CN109610815A - A kind of anti-bank template in building settlement position and its casting method - Google Patents
A kind of anti-bank template in building settlement position and its casting method Download PDFInfo
- Publication number
- CN109610815A CN109610815A CN201910066632.0A CN201910066632A CN109610815A CN 109610815 A CN109610815 A CN 109610815A CN 201910066632 A CN201910066632 A CN 201910066632A CN 109610815 A CN109610815 A CN 109610815A
- Authority
- CN
- China
- Prior art keywords
- template
- bank
- floorboard
- shear wall
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005266 casting Methods 0.000 title claims abstract description 12
- 238000009415 formwork Methods 0.000 claims abstract description 50
- 238000004062 sedimentation Methods 0.000 claims abstract description 47
- 230000003014 reinforcing Effects 0.000 claims abstract description 35
- 238000000465 moulding Methods 0.000 claims abstract description 7
- 238000007789 sealing Methods 0.000 claims description 21
- 238000009434 installation Methods 0.000 claims description 12
- 229920000915 polyvinyl chloride Polymers 0.000 claims description 11
- 230000002787 reinforcement Effects 0.000 claims description 6
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 1
- 230000000875 corresponding Effects 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000009408 flooring Methods 0.000 description 2
- 230000000149 penetrating Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011120 plywood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/08—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/365—Stop-end shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
Abstract
The present invention provides a kind of anti-bank template in building settlement position and its casting method, and structure includes that floorboard template plate, the sedimentation anti-bank in position hang mould and shear wall formwork;It is positioned and is fixed by back cord, back cord is fixed on above floorboard template plate by reinforcing screw rod, then shear wall formwork is installed, floorboard template plate, the sedimentation anti-bank in position is set to hang mould and shear wall formwork and when corresponding reinforcing bar all installs, by shear wall, floorboard, the anti-bank one-time-concreting molding in sedimentation position, compared in traditional handicraft, after the completion of floorboard and shear wall pour, anti- bank template is just installed, pour the mode of anti-bank, it improves work efficiency, and pour the anti-bank built up to leak with floorboard and shear wall junction.
Description
Technical field
The present invention relates to architectural template structure technical field, in particular to the anti-bank template in a kind of building settlement position and its pour
Building method.
Background technique
The conventional construction method of the anti-bank in sedimentation position in toilet or kitchen be carry out after the completion of main structure construction it is secondary
It pours, i.e., after first completion floorboard, the floorboard of toilet or kitchen sedimentation and shear wall pour, then on the side at sedimentation position
Along anti-bank template is arranged, will finally settle the anti-bank pouring molding in position, carry out anti-bank after-pouring the problem is that: sedimentation position
There are certain hidden leakage defects.
Summary of the invention
The technical problems to be solved by the present invention are: a kind of anti-bank template in building settlement position and its casting method are provided,
Solve the problems, such as that the sedimentation position such as toilet present in conventional construction method, kitchen is easy leakage.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention are as follows: a kind of anti-bank template in building settlement position,
Include:
Floorboard template plate, the floorboard template plate pour up, and the face of pouring is parallel to the horizontal plane;
The sedimentation anti-bank in position hangs mould, and the top for being located at floorboard template plate is hung by back cord and reinforcing screw rod;The back
The stupefied top be fixed on the sedimentation anti-bank in position and hang mould, the reinforcing screw rod is vertically connected at floorboard template plate top, described
Reinforcing screw rod is fixed in the end of back cord;
Shear wall formwork is fixed on vertically above floorboard template plate.
The beneficial effects of the present invention are: in the anti-bank formwork structure in building settlement position provided by the invention, by building
Before panel pours, directly hung above floorboard template plate set sedimentation the anti-bank in position hang mould, pass through back cord positioning fix, back
It is stupefied to be fixed on above floorboard template plate by reinforcing screw rod, then shear wall formwork is installed, make floorboard template plate, sink
The drop anti-bank in position hangs mould and shear wall formwork and when corresponding reinforcing bar all installs, by shear wall, floorboard, subsidence part
The anti-bank one-time-concreting molding in position after the completion of floorboard and shear wall pour, just installs anti-bank mould compared in traditional handicraft
Plate pours the mode of anti-bank, improves work efficiency, and pours the anti-bank built up and will not occur with floorboard and shear wall junction
Leakage.
Detailed description of the invention
Fig. 1 is a kind of partial structural diagram of the anti-bank template in building settlement position of the specific embodiment of the invention;
Fig. 2 is a kind of local structure top view of the anti-bank template in building settlement position of the specific embodiment of the invention;
Fig. 3 is a kind of partial structure side view of the anti-bank template in building settlement position of the specific embodiment of the invention;
Label declaration:
1, floorboard template plate;2, the sedimentation anti-bank in position hangs mould;21, back cord;22, screw rod is reinforced;23, side template;24,
PVC casing;25, sealing template;251, triangular prism shape protrusion;26, glued board;3, shear wall formwork.
Specific embodiment
To explain the technical content, the achieved purpose and the effect of the present invention in detail, below in conjunction with embodiment and cooperate attached
Figure is explained.
The most critical design of the present invention is: floorboard template plate, the sedimentation anti-bank in position hang mould and shear wall formwork
And corresponding reinforcing bar forms shear wall, floorboard, the anti-bank one-time-concreting in sedimentation position when all installing.
Fig. 1 to Fig. 3 is please referred to, the present invention relates to a kind of anti-bank templates in building settlement position, comprising:
Floorboard template plate 1, the floorboard template plate 1 pour up, and the face of pouring is parallel to the horizontal plane;
The sedimentation anti-bank in position hangs mould 2, and the top for being located at floorboard template plate 1 is hung by back cord 21 and reinforcing screw rod 22;
The back cord 21 is fixed on the top that the sedimentation anti-bank in position hangs mould 2, and the reinforcing screw rod 22 is vertically connected at floorboard template bottom
1 top of plate, the end of the back cord 21, which is fixed on, reinforces screw rod 22;
Shear wall formwork 3 is fixed on vertically above floorboard template plate.
In the above-mentioned anti-bank formwork structure in building settlement position, by before floorboard pours, directly in floorboard template
Hung above bottom plate 1 set sedimentation the anti-bank in position hang mould 2, by back cord 21 position fix, back cord 21 by reinforce screw rod 22 be fixed on
The top of floorboard template plate 1, then installs shear wall formwork 3, make floorboard template plate 1, the sedimentation anti-bank in position hang mould 2 with
And shear wall formwork 3 and corresponding reinforcing bar be when all installing, by shear wall, floorboard, the sedimentation anti-bank one-time-concreting in position
Molding after the completion of floorboard and shear wall pour, just installs anti-bank template, pours the side of anti-bank compared in traditional handicraft
Formula improves work efficiency, and pours the anti-bank built up and will not leak with floorboard and shear wall junction.
Further, in the anti-bank formwork structure in above-mentioned building settlement position, it includes multiple that the anti-bank in the sedimentation position, which hangs mould 2,
It is hung at the side template 23 of 1 top of floorboard template plate, the back cord 21 is fixed on the top of side template 23.
Seen from the above description, the sedimentation anti-bank in position, which hangs 23 top of side template of mould 2, can be arranged multiple bolts hole, by with
Corresponding bolt hole is docked by bolt on back cord 21, and in order to achieve the effect that side template 23 is reinforced, each side template 23 can also lead to
Screw arbor with nut at both-ends, fixed stay and hog frame etc. is crossed to be auxiliarily fixed.
Further, in the anti-bank formwork structure in above-mentioned building settlement position, the lower part for reinforcing screw rod 22 is arranged with PVC
Casing 24.
Seen from the above description, by being arranged PVC casing 24 in reinforcing 22 lower part of screw rod, on the one hand for obstructing concrete
It with reinforcing screw rod 22, contact the concrete poured will not directly with reinforcing screw rod 22, the reinforcing disassembly of screw rod 22 facilitated to repeat to make
With on the other hand, PVC casing 24 can play the role of hanging mould support and absolute altitude control.
Further, in the anti-bank formwork structure in above-mentioned building settlement position, it includes sealing that the anti-bank in the sedimentation position, which hangs mould 2,
One end of side template 23 Yu 3 junction of shear wall formwork is arranged in template 25, the sealing template 25, and the sealing template 25 is wrapped
The two sides of the triangular prism shape protrusion 251 for including rectangular slab and being arranged in the middle part of rectangular slab, the sealing template 25 are connected to side
The end of template 23.
Seen from the above description, there is triangular prism by one end setting in side template 23 Yu 3 junction of shear wall formwork
The sealing template 25 of shape protrusion 251, so that the anti-bank poured and shear wall hinged place form the groove of triangular prism shape, to extend
Penetrating passage further avoids anti-bank and leaks with shear wall junction.
Further, in the anti-bank formwork structure in above-mentioned building settlement position, the side template 23 is connect with shear wall formwork 3
The one end at place pours face equipped with glued board 26.
Seen from the above description, face setting is poured by one end in side template 23 Yu the junction of shear wall formwork 3
Glued board 26 is conducive to the installation of junction shear wall formwork 3 so that the anti-bank poured and shear wall junction thickness are reduced.
Further, in the anti-bank formwork structure in above-mentioned building settlement position, the glued board 26 with a thickness of 9-11mm.
Further, in the anti-bank formwork structure in above-mentioned building settlement position, the floorboard template plate 1, sedimentation position
It is aluminium alloy that anti-bank, which hangs mould 2 and the material of shear wall formwork 3,.
The invention further relates to a kind of casting methods of the anti-bank template in building settlement position, comprising the following steps:
S1: by pouring up for floorboard template plate 1, level, which is laid with, is fixed;
S2: by floorboard reinforcement installation in 1 top of floorboard template plate;
S3: the anti-bank in position will be settled and hang the top that mould 2 is installed on floorboard template plate 1;
S4: it by anti-bank reinforcement installation between the side plate that the sedimentation anti-bank in position hangs mould 2, is fixed with floorboard reinforcing bar;
S5: shear wall formwork 3 is perpendicularly fixed at 1 top of floorboard template plate;
S6: shear force wall reinforcing steel bar is installed between the side plate of shear wall formwork 3;
S7: it hangs in mould 2 and is poured respectively in shear wall formwork 3 mixed to 1 top of floorboard template plate, the sedimentation anti-bank in position
Solidifying soil, so that the anti-bank in sedimentation position, floorboard and the molding of shear wall one-time-concreting.
Further, in the casting method of the anti-bank template in above-mentioned building settlement position, the S3 specifically:
S3: 23 top of each side template that the sedimentation anti-bank in position hangs mould 2 is positioned by multiple back cords 21, at floorboard template bottom
Pre-buried reinforcing screw rod 22 on plate 1, and it is arranged PVC casing 24 in the lower section for reinforcing the exposing of screw rod 22 1 part of floorboard template plate,
The end of back cord 21 is arranged to and is fixed on the upper section for reinforcing screw rod 22, is installed on flooring so that the anti-bank in position will be settled and hang mould 2
The top of plate template plate 1.
It further, further include step after the S3 in the casting method of the anti-bank template in above-mentioned building settlement position
S31: side template 23 and 3 junction of shear wall formwork installation sealing template 25 that the anti-bank in position hangs mould 2 will be settled;The sealing mould
Plate 25 includes rectangular slab and the triangular prism shape protrusion 251 being arranged in the middle part of rectangular slab;
Face installation glue is poured by settle that the anti-bank in position hangs the side template 23 of mould 2 and one end of 3 junction of shear wall formwork
Plywood 26.
Embodiment 1
A kind of anti-bank template in building settlement position, comprising:
Floorboard template plate 1, the floorboard template plate 1 pour up, and the face of pouring is parallel to the horizontal plane;
The sedimentation anti-bank in position hangs mould 2, and the top for being located at floorboard template plate 1 is hung by back cord 21 and reinforcing screw rod 22;
The back cord 21 is fixed on the top that the sedimentation anti-bank in position hangs mould 2, and the reinforcing screw rod 22 is vertically connected at floorboard template bottom
1 top of plate, the end of the back cord 21, which is fixed on, reinforces screw rod 22;
Shear wall formwork 3 is fixed on vertically above floorboard template plate.
It includes multiple side templates 23 for being hung at 1 top of floorboard template plate that the sedimentation anti-bank in position, which hangs mould 2, described
Back cord 21 is fixed on the top of side template 23.The lower part for reinforcing screw rod 22 is arranged with PVC casing 24.The sedimentation position is anti-
It includes sealing template 25 that bank, which hangs mould 2, and one end of side template 23 Yu 3 junction of shear wall formwork is arranged in the sealing template 25,
The sealing template 25 includes rectangular slab and the triangular prism shape protrusion 251 being arranged in the middle part of rectangular slab, the sealing template 25
Two sides are connected to the end of side template 23.The side template 23 and the face that pours of one end of 3 junction of shear wall formwork are set
There is glued board 26.The glued board 26 with a thickness of 9-11mm.The floorboard template plate 1, the sedimentation anti-bank in position hang 2 and of mould
The material of shear wall formwork 3 is aluminium alloy.
Embodiment 2
A kind of casting method of the anti-bank template in building settlement position, comprising the following steps:
S1: by pouring up for floorboard template plate 1, level, which is laid with, is fixed;
S2: by floorboard reinforcement installation in 1 top of floorboard template plate;
S3: 23 top of each side template that the sedimentation anti-bank in position hangs mould 2 is positioned by multiple back cords 21, at floorboard template bottom
Pre-buried reinforcing screw rod 22 on plate 1, and it is arranged PVC casing 24 in the lower section for reinforcing the exposing of screw rod 22 1 part of floorboard template plate,
The end of back cord 21 is arranged to and is fixed on the upper section for reinforcing screw rod 22, is installed on flooring so that the anti-bank in position will be settled and hang mould 2
The top of plate template plate 1;
S31: side template 23 and 3 junction of shear wall formwork installation sealing template 25 that the anti-bank in position hangs mould 2 will be settled;Institute
State the triangular prism shape protrusion 251 that sealing template 25 includes rectangular slab and is arranged in the middle part of rectangular slab;
S4: it by anti-bank reinforcement installation between the side plate that the sedimentation anti-bank in position hangs mould 2, is fixed with floorboard reinforcing bar;
S5: shear wall formwork 3 is perpendicularly fixed at 1 top of floorboard template plate;
S6: shear force wall reinforcing steel bar is installed between the side plate of shear wall formwork 3;
S7: it hangs in mould 2 and is poured respectively in shear wall formwork 3 mixed to 1 top of floorboard template plate, the sedimentation anti-bank in position
Solidifying soil, so that the anti-bank in sedimentation position, floorboard and the molding of shear wall one-time-concreting.
In conclusion in the anti-bank formwork structure in building settlement position provided by the invention, by before floorboard pours,
Directly hung above floorboard template plate set sedimentation the anti-bank in position hang mould, by back cord position fix, back cord by reinforce spiral shell
Bar is fixed on above floorboard template plate, then installs shear wall formwork, hangs floorboard template plate, the sedimentation anti-bank in position
When mould and shear wall formwork and corresponding reinforcing bar all install, shear wall, floorboard, the sedimentation anti-bank in position are once poured
Type is built up, compared in traditional handicraft, after the completion of floorboard and shear wall pour, anti-bank template is just installed, anti-bank is poured
Mode improves work efficiency, and pours the anti-bank built up and will not leak with floorboard and shear wall junction.By adding
Gu screw rod lower part is arranged PVC casing, on the one hand for obstruct concrete and reinforce screw rod, make the concrete poured will not directly with
Screw rod contact is reinforced, facilitates and reinforces screw rod disassembly reuse, on the other hand, PVC casing, which can play, hangs mould support and mark
The effect of height control.There is the sealing mould of triangular prism shape protrusion by one end setting in side template Yu shear wall formwork junction
Plate, so that the groove that the anti-bank poured and shear wall hinged place form triangular prism shape further avoids to extend penetrating passage
Anti- bank is leaked with shear wall junction.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalents made by bright specification and accompanying drawing content are applied directly or indirectly in relevant technical field, similarly include
In scope of patent protection of the invention.
Claims (10)
1. a kind of anti-bank template in building settlement position, it is characterised in that: include:
Floorboard template plate, the floorboard template plate pour up, and the face of pouring is parallel to the horizontal plane;
The sedimentation anti-bank in position hangs mould, and the top for being located at floorboard template plate is hung by back cord and reinforcing screw rod;The back cord is solid
The top of mould is hung due to the sedimentation anti-bank in position, the reinforcing screw rod is vertically connected at floorboard template plate top, the back cord
End be fixed on reinforcing screw rod;
Shear wall formwork is fixed on vertically above floorboard template plate.
2. the anti-bank template in building settlement position according to claim 1, which is characterized in that the anti-bank in the sedimentation position hangs mould
Including multiple side templates being hung above floorboard template plate, the back cord is fixed on the top of side template.
3. the anti-bank template in building settlement position according to claim 2, which is characterized in that the lower part set for reinforcing screw rod
Equipped with PVC casing.
4. the anti-bank template in building settlement position according to claim 2, which is characterized in that the anti-bank in the sedimentation position hangs mould
Including sealing template, the sealing template-setup is in one end of side template and shear wall formwork junction, the sealing template packet
The two sides of the triangular prism shape protrusion for including rectangular slab and being arranged in the middle part of rectangular slab, the sealing template are connected to side template
End.
5. the anti-bank template in building settlement position according to claim 4, which is characterized in that the side template and shear wall mould
One end of plate junction pours face equipped with glued board.
6. the anti-bank template in building settlement position according to claim 5, which is characterized in that the glued board with a thickness of 9-
11mm。
7. the anti-bank template in building settlement position according to claim 1, which is characterized in that the floorboard template plate,
It is aluminium alloy that the sedimentation anti-bank in position, which hangs mould and the material of shear wall formwork,.
8. a kind of casting method of the anti-bank template in building settlement position, which comprises the following steps:
S1: by pouring up for floorboard template plate, level, which is laid with, is fixed;
S2: by floorboard reinforcement installation in floorboard template plate top;
S3: the anti-bank in position will be settled and hang the top that mould is installed on floorboard template plate;
S4: it by anti-bank reinforcement installation between the side plate that the sedimentation anti-bank in position hangs mould, is fixed with floorboard reinforcing bar;
S5: shear wall formwork is perpendicularly fixed above floorboard template plate;
S6: shear force wall reinforcing steel bar is installed between the side plate of shear wall formwork;
S7: it hangs to floorboard template plate top, the sedimentation anti-bank in position and distinguishes casting concrete in Mo Nei and shear wall formwork, make
The anti-bank in position, floorboard and the molding of shear wall one-time-concreting must be settled.
9. the casting method of the anti-bank template in building settlement position according to claim 8, which is characterized in that the S3 is specific
Are as follows:
S3: each side template top that the sedimentation anti-bank in position hangs mould is positioned by multiple back cords, pre-buried on floorboard template plate
Screw rod is reinforced, and is arranged PVC casing in the lower section for reinforcing screw rod exposing floorboard template plate part, the end of back cord is arranged
And it is fixed on the upper section for reinforcing screw rod, to hang the top that mould is installed on floorboard template plate for the anti-bank in position is settled.
10. the casting method of the anti-bank template in building settlement position according to claim 8, which is characterized in that the S3 it
Afterwards, further include step S31: side template and shear wall formwork junction installation sealing template that the anti-bank in position hangs mould will be settled;Institute
State the triangular prism shape protrusion that sealing template includes rectangular slab He is arranged in the middle part of rectangular slab;
Face installation glued board is poured by settle that the anti-bank in position hangs the side template of mould and one end of shear wall formwork junction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910066632.0A CN109610815A (en) | 2019-01-24 | 2019-01-24 | A kind of anti-bank template in building settlement position and its casting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910066632.0A CN109610815A (en) | 2019-01-24 | 2019-01-24 | A kind of anti-bank template in building settlement position and its casting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109610815A true CN109610815A (en) | 2019-04-12 |
Family
ID=66017220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910066632.0A Pending CN109610815A (en) | 2019-01-24 | 2019-01-24 | A kind of anti-bank template in building settlement position and its casting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109610815A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112412003A (en) * | 2020-10-27 | 2021-02-26 | 中国建筑第四工程局有限公司 | Anti-bank and cast-in-place wall post integration pouring construction template |
CN113700295A (en) * | 2021-09-28 | 2021-11-26 | 晟通科技集团有限公司 | Template and template system |
-
2019
- 2019-01-24 CN CN201910066632.0A patent/CN109610815A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112412003A (en) * | 2020-10-27 | 2021-02-26 | 中国建筑第四工程局有限公司 | Anti-bank and cast-in-place wall post integration pouring construction template |
CN113700295A (en) * | 2021-09-28 | 2021-11-26 | 晟通科技集团有限公司 | Template and template system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104895318B (en) | Aluminum alloy template system and construction method of same | |
CN107700533B (en) | A kind of box quick assembly and disassembly mould piping lane construction technology | |
CN109736353A (en) | Construction method of composite single-side formwork deep foundation pit basement outer wall | |
CN206971270U (en) | Exterior wall formwork system in underground pipe gallery cast-in-place construction | |
CN112854745A (en) | Construction process of assembled building aluminum alloy template | |
CN106869489A (en) | Super High Core Walls Structure level and vertical synchronous construction top module system and construction method | |
CN109610815A (en) | A kind of anti-bank template in building settlement position and its casting method | |
CN106193588B (en) | A kind of method pouring building post-cast strip and pour mould | |
CN109914781A (en) | A kind of monoblock type overlapping board construction method | |
CN206289619U (en) | Guide wall form board mounting structure and wall casting system | |
CN204645727U (en) | A kind of prefabricated toilet | |
CN109441099A (en) | Basement single side formwork system and the method for utilizing its outer wall of basement of constructing | |
CN108457411A (en) | A kind of laminated floor slab and its construction method of assembled architecture | |
CN112627387A (en) | Rib-free type side connection method for prefabricated external wall panel | |
CN103061508A (en) | Triangular slip form device and construction method for the same triangular slip form | |
CN209603489U (en) | A kind of anti-bank template in building settlement position | |
CN208586938U (en) | Light steel frame EPS modular house | |
CN102433894A (en) | Construction method for station side wall by covered top-down excavation method | |
CN109057322A (en) | A kind of cast-in-place concrete early-dismantling formwork system and its construction method | |
CN108979205A (en) | Super high-rise dwelling house structure staggered floor cross construction method | |
CN202831621U (en) | Integrated slipform for silo concrete | |
CN206267520U (en) | A kind of self-supporting post-cast strip is poured with hanging mould | |
CN205976472U (en) | Pour mould of building post -cast strip | |
CN106437146A (en) | Template used for casting floor beam and construction method of floor beam | |
CN1963110A (en) | Construction method for large-space rebuilding and double-girder replacement of bearing wall made of brick and concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200602 Address after: 350000 Fujian Fuzhou high tech Zone Haixi science and Technology East Road universal R & D center 8 layers Applicant after: CHINALCO NANPING ALUMINIUM (FUJIAN) ALUMINUM STRUCTURE TECHNOLOGY DEVELOPMENT Co.,Ltd. Address before: Nanping City, Fujian province 353099 Yanping District Industrial Road No. 91 Applicant before: FUJIAN NANLYU ALUMINUM MOLD TECHNOLOGY Co.,Ltd. |