CN110295742A - A kind of stair step aluminum alloy mould plate being easily installed - Google Patents
A kind of stair step aluminum alloy mould plate being easily installed Download PDFInfo
- Publication number
- CN110295742A CN110295742A CN201810232836.2A CN201810232836A CN110295742A CN 110295742 A CN110295742 A CN 110295742A CN 201810232836 A CN201810232836 A CN 201810232836A CN 110295742 A CN110295742 A CN 110295742A
- Authority
- CN
- China
- Prior art keywords
- block
- baffle
- pours
- pouring
- braced frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention provides a kind of stair step aluminum alloy mould plate being easily installed.The stair step aluminum alloy mould plate being easily installed includes multiple support constructions;Multiple first pouring structures, a part of support construction are fixed on first pouring structure, and first pouring structure includes the first braced frame and the first steel plate;Multiple first position limiting structures, first position limiting structure engage with adjacent two first braced frames, and first position limiting structure includes the first block, connecting rod, the second block, the first gag lever post and positive stop strip;Three first pour baffle;Second position limiting structure;Multiple second pouring structures, multiple second pouring structures are connected to support construction described in another part, and second pouring structure includes the second braced frame and the second steel plate;Third position limiting structure;Third pouring structure.The stair step aluminum alloy mould plate provided by the invention being easily installed have the advantages that it is easy to assembly flexibly, pour that mortar leakage prevention, to pour effect good.
Description
Technical field
The present invention relates to technical field of buildings more particularly to a kind of stair step aluminum alloy mould plates being easily installed.
Background technique
Stair are the components in building as floor gap vertical transportation, when being mainly used between floor larger with height difference
Traffic connection, and in construction cast-type reinforced concrete stairs because have good integrity, rigidity is big, anti-seismic performance is good
The advantages of be widely used, mostly use aluminium alloy, wooden support template to construct in casting process.
However traditional stair step aluminum alloy mould plate assembled in building construction process it is not convenient enough, in the construction process
It is inconvenient to the processing of spillage point.
Therefore, it is necessary to provide a kind of new stair step aluminum alloy mould plate solution above-mentioned technical problem being easily installed.
Summary of the invention
The technical problem to be solved by the present invention is to provide it is a kind of it is easy to assembly flexibly, pour that mortar leakage prevention, to pour effect good just
In the stair step aluminum alloy mould plate of installation.
In order to solve the above technical problems, the stair step aluminum alloy mould plate provided by the invention being easily installed includes: multiple
Support construction;First pouring structure, first pouring structure are equipped with multiple, and a part of support construction is fixed on described the
One pouring structure, first pouring structure include the first braced frame and the first steel plate, and first braced frame is connected to
The support construction, first Interal fixation is in first braced frame;Multiple first position limiting structures, first limit
Structure engages with adjacent two first braced frames, and first position limiting structure includes the first block, connecting rod, second
Block, the first gag lever post and positive stop strip, first block with described in one in adjacent two first braced frames
First braced frame contradicts, second block and another described first in adjacent two first braced frames
Support frame frame contradicts, and the connecting rod is fixed on first block, and the positive stop strip is set to second block away from described the
One end of one block, first gag lever post extend to the connecting rod through the positive stop strip, first gag lever post with
The positive stop strip rotation connection;Three first pour baffle, and three described first pour baffle and are set to multiple first supports
Three adjacent side walls of the rectangular platform that frame surrounds;Second position limiting structure, second position limiting structure are sticked in adjacent two
A described first pours baffle;Multiple second pouring structures, multiple second pouring structures are connected to the support construction, institute
Stating the second pouring structure includes the second braced frame and the second steel plate, and multiple second braced frames are connected to another part
The support construction, second Interal fixation in second braced frame, first block with described in adjacent two
Second braced frame in second braced frame contradicts, second block and adjacent two second supports
Another described second braced frame in frame contradicts;Second pours baffle, and described second, which pours baffle, is fixed on multiple institutes
It states on the longer side wall for the rectangular platform that the second braced frame surrounds;Third position limiting structure, the third position limiting structure are sticked in
Described second, which pours baffle and described first, pours baffle;Third pouring structure, the third pouring structure are poured with described second
Build baffle engaging, the third pouring structure be equipped with it is multiple, multiple third pouring structures are equally spaced to be poured in described second
Build baffle.
Preferably, adjacent first braced frame and second braced frame are solid by first position limiting structure
Fixed, first block and first braced frame close to second braced frame contradict, second block with lean on
Second braced frame of nearly first braced frame contradicts.
Preferably, second position limiting structure include the second gag lever post, the first limit block and the second limit block, described first
Limited block is fixed on one described first that adjacent two described first pour in baffle and pours baffle, second limited block
With adjacent two described first pour another in baffle described first pour baffle and contradict, second gag lever post runs through
It is threadedly coupled in first limited block with second limited block.
Preferably, described second pour baffle with described first pour baffle conflict, described second pour baffle include branch
Fagging and multiple first limiting slots, the support plate pour baffle conflict, and multiple described first limiting slots etc. with described first
Away from being distributed in the support plate.
Preferably, the third position limiting structure includes screw rod, the first fixed block and the second fixed block, first fixed block
It is contradicted with the support plate, second fixed block pours baffle conflict, the spiral shell with close to described the first of the support plate
Bar is threadedly coupled through first fixed block with second fixed block, and the screw rod and first fixed block rotate
Connection.
Preferably, the third pouring structure includes that third pours baffle, and multiple thirds pour baffle and equidistantly fix
In the support plate, and the third pours baffle and first limiting slot corresponds.
Preferably, the third pouring structure further includes two the second limiting slots and two third blocks, and the third is poured
The both ends for building baffle are equipped with the third block, and the third block and the third, which pour, surrounds described second between baffle
Limiting slot.
Preferably, second limiting slot is equal with the width of first limiting slot, first limiting slot with it is described
Third pours baffle engaging, and second limiting slot engages with the support plate, and the third block is supported with the support plate
Touching.
Preferably, the support construction includes pedestal, support frame, connector sleeve, first determines block, dynamic block, the second fixed gear
Block, bolt and sliding slot, a part of connector sleeve and first braced frame contradict, connector sleeve described in another part with it is described
Second braced frame contradicts, and described first, which determine block and described second, determines block and be symmetrically fixed on the connector sleeve, the connection
It puts on and is equipped with the sliding slot, the dynamic block is determined block and described second set on described first and determined between block, and the dynamic gear
Block is slidably connected with the sliding slot, and the bolt-through determines block in described second and extends to the dynamic block, and the dynamic gear
Block and the bolt contradict, and one end of support frame as described above is connected to the connector sleeve, and support frame as described above is away from the connector sleeve
One end is equipped with the pedestal, and the pedestal is detachably connected with support frame as described above.
Preferably, the support construction includes pedestal, support frame, connector sleeve, first determines block, dynamic block, bolt and cunning
Slot, a part of connector sleeve and first braced frame contradict, connector sleeve described in another part and second support frame
Frame contradicts, and described first, which determines block, is fixed on the connector sleeve, and the connector sleeve is equipped with the sliding slot, the dynamic block and institute
It states first and determines the same side wall that block is set to the connector sleeve, and the dynamic block is slidably connected with the sliding slot, the bolt
The dynamic block is extended to through the connector sleeve, and the dynamic block and the bolt contradict, one end of support frame as described above
Be connected to the connector sleeve, support frame as described above is equipped with the pedestal away from one end of the connector sleeve, and the pedestal with it is described
Support frame is detachably connected.
Compared with the relevant technologies, the stair step aluminum alloy mould plate provided by the invention being easily installed has following beneficial
Effect:
The present invention provides a kind of stair step aluminum alloy mould plate being easily installed, between first braced frame of adjacent two
It contradicts to squeeze by first block and second block and fix, while two adjacent the first braced frame side walls
In parallel, one end of first block is equipped with the connecting rod, and first gag lever post and the positive stop strip contradict, while described
First gag lever post is threadedly coupled with the connecting rod, first pouring structure is easily installed and dismantles, described in adjacent two
It contradicts to squeeze by first block and second block between second braced frame and fix, while described in adjacent two
Second braced frame side wall is parallel, is easily installed and dismantles second pouring structure, make when pouring stair step more just
Victory is convenient, convenient for safeguarding in casting process to spillage point, effectively prevents the spillage in casting process, and adjacent two
A described first pours and is fixed between baffle by second position limiting structure, while described first pours baffle and described second
It pours and is limited between baffle by the third position limiting structure, enhance the stability between aluminium alloy formwork for placing, symmetrically
Two described second pour and are limited between baffle by multiple third pouring structures being equally spaced, effective to alleviate
The second lateral pressure for pouring baffle described in casting process, convenient for the Pouring concrete at the same time on aluminum alloy mould plate, greatly
Speed of perfusion and its quality are improved greatly.
Detailed description of the invention
Fig. 1 is that a kind of structure of preferred embodiment of the stair step aluminum alloy mould plate provided by the invention being easily installed is shown
It is intended to;
Fig. 2 is the attachment structure schematic diagram of the first pouring structure and the first position limiting structure shown in FIG. 1;
Fig. 3 is the structural schematic diagram of the second pouring structure shown in FIG. 1;
Fig. 4 is the portion A shown in FIG. 1 enlarged diagram;
Fig. 5 is the portion B shown in FIG. 1 enlarged diagram;
Fig. 6 is that the structure of the support construction of the embodiment one of the stair step aluminum alloy mould plate provided by the invention being easily installed is shown
It is intended to;
Fig. 7 is that the structure of the support construction of the embodiment two of the stair step aluminum alloy mould plate provided by the invention being easily installed is shown
It is intended to.
Figure label: 1, support construction, 11, pedestal, 12, support frame, 13, connector sleeve, 14, first determines block, 15, dynamic gear
Block, 16, second determines block, 17, bolt, 18, sliding slot, the 2, first pouring structure, the 21, first braced frame, the 22, first steel plate,
3, the first position limiting structure, the 31, first block, 32, connecting rod, the 33, second block, the 34, first gag lever post, 35, positive stop strip, 4,
One pours baffle, and the 5, second position limiting structure, the 51, second gag lever post, the 52, first limited block, the 53, second limited block, 6, second pours
Building structure, the 61, second braced frame, the 62, second steel plate, 7, second pours baffle, 71, support plate, the 72, first limiting slot, 8,
Third position limiting structure, 81, screw rod, the 82, first fixed block, the 83, second fixed block, 9, third pouring structure, 91, third pour gear
Plate, the 92, second limiting slot, 93, third block.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Embodiment one:
Please refer to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6, wherein Fig. 1 is that the stair provided by the invention being easily installed are stepped on
Walk a kind of structural schematic diagram of preferred embodiment of aluminum alloy mould plate;Fig. 2 is the first pouring structure shown in FIG. 1 and the first limit
The attachment structure schematic diagram of structure;Fig. 3 is the structural schematic diagram of the second pouring structure shown in FIG. 1;Fig. 4 is the portion A shown in FIG. 1
Enlarged diagram;Fig. 5 is the portion B shown in FIG. 1 enlarged diagram;Fig. 6 is the stair step aluminium provided by the invention being easily installed
The structural schematic diagram of the support construction of the embodiment one of alloy templates.The stair step aluminum alloy mould plate being easily installed includes: more
A support construction 1;First pouring structure 2, first pouring structure 2 be equipped with it is multiple, a part of support construction is fixed on
First pouring structure 2, first pouring structure 2 include the first braced frame 21 and the first steel plate 22, described first
Support frame frame 21 is connected to the support construction 1, and first steel plate 22 is fixed on first braced frame 21;Multiple first limits
Bit architecture 3, first position limiting structure 3 engage with adjacent two first braced frames 21, first position limiting structure 3
Including the first block 31, connecting rod 32, the second block 33, the first gag lever post 34 and positive stop strip 35, first block 31 and phase
First braced frame 21 in two adjacent first braced frames 21 contradicts, second block 33 with it is adjacent
Two first braced frames 21 in another described first braced frame 21 contradict, the connecting rod 32 is fixed on institute
State the first block 31, the positive stop strip 35 is set to one end that second block 33 deviates from first block 31, and described first
Gag lever post 34 extends to the connecting rod 32 through the positive stop strip 35, first gag lever post 34 with 35 turns of the positive stop strip
Dynamic connection;Three first pour baffle 4, and three described first pour what baffle 4 was surrounded set on multiple first support frames 21
Three adjacent side walls of rectangular platform;Second position limiting structure 5, second position limiting structure 5 are sticked in described in adjacent two
First pours baffle 4;Multiple second pouring structures 6, multiple second pouring structures 6 are connected to the support construction 1, described
Second pouring structure 6 includes the second braced frame 61 and the second steel plate 62, in addition multiple second braced frames 61 are connected to
A part of support construction 1, second steel plate 62 are fixed on second braced frame 61, first block 31 and phase
Second braced frame 61 in two adjacent second braced frames 61 contradicts, second block 33 with it is adjacent
Two second braced frames 61 in another described second braced frame 61 contradict;Second pours baffle 7, and described
Two, which pour baffle 7, is fixed on the longer side wall for the rectangular platform that multiple second braced frames 61 surround;Third limit knot
Structure 8, the third position limiting structure 8, which is sticked in described second and pours baffle 7 and described first, pours baffle 4;Third pouring structure
9, the third pouring structure 9 pours baffle 7 with described second and engages, the third pouring structure 9 be equipped with it is multiple, it is multiple described
Third pouring structure 9, which is equally spaced, pours baffle 7 in described second.
Adjacent first braced frame 21 and second braced frame 61 are solid by first position limiting structure 3
Fixed, first block 31 is contradicted with first braced frame 21 close to second braced frame 61, the second gear
Second braced frame 61 of block 33 and close first braced frame 21 contradicts, in order to make first braced frame 21
It connect with second braced frame 61 even closer, convenient for being safeguarded in casting process to spillage point, effectively prevents
The spillage in casting process.
Second position limiting structure 5 include the second gag lever post 51, the first limited block 52 and the second limited block 53, described first
Limited block 52 is fixed on one described first that adjacent two described first pour in baffle 4 and pours baffle 4, second limit
Position block 53 and it is adjacent two described first pour in baffle 4 another described first pour the conflict of baffle 4, second limit
Position bar 51 is threadedly coupled through first limited block 52 with second limited block 53, pours baffle for three described first
4 are set to adjacent three side wall for the platform that multiple first pouring structures 2 surround, and are bolted, two institutes
First is stated to pour by second position limiting structure 5 fixation between baffle 4, by first limited block 52 and second limit
Block 53 is sticked in adjacent two described first respectively and pours on baffle 4, turns second gag lever post 51, makes adjacent two
Described first, which pours baffle 4, contradicts limit.
Described second, which pours baffle 7, pours the conflict of baffle 4 with described first, and described second, which pours baffle 7, includes support plate
71 and multiple first limiting slots 72, the support plate 71 pours the conflict of baffle 4, and multiple first limiting slots with described first
72 are equally spaced in the support plate 71, and the third position limiting structure 8 includes screw rod 81, the first fixed block 82 and the second fixed block
83, first fixed block 82 is contradicted with the support plate 71, the institute of second fixed block 83 and the close support plate 71
It states first and pours the conflict of baffle 4, the screw rod 81 connects through first fixed block 82 with 83 screw thread of the second fixed block
It connects, and the screw rod 81 and first fixed block 82 are rotatablely connected, described first, which pours baffle 4 and described second, pours baffle
It is limited between 7 by the third position limiting structure 8, enhances the stability between aluminium alloy formwork for placing.
The third pouring structure 9 includes that third pours baffle 91, and multiple thirds pour baffle 91 and are equidistantly fixed on
The support plate 71, and the third pours baffle 91 and first limiting slot 72 corresponds, in order to improve pouring for stair
Build quality and its efficiency.In the present embodiment, the third pouring structure 9 further includes two the second limiting slots 92 and two third gear
Block 93, the both ends that the third pours baffle 91 are equipped with the third block 93, and the third block 93 is poured with the third
It builds and surrounds second limiting slot 92 between baffle 91, the width phase of second limiting slot 92 and first limiting slot 72
Deng first limiting slot 72 pours baffle 91 with the third and engages, and second limiting slot 92 blocks with the support plate 71
It closes, and the third block 93 and the support plate 71 contradict, and the third is poured to second limiting slot 92 of baffle 91
Engage with first limiting slot 72 one-to-one correspondence in the support plate 71, passes through the third block 93 and the support plate
71 contradict limit, and symmetrical two described second pour between baffle 7 through multiple third pouring structures 9 being equally spaced
It is limited, effectively alleviates described in casting process the second lateral pressure for pouring baffle 7.
The support construction 1 determines block 14, dynamic block 15, second including pedestal 11, support frame 12, connector sleeve 13, first
Determine block 16, bolt 17 and sliding slot 18, a part of connector sleeve 13 is contradicted with first braced frame 21, another part institute
It states connector sleeve 13 and second braced frame 61 to contradict, described first, which determine block 14, determine that block 16 is symmetrical to be fixed with described second
In the connector sleeve 13, the connector sleeve 13 is equipped with the sliding slot 18, and the dynamic block 15 is set to described first and determines block 14
Determine between block 16 with described second, and the dynamic block 15 is slidably connected with the sliding slot 18, the bolt 17 is through institute
It states second and determines block 16 and extend to the dynamic block 15, and the dynamic block 15 and the bolt 17 contradict, support frame as described above 12
One end be connected to the connector sleeve 13, support frame as described above 12 is equipped with the pedestal 11 away from one end of the connector sleeve 13, and
The pedestal 11 is detachably connected with support frame as described above 12, turns the bolt 17, determines the dynamic block 15 with described first
Block 14 clamps second braced frame 61 and its first braced frame 21, make first pouring structure 2 with it is described
Second pouring structure 6 is connected as an entirety, keeps installing and dismounting aluminum alloy mould plate more convenient.
Embodiment two:
Please refer to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 7, wherein Fig. 1 is that the stair provided by the invention being easily installed are stepped on
Walk a kind of structural schematic diagram of preferred embodiment of aluminum alloy mould plate;Fig. 2 is the first pouring structure shown in FIG. 1 and the first limit
The attachment structure schematic diagram of structure;Fig. 3 is the structural schematic diagram of the second pouring structure shown in FIG. 1;Fig. 4 is the portion A shown in FIG. 1
Enlarged diagram;Fig. 5 is the portion B shown in FIG. 1 enlarged diagram;Fig. 7 is the stair step aluminium provided by the invention being easily installed
The structural schematic diagram of the support construction of the embodiment two of alloy templates.The stair step aluminum alloy mould plate being easily installed includes: more
A support construction 1;First pouring structure 2, first pouring structure 2 be equipped with it is multiple, a part of support construction is fixed on
First pouring structure 2, first pouring structure 2 include the first braced frame 21 and the first steel plate 22, described first
Support frame frame 21 is connected to the support construction 1, and first steel plate 22 is fixed on first braced frame 21;Multiple first limits
Bit architecture 3, first position limiting structure 3 engage with adjacent two first braced frames 21, first position limiting structure 3
Including the first block 31, connecting rod 32, the second block 33, the first gag lever post 34 and positive stop strip 35, first block 31 and phase
First braced frame 21 in two adjacent first braced frames 21 contradicts, second block 33 with it is adjacent
Two first braced frames 21 in another described first braced frame 21 contradict, the connecting rod 32 is fixed on institute
State the first block 31, the positive stop strip 35 is set to one end that second block 33 deviates from first block 31, and described first
Gag lever post 34 extends to the connecting rod 32 through the positive stop strip 35, first gag lever post 34 with 35 turns of the positive stop strip
Dynamic connection;Three first pour baffle 4, and three described first pour what baffle 4 was surrounded set on multiple first support frames 21
Three adjacent side walls of rectangular platform;Second position limiting structure 5, second position limiting structure 5 are sticked in described in adjacent two
First pours baffle 4;Multiple second pouring structures 6, multiple second pouring structures 6 are connected to the support construction 1, described
Second pouring structure 6 includes the second braced frame 61 and the second steel plate 62, in addition multiple second braced frames 61 are connected to
A part of support construction 1, second steel plate 62 are fixed on second braced frame 61, first block 31 and phase
Second braced frame 61 in two adjacent second braced frames 61 contradicts, second block 33 with it is adjacent
Two second braced frames 61 in another described second braced frame 61 contradict;Second pours baffle 7, and described
Two, which pour baffle 7, is fixed on the longer side wall for the rectangular platform that multiple second braced frames 61 surround;Third limit knot
Structure 8, the third position limiting structure 8, which is sticked in described second and pours baffle 7 and described first, pours baffle 4;Third pouring structure
9, the third pouring structure 9 pours baffle 7 with described second and engages, the third pouring structure 9 be equipped with it is multiple, it is multiple described
Third pouring structure 9, which is equally spaced, pours baffle 7 in described second.
Adjacent first braced frame 21 and second braced frame 61 are solid by first position limiting structure 3
Fixed, first block 31 is contradicted with first braced frame 21 close to second braced frame 61, the second gear
Second braced frame 61 of block 33 and close first braced frame 21 contradicts, in order to make first braced frame 21
It connect with second braced frame 61 even closer, convenient for being safeguarded in casting process to spillage point, effectively prevents
The spillage in casting process.
Second position limiting structure 5 include the second gag lever post 51, the first limited block 52 and the second limited block 53, described first
Limited block 52 is fixed on one described first that adjacent two described first pour in baffle 4 and pours baffle 4, second limit
Position block 53 and it is adjacent two described first pour in baffle 4 another described first pour the conflict of baffle 4, second limit
Position bar 51 is threadedly coupled through first limited block 52 with second limited block 53, pours baffle for three described first
4 are set to adjacent three side wall for the platform that multiple first pouring structures 2 surround, and are bolted, two institutes
First is stated to pour by second position limiting structure 5 fixation between baffle 4, by first limited block 52 and second limit
Block 53 is sticked in adjacent two described first respectively and pours on baffle 4, turns second gag lever post 51, makes adjacent two
Described first, which pours baffle 4, contradicts limit.
Described second, which pours baffle 7, pours the conflict of baffle 4 with described first, and described second, which pours baffle 7, includes support plate
71 and multiple first limiting slots 72, the support plate 71 pours the conflict of baffle 4, and multiple first limiting slots with described first
72 are equally spaced in the support plate 71, and the third position limiting structure 8 includes screw rod 81, the first fixed block 82 and the second fixed block
83, first fixed block 82 is contradicted with the support plate 71, the institute of second fixed block 83 and the close support plate 71
It states first and pours the conflict of baffle 4, the screw rod 81 connects through first fixed block 82 with 83 screw thread of the second fixed block
It connects, and the screw rod 81 and first fixed block 82 are rotatablely connected, described first, which pours baffle 4 and described second, pours baffle
It is limited between 7 by the third position limiting structure 8, enhances the stability between aluminium alloy formwork for placing.
The third pouring structure 9 includes that third pours baffle 91, and multiple thirds pour baffle 91 and are equidistantly fixed on
The support plate 71, and the third pours baffle 91 and first limiting slot 72 corresponds, in order to improve pouring for stair
Build quality and its efficiency.In the present embodiment, the third pouring structure 9 further includes two the second limiting slots 92 and two third gear
Block 93, the both ends that the third pours baffle 91 are equipped with the third block 93, and the third block 93 is poured with the third
It builds and surrounds second limiting slot 92 between baffle 91, the width phase of second limiting slot 92 and first limiting slot 72
Deng first limiting slot 72 pours baffle 91 with the third and engages, and second limiting slot 92 blocks with the support plate 71
It closes, and the third block 93 and the support plate 71 contradict, and the third is poured to second limiting slot 92 of baffle 91
Engage with first limiting slot 72 one-to-one correspondence in the support plate 71, passes through the third block 93 and the support plate
71 contradict limit, and symmetrical two described second pour between baffle 7 through multiple third pouring structures 9 being equally spaced
It is limited, effectively alleviates described in casting process the second lateral pressure for pouring baffle 7.
The support construction 1 determines block 14, dynamic block 15, bolt including pedestal 11, support frame 12, connector sleeve 13, first
17 and sliding slot 18, a part of connector sleeve 13 is contradicted with first braced frame 21, connector sleeve 13 described in another part with
Second braced frame 61 contradicts, and described first, which determines block 14, is fixed on the connector sleeve 13, and the connector sleeve 13 is equipped with
The sliding slot 18, the dynamic block 15 determine the same side wall that block 14 is set to the connector sleeve 13 with described first, and described dynamic
Block 15 is slidably connected with the sliding slot 18, and the bolt 17 extends to the dynamic block 15 through the connector sleeve 13, and
The dynamic block 15 is contradicted with the bolt 17, and one end of support frame as described above 12 is connected to the connector sleeve 13, support frame as described above
12 are equipped with the pedestal 11 away from one end of the connector sleeve 13, and the pedestal 11 is detachably connected with support frame as described above 12,
The bolt 17 is turned, so that the dynamic block 15 is determined block 14 with described first and clamps second braced frame 61 and its described
First braced frame 21 makes first pouring structure 2 be connected as an entirety with second pouring structure 6, tears installation open
It is more convenient to unload aluminum alloy mould plate.
The stair step aluminum alloy mould plate of embodiment one and embodiment two being easily installed is made 20 sets respectively, then will
20 sets of stair step aluminum alloy mould plates being easily installed of embodiment one and embodiment two are stepped on 20 sets of common aluminium alloy stair
Step template puts into the stair that the identical floor of construction environment pours same size shape respectively, by repeatedly periodic
Data comparison show that the spillage rate for the stair step aluminum alloy mould plate of embodiment one being easily installed is than common aluminium alloy stair
Template of marking time spillage rate low 5%, the installing and dismounting efficiency for the stair step aluminum alloy mould plate of embodiment one being easily installed is than common
Aluminium alloy stair tread formwork installing and dismounting high-efficient 9%, the stair step aluminum alloy mould plate of embodiment one being easily installed
Pouring quality it is higher by 5% than the pouring quality of common aluminium alloy stair tread formwork, the stair of embodiment two being easily installed are stepped on
The spillage rate for walking aluminum alloy mould plate is than common aluminium alloy stair tread formwork spillage rate lower by 5%, and embodiment two is easily installed
The installing and dismounting efficiency of stair step aluminum alloy mould plate is more high-efficient than the installing and dismounting of common aluminium alloy stair tread formwork
10%, the pouring quality for the stair step aluminum alloy mould plate of embodiment two being easily installed is than common aluminium alloy stair step mould
The pouring quality of plate is high by 5%.
The working principle of the stair step aluminum alloy mould plate provided by the invention being easily installed is as follows:
The pedestal 11 is fixed on first and pours area, is fixed by foundation bolt, then pours knot for multiple described first
Structure 2 and second pouring structure 6 are uniformly laid in the support construction 1, make first braced frame of adjacent two
21 side walls are parallel, and first position limiting structure 3 is sticked in first braced frame 21 of adjacent two, turns described first
Gag lever post 34, first gag lever post 34 is contradicted with the positive stop strip 35, while first gag lever post 34 and the connecting rod
32 are threadedly coupled, and contradict first block 31 with second block 33 and squeeze two adjacent first braced frames
21, multiple first pouring structures 2 are installed, 61 side wall of the second braced frame of adjacent two is parallel, by described first
Position limiting structure 3 is sticked in second braced frame 61 of adjacent two, turns first gag lever post 34, first limit
Bar 34 and the positive stop strip 35 contradict, while first gag lever post 34 is threadedly coupled with the connecting rod 32, makes described first
Block 31 and second block 33, which contradict, squeezes fixed two adjacent second braced frames 61, installs multiple described the
Two pouring structures 6, while being consolidated first position limiting structure 2 and second position limiting structure 6 by first position limiting structure 3
It is fixed, convenient for safeguarding in casting process to spillage point, effectively prevent the spillage in casting process.
Then the adjacent of platform that baffle 4 is surrounded set on multiple first pouring structures 2 is poured by three described first
Three side walls, and be bolted, two described first pour it is solid by second position limiting structure 5 between baffle 4
It is fixed, first limited block 52 is sticked in adjacent two described first with second limited block 53 respectively and pours baffle 4
On, second gag lever post 51 is turned, so that adjacent two described first is poured baffle 4 and contradicts limit;Described second is poured
Baffle 7 is fixed on the longer side wall for the platform that multiple second pouring structures 6 surround, while described first pours baffle
4 and described second pour between baffle 7 through the third position limiting structure 8 limit, enhance between aluminium alloy formwork for placing
Then the third is poured first limit on second limiting slot 92 and the support plate 71 of baffle 91 by stability
Position slot 72 corresponds engaging, is contradicted and is limited with the support plate 71 by the third block 93, and symmetrical two described the
Two pour and are limited between baffle 7 by multiple third pouring structures 9 being equally spaced, and effectively alleviate and are pouring
Described second lateral pressure for pouring baffle 7 in the process, then turns the bolt 17, makes the dynamic block 15 and described first
Determine block 14 and clamps second braced frame 61 and its first braced frame 21.
Compared with the relevant technologies, the stair step aluminum alloy mould plate provided by the invention being easily installed has following beneficial
Effect:
The present invention provides a kind of stair step aluminum alloy mould plate being easily installed, first braced frame 21 of adjacent two it
Between contradict to squeeze with second block 33 by first block 31 and fix, while two adjacent first support frames
21 side wall of frame is parallel, and one end of first block 31 is equipped with the connecting rod 32, first gag lever post 34 and the limit
Item 35 contradicts, while first gag lever post 34 is threadedly coupled with the connecting rod 32, is easily installed and is dismantled described first and pour
Building structure 2 is supported by first block 31 with second block 33 between second braced frame 61 of adjacent two
Touching, which squeezes, to be fixed, while two adjacent 61 side walls of the second braced frame are parallel, are easily installed and dismantle described second and pour
Building structure 6 makes the more convenient convenience when pouring stair step, convenient for safeguarding in casting process to spillage point, effectively
Prevent the spillage in casting process, adjacent two described first pour between baffle 4 through second position limiting structure 5
It is fixed, while described first pours baffle 4 and described second and pours and limited between baffle 7 by the third position limiting structure 8, increasing
Stability between strong aluminium alloy formwork for placing, symmetrical two described second pour between baffle 7 by multiple equidistant points
The third pouring structure 9 of cloth is limited, and is effectively alleviated described in casting process second and is poured the lateral of baffle 7
Pressure substantially increases speed of perfusion and its quality convenient for the Pouring concrete at the same time on aluminum alloy mould plate.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (10)
1. a kind of stair step aluminum alloy mould plate being easily installed characterized by comprising
Multiple support constructions;
First pouring structure, first pouring structure be equipped with it is multiple, a part of support construction is fixed on described first and pours
Building structure, first pouring structure include the first braced frame and the first steel plate, and first braced frame is connected to described
Support construction, first Interal fixation is in first braced frame;
Multiple first position limiting structures, first position limiting structure engage with adjacent two first braced frames, and described
One position limiting structure include the first block, connecting rod, the second block, the first gag lever post and positive stop strip, first block with it is adjacent
Two first braced frames in first braced frame contradict, second block and two adjacent institutes
Another described first braced frame stated in the first braced frame contradicts, and the connecting rod is fixed on first block, institute
One end that positive stop strip deviates from first block set on second block is stated, first gag lever post is through the positive stop strip
The connecting rod is extended to, first gag lever post and the positive stop strip are rotatablely connected;
Three first pour baffle, and three described first pour baffle and are set to the rectangular platform that multiple first support frames surround
Three adjacent side walls;
Second position limiting structure, second position limiting structure are sticked in adjacent two described first and pour baffle;
Multiple second pouring structures, multiple second pouring structures are connected to the support construction, second pouring structure
Including the second braced frame and the second steel plate, multiple second braced frames are connected to support construction described in another part,
Second Interal fixation is in second braced frame, first block and adjacent two second braced frames
Second braced frame contradict, second block and another in adjacent two second braced frames
Second braced frame contradicts;
Second pours baffle, described second pour baffle be fixed on rectangular platform that multiple second braced frames surround compared with
In long side wall;
Third position limiting structure, the third position limiting structure, which is sticked in described second and pours baffle and described first, pours baffle;
Third pouring structure, the third pouring structure pour baffle with described second and engage, and the third pouring structure is equipped with
Multiple, multiple third pouring structures, which are equally spaced, pours baffle in described second.
2. the stair step aluminum alloy mould plate according to claim 1 being easily installed, which is characterized in that adjacent described
One braced frame is fixed with second braced frame by first position limiting structure, first block and close to described the
First braced frame of two braced frames contradicts, and described the second of second block and close first braced frame
Braced frame contradicts.
3. the stair step aluminum alloy mould plate according to claim 1 being easily installed, which is characterized in that second limit
Structure includes the second gag lever post, the first limit block and the second limit block, and first limited block is fixed on described in adjacent two
First one described first for pouring in baffle pours baffle, and second limited block pours gear with adjacent two described first
Another in plate described first pours baffle conflict, and second gag lever post is through first limited block and described second
Limited block is threadedly coupled.
4. the stair step aluminum alloy mould plate according to claim 1 being easily installed, which is characterized in that described second pours
Baffle pours baffle conflict with described first, and described second to pour baffle include support plate and multiple first limiting slots, the branch
Fagging pours baffle conflict with described first, and multiple first limiting slots are equally spaced in the support plate.
5. the stair step aluminum alloy mould plate according to claim 4 being easily installed, which is characterized in that the third limit
Structure includes screw rod, the first fixed block and the second fixed block, and first fixed block and the support plate contradict, and described second is solid
Determine block and close to the support plate described first pour baffle conflict, the screw rod through first fixed block with it is described
Second fixed block is threadedly coupled, and the screw rod and first fixed block are rotatablely connected.
6. the stair step aluminum alloy mould plate according to claim 4 being easily installed, which is characterized in that the third pours
Structure includes that third pours baffle, and multiple thirds pour baffle and are equidistantly fixed on the support plate, and the third pours
Baffle and first limiting slot correspond.
7. the stair step aluminum alloy mould plate according to claim 6 being easily installed, which is characterized in that the third pours
Structure further includes two the second limiting slots and two third blocks, and the both ends that the third pours baffle are equipped with the third gear
Block, the third block and the third, which pour, surrounds second limiting slot between baffle.
8. the stair step aluminum alloy mould plate according to claim 7 being easily installed, which is characterized in that second limit
Slot is equal with the width of first limiting slot, and first limiting slot pours baffle with the third and engages, second limit
Position slot engages with the support plate, and the third block and the support plate contradict.
9. the stair step aluminum alloy mould plate according to claim 1 being easily installed, which is characterized in that the support construction
Block is determined including pedestal, support frame, connector sleeve, first, dynamic block, second determines block, bolt and sliding slot, a part of connection
Set is contradicted with first braced frame, and connector sleeve described in another part and second braced frame contradict, and described first is fixed
Block determines block with described second and is symmetrically fixed on the connector sleeve, and the connector sleeve is equipped with the sliding slot, the dynamic block
Determine block and described second set on described first to determine between block, and the dynamic block is slidably connected with the sliding slot, the spiral shell
Bolt determines block through described second and extends to the dynamic block, and the dynamic block and the bolt contradict, support frame as described above
One end be connected to the connector sleeve, support frame as described above is equipped with the pedestal, and the pedestal away from one end of the connector sleeve
It is detachably connected with support frame as described above.
10. the stair step aluminum alloy mould plate according to claim 1 being easily installed, which is characterized in that the support knot
Structure includes pedestal, support frame, connector sleeve, first determines block, dynamic block, bolt and sliding slot, a part of connector sleeve with it is described
First braced frame contradicts, and connector sleeve described in another part and second braced frame contradict, and described first, which determines block, fixes
In the connector sleeve, the connector sleeve is equipped with the sliding slot, and the dynamic block determines block set on the connection with described first
The same side wall of set, and the dynamic block is slidably connected with the sliding slot, the bolt-through extends to institute in the connector sleeve
Block is stated, and the dynamic block and the bolt contradict, one end of support frame as described above is connected to the connector sleeve, the support
Frame is equipped with the pedestal away from one end of the connector sleeve, and the pedestal is detachably connected with support frame as described above.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810232836.2A CN110295742A (en) | 2018-03-21 | 2018-03-21 | A kind of stair step aluminum alloy mould plate being easily installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810232836.2A CN110295742A (en) | 2018-03-21 | 2018-03-21 | A kind of stair step aluminum alloy mould plate being easily installed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110295742A true CN110295742A (en) | 2019-10-01 |
Family
ID=68025298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810232836.2A Pending CN110295742A (en) | 2018-03-21 | 2018-03-21 | A kind of stair step aluminum alloy mould plate being easily installed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110295742A (en) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3440828A1 (en) * | 1984-11-08 | 1986-05-15 | Wolfgang 7958 Laupheim Baumann | Shuttering element to be used in the building industry |
DE29705006U1 (en) * | 1997-01-17 | 1997-06-05 | W-K Basisbau GmbH, 48683 Ahaus | Formwork for a step |
CN201065647Y (en) * | 2007-04-05 | 2008-05-28 | 中国新兴建设开发总公司 | Big steel formwork edge joint gun-type fastening member |
CN101852012A (en) * | 2010-06-25 | 2010-10-06 | 山西惠丰型材有限公司 | Plastic exposed concrete building template |
CN201649633U (en) * | 2010-04-01 | 2010-11-24 | 中铁十局集团建筑工程有限公司 | Steel formwork for forming building stair treads |
CN102747834A (en) * | 2012-06-26 | 2012-10-24 | 常州新区宏源塑料有限公司 | Plastic building templates and buckle connecting pieces |
CN203008370U (en) * | 2012-11-30 | 2013-06-19 | 山河建设集团有限公司 | Stair tread pouring formwork |
CN203716493U (en) * | 2013-12-02 | 2014-07-16 | 浙江凯雄科技有限公司 | Connecting buckle for combining building templates |
CN204174933U (en) * | 2014-10-14 | 2015-02-25 | 广州市艺达机械有限公司 | Template assembly is with connecting jig |
CN206376538U (en) * | 2016-12-12 | 2017-08-04 | 深圳市中铝南方铝模科技有限公司 | A kind of aluminium alloy stair tread formwork |
CN206385806U (en) * | 2016-12-15 | 2017-08-08 | 天津二建建筑工程有限公司 | A kind of stair template supporting construction |
CN206397146U (en) * | 2017-01-16 | 2017-08-11 | 武夷学院 | A kind of Novel staircase template |
CN206397143U (en) * | 2016-12-01 | 2017-08-11 | 郭永伟 | A kind of rapid construction stair template |
-
2018
- 2018-03-21 CN CN201810232836.2A patent/CN110295742A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3440828A1 (en) * | 1984-11-08 | 1986-05-15 | Wolfgang 7958 Laupheim Baumann | Shuttering element to be used in the building industry |
DE29705006U1 (en) * | 1997-01-17 | 1997-06-05 | W-K Basisbau GmbH, 48683 Ahaus | Formwork for a step |
CN201065647Y (en) * | 2007-04-05 | 2008-05-28 | 中国新兴建设开发总公司 | Big steel formwork edge joint gun-type fastening member |
CN201649633U (en) * | 2010-04-01 | 2010-11-24 | 中铁十局集团建筑工程有限公司 | Steel formwork for forming building stair treads |
CN101852012A (en) * | 2010-06-25 | 2010-10-06 | 山西惠丰型材有限公司 | Plastic exposed concrete building template |
CN102747834A (en) * | 2012-06-26 | 2012-10-24 | 常州新区宏源塑料有限公司 | Plastic building templates and buckle connecting pieces |
CN203008370U (en) * | 2012-11-30 | 2013-06-19 | 山河建设集团有限公司 | Stair tread pouring formwork |
CN203716493U (en) * | 2013-12-02 | 2014-07-16 | 浙江凯雄科技有限公司 | Connecting buckle for combining building templates |
CN204174933U (en) * | 2014-10-14 | 2015-02-25 | 广州市艺达机械有限公司 | Template assembly is with connecting jig |
CN206397143U (en) * | 2016-12-01 | 2017-08-11 | 郭永伟 | A kind of rapid construction stair template |
CN206376538U (en) * | 2016-12-12 | 2017-08-04 | 深圳市中铝南方铝模科技有限公司 | A kind of aluminium alloy stair tread formwork |
CN206385806U (en) * | 2016-12-15 | 2017-08-08 | 天津二建建筑工程有限公司 | A kind of stair template supporting construction |
CN206397146U (en) * | 2017-01-16 | 2017-08-11 | 武夷学院 | A kind of Novel staircase template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204645623U (en) | Aluminium alloys wafts window template system | |
WO2013139102A1 (en) | Early-removal formwork system for concreting of constructions comprising beams, plates and columns | |
CN208346615U (en) | Box girder inner formwork | |
CN109610815A (en) | A kind of anti-bank template in building settlement position and its casting method | |
CN108252504A (en) | Tube shear wall concrete structure large form hoisting type construction method and constructing device | |
CN207063522U (en) | A kind of frame column high-supported formwork | |
CN205636516U (en) | Convertible template system of hollow concrete leaning tower | |
CN202577939U (en) | Reusable overhanging I-beam fixing device | |
CN207700680U (en) | A kind of roof boarding hangs mould | |
CN110295742A (en) | A kind of stair step aluminum alloy mould plate being easily installed | |
CN202509764U (en) | Template bracing structure for constructional column | |
CN209603489U (en) | A kind of anti-bank template in building settlement position | |
CN108179873A (en) | Hanging mould structure and its application construction method | |
CN207686280U (en) | A kind of aluminum alloy mould plate early dismantling head device that assortable full hall scaffold uses | |
CN209338999U (en) | A kind of telescopic overhanging support | |
CN204715739U (en) | A kind of shear wall formwork ruggedized construction | |
CN208884991U (en) | Deformation slit formwork | |
CN206267520U (en) | A kind of self-supporting post-cast strip is poured with hanging mould | |
CN211421839U (en) | Hoop type concrete pouring template system for plugging through floor slab pipeline hole gap | |
CN106499180B (en) | A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method | |
CN104948004B (en) | A kind of site safety manages revolving enclosure wall | |
CN212613727U (en) | Be applied to mould shell of close rib structure superstructure building | |
CN212535083U (en) | Building construction stair template with quick assembly disassembly structure | |
CN211850727U (en) | Integrated operation platform for cast-in-place shear wall | |
CN204899217U (en) | Concrete is vertical to meet template bracket reinforcing apparatus that batch position pour |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191001 |
|
RJ01 | Rejection of invention patent application after publication |