CN110259204A - A kind of scenic spot dead wood trunk pool construction method - Google Patents
A kind of scenic spot dead wood trunk pool construction method Download PDFInfo
- Publication number
- CN110259204A CN110259204A CN201910661011.7A CN201910661011A CN110259204A CN 110259204 A CN110259204 A CN 110259204A CN 201910661011 A CN201910661011 A CN 201910661011A CN 110259204 A CN110259204 A CN 110259204A
- Authority
- CN
- China
- Prior art keywords
- main body
- dead wood
- wood trunk
- scenic spot
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H4/00—Swimming or splash baths or pools
- E04H4/0075—Swimming or splash baths or pools made of concrete
- E04H4/0081—Swimming or splash baths or pools made of concrete with walls and floor cast in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of scenic spot dead wood trunk pool construction methods, comprising the following steps: A: setting up skeleton, the skeleton forms hollow housing, and the exterior contour of the skeleton is consistent with dead wood trunk pond shape;B: it is enclosed in the outer surface of the skeleton and sets steel wire;C: it is enclosed in the outer surface of steel wire and sets geotextiles;The first concrete is poured in the cavity of D: Xiang Suoshu skeleton and fills the cavity, after first concrete reaches predetermined strength, obtains the first main body;E: the second concrete is smeared on the surface of first main body and preliminary moulding obtains the second main body after second concrete reaches predetermined strength;F: the surface of second main body is carved, third main body is obtained;G: coloring treatment is carried out to the surface of the third main body, obtains dead wood trunk pond.The present invention substantially increases the whole fidelity in scenic spot dead wood trunk pond;Construction method is simple, easy to operate, substantially increases construction efficiency.
Description
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of scenic spot dead wood trunk pool construction method.
Background technique
Perishable, the easily rotten defect of timber itself, service life are not grown, it is impossible to be used in the outdoor locations such as river, scenic spot.
The dead wood trunk of imitation wood construction method production, can realistically restore the appearance at scenic spot, increase the ornamental dynamics at scenic spot, while can
To save a large amount of timber.
But in existing scenic spot with stream cooperation scenic spot dead wood trunk pond fidelity it is lower, construction it is cumbersome and construct
Efficiency is lower, is unable to satisfy construction demand.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of scenic spot dead wood trunk pool construction methods, can be improved scenic spot
The fidelity in dead wood trunk pond, and make construction method simple to operation, and be conducive to improve construction efficiency.
In order to solve the above technical problem, the present invention provides technical solution it is as follows:
A kind of scenic spot dead wood trunk pool construction method, comprising the following steps:
A: setting up skeleton, and the skeleton forms hollow housing, the exterior contour of the skeleton and dead wood trunk pond shape
Unanimously;
B: it is enclosed in the outer surface of the skeleton and sets steel wire;
C: it is enclosed in the outer surface of steel wire and sets geotextiles;
The first concrete is poured in the cavity of D: Xiang Suoshu skeleton and fills the full cavity, reaches pre- to first concrete
After determining intensity, the first main body is obtained;
E: smearing the second concrete and preliminary moulding on the surface of first main body, reaches predetermined strong to second concrete
After degree, the second main body is obtained;
F: the surface of second main body is carved, third main body is obtained;
G: coloring treatment is carried out to the surface of the third main body, obtains dead wood trunk pond.
Further, in the step C, the geotextiles are formed by overlapping by muti-piece and lap-joint uses and is adhesively fixed, phase
The lap of splice of adjacent two pieces of geotextiles is not less than 5cm.
Further, in the step D, first concrete includes the component of following parts by weight: 1 part of cement, 2
The fine sand of part and the pellet of 3 parts of 0.6 ~ 2.5cm.
Further, in the step E, the second concrete is smeared on the surface of first main body and preliminary moulding includes
Following steps:
E1: after the surface wettability of first main body, bottom cement mortar is smeared on the surface of first main body;
E2: it after bottom cement mortar smearing is completed to the first setting time, is smeared on bottom cement mortar surface
Waterproof cement mortar;
E3: it after waterproof cement mortar smearing is completed to the second setting time, is smeared on the waterproof cement mortar surface
Moulding cement mortar, and preliminary moulding is carried out to moulding cement mortar.
Further, in the step E3, the smearing thickness of the moulding cement mortar is 20~50mm.
Further, in the step G, the method for carrying out coloring treatment to the surface of the third main body includes: in institute
The surface spraying alkali-resistant primer for stating third main body forms prime coat, then according to design keynote color spraying mill base shape on prime coat
At color paste layer, the last brushing protective coating on color paste layer.
Further, when brushing protective coating by the way of multiple multilayer brushing, adjacent brushing direction twice is mutually hung down
Directly.
Further, the protective coating uses transparent watertight coating.
Further, the mill base is mainly deployed by weatherability mill base and emulsion paint.
Further, it is further comprised the steps of: before the step A
S1: surveying setting-out determines the position in dead wood trunk pond;
S2: anti-fluid barrier is built in the position in dead wood trunk pond.
The invention has the following advantages:
Texture is true to nature, sturdy and durable, non-maintaining, and fidelity is high, is stale-proof, is non-ignitable, is indeformable, service life is long;
Simple and convenient, easily operated, the construction time is shorter, has practical value;
In accordance with natural environment is carved, achievees the effect that beauty.
Specific embodiment
The present invention is further explained in the light of specific embodiments, so that those skilled in the art can be preferably
Understand the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
A kind of scenic spot dead wood trunk pool construction method, comprising the following steps:
S1: wall unwrapping wire: before in construction, according to the absolute altitude and data of drawing, unwrapping wire engineering is carried out, finds masonry sideline accurately, closed
Reason utilizes intermountain barren rock, carries out basic paving;
S2: it builds anti-fluid barrier: building anti-fluid barrier near the mountain using steel pipe, prevent massif water in construction from flowing into boundary of works area;
A: setting up skeleton, and the skeleton forms hollow housing, the exterior contour of the skeleton and dead wood trunk pond shape
Unanimously, wherein specification can be used to carry out the binding of dead wood trunk longitudinal framework reinforcing bar for the plain bar of 8@150 of Φ, using Φ
Stirrup of the plain bar of 6@200 as longitudinal framework reinforcing bar;
B: it is enclosed in the outer surface of the skeleton and sets steel wire, wherein can bound using galvanized steel wire netting in the skeleton being welded
On, galvanized steel wire netting specification are as follows: tied silk is the cold galvanizing tied silk of 20#, and tied silk diameter 0.3mm, mesh specification is 0.4x0.4cm;
C: it is enclosed in the outer surface of steel wire and sets geotextiles, wherein the geotextiles non-woven geotextile high using tensile strength uses 20#
Cold galvanizing tied silk is sturdy with skeleton geotextiles, prevents the first concrete loss when carrying out dead wood trunk profile and pouring;
The first concrete is poured in the cavity of D: Xiang Suoshu skeleton and fills the full cavity, reaches pre- to first concrete
After determining intensity, the first main body is obtained;
E: the second concrete and preliminary moulding are smeared on the surface (Geotextile) of first main body, to second coagulation
After soil reaches predetermined strength, the second main body is obtained;
F: carving the surface of second main body, and trees texture needs experienced master worker to construct, according to true
Trees texture, imitate tree texture trend, depict the growth characteristics such as tree node, bark, obtain third main body;
G: coloring treatment is carried out to the surface of the third main body, obtains dead wood trunk pond.
In one optional embodiment of the present embodiment, in the step C, geotextiles are formed by overlapping by muti-piece and lap-joint adopts
It is fixed with bonding mode, the lap of splice (overlap length) of adjacent two pieces of geotextiles is not less than 5cm, to guarantee connection reliability.
Wherein, the lap-joint of adjacent two pieces of geotextiles passes through adhesion coating caking of oil.It answers paving on one wire when geotextiles paving and should protect
Card paving is smooth and avoids wrinkle, paving again after then cutting off geotextiles knee such as turning.For example, if generating folding in being laid with
When wrinkle height is 2cm, then this part wrinkle should be cut, then overlap joint gets up along laying direction again, and is glued with sticking layer oil.
In one optional embodiment of the present embodiment, in the step D, first concrete includes following parts by weight
Component: the pellet of 1 part of cement, 2 parts of fine sand and 3 parts of 0.6 ~ 2.5cm.
In one optional embodiment of the present embodiment, in the step E, it is mixed that second is smeared on the surface of first main body
Solidifying soil and preliminary moulding the following steps are included:
E1: after the surface wettability of first main body, bottom cement mortar, bottom water are smeared on the surface of first main body
M7.5, smearing thickness 2cm can be selected in the grade of compressive strength of cement mortar;
E2: (so that bottom cement mortar reaches setting by force after bottom cement mortar smearing is completed to the first setting time
Degree), the first setting time can be used 24 hours, smear waterproof cement mortar in bottom cement mortar to play preferable waterproof
Colour fixation, the proportion of cement and sand is 1:3 in waterproof cement mortar;
E3: (so that waterproof cement mortar reaches setting by force after waterproof cement mortar smearing is completed to the second setting time
Degree), the second setting time can be used 24 hours, smear moulding cement mortar on waterproof cement mortar surface, and to moulding cement
Mortar carries out preliminary moulding, and preliminary moulding should make the moulding of imitation wood fine and smoothly, tentatively make the shape of trees, carves for wood grain
Quarter lays a good foundation.
In one optional embodiment of the present embodiment, the smearing thickness of moulding cement mortar is 20~50mm in step E3,
In order to subsequent moulding, modeling effect is promoted while proof strength.
By the above process it is found that the slurry smeared in geotextiles includes bottom cement mortar, waterproof cement mortar and makes
Type cement mortar repeatedly smears mode using layering, can both guarantee that the structural strength of mortar in order to subsequent moulding, is gone back simultaneously
Preferable tint retention is played to subsequent coloring.
In one optional embodiment of the present embodiment, in the step G, the surface of the third main body is carried out at coloring
The method of reason includes: first in third body surfaces spraying alkali-resistant primer formation prime coat, then according to design keynote on prime coat
Color spraying mill base forms color paste layer, finally the brushing protective coating on color paste layer, so that the color after the completion of colouring is more held
Long, and polishing effect is presented, while color paste layer can be protected, prevent the damage exposed to the sun and rain to color paste layer.
Wherein, it is wet that watering should be carried out to base before carrying out coloring treatment, reach wet and without water mark, Yi Mianliu
Slurry.
In one optional embodiment of the present embodiment, mill base includes cement, pigment, glue and water, cement, pigment, glue
With the weight proportion of water are as follows: 2:1:1:10.
In one optional embodiment of the present embodiment, mill base is mainly deployed by weatherability mill base and emulsion paint, to mention
, there is larger color difference in high mill base antiageing effect after avoiding mill base from being used for a long time.
It is adjacent when brushing protective coating by the way of multiple multilayer brushing in one optional embodiment of the present embodiment
Brushing direction twice is perpendicular, to guarantee the brushing uniformity and richness.Following methods can be used when specific brushing: in mill base
Layer is brushed after terminating 24 hours, and the brushing of first time protective coating is carried out, and brushing direction is laterally;6 to the end of brushing for the first time
(guarantee that the protective coating brushed for the first time is completely dried) after~8 hours, the brushing of second of protective coating, brushing side are carried out
To be longitudinal, spontaneously dried after brushing.
Wherein, when brushing protective coating, construction temperature should be not less than 5 DEG C, and ambient humidity is not higher than 85%.Rainy front and back is not
Protective coating brushing is preferably carried out, can be brushed after color paste layer is dry after rain, should be kept away in 24 hours after the completion of final brushing
Exempt to drench with rain to prevent white spotted finiss and influence using effect;First doing at joint filling when being greater than the gap of 2mm or more occurs in color paste layer
Reason, carries out protective coating brushing, again then to prevent protective coating can not efficient drying;Never coating is brushed every time to accumulate, with
Coating is avoided to accumulate and cause to crack.
In one optional embodiment of the present embodiment, protective coating uses transparent watertight coating, and theoretical coated weight is 8~10
m²/L。
Embodiment described above is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection model of the invention
It encloses without being limited thereto.Those skilled in the art's made equivalent substitute or transformation on the basis of the present invention, in the present invention
Protection scope within.Protection scope of the present invention is subject to claims.
Claims (10)
1. a kind of scenic spot dead wood trunk pool construction method, which comprises the following steps:
A: setting up skeleton, and the skeleton forms hollow housing, the exterior contour of the skeleton and dead wood trunk pond shape
Unanimously;
B: it is enclosed in the outer surface of the skeleton and sets steel wire;
C: it is enclosed in the outer surface of steel wire and sets geotextiles;
The first concrete is poured in the cavity of D: Xiang Suoshu skeleton and fills the full cavity, reaches pre- to first concrete
After determining intensity, the first main body is obtained;
E: smearing the second concrete and preliminary moulding on the surface of first main body, reaches predetermined strong to second concrete
After degree, the second main body is obtained;
F: the surface of second main body is carved, third main body is obtained;
G: coloring treatment is carried out to the surface of the third main body, obtains dead wood trunk pond.
2. scenic spot dead wood trunk pool construction method as described in claim 1, which is characterized in that in the step C, the soil
Work cloth is formed by overlapping by muti-piece and lap-joint is using being adhesively fixed, and the lap of splice of adjacent two pieces of geotextiles is not less than 5cm.
3. scenic spot dead wood trunk pool construction method as described in claim 1, which is characterized in that in the step D, described
One concrete includes the component of following parts by weight: the pellet of 1 part of cement, 2 parts of fine sand and 3 parts of 0.6 ~ 2.5cm.
4. scenic spot dead wood trunk pool construction method as described in claim 1, which is characterized in that in the step E, described
The surface of first main body smear the second concrete and preliminary moulding the following steps are included:
E1: after the surface wettability of first main body, bottom cement mortar is smeared on the surface of first main body;
E2: it after bottom cement mortar smearing is completed to the first setting time, is smeared on bottom cement mortar surface
Waterproof cement mortar;
E3: it after waterproof cement mortar smearing is completed to the second setting time, is smeared on the waterproof cement mortar surface
Moulding cement mortar, and preliminary moulding is carried out to moulding cement mortar.
5. scenic spot dead wood trunk pool construction method as claimed in claim 4, which is characterized in that described in the step E3
The smearing thickness of moulding cement mortar is 20~50mm.
6. scenic spot dead wood trunk pool construction method as described in claim 1, which is characterized in that in the step G, to described
The method that the surface of third main body carries out coloring treatment includes: to form priming paint in the surface of third main body spraying alkali-resistant primer
Layer, then color paste layer, finally the brushing protective coating on color paste layer are formed according to design keynote color spraying mill base on prime coat.
7. scenic spot dead wood trunk pool construction method as claimed in claim 6, which is characterized in that used when brushing protective coating
The mode of multiple multilayer brushing, adjacent brushing direction twice are perpendicular.
8. scenic spot dead wood trunk pool construction method as claimed in claim 6, which is characterized in that the protective coating is using saturating
Bright waterproof coating.
9. scenic spot dead wood trunk pool construction method as claimed in claim 6, which is characterized in that the mill base is mainly by weather-proof
Property mill base and emulsion paint are deployed.
10. scenic spot dead wood trunk pool construction method as described in claim 1, which is characterized in that also wrapped before the step A
Include step:
S1: surveying setting-out determines the position in dead wood trunk pond;
S2: anti-fluid barrier is built in the position in dead wood trunk pond.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910661011.7A CN110259204A (en) | 2019-07-22 | 2019-07-22 | A kind of scenic spot dead wood trunk pool construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910661011.7A CN110259204A (en) | 2019-07-22 | 2019-07-22 | A kind of scenic spot dead wood trunk pool construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110259204A true CN110259204A (en) | 2019-09-20 |
Family
ID=67927599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910661011.7A Pending CN110259204A (en) | 2019-07-22 | 2019-07-22 | A kind of scenic spot dead wood trunk pool construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110259204A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030077056A (en) * | 2002-03-25 | 2003-10-01 | 박정숙 | Artificial tree |
CN101804661A (en) * | 2010-03-30 | 2010-08-18 | 蔡豪佳 | Method for building simulated and pseudoclassic buildings with cement |
CN104890434A (en) * | 2015-04-09 | 2015-09-09 | 北京天一众合环境工程有限公司 | Plastic-stone landscape making method |
CN105774362A (en) * | 2014-12-19 | 2016-07-20 | 曹铸臣 | Method for manufacturing landscape sculpture by adopting foam concrete |
CN107554178A (en) * | 2017-10-17 | 2018-01-09 | 绍兴壹佳建设有限公司 | A kind of artificial hillock construction method |
CN109572303A (en) * | 2018-11-29 | 2019-04-05 | 四川国鼎建筑设计有限公司 | A kind of man-made tourist site manufacturing method |
-
2019
- 2019-07-22 CN CN201910661011.7A patent/CN110259204A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030077056A (en) * | 2002-03-25 | 2003-10-01 | 박정숙 | Artificial tree |
CN101804661A (en) * | 2010-03-30 | 2010-08-18 | 蔡豪佳 | Method for building simulated and pseudoclassic buildings with cement |
CN105774362A (en) * | 2014-12-19 | 2016-07-20 | 曹铸臣 | Method for manufacturing landscape sculpture by adopting foam concrete |
CN104890434A (en) * | 2015-04-09 | 2015-09-09 | 北京天一众合环境工程有限公司 | Plastic-stone landscape making method |
CN107554178A (en) * | 2017-10-17 | 2018-01-09 | 绍兴壹佳建设有限公司 | A kind of artificial hillock construction method |
CN109572303A (en) * | 2018-11-29 | 2019-04-05 | 四川国鼎建筑设计有限公司 | A kind of man-made tourist site manufacturing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104773023B (en) | The close net of barricade adhesion type steelframe now moulds GRC artificial hillocks and its construction method | |
CN106088109B (en) | Discarded pit slope ecological recovery covers green construction method | |
CN104233916A (en) | Preparation method of color ecological permeable floor | |
CN110271355A (en) | A kind of construction method of plastic stone rockery | |
CN106630805A (en) | Imitation stone concrete decorative boards and preparation method thereof | |
CN101804661A (en) | Method for building simulated and pseudoclassic buildings with cement | |
CN108412093A (en) | A kind of Modern Landscape decoration loam wall and its construction method | |
CN106630819A (en) | Anti-efflorescence sea water coral aggregate concrete block | |
CN204774343U (en) | Barricade adheres to close net of formula steelframe and moulds GRC artificial hillock at present | |
KR101287150B1 (en) | Using waste materials architectural molding composition construction methods and the structural and composition | |
CN110259204A (en) | A kind of scenic spot dead wood trunk pool construction method | |
CN110179191A (en) | A kind of cement artificial tree and terrain effect manufacture craft | |
CN105818604A (en) | Life tree and construction method thereof | |
KR101172007B1 (en) | Making method of imitation stone | |
JP5785185B2 (en) | Manufacturing method and greening method of moss panel for greening | |
CN109797568A (en) | The preparation method of sandstone patch stone | |
CN103266746A (en) | Manufacturing and installation method for molded limestone | |
Onderdonk | The Ferro-concrete Style: Reinforced Concrete in Modern Architecture, with Four Hundred Illustrations of European and American Ferro-concrete Design | |
CN206784148U (en) | A kind of concrete imitation wooden footway | |
JP2021109881A (en) | Concrete decorative agent, concrete decorative member, and method for producing concrete decorative agent | |
CN109056983A (en) | The construction method of water scenery essay | |
CN106758682B (en) | A kind of ecology wooden footway structure and its technique | |
KR102511347B1 (en) | PRC artificial rock laminate structure and construction method of PRC artificial rock including same | |
CN109025167A (en) | A kind of construction method of colour die floor | |
CN109424191A (en) | Based on to marble, the granite laying process in building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |