CN211850727U - Integrated operation platform for cast-in-place shear wall - Google Patents

Integrated operation platform for cast-in-place shear wall Download PDF

Info

Publication number
CN211850727U
CN211850727U CN201922489270.4U CN201922489270U CN211850727U CN 211850727 U CN211850727 U CN 211850727U CN 201922489270 U CN201922489270 U CN 201922489270U CN 211850727 U CN211850727 U CN 211850727U
Authority
CN
China
Prior art keywords
cast
upright post
shear wall
layer
layer main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922489270.4U
Other languages
Chinese (zh)
Inventor
冯颖
匡靓
罗克明
黄华通
黄文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN201922489270.4U priority Critical patent/CN211850727U/en
Application granted granted Critical
Publication of CN211850727U publication Critical patent/CN211850727U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building protection devices, in particular to an integrated operation platform for cast-in-place shear walls, which comprises a guardrail frame, a lower layer main upright post, a lower layer inner upright post, an upper layer main upright post, an inclined strut and a split bolt, wherein the lower layer main upright post is arranged outside a cast shear wall, the lower layer inner upright post is arranged inside the cast shear wall, and the lower layer main upright post and the lower layer inner upright post are connected through the split bolt; the upper-layer main upright column is arranged above the lower-layer main upright column, and the lower end of the upper-layer main upright column is arranged on the outer side of the cast shear wall and is connected with the lower-layer inner upright column through a split bolt; the guardrail frame is arranged on the outer side of the upper-layer main upright post; the shear wall casting device is characterized by further comprising a connecting piece and casting templates for casting and forming the shear wall, wherein the casting templates are arranged between the two adjacent upper-layer main columns in parallel. The utility model discloses an integral type operation platform is used to cast-in-place shear force wall can be used to pour design shear force wall and mountable guardrail frame.

Description

Integrated operation platform for cast-in-place shear wall
Technical Field
The utility model relates to a building protection device technical field especially relates to cast-in-place shear force integral type operation platform for wall.
Background
At present, for the shear wall structure of the fabricated building, the construction is efficient, rapid, energy-saving and environment-friendly; in the aspect of safety protection of floor construction, a simple external guardrail frame is mostly installed on a shear wall; however, if the shear wall is cast in place, a formwork for casting the shear wall needs to be erected on the operation layer, and the simple external guardrail frame cannot be installed. Therefore, there is a need for an integrated operation platform, which can be used for casting and shaping a shear wall and can be provided with an external guardrail frame.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cast-in-place shear force integral type operation platform for wall to prior art's not enough, can be used to pour design shear force wall and mountable external guardrail frame.
In order to achieve the purpose, the integrated operation platform for the cast-in-place shear wall comprises a guardrail frame, and further comprises a lower-layer main stand column, a lower-layer inner stand column, an upper-layer main stand column, an inclined strut and a split bolt, wherein the lower-layer main stand column is arranged on the outer side of a cast shear wall, the lower-layer inner stand column is arranged on the inner side of the cast shear wall, and the lower-layer main stand column and the lower-layer inner stand column are connected through the split bolt;
the upper-layer main upright column is arranged above the lower-layer main upright column, and the lower end of the upper-layer main upright column is arranged on the outer side of the cast shear wall and is connected with the lower-layer inner upright column through a split bolt;
the guardrail frame is arranged on the outer side of the upper-layer main upright post; one end of the diagonal brace is arranged at the bottom of the guardrail frame, and the other end of the diagonal brace is pivoted with the main upright post;
the upper-layer main upright post is arranged at intervals with the upper-layer inner upright post through split bolts;
a plurality of upper-layer main upright columns are arranged at intervals;
the shear wall is characterized by also comprising a connecting piece and pouring templates for pouring and forming the shear wall, wherein the pouring templates are arranged between two adjacent upper-layer main columns in parallel; the upper layer main upright post and the pouring template, and the pouring template are detachably connected through connecting pieces.
Furthermore, still include interim oblique stay cord, the one end of interim oblique stay cord is connected in upper main column, and the other end of interim oblique stay cord is connected in the fashioned floor of pouring.
Furthermore, the lower end parts of the upper inner vertical columns are inserted into the poured floor.
Further, still include the reinforcement backing, the reinforcement backing sets up in the outside of upper main column, and the length direction of upper main column is mutually perpendicular with the length direction of reinforcement backing.
Further, still include the piece of patching, the piece of patching sets up in the lower tip of upper main column, and the piece of patching passes through the bolt to be connected with upper main column, and upper main column passes through the piece of patching to be connected with lower floor's inner column.
Furthermore, a hanging ring is arranged above the guardrail frame.
Further, the connecting piece is a bolt and nut assembly or a pin.
The utility model has the advantages that: the utility model discloses a cast-in-place shear force integral type operation platform for wall installs lower floor's head tree, lower floor's inner prop in order to fix lower floor's head tree in fashioned wall body, and upper layer head tree installs in lower floor's head tree and realizes fixing upper layer head tree to support the guardrail frame. The utility model discloses an integral type operation platform is used to cast-in-place shear force wall, during the guardrail frame on this layer of installation, does not influence the operation of pouring of the cast-in-place shear force wall on this layer. The utility model discloses a cast-in-place shear force is integral type operation platform for wall, it is used for pouring the cast-in-place shear force wall of shaping to pour the template, the utility model discloses a cast-in-place shear force is integral type operation platform for wall can be used to pour design shear force wall and mountable guardrail frame.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a schematic top view of the present invention.
The reference numerals include:
1-guardrail frame 2-lower main upright post 3-lower inner upright post
4-upper layer main upright post 5-inclined strut 6-split bolt
7-temporary stay cable 8-reinforced backtie 9-patch part
10, a hanging ring 11, a pouring template 12 and a connecting piece.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 and 2, the integrated operation platform for cast-in-place shear wall of the present invention comprises a guardrail frame 1, and further comprises a lower main column 2, a lower inner column 3, an upper main column 4, an inclined strut 5, and a tie bolt 6, wherein the lower main column 2 is arranged outside the shear wall which is cast, the lower inner column 3 is arranged inside the shear wall which is cast, and the lower main column 2 and the lower inner column 3 are connected through the tie bolt 6;
the upper-layer main upright post 4 is arranged above the lower-layer main upright post 2, and the lower end of the upper-layer main upright post 4 is arranged on the outer side of the cast shear wall and is connected with the lower-layer inner upright post 3 through a split bolt 6;
the guardrail frame 1 is arranged on the outer side of the upper-layer main upright post 4; one end of the diagonal brace 5 is arranged at the bottom of the guardrail frame 1, and the other end of the diagonal brace 5 is pivoted with the main upright post;
the upper layer inner upright post is arranged at intervals with the upper layer main upright post 4 through a split bolt 6;
a plurality of upper-layer main columns 4 are arranged, and the plurality of upper-layer main columns 4 are arranged at intervals;
the shear wall is characterized by further comprising a connecting piece 12 and pouring templates 11 for pouring and forming the shear wall, wherein the plurality of pouring templates 11 are arranged between two adjacent upper-layer main columns 4 in parallel; the upper-layer main upright post 4 and the pouring template 11, and the pouring template 11 are detachably connected through connecting pieces 12.
The utility model discloses a cast-in-place shear force integral type operation platform for wall installs lower floor's head tree 2, lower floor's inner prop 3 in fashioned wall body with fixed lower floor's head tree 2, and upper layer head tree 4 is installed in lower floor's head tree 2 and is realized fixing upper layer head tree 4 to support guardrail frame 1. The utility model discloses an integral type operation platform is used to cast-in-place shear force wall, when installing guardrail frame 1 on this layer, do not influence the operation of pouring of the cast-in-place shear force wall on this layer. The utility model discloses a cast-in-place shear force is integral type operation platform for wall, pour template 11 and be used for pouring the cast-in-place shear force wall of shaping, the utility model discloses a cast-in-place shear force is integral type operation platform for wall can be used to pour design shear force wall and mountable guardrail frame 1.
Furthermore, still include interim oblique stay cord 7, the one end of interim oblique stay cord 7 is connected in upper main column 4, and the other end of interim oblique stay cord 7 is connected in the floor of having pour the shaping. The utility model discloses a cast-in-place shear force integral type operation platform for wall further improves the stability of upper main upright post 4.
Furthermore, the lower end parts of the upper inner vertical columns are inserted into the poured floor. The utility model discloses a cast-in-place shear force integral type operation platform for wall further improves the stability of upper main upright post 4.
Further, the reinforcing structure further comprises a reinforcing back 8, the reinforcing back 8 is arranged on the outer side of the upper-layer main upright post 4, and the length direction of the upper-layer main upright post 4 is perpendicular to the length direction of the reinforcing back 8. Utility model's cast-in-place shear force integral type operation platform for wall consolidates the back and ties 8 wholeness and the stability that have improved upper main column 4.
Further, still include the piece 9 of piecing together, piece 9 sets up in the lower tip of upper main upright post 4, and piece 9 of piecing together is connected with upper main upright post 4 through the bolt, and upper main upright post 4 is connected with lower floor's inner upright post 3 through piece 9 of piecing together. The utility model discloses an integral type operation platform is used to cast-in-place shear force wall, upper layer head tree 4 and lower floor's head tree 2 can the looks isostructure, carries out to upper layer head tree 4 through piece 9 of mending and pieces together for upper layer head tree 4 can downwardly extending to lower floor's head tree 2's top is with fixed upper layer head tree 4. The utility model discloses a cast-in-place shear force integral type operation platform for wall, it is with low costs.
Further, a hanging ring 10 is arranged above the guardrail frame 1. The utility model discloses a cast-in-place shear force integral type operation platform for wall easily hoists.
Further, the connecting member 12 is a bolt and nut assembly or a pin. The utility model discloses an integral type operation platform is used to cast-in-place shear force wall, bolt and nut subassembly or pin are easily connected and are dismantled and pour template 11.
In conclusion, the present invention has the above-mentioned excellent characteristics, so that it can be used to enhance the effectiveness of the prior art and has practicability, and thus it is a product with practical value.
The above description is only for the preferred embodiment of the present invention, and for those skilled in the art, there are variations on the detailed description and the application scope according to the idea of the present invention, and the content of the description should not be construed as a limitation to the present invention.

Claims (7)

1. Cast-in-place shear force integral type operation platform for wall, including the guardrail frame, its characterized in that: the shear wall comprises a shear wall body and is characterized by further comprising a lower-layer main upright post, a lower-layer inner upright post, an upper-layer main upright post, an inclined strut and a split bolt, wherein the lower-layer main upright post is arranged on the outer side of the shear wall which is cast, the inner side of the shear wall which is cast is arranged on the lower-layer inner upright post, and the lower-layer main upright post and the lower-layer inner upright post are connected through the split;
the upper-layer main upright column is arranged above the lower-layer main upright column, and the lower end of the upper-layer main upright column is arranged on the outer side of the cast shear wall and is connected with the lower-layer inner upright column through a split bolt;
the guardrail frame is arranged on the outer side of the upper-layer main upright post; one end of the diagonal brace is arranged at the bottom of the guardrail frame, and the other end of the diagonal brace is pivoted with the main upright post;
the upper-layer main upright post is arranged at intervals with the upper-layer inner upright post through split bolts;
a plurality of upper-layer main upright columns are arranged at intervals;
the shear wall is characterized by also comprising a connecting piece and pouring templates for pouring and forming the shear wall, wherein the pouring templates are arranged between two adjacent upper-layer main columns in parallel; the upper layer main upright post and the pouring template, and the pouring template are detachably connected through connecting pieces.
2. The integrated operation platform for the cast-in-place shear wall according to claim 1, characterized in that: still include interim oblique stay cord, the one end of interim oblique stay cord is connected in upper main column, and the other end of interim oblique stay cord is connected in the fashioned floor of pouring.
3. The integrated operation platform for the cast-in-place shear wall according to claim 1, characterized in that: the lower end parts of the upper inner-layer upright columns are inserted into the poured floor.
4. The integrated operation platform for the cast-in-place shear wall according to claim 1, characterized in that: the reinforcing device is characterized by further comprising a reinforcing back fastener, wherein the reinforcing back fastener is arranged on the outer side of the upper-layer main stand column, and the length direction of the upper-layer main stand column is perpendicular to the length direction of the reinforcing back fastener.
5. The integrated operation platform for the cast-in-place shear wall according to claim 1, characterized in that: still include the piece of patching, the piece of patching sets up in the lower tip of upper main column, and the piece of patching passes through the bolt to be connected with upper main column, and upper main column passes through the piece of patching to be connected with lower floor's inner column.
6. The integrated operation platform for the cast-in-place shear wall according to claim 1, characterized in that: and a hanging ring is arranged above the guardrail frame.
7. The integrated operation platform for the cast-in-place shear wall according to claim 1, characterized in that: the connecting piece is a bolt and nut assembly or a pin.
CN201922489270.4U 2019-12-31 2019-12-31 Integrated operation platform for cast-in-place shear wall Expired - Fee Related CN211850727U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922489270.4U CN211850727U (en) 2019-12-31 2019-12-31 Integrated operation platform for cast-in-place shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922489270.4U CN211850727U (en) 2019-12-31 2019-12-31 Integrated operation platform for cast-in-place shear wall

Publications (1)

Publication Number Publication Date
CN211850727U true CN211850727U (en) 2020-11-03

Family

ID=73209475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922489270.4U Expired - Fee Related CN211850727U (en) 2019-12-31 2019-12-31 Integrated operation platform for cast-in-place shear wall

Country Status (1)

Country Link
CN (1) CN211850727U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965756A (en) * 2019-12-31 2020-04-07 广西建工集团第五建筑工程有限责任公司 Integrated operation platform for cast-in-situ shear wall and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965756A (en) * 2019-12-31 2020-04-07 广西建工集团第五建筑工程有限责任公司 Integrated operation platform for cast-in-situ shear wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN105971271B (en) Unilateral cantilever form and its construction method of climbing certainly
CN101736893B (en) Overhanging type scaffold supporting system
CN209482679U (en) Tub brace type integral steel platform suitable for sloping core construction
CN109457931A (en) Tub brace type integral steel platform and its construction method suitable for sloping core construction
CN211850727U (en) Integrated operation platform for cast-in-place shear wall
CN109973112A (en) A kind of narrow space tunnel anchorage in super large inclination angle dissipates cable saddle portal frame system and its installation method
CN108374549A (en) A kind of Fast Installation and detachable construction platform
CN203113793U (en) Large formwork installation system of oblique structure
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN109339087A (en) A kind of foundation structure system of low-rise building
CN211850726U (en) Safety protection operation platform for cast-in-situ shear wall
CN208650505U (en) The integrated template type attachment device of lifting platform
CN209145255U (en) A kind of external hanging type scaffold being fixed on traditional structure cycle beam or flange
CN208454342U (en) A kind of safety of tower crane platform and standard knot install conjoined device
CN208563351U (en) A kind of roadbed side slope arched framework ruggedized construction
CN110273432A (en) A kind of existing main structure of subway station enlarging construction method
CN215484618U (en) A pour template structure for assembled shear force wall and post
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN205976412U (en) Integrated platform of encorbelmenting of boundary beam formwork protection
CN209703294U (en) A kind of Collison fence for bridge formwork for placing lifting ruggedized construction
CN213449475U (en) Template structure with early-dismantling supporting seat and matched cross beam
CN209368859U (en) A kind of foundation structure system of low-rise building
CN211873825U (en) Splicing type cast-in-place column large steel die
CN209066490U (en) A kind of dedicated bearing diagonal component of piping lane
CN110965756A (en) Integrated operation platform for cast-in-situ shear wall and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd.

Address before: 545006 No. 167, east ring Avenue, Liuzhou City, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201103

CF01 Termination of patent right due to non-payment of annual fee