CN203716493U - Connecting buckle for combining building templates - Google Patents

Connecting buckle for combining building templates Download PDF

Info

Publication number
CN203716493U
CN203716493U CN201320776668.6U CN201320776668U CN203716493U CN 203716493 U CN203716493 U CN 203716493U CN 201320776668 U CN201320776668 U CN 201320776668U CN 203716493 U CN203716493 U CN 203716493U
Authority
CN
China
Prior art keywords
connection
latch
peg
buckle
pin hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320776668.6U
Other languages
Chinese (zh)
Inventor
张嘉敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG KAIXIONG TECHNOLOGY Co Ltd
Original Assignee
ZHEJIANG KAIXIONG TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG KAIXIONG TECHNOLOGY Co Ltd filed Critical ZHEJIANG KAIXIONG TECHNOLOGY Co Ltd
Priority to CN201320776668.6U priority Critical patent/CN203716493U/en
Application granted granted Critical
Publication of CN203716493U publication Critical patent/CN203716493U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a connecting buckle for combining building templates. The connecting buckle comprises two parts, namely a plug connector and a plug pin, wherein the plug connector consists of a stopping tail part with a larger external diameter and a connecting shaft, of which the external diameter corresponds to those of connecting holes in the building templates; a plug pin hole is formed in the head part of the connecting shaft, and can be connected with the plug pin in a clamping way. According to the connecting buckle, the defects of a conventional steel coil are overcome; the connecting buckle for combining the building templates is designed and has the characteristics of simple structure, low production cost, small occupied space, and simplicity and convenience in mounting.

Description

The connection buckle of construction formwork combination use
Technical field
The utility model relates to the built-up member between construction formwork, particularly the connection buckle of construction formwork combination use.
Background technology
In the concreting process of modern architecture, in order to be suitable for large area, multi-angle, the concreting face demand of many structures, can relate to being connected between multiple templates of the same race or template not of the same race, as illustrated in fig. 1 and 2, template 1 ' and 2 ' connection all can be provided with along limit some corresponding connecting holes 11 ', 21 ', different templates 1 ' and 2 ' between corresponding connecting hole 11 ', 21 ' steel circle 3 by many bending structures ' realize, wherein steel circle 3 ' head horizontal and through two templates 1 ', 2 ' on corresponding connecting hole 11 ', 21 ', rotate taking the head of this steel circle level as rotating shaft afterwards whole steel circle 3 ' and make two templates 1 of the middle part draw-in groove 31 of steel circle ' block ', 2 ' upper for arrange connecting hole 11 ', 21 ' along limit 12 ', 22 ' and realize two templates 1 ', 2 ' connection location.
Above steel circle 3 ' connection effect also substantially can satisfy the demand, but find through use for many years, also there is following some deficiency in it: connected by template larger along the size restrictions on limit, template connect along the thickness on limit cross conference cause steel circle 3 ' middle part draw-in groove 31 ' dilatating and deformable, template connect along the undersized meeting on limit cause steel circle 3 ' middle part draw-in groove 31 ' cannot realize effective locking; 2, the project organization of many bendings makes processed complex, and cost of production is high; 3, the middle part of steel circle is exposed and is protruded in template outside after installation, can bring interference to other facilities in template; 4, relatively effort is installed.
Utility model content
For the problems referred to above, the utility model has designed the connection buckle of a kind of construction formwork combination use, its have simple in structure, cost of production is low, it is little to take up room, easy-to-install feature.
For achieving the above object, the utility model is by the following technical solutions:
A connection buckle for construction formwork combination use, is characterized in that: comprise and connect connection-peg and latch two parts; Described connection connection-peg is made up of the larger stop bit afterbody of external diameter and the outside dimension connecting axle corresponding with connecting hole on construction formwork, the head of described connecting axle be provided with can with the pin hole of described latch engagement connection.
Further, the inverted cone-shaped structure setting that above-mentioned latch is big up and small down, the upper dimension of latch is greater than the pin hole maximum size on described connection connection-peg, and the lower dimension of latch is less than the pin hole maximum size on described connection connection-peg.
Further, the left surface of above-mentioned latch and right flank are set as respectively vertical plane and inclined-plane.
Further, the top of above-mentioned latch be provided with one be convenient to that instrument interts location put forth effort hole.
In use, first each connecting hole of two templates is corresponding one by one, afterwards the connecting axle that connects connection-peg is inserted and stretched out from another side from connecting hole, afterwards latch is inserted on the pin hole that connects connection-peg connecting axle until cannot go deep into, now, the connection of a template is connected connection-peg stop bit afterbody along limit blocks, the connection of another piece template is blocked by latch along limit, complete being connected of two one group of connecting hole of template, whole operating process is simple and laborsaving, the connection that connection connection-peg after simultaneously connecting and latch are hidden in construction formwork completely does not expose along Bian Nei, can other accessories of construction formwork not caused and be interfered or impact.
In above structure, because of the big up and small down inverted cone-shaped structure setting of whole latch, in practical operation, can pass through the adjustment to latch insertion depth, adjust in real time the distance connecting between stop bit afterbody and the latch of connection-peg, meet construction formwork with this and connect the connection needs while changing along limit thickness.
In addition, connection connection-peg and latch that above whole connection buckle is arranged by split form, and the structure of two accessories is all fairly simple, not only easy to process and can independently process separately, can reduce to a certain extent manufacturing cost.
Brief description of the drawings
Fig. 1, the existing syndeton schematic diagram being buckled in template assembling;
The local enlarged diagram of A portion in Fig. 2, above Fig. 1;
The perspective view of Fig. 3, the utility model buckle;
Fig. 4, the syndeton schematic diagram of the utility model in template assembling;
The local enlarged diagram of B portion in Fig. 5, the utility model Fig. 4.
Detailed description of the invention
As in Figure 3-5, a kind of connection buckle of construction formwork combination use, comprises and connects connection-peg 1 and latch 2 two parts.
Described connection connection-peg 1 is made up of the larger stop bit afterbody 11 of external diameter and the outside dimension connecting axle 12 corresponding with connecting hole on construction formwork, the head of described connecting axle 12 be provided with can with the pin hole 121 of described latch 2 engagement connections.
The inverted cone-shaped structure setting that described latch 2 is big up and small down, top 21 sizes of latch 2 are greater than pin hole 121 maximum sizes on described connection connection-peg, and bottom 22 sizes of latch 2 are less than pin hole 121 maximum sizes on described connection connection-peg.
In use, first the connecting hole 41 of the connecting hole of template 3 31 and template 4 is corresponding one by one, afterwards the connecting axle 12 that connects connection-peg is inserted and stretched out from another side connecting hole 41 from connecting hole 31, afterwards latch 2 is inserted on the pin hole 121 that connects connection-peg connecting axle until cannot go deep into, now, the connection of template 3 is connected connection-peg 1 stop bit afterbody 11 along limit 32 blocks, the connection of another piece template 4 is blocked by latch 2 along limit 42, complete two templates 3, 4 one groups of connecting holes 31, 41 be connected, whole operating process is simple and laborsaving, connection connection-peg 1 and latch 2 after connecting are hidden in construction formwork 3 simultaneously completely, 4 connection is along limit 32, in 42 and do not expose, can be to construction formwork 3, other accessories of 4 cause interferes or impact.
At this, for ensureing the locking effect of latch 2, on latch 2, corresponding templates is arranged to vertical plane along the left surface 23 on limit 42, the right flank 24 of latch 2 is set as inclined-plane, the vertical setting of above latch left surface 23, can ensure that template 3,4 connects the verticality of location, the inclined-plane setting of latch right flank 24 facilitates latch 2 to insert pin hole 121, and is conducive to effective locking that both connect.
In above structure, because of the big up and small down inverted cone-shaped structure setting of whole latch 2, in practical operation, can be by latch 3 being inserted to the adjustment of the pin hole degree of depth, adjust in real time the distance connecting between stop bit afterbody 11 and the latch 2 of connection-peg 1, the connection needs when meeting construction formwork connection and change along limit thickness with this.
To sum up, connection connection-peg 1 and latch 2 that above whole connection buckle is arranged by split form, and the structure of two accessories is all fairly simple, not only easy to process and can independently process separately, can reduce to a certain extent manufacturing cost.
In addition, the extracting of latch 2 while dismounting for convenience, the top 21 of described latch 2 be provided with one be convenient to that instrument interts location put forth effort hole 211.
The above, it is only preferred embodiments of the present utility model, not the utility model is done to any pro forma restriction, every foundation know-why of the present utility model, to any simple modification made for any of the above embodiments, equivalent variations or modification, still belongs in the scope of technical solutions of the utility model.

Claims (4)

1. a connection buckle for construction formwork combination use, is characterized in that: comprise and connect connection-peg and latch two parts; Described connection connection-peg is made up of the larger stop bit afterbody of external diameter and the outside dimension connecting axle corresponding with connecting hole on construction formwork, the head of described connecting axle be provided with can with the pin hole of described latch engagement connection.
2. connection buckle as claimed in claim 1, it is characterized in that: the inverted cone-shaped structure setting that described latch is big up and small down, the upper dimension of latch is greater than the pin hole maximum size on described connection connection-peg, states the pin hole maximum size connecting on connection-peg described in the lower dimension of latch is less than.
3. connection buckle as claimed in claim 2, is characterized in that: the left surface of described latch and right flank are set as respectively vertical plane and inclined-plane.
4. the connection buckle as described in claim 1-3, is characterized in that: the top of described latch be provided with one be convenient to that instrument interts location put forth effort hole.
CN201320776668.6U 2013-12-02 2013-12-02 Connecting buckle for combining building templates Expired - Lifetime CN203716493U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320776668.6U CN203716493U (en) 2013-12-02 2013-12-02 Connecting buckle for combining building templates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320776668.6U CN203716493U (en) 2013-12-02 2013-12-02 Connecting buckle for combining building templates

Publications (1)

Publication Number Publication Date
CN203716493U true CN203716493U (en) 2014-07-16

Family

ID=51155659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320776668.6U Expired - Lifetime CN203716493U (en) 2013-12-02 2013-12-02 Connecting buckle for combining building templates

Country Status (1)

Country Link
CN (1) CN203716493U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295742A (en) * 2018-03-21 2019-10-01 义乌工商职业技术学院 A kind of stair step aluminum alloy mould plate being easily installed
CN110469108A (en) * 2019-08-01 2019-11-19 上海建工七建集团有限公司 Punching block window hole molding board and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295742A (en) * 2018-03-21 2019-10-01 义乌工商职业技术学院 A kind of stair step aluminum alloy mould plate being easily installed
CN110469108A (en) * 2019-08-01 2019-11-19 上海建工七建集团有限公司 Punching block window hole molding board and its installation method

Similar Documents

Publication Publication Date Title
CN205841435U (en) The hilllock stone special T-bolt of industry die bottom plate
CN105228347A (en) A kind of PCB jigsaw gong plate method
CN203716493U (en) Connecting buckle for combining building templates
CN204571524U (en) A kind of high antitheft blade lock head and private key thereof
CN204097981U (en) A kind of hydroelectric project underground powerhouse arrangement
CN205831250U (en) A kind of Fastener for braid
CN201883353U (en) Permeable environment-friendly planting floor tile
CN207003671U (en) Architectural engineering support beam and stand column pile attachment structure
CN207315814U (en) One kind splicing furniture mounting structure
CN203924501U (en) Steel bar skeleton positioning
CN202604127U (en) Faceplate connecting piece for pull baskets
CN201565862U (en) Axes profile locating tool
CN204690530U (en) For compensating the steel structure backing plate of shoulder height
CN203440956U (en) Non-coplanar inclination unitized curtain wall system
CN205969103U (en) Robot arm rotates shoulder joint
CN204059715U (en) The locking syndeton of channel cross connecting piece
CN202831238U (en) Steel casting joint
CN213039069U (en) Lock hole structure of control cabinet door lock
CN206469454U (en) Put leaf component and air conditioner
CN204357226U (en) A kind of structure of fiber cable cross connection box base door bolt
CN204983521U (en) Mounting structure of external corner department decorative board
CN204230459U (en) A kind of 90 degree of novel connectors
CN205148532U (en) Production woodworking router dustcoat connection piece for wooden toy
CN204126171U (en) One starting sheet cell integral type built-in fitting
CN204493368U (en) A kind of axle limit structure and use the long-spiral drilling machine of this axle limit structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Connecting buckle for combining building templates

Effective date of registration: 20200521

Granted publication date: 20140716

Pledgee: Zhejiang Taizhou Huangyan Rural Commercial Bank Co.,Ltd.

Pledgor: ZHEJIANG KAIXIONG TECHNOLOGY Co.,Ltd.

Registration number: Y2020330000256

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140716