAIG;PALATOV, DENNIS;REEL/FRAME:024163/0113

Effective date: 20100330

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION