CN208884991U - Deformation slit formwork - Google Patents

Deformation slit formwork Download PDF

Info

Publication number
CN208884991U
CN208884991U CN201821264668.7U CN201821264668U CN208884991U CN 208884991 U CN208884991 U CN 208884991U CN 201821264668 U CN201821264668 U CN 201821264668U CN 208884991 U CN208884991 U CN 208884991U
Authority
CN
China
Prior art keywords
keel
panel
fixed
keel frame
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821264668.7U
Other languages
Chinese (zh)
Inventor
李栋栋
袁家平
桂家仟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing International Investment Consultation Group Co Ltd
Engineering Management Co Ltd Of Chongqing City
Original Assignee
Chongqing International Investment Consultation Group Co Ltd
Engineering Management Co Ltd Of Chongqing City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing International Investment Consultation Group Co Ltd, Engineering Management Co Ltd Of Chongqing City filed Critical Chongqing International Investment Consultation Group Co Ltd
Priority to CN201821264668.7U priority Critical patent/CN208884991U/en
Application granted granted Critical
Publication of CN208884991U publication Critical patent/CN208884991U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of deformation slit formwork, including panel and keel frame, pulling eye is provided on panel, the bottom of panel is fixed by built-in fitting and wall;Keel frame is fixed on the side of panel, and keel frame includes being mutually perpendicular to fixed more longitudinal keels and multiple groups lateral keel, and every group of lateral keel includes a pair of of the steel pipe being oppositely arranged, and this to being fixed with nut between steel pipe;The top and bottom of keel frame are respectively and fixedly provided with bamboo slab rubber, the top surface of keel frame is provided with suspension hook, the bottom of the bamboo slab rubber and panel that are fixed on keel frame bottom surface is provided with erection slot, and deformation slit formwork is placed on built-in fitting by setting up slot, the bottom of fixed panel and wall;The side of the unlocked keel frame of panel is fixed with screw rod fixing piece, and screw rod fixing piece is for fixing Screw arbor with nut at both-ends.The utility model is readily disassembled, and can be used in turn, and construction efficiency is improved, and guarantees construction safety.

Description

Deformation slit formwork
Technical field
The utility model relates to technical field of building construction, and in particular, to a kind of deformation slit formwork.
Background technique
In some heavy constructions, since building shape becomes increasingly complex, volume is increasing, it is because of unevenness in order to prevent The deformation of the factors such as even sedimentation or temperature change or cracking, are usually arranged deformation joint in architectural design.Deformation joint is expansion joint, sinks The general name of drop seam and aseismic joint, in the construction process, the size of deformation joint is smaller, causes operating space narrow, so that deformation joint Template installs and removes difficulty, and there are problems for deformation joint quality, can bring security risk to concrete formation quality.
Existing deformation slit formwork, be usually utilized in deformation joint filled and process plate or the filling modes such as the lumps of wood make and At still, cystosepiment dismounting is relatively difficult, and cystosepiment is easily deformed, and when pouring, is influenced the structure size of deformation joint, is led The problems such as concrete wall Forming Quality is poor, size is inconsistent is caused, and then influences the safe handling of building.According to plank sheathing or Sandwiched cystosepiment is also not easy to guarantee the structure size of deformation joint as deformation slit formwork among steel plate, and is not easy to remove seam internal model Plate.
Utility model content
In view of problem above, the purpose of the utility model is to provide a kind of deformation slit formworks, to solve existing deformation slit die Plate is not easy to guarantee the structure size of deformation joint, and is not easy the problem of removing.
To achieve the goals above, the utility model uses following technical scheme:
Deformation slit formwork described in the utility model carries out drawknot by Screw arbor with nut at both-ends and fixes, including panel and keel frame Frame is provided with pulling eye on the panel, and the pulling eye is used to pass through the panel for the Screw arbor with nut at both-ends, the panel Bottom is fixed by built-in fitting and wall;The keel frame is fixed on the side of the panel, and the keel frame includes phase Mutually vertical fixed more longitudinal keels and multiple groups lateral keel, between lateral keel described in the more longitudinal keels and multiple groups is equal Every setting, every group of lateral keel includes a pair of of the steel pipe being oppositely arranged, and this to nut is fixed between steel pipe, for described right Screw rod is drawn to pass through;The top and bottom of the keel frame are respectively and fixedly provided with bamboo slab rubber, and the top surface of keel frame is provided with suspension hook, Gu It is provided with erection slot due to the bamboo slab rubber of the keel frame bottom surface and the bottom of panel, it will be described by the erection slot Deformation slit formwork is placed on built-in fitting, the bottom of the fixed panel and wall;The side of the unlocked keel frame of panel Face is fixed with screw rod fixing piece, and the screw rod fixing piece is for fixing Screw arbor with nut at both-ends.
Preferably, the screw rod fixing piece is inner thread sleeve.
Preferably, the Screw arbor with nut at both-ends and the deformation slit formwork junction are provided with rubber washer.
Preferably, the keel frame further includes reinforcing keel, the week reinforced keel and be set to the keel frame Side.
Preferably, the reinforcing keel are one of square steel, angle steel and channel steel or a variety of.
Preferably, the reinforcing keel are two channel steels being set side by side, and two channel steels fit together to form I-shaped Type.
Preferably, the keel frame further includes multiple supporting blocks, and the keel frame is being fixed in the supporting block setting On the bamboo slab rubber of frame bottom surface, it is provided with through-hole in the supporting block, is provided with screw thread in through-hole.
Preferably, supporting sleeve is arranged on the Screw arbor with nut at both-ends.
Compared with prior art, the utility model has the following advantages and beneficial effects:
The utility model determines the structure size of deformation slit formwork by the combination of panel and keel frame, and by dragon The components such as the nut and screw rod fixing piece that are arranged in bone frame fix Screw arbor with nut at both-ends, so that the deformation slit formwork is readily disassembled, It can be used in turn, improve construction efficiency, guarantee construction safety.The utility model structure is simple, and it is convenient to operate, easy to process.
Detailed description of the invention
Fig. 1 is deformation slit formwork structural schematic diagram described in the utility model;
Fig. 2 is the utility model construction and installation overall structure diagram.
Specific embodiment
Embodiment described in the utility model described below with reference to the accompanying drawings.Those skilled in the art can recognize Know, it, can be with a variety of different modes or combinations thereof to institute without departing from the spirit and scope of the utility model The embodiment of description is modified.Therefore, attached drawing and description are regarded as illustrative in nature, rather than for limiting claim Protection scope.In addition, in the present specification, attached drawing is drawn not in scale, and identical appended drawing reference indicates identical portion Point.
The present embodiment is described in detail below with reference to Fig. 1 and Fig. 2.
Fig. 1 is deformation slit formwork structural schematic diagram described in the utility model, and Fig. 2 is that the utility model construction and installation are integrally tied Structure schematic diagram, as depicted in figs. 1 and 2, deformation slit formwork 100 described in the utility model, including panel and keel frame, pass through Screw arbor with nut at both-ends 1 carries out drawknot and fixes, and panel is contacted with concrete wall 2 to be poured, and is prevented from pouring deformation, is provided on panel Pulling eye, pulling eye are used to pass through panel for Screw arbor with nut at both-ends 1, and the shape of pulling eye and the cross sectional shape of Screw arbor with nut at both-ends 1 are adapted, The bottom of panel is fixed by built-in fitting 3 with wall, and built-in fitting 3 can be studdle, convenient for panel and wall installation and Disassembly;Keel frame is fixed on the side of panel, and keel frame includes being mutually perpendicular to fixed more longitudinal keels 4 and multiple groups cross To keel 5, more longitudinal keels 4 and multiple groups lateral keel 5 are spaced setting, and formation is latticed, and every group of lateral keel 5 includes phase To a pair of of steel pipe of setting, and this to nut 6 is fixed between steel pipe, passed through for Screw arbor with nut at both-ends 1;The top surface of keel frame and Bottom surface is respectively and fixedly provided with bamboo slab rubber 7, and the top surface of keel frame is provided with suspension hook 8, and the installation convenient for deformation slit formwork is in place and hangs out, The bottom of the bamboo slab rubber 7 and panel that are fixed on keel frame bottom surface, which is provided with, sets up slot 9, by setting up slot 9 for deformation joint Template erection is on built-in fitting 3, the bottom of fixed panel and wall;It is solid that the side of the unlocked keel frame of panel is fixed with screw rod Determine part, screw rod fixing piece is for fixing Screw arbor with nut at both-ends 1.Wherein, bamboo slab rubber 7 can be connected by bolt or screw rod and keel frame Fixation is connect, setting up slot 9 can be bar shaped groove, sets up the size of slot 9 depending on the size of built-in fitting, built-in fitting 3 is placed In setting up in slot 9 and will not shake, thus fixed panel and wall.
The utility model determines the structure size of deformation slit formwork by the combination of panel and keel frame, and by dragon The components such as the nut and screw rod fixing piece that are arranged in bone frame fix Screw arbor with nut at both-ends, so that the deformation slit formwork is readily disassembled, It can be used in turn, improve construction efficiency, guarantee construction safety, and solve the problems, such as that narrow positions formwork is inconvenient.
In one embodiment of the utility model, suspension hook 8 can be the shapes such as inverted u-shaped hanging ring, ellipse or circle, It can be formed by bar bending, the bottom of U-shaped opening end and ellipse or round suspension hook is welded on the cross of keel frame top surface To on keel or longitudinal keel, alternatively, suspension hook 8 can also be welded on the top surface of panel.
In one embodiment of the utility model, screw rod fixing piece is inner thread sleeve, or is placed in the spiral shell of panel itself Mother, Screw arbor with nut at both-ends 1 are threadedly coupled with screw rod fixing piece, convenient for the installation and removal of Screw arbor with nut at both-ends.The utility model is also not necessarily limited to This, for example, in another embodiment, screw rod fixing piece includes fixinig plate, fixinig plate is welded on panel, is opened on fixinig plate Equipped with through-hole, internal screw thread is provided in through-hole.Constitute the inner thread sleeve of screw rod fixing piece and the center line of internal thread through hole The center line of nut is located on same axis between lateral keel, be for passing through for Screw arbor with nut at both-ends, and it is fixed to drawing spiral shell Bar.
In order to prevent in placing concrete, spillage concrete binding Screw arbor with nut at both-ends, it is preferable that Screw arbor with nut at both-ends and deformation joint Connection part of templates is provided with rubber washer.
In order to further improve the structural strength and rigidity of deformation slit formwork, in one embodiment of the utility model In, keel frame further includes reinforcing keel 10, reinforces the periphery that keel 10 are set to keel frame.Reinforce keel 10 and laterally dragon Bone 5 and longitudinal keel 4 are welded and fixed, and reinforcing keel 10 can be one of square steel, angle steel and channel steel or a variety of.Further Ground, it is preferable that reinforcing keel 10 is two channel steels being set side by side, and two channel steels fit together to be formed it is I-shaped.
In one embodiment of the utility model, the keel frame further includes multiple supporting blocks 11, the supporting block 11 are arranged on the bamboo slab rubber 7 for being fixed on the keel frame bottom surface, and through-hole is provided in supporting block 11, is provided with spiral shell in through-hole Line can further fix bottom and the wall of the deformation slit formwork by the internal screw thread that bolt passes through the supporting block, and Convenient for the installation and removal of the deformation slit formwork.
It is fixed as shown in Fig. 2, deformation slit formwork described in the utility model carries out drawknot by Screw arbor with nut at both-ends, deformation slit formwork Positioned at the inside of concrete wall 2 to be poured, the outside of concrete wall 2 to be poured is provided with plank 12, in plank It is provided with bamboo slab rubber between concrete wall 2 to be poured, to ensure the pouring molding quality of concrete wall to be poured. Screw arbor with nut at both-ends 1 passes through the screw rod fastener of plank 12 and deformation slit formwork and the nut 6 in lateral keel gap, and in plank 12 Outside and the outside of keel frame Screw arbor with nut at both-ends 1 is fastened and fixed, using steel pipe frame 13, fixed fastener 14 and Nut is fastened and fixed the both ends of Screw arbor with nut at both-ends 1.It is covered at the position that Screw arbor with nut at both-ends 1 passes through concrete wall 2 to be poured It equipped with supporting sleeve 15, lumps together to avoid Screw arbor with nut at both-ends with the concrete poured, convenient for being removed to deformation slit formwork When, remove Screw arbor with nut at both-ends.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, for this field Technical staff for, various modifications and changes may be made to the present invention.Within the spirit and principle of the utility model, Any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (8)

1. a kind of deformation slit formwork carries out drawknot by Screw arbor with nut at both-ends and fixes, which is characterized in that including panel and keel frame Frame,
Pulling eye is provided on the panel, the pulling eye is used to pass through the panel, the panel for the Screw arbor with nut at both-ends Bottom fixed by built-in fitting and wall;
The keel frame is fixed on the side of the panel, and the keel frame includes being mutually perpendicular to the longitudinal dragon of fixed more Bone and multiple groups lateral keel, lateral keel described in the more longitudinal keels and multiple groups are spaced setting, every group of lateral keel packet Include a pair of of the steel pipe being oppositely arranged, and this to nut is fixed between steel pipe, passed through for the Screw arbor with nut at both-ends;The keel frame The top and bottom of frame are respectively and fixedly provided with bamboo slab rubber, and the top surface of keel frame is provided with suspension hook, are fixed on the keel frame bottom surface Bamboo slab rubber and the bottom of panel be provided with erection slot, the deformation slit formwork is placed in by the erection slot pre-buried On part, the bottom of the fixed panel and wall;
The side of the unlocked keel frame of panel is fixed with screw rod fixing piece, and the screw rod fixing piece is for fixed to drawing spiral shell Bar.
2. deformation slit formwork according to claim 1, which is characterized in that the screw rod fixing piece is inner thread sleeve.
3. deformation slit formwork according to claim 1, which is characterized in that the Screw arbor with nut at both-ends and the deformation slit formwork connect The place of connecing is provided with rubber washer.
4. deformation slit formwork according to claim 1, which is characterized in that the keel frame further includes reinforcing keel, institute It states and reinforces the periphery that keel are set to the keel frame.
5. deformation slit formwork according to claim 4, which is characterized in that the reinforcing keel are square steel, angle steel and channel steel One of or it is a variety of.
6. deformation slit formwork according to claim 4, which is characterized in that the reinforcing keel are two slots being set side by side Steel, and two channel steels fit together to be formed it is I-shaped.
7. deformation slit formwork according to claim 1, which is characterized in that the keel frame further includes multiple supporting blocks, The supporting block is arranged on the bamboo slab rubber for being fixed on the keel frame bottom surface, and through-hole, through-hole are provided in the supporting block Inside it is provided with screw thread.
8. deformation slit formwork according to claim 1, which is characterized in that be arranged with supporting sleeve on the Screw arbor with nut at both-ends.
CN201821264668.7U 2018-08-07 2018-08-07 Deformation slit formwork Active CN208884991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821264668.7U CN208884991U (en) 2018-08-07 2018-08-07 Deformation slit formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821264668.7U CN208884991U (en) 2018-08-07 2018-08-07 Deformation slit formwork

Publications (1)

Publication Number Publication Date
CN208884991U true CN208884991U (en) 2019-05-21

Family

ID=66508259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821264668.7U Active CN208884991U (en) 2018-08-07 2018-08-07 Deformation slit formwork

Country Status (1)

Country Link
CN (1) CN208884991U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453911A (en) * 2019-09-06 2019-11-15 伍伟中 Closing type erecting formwork system and construction method thereof
CN112681727A (en) * 2020-12-16 2021-04-20 中国建筑第八工程局有限公司 Template structure of special-shaped column in limited space and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453911A (en) * 2019-09-06 2019-11-15 伍伟中 Closing type erecting formwork system and construction method thereof
CN110453911B (en) * 2019-09-06 2023-09-08 伍伟中 Door-closing type supporting formwork system and construction method thereof
CN112681727A (en) * 2020-12-16 2021-04-20 中国建筑第八工程局有限公司 Template structure of special-shaped column in limited space and construction method thereof

Similar Documents

Publication Publication Date Title
CN205713080U (en) A design mould for making dual shear force wall in expansion joint department
CN207347929U (en) Crash barrier template structure and anticollision barrier casting system
CN105625186B (en) A kind of heavy in section concrete Y shape pillar construction method
CN108756227A (en) The structure on two sides and its construction method of a kind of concrete column support top post-cast strip
CN202017346U (en) Late poured band hanging formwork structure
CN207419520U (en) Piping lane construction template component
CN208884991U (en) Deformation slit formwork
CN106337559B (en) The morning of formwork-support tears support system and its application method open
CN109322482A (en) A kind of cast-in-place wall column formwork of convenient adjustable reinforces support construction and its construction method
CN206319601U (en) A kind of vertical ruggedized construction of aluminum alloy pattern plate
CN208039827U (en) Building templates fixing device
CN110017023A (en) Collar tie beam construction method based on tool-type regularization concrete collar tie beam formwork erecting structure
CN109356382A (en) Drawing and pulling type deformation joint formwork system and construction method
CN106567538B (en) A kind of positioning mold of toilet concrete flanging
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN107419897A (en) A kind of reinforcing mould of windowsill coping formwork
CN209194995U (en) A kind of cast-in-place wall column formwork reinforcing support construction of convenient adjustable
CN208734084U (en) A kind of aluminum dipping form that stability is strong hangs mould
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN208235942U (en) One kind being used for shear wall interlayer joint part three-stage moldboard reinforcing tool
CN207672995U (en) A kind of In Great Basement late poured band support template
CN110453916A (en) By the arc beam construction method of adjustable arc beams regularization formwork erecting structure
CN110499914A (en) Anti- bank formwork reinforcement built-in fitting, anti-bank formwork reinforcement structure and its construction method
CN110273432A (en) A kind of existing main structure of subway station enlarging construction method
CN205654082U (en) Half tunnel formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant