KR101287150B1 - Using waste materials architectural molding composition construction methods and the structural and composition - Google Patents

Using waste materials architectural molding composition construction methods and the structural and composition Download PDF

Info

Publication number
KR101287150B1
KR101287150B1 KR1020090128169A KR20090128169A KR101287150B1 KR 101287150 B1 KR101287150 B1 KR 101287150B1 KR 1020090128169 A KR1020090128169 A KR 1020090128169A KR 20090128169 A KR20090128169 A KR 20090128169A KR 101287150 B1 KR101287150 B1 KR 101287150B1
Authority
KR
South Korea
Prior art keywords
construction
model
basic
water
frame
Prior art date
Application number
KR1020090128169A
Other languages
Korean (ko)
Other versions
KR20110071558A (en
Inventor
이강혁
이원재
이정은
이복이
Original Assignee
이강혁
이원재
이복이
이정은
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이강혁, 이원재, 이복이, 이정은 filed Critical 이강혁
Priority to KR1020090128169A priority Critical patent/KR101287150B1/en
Publication of KR20110071558A publication Critical patent/KR20110071558A/en
Application granted granted Critical
Publication of KR101287150B1 publication Critical patent/KR101287150B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C5/00Processes for producing special ornamental bodies
    • B44C5/06Natural ornaments; Imitations thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D1/00Processes for applying liquids or other fluent materials
    • B05D1/02Processes for applying liquids or other fluent materials performed by spraying
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C3/00Processes, not specifically provided for elsewhere, for producing ornamental structures
    • B44C3/02Superimposing layers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44FSPECIAL DESIGNS OR PICTURES
    • B44F3/00Designs characterised by outlines

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 발명은 조형건축 및 조형물을 시공함에 있어서, 각종 생활 폐자재를 재활용하여 다양한 형상의 조형물은 물론 조형건축을 하기 위한 재활용자재를 이용한 조형건축물 시공방법과 그 구조 및 조성물에 관한 것으로, 각종 조형건축물이나 조형물을 시공함에 있어서, 조형건축물의 자리 잡기 위한 터파기 후 트러스 지주 보 바닥 외 기초구조를 시공함에 있어 조형건축물의 규모와 하중, 지진내구성, 기후 조건, 건축 환경에 따라 조형건축물의 전체형태를 유지하며 잡아 줄 수 있는 기본골격(뼈대) 즉 전체모형 기초 틀은 철재, 철근콘크리트, 목재 등 각종 다양한 자재를 활용하는 복합시공 구조로 하는 기본골격시공공정과, 상기 기본골격시공공정에서 얻어진 기본골격에 건축폐자재 중 주로 목재 각재를 사용하여 원하는 모형에 맞추어 기본틀을 세로로 세워 부착하고 모형의 외형 쪽으로 세부적인 모형을 만들기 위하여 전체 외부모형을 잡아주기 위한 지지대를 가로로 설치하여 폐 목각재를 부착하여 세부모형에 필요한 기본틀을 잡는 모형 기본틀 구성공정과, 상기 모형 기본틀 구성공정에서 세로로 세워져서 기본틀을 구성하는 폐 목각재 사이에 단열과 방음을 위한 단열재를 별도의 블럭으로 제작하여 쌓거나 반죽한 상태에서 직접 쌓아서 구성하는 단열재시공공정과, 상기 단열재 시공공정에서 세로로 세워진 기본틀 폐 목각재 사이에 단열시공한 모형 기본틀에 폐 합판을 10~20cm 정도로 길게 절단재단 하여 서로 연결하여 부착하는 기본틀보강공정과, 상기 기본틀보강공정에서 보강된 기본틀에 생활폐자재인 종이박스 폐 종이재를 물을 뿌려 부드럽게 한 종이재 끝을 10cm정도 겹쳐가며 원하는 모형이 나오도록 부착하고 종이재 이음 부분에 마스킹테이프로 이음 부분이 잘 고정되도록 부쳐서 원하는 조형형상을 완성하는 기초조형형성공정과, 상기 기초조형형성공정에서 완성된 기초조형 외부에 철사로 된 철망을 고정하는 철망 고정공정과, 상기 철망 고정공정에서 철망이 고정된 상태에서 수용성 프라이머를 1회 도포하고 시멘트20% 압착시멘트10% 모래40% 황토 또는 건축주가 요구하는 석분20% 수용성접착제5% 방수액4% 항산화용액1%의 혼합비율 섞여진 혼합몰탈을 미장 하거나 에어로 뿜는 방법으로 두께 20mm~50mm를 도포하는 혼합몰탈 도포공정과, 상기 혼합몰탈 도포공정에서 도포된 몰탈의 표면에 각종 재질감을 표현하기 위한 무늬가 새겨진 고무판으로 된 형틀로 눌러서 표면무늬를 형성하는 표면무늬형성공정과, 상기 표면무늬형성공정에서 표면에 무늬가 형성되어 양생 된 몰탈의 표면에 시멘트나 황토몰탈90% 수용성접착제3% 방수액6% 항산화용액1%를 물로 아주 묽게 개어서 된 표면마감재를 붓으로 칠하거나 에어로 뿜는 방법으로 도포하는 마감처리공정과, 상기 마감처리공정에서 도포한 혼합물이 양생되면 모형에 알맞은 색상으로 페인팅하는 페인팅공정과, 전기, 상하수도설비, 냉난방설비, 창호, 문짝, 문틀, 등을 설치하는 건축설비공정과, 실내장식공정을 더 포함하는 폐자재를 이용한 조형건축물 시공방법으로 건축폐자재인 목재를 세로로 세운 지주와 지주에 가로로 부착한 지지대를 폐 합판으로 서로 연결하여 구성하는 기본틀과, 상기 기본틀에 생활폐자재인 폐지로 구성되는 기초조형형성물과, 상기 기초조형형성물의 외부에 고정하는 철사로 된 철망과, 상기 철망에 타설되고 표면에 무늬를 형성하는 두께 20~50mm의 혼합몰탈과, 상기 혼합몰탈 표면에 도포 되는 마감층과, 상기 마감층 표면에 도포 되는 페인트층으로 구성함으로써, 폐자재를 이용한 각종 조형건축 및 조형물을 제공함에 있어 각종 폐자재를 이용하므로 시공비를 저렴하게 하고 새로운 친환경건축공법을 양산하며 그동안 내집마련에 경제적인 부담감을 일부라도 해소하며 모형에 다소 제한된 건축물을 종이재질로 된 종이재나 종이박스를 사용하여 원하는 모형을 자유롭게 형성함으로써 다양한 곡선연출이 가능하도록 하여 장소를 불문하고 어떠한 형태의 조형건축이나 조형물형성 작업을 가능케 하며 그 위에 개발한 특수 혼합 몰탈 작업을 함으로써 방음 및 화재위험이 없도록 하며 전체적인 중량을 가볍게 하여 건축구조에 전혀 무리가 가지 않도록 함은 물론이고 누구나 조금만 배우고 습득하면 쉽게 시공할 수 있는 간편한 대중적 공법으로 실용화 가능성이 매우 큰 조형건축 및 조형물 시공법이다. The present invention relates to a method for constructing a model building and its structure and composition using recycled materials for recycling molding as well as moldings of various shapes by recycling various household waste materials. In the construction of the building, the overall shape of the building depends on the size and load of the building, earthquake durability, climatic conditions, and the building environment. The basic skeleton that can be held and grasped (skeleton), that is, the overall model foundation frame, is a basic skeleton construction process using a composite construction structure using various materials such as steel, reinforced concrete, wood, and the basic skeleton obtained in the basic skeleton construction process. Among the building waste materials, the basic frame is vertically adapted to the desired model by using wood lumber. In order to make a detailed model in the shape of the model and install it horizontally, a support base for holding the entire external model is installed horizontally, and the waste wood carving material is attached to catch the basic frame necessary for the detailed model. Insulation material construction process, which is made by stacking or kneading the insulation material for heat insulation and sound insulation in a separate block between the waste wood carving materials erected vertically in the frame construction process, and stacking or kneading, and the insulation material construction process Base frame reinforcement process of cutting and cutting the waste plywood by 10 ~ 20cm long to the base frame insulated between the vertical frame waste woodcarvings in the vertical frame, and the base frame reinforced in the base frame reinforcement process Paper box, which is a household waste material, is covered with 10cm of paper The base forming process to complete the desired molding shape by attaching it so that the joint part is fixed to the paper joint part with a masking tape, and fixing the wire mesh of the wire outside the basic forming completed in the base forming process. In the wire mesh fixing process, the water-soluble primer is applied once while the wire mesh is fixed in the wire mesh fixing process. Cement 20% Pressed cement 10% Sand 40% Loess or stone powder required by the builder 20% Water-soluble adhesive 5% Waterproof solution 4% Mixed mortality of 1% antioxidant solution Mixed mortar coating process to apply 20% to 50mm thickness by plastering or air-mixing mixed mortar, and pattern for expressing various textures on the surface of mortar coated in the mixed mortar coating process In the surface pattern forming process of forming a surface pattern by pressing the mold of the rubber plate engraved, A pattern is formed on the surface of the cured mortar. Cement or ocher mortar 90% Water-soluble adhesive 3% Waterproofing solution 6% Antioxidant solution 1% Very thin with water The surface finish is applied by brushing or air blowing. Process, the painting process of the mixture applied in the finishing process, the painting process for painting in the color suitable for the model, the construction equipment process for installing electricity, water and sewage equipment, air-conditioning equipment, windows, doors, door frames, etc., interior decoration In the building construction method using the waste materials further including the process, the base frame consisting of vertically erected timber, which is a construction waste material, and the support which is horizontally attached to the strut, are connected to each other by waste plywood, A base molding formed of waste paper, which is a waste material, a wire mesh made of wire fixed to the outside of the base molding, and placed on the wire mesh To provide a variety of moldings and sculptures using waste materials by consisting of a mixed mortar having a thickness of 20 ~ 50mm to form a pattern, a finish layer applied to the surface of the mixed mortar, and a paint layer applied to the surface of the finish layer By using various waste materials, the construction cost is lowered and new eco-friendly construction methods are mass produced. In the meantime, some of the economic burdens for home building are solved, and some limited buildings are designed using paper or paper boxes made of paper. By forming freely, it is possible to draw various curves and make any type of building construction or form work regardless of the place, and special mixed mortar work developed on it prevents soundproofing and fire risk and makes the overall weight light Of course, so as not to overwhelm the structure at all Anyone learning a little easier when the practical possibilities in a simple and popular method is very large plastic sculptures architectural construction method capable of acquiring construction.

또한 기존조형 FRP보다 강도와 수명이 월등히 뛰어나다. 설사 몰탈 부분이 깨지거나 훼손되어도 그 부분만 원래대로 복원하는 보수작업을 손쉽게 할 수 있으며, FRP나 GRC처럼 인체에 유해한 유리섬유나 유해물질을 첨가제를 사용하지 않으면서도 인체의 유독성을 더욱 줄이기 위해 항산화 용액을 첨가하여 유독성 유해성분을 더욱 줄이도록 하였으며, 강도를 좋게 하기 위해 많은 경험과 실행을 토대로 첨가물 혼합비율과 시공 공정과정의 방법을 개발하여서 몰탈의 강도를 증가시켰다.In addition, its strength and lifespan are much better than existing model FRP. Even if the mortar part is broken or damaged, it is easy to repair and repair only the original part.Also, it is an antioxidant to reduce the toxicity of the human body even without using additives such as FRP or GRC. The solution was added to further reduce the harmful toxic components. To improve the strength, the strength of mortar was increased by developing additive mixing ratio and construction process method based on many experiences and practices.

또한 본 시공법은 전체 틀 모형 일체형으로 이루어지므로 응집력이 뛰어나며, 내부의 틀과 종이재가 받혀 주므로 탄력성이 매우 탁월하여 내진성이 뛰어나고, 건축폐기 시 폐기처리가 쉬우며 유기부산물이 없어 자연으로 돌아가기 좋은 조건이므로 친환경적 공법이라 자부할 수 있다. In addition, this construction method is composed of the whole frame model, so it has excellent cohesion, and because it is supported by the internal frame and paper material, it has excellent elasticity, so it has excellent seismic resistance, easy disposal in construction waste, and no organic by-products. Therefore, it can be regarded as an eco-friendly construction method.

뿐만 아니라 기존의 건축 및 조형 장식물보다 실용적이며 독창적이고 외관미 또한 매우 미려한 고품격의 조형건축 및 조형물을 신속 정확하게 시공 제작하여 건축주와 고객 시공업자가 동시에 만족하도록 하는 신규한 발명이다.In addition, it is a new invention that promptly and accurately constructs and manufactures high-quality moldings and sculptures that are practical, original and beautiful in appearance, and more beautiful than existing architectural and molding ornaments, so that the owners and customers can be satisfied at the same time.

건축폐자재, 종이, 몰탈 Construction waste materials, paper, mortar

Description

재활용자재를 이용한 조형건축물 및 조형물 시공방법과 그 구조{Using waste materials architectural molding composition construction methods and the structural and composition}Using waste materials architectural molding composition construction methods and the structural and composition

본 발명은 조형건축 및 조형물을 시공함에 있어서, 각종 생활 폐자재를 재활용하여 다양한 형상의 조형물은 물론 조형건축을 하기 위한 재활용자재를 이용한 조형건축물 및 조형물 시공방법과 그 구조에 관한 것이다. The present invention relates to a molding building and a method of constructing a building using a recycled material for molding as well as moldings of various shapes by recycling various household waste materials in the construction of the molding architecture and sculptures.

조형물을 구성함에 있어서는 실내를 장식하는 실내장식용과 건축물의 외벽을 장식하는 실외장식물, 그리고 독자적으로 구성하여 실외에 설치하는 조경용 조형물로 구분할 수 있다.In constructing sculptures, they can be divided into interior decorations for decorating the interior, outdoor decorations for decorating the exterior walls of buildings, and landscaping sculptures that are independently constructed and installed outdoors.

이에 지금까지의 조형물을 살펴보면, 특허출원 제1997-0058874호(1997.11.08)는 가벼운 경량재를 이용하여 돌모양을 만들어 연못, 화분 케이스, 돌조경물, 돌암벽, 수반, 석등, 맷돌, 시냇물 형틀 등의 실내조경물을 제공하고자 하는것으로, 실내조경용 화분, 연못 등을 가벼운 경량재를 이용하여 제조한 실내조경물 및 그 제조방법에 관한 것으로, 실내조경물은 먼저, 경량재를 열선을 사용하여 원하는 모양으로 만들고, 다음에는 경량재 외면에 락카 신나를 붓으로 발라 돌 모양의 굴곡부를 만들며, 그 후에는 경량재 외면에 방수 코팅을 바르고, 다음에는 경량재 외면에 강력 접착용 돌가루를 뿌리며, 조경물의 외면 적당 부분에 본드를 바르고 후로킹 가루를 뿌리는 단계로 이루어지며 나무 식재구에 꽃나무를 심고 연못에 물을 채워 사용하도록 하였다.Thus, looking at the sculptures so far, patent application No. 1997-0058874 (1997.11.08) makes a stone shape using light lightweight materials, ponds, pot cases, stone landscapes, stone rocks, heads, stone lanterns, millstones, streams The present invention relates to an indoor landscaping plant and a method for manufacturing the landscaping pot, a pond, etc. using a lightweight lightweight material, and to an indoor landscaping material, using a heating wire. Make a stone-shaped bend by applying lacquer thinner to the outside of the lightweight material, then apply a waterproof coating to the outside of the lightweight material, and then spraying strong adhesive stone on the outside of the lightweight material, Bonding is applied to the appropriate part and sprinkling of the locking powder. Flower trees are planted in the tree plantings and the pond is filled with water.

그리고 특허출원 제2002-0039909호(2002.07.10)는 장식 모형물 및 그 장식 모형물의 제조 방법에 관한 것으로, 소정 형상의 모형물을 제작한 후, 이 모형물 위에 흡습재를 덮고, 그 위에 접착제를 도포하여, 그 접착제가 흡습재에 스며들어 모형물과 흡습재가 일체로 부착되게 한 후, 모형물에 도포한 접착제가 굳은 다음, 또 다른 제 2 흡습재를 사용하여 그 위를 덮고 물을 뿌려서 모형물의 외형상을 그대로 표출되게 하는 것을 특징으로 하며, 상기한 모형물 위에 흡습재를 덮고, 그 위에 접착제를 도포하여, 그 접착제가 흡습재에 스며들어 모형물과 흡습재가 일체로 부착되게 할 때, 입자물을 함께 뿌려서 부착하는 것을 특징으로 하며, 그 장식물은, 수용액을 담을 수 있는 울타리와, 상기 울타리 내 바닥에 설치되는 모형물과, 상기 모형물 위에 접착제와 함께 일체로 형성되는 흡습재와, 상기 흡습재 위에 일체로 형성시키는 제 2 흡습재를 포함하도록 하였다.In addition, Korean Patent Application No. 2002-0039909 (2002.07.10) relates to a decorative model and a method of manufacturing the decorative model. After manufacturing a model having a predetermined shape, the absorbent material is covered on the model, and an adhesive is applied thereon. After the adhesive penetrates into the absorbent material so that the model and the absorbent material are integrally attached, the adhesive applied to the model hardens, and then another second absorbent material is used to cover the top of the model and spray the water on the shape of the model. It is characterized in that it is expressed as it is, cover the moisture absorbent on the above-mentioned model, and apply an adhesive thereon, when the adhesive penetrates the moisture absorbent to make the model and the absorbent material integrally attached, sprinkled with particles It is characterized in that, the decoration, a fence that can contain an aqueous solution, a model installed on the floor in the fence, with an adhesive on the model And the moisture-absorbing material which is formed separately, and to a second moisture-absorbing material which integrally formed on the moisture-absorbing material.

그리고 본인의 선 출원인 특허출원 제1999-0052791호(1999.11.25)는 실내,외에 각종 조형장식물을 시공함에 있어서, 건축 폐자재 중 주로 각재를 사용하여 기존 건축물의 외면이나 바닥면 상면에 독립적인 골격(뼈대)을 형성하는 골격(뼈대)형성공정인 제1공정과, 상기 제1공정에서 세워진 골격(뼈대)위에 종이재로 된 종이재를 원하는 형상이 잡히도록 잘 구긴 다음 구겨진 상태의 종이재를 원하는 모형이 나오도록 잘 부착하는 기초모형형성공정인 제2공정과, 상기 제2공정에서 골격위에 원하는 모양대로 붙여진 폐종이재의 기초모형이 유지되도록 하며 몰탈이 잘 붙도록 가느다란 철사를 엮어서 만든 얇은 철망을 잘 부착하는 기초모형유지공정인 제3공정과, 상기 제3공정에서 종이재에 붙여진 철망위로 시멘트30%:모래68%:수용성접착제2%의 혼합비율로 섞여진 몰탈을 물에 개어서 두께가 약10~20㎜정도 되도록 얇게 펴서 바르는 몰탈미장공정인 제4공정과, 상기 제4공정에서 발라진 몰탈이 양생되면 그곳의 분위기에 알맞게 각종 색상을 도색하여 실내,외의 조형장식물을 완성하는 색상도색공정인 제5공정으로 이루어진 폐자재를 이용한 실내,외 조형장식물시공방법을 제공함으로써, 각종 폐자재를 이용함으로써 시공비를 저렴하게 하고, 종이재로된 종이재나 종이박스를 구긴 다음 원하는 모형을 형성함으로써 불규칙하고 다양한 형상의 곡선창출이 가능하도록 하여 장소를 불문하고 어떠한 형태의 조형물형성작업을 가능하게 하며, 종이재로 된 종이재나 종이박스 위에 몰탈 작업을 함으로써 방음 및 화재의 위험이 없도록 하며 전체적인 중량을 가볍게 하여 건물에 전혀 무리가 가지 않도록 함은 물론 기존 FRP보다 강도가 뛰어나며 설사 몰탈 부분이 깨지거나 훼손되더라도 그 부분만을 원래대로 복원하는 보수작업을 손쉽게 하는 등 기존의 조형장식물보다 보다 실용적이고 독자적이며 외관미 또한 매우 미려한 고품격의 조형물을 신속하고 정확하게 제작하여 업주와 시공업자 및 고객이 동시 만족을In addition, the patent application No. 1999-0052791 (Nov. 25, 1999), which is a pre-applicant of the present invention, uses various materials mainly for the construction of interior and exterior moldings. The first step, which is a skeleton (skeleton) forming process for forming a (skeleton), and the paper material made of a paper material on the skeleton (skeleton) erected in the first step well crushed to obtain a desired shape and then crumpled the paper material The second step, which is a basic model forming process that attaches well to the desired model, and the thin model made by weaving thin wires so that the mortar adheres well while maintaining the basic model of the waste paper material attached to the shape desired on the skeleton in the second step. In the third step, which is the basic model maintenance process for attaching the wire mesh well, and the wire mesh attached to the paper material in the third step, cement 30%: sand 68%: water-soluble adhesive is mixed in the mixing ratio of 2% The fourth process, the mortar plastering process, which is applied by thinly spreading the mask to a thickness of about 10 to 20 mm, and the mortar applied in the fourth process is cured, and paints various colors to suit the atmosphere therein. By providing a method of constructing interior and exterior moldings using the waste materials made up of the fifth process, which is a color painting process to complete the decoration, the construction cost can be reduced by using various waste materials, and the paper or paper box made of paper Next, by forming a desired model, it is possible to create irregular and various shapes of curves, enabling any form of sculptures to be made at any place, and risk of sound insulation and fire by mortaring on paper or paper box made of paper. And the overall weight is light so that the building is not overwhelmed. It is excellent in strength and makes high quality sculptures that are more practical, unique and beautiful in appearance than existing moldings, such as repairing work to restore only the original parts even if the mortar part is broken or damaged even if it is broken or damaged. And contractors and customers

얻도록 한 것이다.To get it.

그러나 상기한 지금까지의 조형물형성 방법에 의하여 조형물을 형성함은 그 사용 용도가 극히 한정적이고 조형건축은 어려우며, 시공비가 상승하고 친환경적이지 못하면서 화재의 위험에 취약하고 조형물을 조형하는데 숙련된 기술을 요구하며, FRP나 GRC등을 사용 시는 인체에 유해한 유리섬유나 유해물질 등 첨가제를 사용하여 환경오염의 원인이 되고 실용적이지 못한 등 조형물의 내구성에 문제가 있어 조형물로서의 그 기능을 다하지 못하였다. However, forming the moldings by the above-described molding forming method is extremely limited in its use, difficult to build the construction, vulnerable to the risk of fire without increasing the construction cost and environmentally friendly, and requires skilled skills in molding the moldings. In addition, when using FRP or GRC, additives such as glass fiber or harmful substances that are harmful to the human body are used to cause environmental pollution and are not practical.

상기한 문제점을 해결하고자 본 발명에서는 각종 조형건축물이나 조형물을 시공함에 있어서, 조형건축물의 자리 잡기 위한 터파기 후 트러스 지주 보 바닥 외 기초구조를 시공함에 있어 조형건축물의 규모와 하중, 지진내구성, 기후 조건, 건축 환경에 따라 조형건축물의 전체형태를 유지하며 잡아 줄 수 있는 기본골격(뼈대) 즉 전체모형 기초 틀은 철재, 철근콘크리트, 목재 등 각종 다양한 자재를 활용하는 복합시공 구조로 하는 기본골격시공공정과, 상기 기본골격시공공정에서 얻어진 기본골격에 건축폐자재 중 주로 목재 각재를 사용하여 원하는 모형에 맞추어 기본틀을 세로로 세워 부착하고 모형의 외형 쪽으로 세부적인 모형을 만들기 위하여 전체 외부모형을 잡아주기 위한 지지대를 가로로 설치하여 폐 목각재를 부착하여 세부모형에 필요한 기본틀을 잡는 모형 기본틀 구성공정과, 상기 모형 기본틀 구성공정에서 세로로 세워져서 기본틀을 구성하는 폐 목각재 사이에 단열과 방음을 위한 단열재를 별도의 블럭으로 제작하여 쌓거나 반죽한 상태에서 직접 쌓아서 구성하는 단열재시공공정과, 상기 단열재 시공공정에서 세로로 세워진 기본틀 폐 목각재 사이에 단열시공한 모형 기본틀에 폐 합판을 10~20cm 정도로 길게 절단재단 하여 서로 연결하여 부착하는 기본틀보강공정과, 상기 기본틀보강공정에서 보강된 기본틀에 생활 재활용자재인 종이박스 폐 종이재를 물을 뿌려 부드럽게 한 종이재 끝을 10cm정도 겹쳐가며 원하는 모형이 나오도록 부착하고 종이재 이음 부분에 마스킹테이프로 이음 부분이 잘 고정되도록 붙여서 원하는 조형형상을 완성하는 기초조형형성공정과, 상기 기초조형형성공정에서 완성된 기초조형 외부에 철사로 된 철망을 고정하는 철망 고정공정과, 상기 철망 고정공정에서 철망이 고정된 상태에서 수용성 프라이머를 1회 도포하고 시멘트20% 압착시멘트10% 모래40% 황토 또는 건축주가 요구하는 석분20% 수용성접착제5% 방수액4% 항산화용액1%의 혼합비율 섞여진 혼합몰탈을 미장 하거나 에어로 뿜는 방법으로 두께 20mm~50mm를 도포하는 혼합몰탈 도포공정과, 상기 혼합몰탈 도포공정에서 도포된 몰탈의 표면에 각종 재질감을 표현하기 위한 무늬가 새겨진 고무판으로 된 형틀로 눌러서 표면무늬를 형성하는 표면무늬형성공정과, 상기 표면무늬형성공정에서 표면에 무늬가 형성되어 양생된 몰탈의 표면에 시멘트나 황토몰탈90% 수용성접착제3% 방수액6% 항산화용액1%를 물로 아주 묽게 개어서 된 표면마감재를 붓으로 칠하거나 에어로 뿜는 방법으로 도포하는 마감처리공정과, 상기 마감처리공정에서 도포한 혼합물이 양생되면 모형에 알맞은 색상으로 페인팅하는 페인팅공정과, 전기, 상하수도설비, 냉난방설비, 창호, 문짝, 문틀, 등을 설치하는 건축설비공정과, 단열과 방음을 위한 단열재 시공공정과, 실내장식공정을 더 포함하는 재활용자재를 이용한 조형건축물 시공방법으로 건축폐자재인 목재를 세로로 세운 지주과 지주에 가로로 부착한 지지대를 폐 합판으로 서로 연결하여 구성하는 기본틀과, 상기 기본틀에 생활 재활용자재인 폐지로 구성되는 기초조형형성물과, 상기 기초조형형성물의 외부에 고정하는 철사로 된 철망과, 상기 철망에 타설되고 표면에 무늬를 형성하는 두께 20~50mm의 혼합몰탈과, 상기 혼합몰탈 표면에 도포 되는 마감층과, 상기 마감층 표면에 도포 되는 페인트층으로 구성하였다.In the present invention to solve the above problems, in the construction of various types of buildings or sculptures, the size and load of the buildings, earthquake durability, climate in the construction of the foundation structure other than the truss support beam floor after the excavation for the positioning of the buildings Basic framework (skeleton) that can hold and hold the overall shape of the building according to the condition and the construction environment, that is, the overall model foundation frame is a basic framework construction with a complex construction structure using various materials such as steel, reinforced concrete, wood The basic framework obtained from the process and the basic framework construction process, mainly using wood lumber among the building waste materials, attaches the basic frame vertically in accordance with the desired model, and grabs the entire external model to make a detailed model toward the exterior of the model. A horizontal support is installed horizontally to attach the waste woodcarving material, which is necessary for detailed modeling. In a state in which the insulation material for insulation and sound insulation is produced as a separate block between the model base frame construction process for holding the main frame and the waste wood carving materials erected vertically in the model frame construction process, Base frame reinforcement to cut and connect the waste plywood by 10 ~ 20cm long to the model base frame that is insulated between the insulation material construction process that is directly stacked and the basic frame waste woodcarvings vertically established in the insulation construction process Process and reinforce the basic frame reinforced by the basic frame reinforcing process, attach the paper box waste paper material, which is a household recycled material, with water to soften the end of the paper material by about 10cm and attach it so that the desired model comes out and mask on the paper material joint. The basic molding forming process of attaching the joint part to be fixed with tape to complete the desired molding shape, and the basic molding forming Wire mesh fixing process to fix wire mesh made of wire outside the basic molding completed in the work, and in the wire mesh fixing process, water-soluble primer is applied once with the wire mesh fixed and cement 20% compressed cement 10% sand 40% ocher or The mixing mortar coating process required by the owner, 20% water soluble adhesive 5% waterproofing solution 4% antioxidant solution 1% mixing ratio The mixed mortar coating process of applying 20mm to 50mm thickness by plastering or air-blown mixed mixed mortar and the mixed mortar coating process The surface pattern forming process of forming a surface pattern by pressing a mold made of a rubber plate engraved with a pattern for expressing various textures on the surface of the mortar coated on the surface, and the surface of the mortar cured by forming a pattern on the surface in the surface pattern forming process Brush the surface finish with cement or ocher mortar 90% water-soluble adhesive 3% waterproofing solution 6% antioxidant solution very thin with water Installation process by spraying with air, painting process with color applied to the model when the mixture is cured, and electricity, water and sewage equipment, heating and cooling equipment, windows, doors, door frames, etc. The building equipment process, the insulation construction process for insulation and soundproofing, and the decorative construction method using recyclable materials including the interior decoration process. A basic molding formed by connecting with each other by waste plywood, a basic molding formed by waste paper which is a recycled material for living in the basic framework, a wire mesh made of wire fixed to the outside of the basic molding, and placed in the wire mesh. Mixed mortar having a thickness of 20 to 50mm to form a pattern on the surface, a finishing layer applied to the surface of the mixed mortar, and applied to the surface of the finishing layer It was composed of the paint layer.

각종 조형건축물 및 조형물을 제공함에 있어 각종 재활용자재를 이용하므로 시공비를 저렴하게 하고 새로운 친환경건축공법을 양산하며 그동안 내집마련에 경제적인 부담감을 일부라도 해소하며 모형에 다소 제한된 건축물을 종이재질로 된 종이재나 종이박스를 사용하여 원하는 모형을 자유롭게 형성함으로써 다양한 곡선연출이 가능하도록 하여 장소를 불문하고 어떠한 형태의 조형건축이나 조형물형성 작업을 가능케 하며 그 위에 개발한 특수 혼합 몰탈 작업을 함으로써 방음 및 화재위험이 없도록 하며 전체적인 중량을 가볍게 하여 건축구조에 전혀 무리가 가지 않도록 함은 물론이고 누구나 조금만 배우고 습득하면 쉽게 시공할 수 있는 간편한 대중적 공법으로 실용화 가능성이 매우 큰 재활용자재를 이용한 조형건축물 및 조형물 시공방법과 그 구조 및 조성물에 관한 것이다. In providing various moldings and sculptures, various recycled materials are used to reduce construction costs, mass-produce new eco-friendly construction methods, and to solve some of the economic burdens for home building. By forming the desired model freely using ash or paper box, it is possible to produce various curves. It can be used for any type of architectural construction or molding, and the special mixing mortar work developed on it enables soundproofing and fire risk. It is a simple public method that can be easily constructed if anyone learns and learns a little by lightening the overall weight by lightening the overall weight, and the method of constructing moldings and sculptures using recycled materials that have great potential for practical use. It relates to the structure and composition.

또한 기존 조형 FRP보다 강도와 수명이 월등히 뛰어나다. 설사 몰탈 부분이 깨지거나 훼손되어도 그 부분만 원래대로 복원하는 보수작업을 손쉽게 할 수 있으며, FRP나 GRC처럼 인체에 유해한 유리섬유나 유해물질을 첨가제를 사용하지 않으면서도 인체의 유독성을 더욱 줄이기 위해 항산화 용액을 첨가하여 유독성 유해성분을 더욱 줄이도록 하였으며, 강도를 좋게 하기 위해 많은 경험과 실행을 토대로 첨가물 혼합비율과 시공 공정과정의 방법을 개발하여서 몰탈의 강도를 증가시켰다.In addition, its strength and lifespan are much better than existing molding FRP. Even if the mortar is broken or damaged, it is easy to repair and repair only the original parts. The solution was added to further reduce the harmful toxic components. To improve the strength, the strength of mortar was increased by developing additive mixing ratio and construction process method based on many experiences and practices.

또한 본 시공법은 전체 틀 모형 일체형으로 이루어지므로 응집력이 뛰어나며, 내부의 틀과 종이 종이재가 받혀 주므로 탄력성이 매우 탁월하여 내진성이 뛰어나고, 건축폐기 시 폐기처리가 쉬우며 유기부산물이 없어 자연으로 돌아가기 좋은 조건이므로 친환경적 공법이라 자부할 수 있다. In addition, this construction method is composed of the whole frame model, so it has excellent cohesion, and because it is supported by the internal frame and paper, it has excellent elasticity and excellent seismic resistance, easy disposal in construction disposal, and no organic by-products. As a condition, it can be regarded as an environmentally friendly method.

뿐만 아니라 기존의 건축 및 조형 장식물보다 실용적이며 독창적이고 외관미 또한 매우 미려한 고품격의 조형건축 및 조형물을 신속 정확하게 시공 제작하여 건축주와 고객 시공업자가 동시에 만족하도록 하는 신규한 발명이다.In addition, it is a new invention that promptly and accurately constructs and manufactures high-quality moldings and sculptures that are practical, original and beautiful in appearance, and more beautiful than existing architectural and molding ornaments, so that the owners and customers can be satisfied at the same time.

이와 같은 본 발명을 실시예에 따라 설명하면 다음과 같다.When the present invention is described according to an embodiment as follows.

실시예1.Example 1.

제1공정: 기본골격시공공정 1st step: Basic skeleton construction process

조형물의 자리 잡기 위한 터파기 후 트러스 지주 보 바닥 외 기초구조를 시공함에 있어 조형물의 규모와 하중, 지진내구성, 기후 조건, 건축 환경에 따라 조형물의 전체형태를 유지하며 잡아 줄 수 있는 기본골격(뼈대)(10) 즉 전체모형 기초 틀은 철재, 철근콘크리트, 목재 등 각종 다양한 자재를 활용하는 복합시공 구조로 한다.Basic skeleton that can hold and hold the overall shape of the sculpture according to the size, load, earthquake durability, climatic conditions, and construction environment in the construction of the truss strut beam floor after the excavation to locate the sculpture. (10) In other words, the overall model foundation frame is a composite construction structure that utilizes a variety of materials, such as steel, reinforced concrete, wood.

제2공정: 모형 기본틀 구성공정Second Process: Model Framework

상기 제1공정인 기본골격시공공정에서 얻어진 기본골격에 건축폐자재 중 주로 목재 각재를 사용하여 원하는 모형에 맞추어 기본틀을 지주(20)로 세워 부착하고 모형의 외형 쪽으로 세부적인 모형을 만들기 위하여 전체 외부모형을 잡아주기 위한 지지대(30)를 가로로 설치하여 폐 목각재를 부착하여서 세부모형에 필요한 기본틀을 잡는다.In order to make a detailed model toward the outline of the model by attaching the basic frame to the support (20) in accordance with the desired model, mainly using wood lumber among the building waste materials to the basic skeleton obtained in the basic skeleton construction process Install the support 30 to hold the external model horizontally to attach the waste wood carving material to hold the basic frame necessary for the detailed model.

제3공정: 기본틀보강공정 3rd step: basic frame reinforcing process

상기 제2공정인 모형 기본틀 구성공정에서 구성된 모형 기본틀에 폐 합판(40)을 10~20cm 정도로 길게 절단재단 하여 서로 연결하여 부착한다.The cutting plywood 40 is cut to a length of about 10 to 20 cm to the model base frame configured in the model base frame construction process, which is the second process, and then attached to each other.

제4공정: 기초조형형성공정  4th process: basic molding process

상기 제3공정인 기본틀보강공정에서 보강된 기본틀에 생활폐자재인 종이박스 폐 종이재를 물을 뿌려 부드럽게 한 종이재(50) 끝을 10cm 정도 겹쳐가며 원하는 모형이 나오도록 부착하고 종이재(50) 이음 부분에 마스킹테이프로 이음 부분이 잘 고정되도록 부쳐서 원하는 조형형상을 완성한다.The paper box (50), which is made by sprinkling the waste paper material, which is a household waste material, is sprinkled with water on the base frame reinforced by the basic frame reinforcement process, which is the third step. (50) Complete the desired shape by attaching the joint to the joint with masking tape.

제5공정: 철망 고정공정5th process: wire mesh fixing process

상기 제4공정인 기초조형형성공정에서 완성된 기초조형 외부에 철사로 된 철망(60)을 고정한다.The wire mesh 60 made of wire is fixed to the outside of the basic molding completed in the fourth molding process.

제6공정: 혼합몰탈 도포공정6th step: mixed mortar coating process

상기 제5공정인 철망 고정공정에서 철망(60)이 고정된 상태에서 수용성 프라이머를 1회 도포하고 시멘트20% 압착시멘트10% 모래40% 황토 또는 건축주가 요구하 는 석분20% 수용성접착제5% 방수액4% 항산화용액1%의 혼합비율 섞여진 혼합몰탈(70)을 미장 하거나 에어로 뿜는 방법으로 두께 20mm~50mm를 도포한다.In the fifth step of fixing the wire mesh, the water-soluble primer is applied once and the cement 20% cement 10% sand 40% loess or stone powder 20% water-soluble adhesive 5% waterproofing solution required by the owner Mixing ratio of 4% antioxidant solution 1% The thickness of 20mm ~ 50mm is applied by plastering or air-mixed mixed mortar (70).

제7공정: 표면무늬형성공정인7th step: surface pattern forming process

상기 제6공정인 혼합몰탈(70) 도포공정에서 도포된 몰탈의 표면에 각종 재질감을 표현하기 위한 무늬가 새겨진 고무판으로 된 형틀로 눌러서 표면무늬를 형성한다.The surface pattern is formed by pressing a mold made of a rubber plate engraved with patterns for expressing various textures on the surface of the mortar coated in the sixth step of the mixing mortar 70.

제8공정: 마감처리공정8th Step: Finishing Process

상기 제7공정인 표면무늬형성공정에서 표면에 무늬가 형성되어 양생된 몰탈의 표면에 시멘트나 황토몰탈90% 수용성접착제3% 방수액6% 항산화용액1%를 물로 아주 묽게 개어서 된 표면마감재(80)를 붓으로 칠하거나 에어로 뿜는 방법으로 도포한다.Surface finishing material formed by diluting cement or ocher mortar 90% water-soluble adhesive 3% waterproofing solution 6% antioxidant solution 1% with water on the surface of the cured mortar formed in the surface pattern forming process, the seventh step (80) Apply with a brush or blow into the air.

제9공정: 페인팅공정 9th Step: Painting Process

상기 제8공정인 마감처리공정에서 도포한 표면마감재(80)가 양생되면 모형에 알맞은 색상의 페인트(90)로 페인팅하는 공정으로 각종 조형건축물 및 조형물을 시공한다.When the surface finish material 80 applied in the finishing process, the eighth process is cured, various moldings and sculptures are constructed by painting with paint 90 having a color suitable for the model.

실시예2Example 2

기본골격시공공정;Basic skeleton construction process;

조형건축물의 자리 잡기 위한 터파기 후 트러스 지주 보 바닥 외 기초구조를 시공함에 있어 조형건축물의 규모와 하중, 지진내구성, 기후 조건, 건축 환경에 따라 조형건축물의 전체형태를 유지하며 잡아 줄 수 있는 기본골격(뼈대)(10) 즉 전체모형 기초 틀은 철재, 철근콘크리트, 목재 등 각종 다양한 폐자재를 활용하는 복합시공 구조로 시공한다.Basic structure that can hold and hold the overall shape of the building according to the scale, load, earthquake durability, climatic condition, and construction environment of the building in the construction of the truss support beam and the foundation after the excavation to locate the building. Skeleton (skeleton) 10 that is, the overall model foundation frame is constructed in a composite construction structure utilizing a variety of waste materials, such as steel, reinforced concrete, wood.

모형 기본틀 구성공정;Model framework construction process;

상기 기본골격시공공정에서 얻어진 기본골격에 건축 재활용자재 중 주로 목재 각재를 사용하여 원하는 모형에 맞추어 기본틀인 지주(20)를 세로로 세워 부착하고 모형의 외형 쪽으로 세부적인 모형을 만들기 위하여 전체 외부모형을 잡아주기 위한 지지대(30)를 가로로 설치하여 폐 목각재를 부착하여 세부모형에 필요한 기본틀을 잡는다.The entire external model to make a detailed model to the vertical frame and to attach the strut 20, which is a basic frame, to the basic model vertically in accordance with the desired model by using wood lumber among the building recycled materials. Install the support 30 to hold the horizontally to attach the waste wood carving material to hold the basic frame necessary for the detailed model.

단열재 시공공정;Insulation construction process;

상기 모형 기본틀 구성공정에서 세로로 세워져서 기본틀을 구성하는 목각재 사이에 단열과 방음을 위한 단열재(100)를 10cm 미만으로 자른 볏짚(101) 95%와 부스러기 숯(102) 5%를 수용성본드제와 혼합된 물에 담궜다가 적당히 물기를 뺀 후, 황토(103) 70%, 모래(104) 20%, 자갈(105) 8%, 응고제 2%를 혼합한 후 물 90%에 수용성본드 7%, 방수액 2% ,황산화용액 1%를 혼합한 물과 적당히 점도 있게 교반하여, 1차 볏짚혼합물 60%와 2차 황토혼합물 40%를 다시 혼합하여 교반하고, 이를 그대로 쌓아서 단열하거나 상기와 같이 교반된 것을 미리 제작된 육면체형 블록 틀 안에다 얇은 종이와 얇은 나일론그물망을 겹쳐서 깔고 교반된 혼합물을 넣은 다음 블록 틀 위로 올라온 종이와 그물망을 보자기 싸듯 덮고 블록 틀 뚜껑을 닫아 바닥에 탁탁 쳐서 다진 후 틀을 제거하여 건조시켜 별도로 제작한 블럭을 쌓아서 단열하도록 한다.95% of rice straw (101) and 5% of debris charcoal (102) which cut vertically in the vertical frame construction process to form a basic frame and cut the heat insulating material 100 for insulation and sound insulation to less than 10 cm Soak in water mixed with the bond agent and drain the water. After mixing 70% ocher (103), 20% sand (104), 8% gravel (105), and 2% coagulant, water soluble bond 7% in water 90%. , 2% waterproofing solution, 1% sulfuric acid solution and stirred with moderately viscous water, the mixture of 60% of the first straw straw mixture and 40% of the second ocher mixture was stirred again, stacked and insulated or stirred as described above. In the prefabricated cube block frame, put a thin paper and thin nylon net, put the stirred mixture into it, cover the paper and the net on the block frame like a cloth, wrap the lid of the block frame, tap it on the floor, and chop it. Removed and dried Stack separately made blocks to insulate them.

기본틀보강공정; Basic frame reinforcing process;

상기 단열재 시공공정에서 세로로 세워진 지주(20)인 기본틀을 구성하는 목각재 사이에 단열시공한 모형 기본틀에 폐 합판(40)을 10~20cm 정도로 길게 절단재단 하여 서로 연결하여 부착한다.In the insulating material construction process, the cutting plywood 40 is cut to a length of about 10 to 20 cm between the wood frame materials constituting the base frame, which is a vertical support erected vertically, and connected to each other.

기초조형형성공정;Basic molding process;

상기 기본틀보강공정에서 보강된 기본틀에 생활 재활용자재인 종이박스 폐 종이재(50)를 물을 뿌려 부드럽게 하여 한 종이재(50) 끝을 10cm정도 겹쳐가며 원하는 모형이 나오도록 부착하고 종이재(50) 이음 부분에 마스킹테이프로 이음 부분이 잘 고정되도록 부쳐서 원하는 조형형상을 완성한다.On the base frame reinforced by the basic frame reinforcement process, the paper box waste paper material (50), which is a recycled material for life, is sprayed and softened so that the end of one paper material (50) overlaps about 10 cm and the desired model comes out. (50) Complete the desired shape by attaching the joint to the joint with masking tape.

철망 고정공정;Wire mesh fixing process;

상기 기초조형형성공정에서 완성된 기초조형 외부에 철사로 된 철망(60)을 고정한다.The wire mesh 60 is fixed to the outside of the basic molding completed in the basic molding forming process.

혼합몰탈 도포공정; Mixed mortar coating process;

상기 철망(60) 고정공정에서 철망(60)이 고정된 상태에서 수용성 프라이머를 1회 도포하고 시멘트20% 압착시멘트10% 모래40% 황토 또는 건축주가 요구하는 석분20% 수용성접착제5% 방수액4% 항산화용액1%의 혼합비율 섞여진 혼합몰탈(70)을 미장 하거나 에어로 뿜는 방법으로 두께 20mm~50mm를 도포한다.In the fixing process of the wire mesh 60, the water-soluble primer is applied once while the wire mesh 60 is fixed, and cement 20% compressed cement 10% sand 40% loess or stone powder required by the builder 20% water-soluble adhesive 5% waterproofing solution 4% The mixing ratio of the antioxidant solution 1% mixed mortar (70) mixed with a method of plastering or blowing with air to apply a thickness of 20mm ~ 50mm.

표면무늬형성공정;Surface pattern forming process;

상기 혼합몰탈(70) 도포공정에서 도포 된 혼합몰탈(70)의 표면에 각종 재질감을 표현하기 위한 무늬가 새겨진 고무판으로 된 형틀로 눌러서 표면무늬를 형성한다.The surface of the mixed mortar 70 is applied to the surface of the mixed mortar 70 coated in the mold mortar 70 by pressing a mold made of a rubber plate engraved with a pattern for expressing various textures.

마감처리공정;Finishing process;

상기 표면무늬형성공정에서 표면에 무늬가 형성되어 양생된 혼합몰탈(70)의 표면에 시멘트나 황토몰탈90%, 수용성접착제3%, 방수액6%, 항산화용액1%를 물로 아주 묽게 개어서 된 표면마감재(80)를 붓으로 칠하거나 에어로 뿜는 방법으로 도포한다.A surface finish material formed by diluting 90% of cement or ocher mortar, 3% of water-soluble adhesive, 6% of waterproofing solution, and 1% of antioxidant solution on the surface of the mixed mortar 70 cured by forming a pattern on the surface in the surface pattern forming process. Apply 80 by brushing or air blowing.

페인팅공정; Painting process;

상기 마감처리공정에서 도포한 표면마감재(80가 양생되면 모형에 알맞은 색상의 페인트(90)로 페인팅한다. When the surface finish material (80 is cured) applied in the finishing process is painted with paint 90 of a color suitable for the model.

건축설비공정;Building equipment process;

전기, 상하수도설비, 냉난방설비, 창호, 문짝, 문틀, 등을 설치한다.Install electricity, water and sewage equipment, air-conditioning equipment, windows, doors, door frames, etc.

실내장식공정;Interior decoration process;

상기한 외부조형과 동일한 방법으로 내부를 인테리어 하거나 기존의 실내장식 기법으로 건축물의 실내를 장식하는 공정으로 조형건축물을 완성한다.The interior of the building is decorated in the same way as the exterior molding or the interior decoration of the building is completed by the existing interior decoration technique.

상기한 실시예에 의하여 재활용자재를 이용한 조형건축물 및 조형물을 구성함에 있어서,In the construction of the building and sculptures using recycled materials according to the above embodiment,

건축 폐자재인 목재를 세로로 세운 지주(20)와 지주(20)에 가로로 부착한 지지대(30)를 합판(40)으로 서로 연결하여 구성하는 기본틀과, 상기 기본틀에 생활 재활용 폐지인 종이재(50)로 구성되는 기초조형형성물과, 상기 기초조형형성물의 외부에 고정하는 철사로 된 철망(60)과, 상기 철망(60)에 타설되고 표면에 무늬를 형성하는 두께 20~50mm의 혼합몰탈(70)과, 상기 혼합몰탈(70) 표면에 도포되는 표면마감재(80)층과, 상기 표면마감재(80)층 표면에 도포 되는 페인트(90)층으로 조형물을 구성한다.A base frame composed of vertically mounted props 20 and vertical supporters 30 horizontally attached to the props 20 by plywood 40 and construction waste recycling papers A base molding formed of a paper material 50, a wire mesh 60 made of a wire fixed to the outside of the base molding, and a thickness of 20 to 50 mm that is placed on the wire mesh 60 and forms a pattern on the surface. The molding is composed of a mixed mortar 70, a surface finish material 80 layer applied to the surface of the mixed mortar 70, and a paint 90 layer applied to the surface of the surface finish material 80 layer.

여기서 상기 실시예1과 실시예2에서 기초조형형성공정을, 별도의 외형형틀을 만들어 각종 폐 종이류를 잘게 썰어 물과 혼합하여 분해하여 물기를 뺀 후 수용성 본드와 혼합 반죽하여 외형형틀에 나일론 그물망을 깔고 반죽한 종이를 1.5cm정도로 부치고 폐목재에 결합한 철사그물망을 상기 반죽한 종이 위에 얹고 철사그물망이 내장되도록 반죽한 종이를 채워서 건조하여 별도로 양생하여 조립하도록 할 수도 있다. Here, the basic molding process in Examples 1 and 2 was made in a separate outer mold, finely chopped various waste papers and mixed with water to decompose, drained and mixed and kneaded with a water-soluble bond to form a nylon mesh in the outer mold Placing the kneaded paper to about 1.5cm and wire mesh netted to the waste wood on top of the kneaded paper and filled with kneaded paper so that the wire netting is built may be dried and assembled separately.

즉, 조형건축 및 각종 조형장식물을 시공함에 있어서 조형건축, 조형물의 자리 잡기 위한 터파기 후 트러스 지주 보 바닥 외 기초구조를 조형건축, 조형물의 규모와 하중, 지진내구성, 기후조건, 건축 환경에 따라 조형건축 및 조형물의 전체형태를 유지하며 잡아 줄 수 있는 기본골격(뼈대) 즉 전체모형 기초 틀은 철재, 철근콘크리트, 목재 등 각종 다양한 자재를 활용하는 복합시공 구조로 하고, 상기한 기본골격에 건축폐자재 중 주로 목재 각재를 사용하여 원하는 모형에 맞추어 기본틀을 세로로 세워 부착하고 모형의 외형 쪽으로 세부적인 모형을 만들기 위하여 전체 외부모형을 잡아주기 위한 지지대를 가로로 설치 부착한다. In other words, in the construction of moldings and various kinds of decorative objects, the foundation structure of the truss support beam after the excavation for the positioning of the moldings and sculptures is determined according to the constructions, the scale and load of the sculptures, the durability of the earthquake, the climatic conditions, and the building environment. The basic skeleton (frame) that can hold and hold the overall form of the building and the model, ie, the overall model foundation frame, is a composite construction structure using various materials such as steel, reinforced concrete, wood, Among the waste materials, mainly wood timber is used to attach the basic frame vertically to the desired model and to install the support horizontally to hold the entire external model to make a detailed model toward the model's appearance.

이때 10cm 미만으로 자른 볏짚 95%와 부스러기 숯 5%를 수용성 본드와 혼합된 물에 담구었다 건져서 물기를 뺀 후, 황토 70%, 모래 20%, 자갈 8%, 응고제 2%를 혼합한 후 물 90%에 수용성 본드 7% 방수액 2% 황산화용액 1%를 혼합한 물과 적당히 점도 있게 교반하고 상기 볏짚혼합물 60%와 황토혼합물 40%를 다시 혼합하여 적당히 교반 하고, 이를 직접 상기 세로로 세운 목각재 사이에 채우거나 상기 교반된 혼합물을 별도의 형틀에 보자기와 종이를 깔고 채운 다음, 틀을 제거하여 건조시켜 블록을 만들어서 이를 적층하여 단열할 수도 있다..At this time, 95% of rice straw cut to less than 10cm and 5% of debris charcoal are immersed in water mixed with a water-soluble bond, drained, and then drained, followed by 70% yellow soil, 20% sand, 8% gravel, and 2% coagulant. Stir moderately with water mixed with water-soluble bond 7% water-soluble solution 2% sulfuric acid solution 1% to%, and again mix the rice straw mixture 60% and the ocher mixture 40% and stir appropriately, and the wood carving wood Filling or filling the agitated mixture in a separate mold with a crepe and paper, and then remove the mold to dry to form a block may be laminated and insulated.

여기까지는 필요에 따라 고철 각재를 사용해도 된다. Up to this point, you may use a scrap metal shell as needed.

상기한 지지대에 폐목재 각재를 부착하며 세부모형에 필요한 기본틀을 잡아서 기본틀의 보강을 위하여 합판을 10~20cm 정도로 길게 절단재단 하여 각재 위에 적당한 간격으로 보강부착한다.Attach the waste wood to the support, and hold the base frame necessary for the detailed model, cutting the plywood to about 10 ~ 20cm long for reinforcement of the base frame and reinforcing and attaching the reinforcement at appropriate intervals.

상기한 작업 후에 틈을 막는 효과와 더욱 세밀한 모형을 위해 생활 재활용자재인 종이박스 폐 종이재를 적당히 물을 뿌려 부드럽게 해준 다음 필요 상황에 맞추어 잘 구기거나 그대로 종이재 끝을 10cm 정도 겹쳐가며 원하는 모형이 나오도록 부착하고, 종이재 이음 부분에 마스킹테이프로 이음 부분이 잘 고정되도록 부치고, 원하는 모형대로 붙여진 폐 종이재 위에 기초 모형이 유지되도록 하며 혼합몰탈이 잘 붙도록 가느다란 철사로 만들어진 얇은 철망을 잘 고정한다. For the effect of preventing gaps and more detailed modeling after the above work, soften the paper box waste paper material, which is a household recycled material, with water and soften it properly, then crumple it according to the needs or overlap the end of the paper material by about 10cm. Attach it so that the joints are secured to the paper joints with a masking tape, and keep the basic model on the waste paper sheets attached as desired, and use a thin wire mesh made of thin wires for the mixed mortar to adhere well. Fix it.

상기한 작업을 현장에서 직접 실시할 수도 있으나, 경우에 따라 선호도가 높은 조형건축 및 조형물은 대량생산을 위해 별도의 외형형틀을 만들어 각종 폐 종이류를 잘게 썰어 물과 혼합하여 분해하여 물기를 적당히 뺀 후 수용성 본드와 혼합 반죽하여 형틀에 나일론 그물망을 깔고 반죽한 혼합물을 1.5cm정도로 1차로 부치고 나중에 외형 틀 고정을 위해 철사그물망을 10cm정도 폭으로 절단하여 적당히 자른 폐목재에 부쳐서 철사그물망이 밑으로 향하게 형틀에 1차로 부친 혼합물 위에 부친다음 그물망은 묻히고 각재는 적당히 노출되도록 2차로 혼합물을 1.5cm정도 덧 부 치고 그 위에 나일론 그물망을 부쳐 모형유지에 만반을 기하며 건조시킨 후 외형 쪽으로 가는 철사 얇은 철망을 살짝 뜨게끔 부착하여 다량제작한 다음 현장으로 옮겨와 조립하게 되면 시공의 편리성과 시공기간의 단축에 지대한 영향을 도모한다.Although the above works can be carried out directly on site, in some cases, high-preferred modeling architecture and sculptures are made in a separate outer mold for mass production, and the various waste papers are finely chopped, mixed with water, and drained. Mix and knead with water-soluble bond and lay the nylon net on the mold and knead the kneaded mixture firstly about 1.5cm, and later cut the wire netting about 10cm wide to fix the outer mold, and then attach it to the waste wood that is properly cut and put the wire netting downward. First, put the mixture on top of the mixture, and then the mesh is buried and the lumber is properly exposed. Secondly, add 1.5cm of the mixture to the mixture and nylon net on it to dry the model. After attaching it hotly to make a lot, and then moving to the site and assembling It plans a major impact on the ease and shorten the construction period of the ball.

상기한 작업공정이 완성되면, 모형에 혼합몰탈이 더욱 잘 붙게 하기 위하여 수용성 프라이머를 1회 도장한 후 종이재에 고정된 철망위로 시멘트20% 압착시멘트10% 모래40% 황토 또는 건축주가 요구하는 석분20% 수용성접착제5% 방수액4% 항산화용액1%의 혼합비율 섞여진 몰탈을 물에 개어서 두께가 20mm~50mm로 얇게 펴서 바르거나 뿜칠미장 한 다음 각종 재질감을 살리기 위해 예를 들어 바위표면에 재질감, 나무표면의 재질감 등을 표현하기 위해 재질감 모형가다를 신축성이 좋고 변형이 좋은 고무판 모형가다로 사전에 제작 준비하여 미장된 몰탈 위에 눌러 부쳐 재질감을 표현하여 건조시킨 후 시멘트나 황토몰탈90% 수용성접착제3% 방수액6% 항산화용액1%를 물로 아주 묽게 개어서 건조된 몰탈 위에 붓으로 바르거나 뿜칠 도장한다. 이 작업은 몰탈 모형면의 미세한 기포사이를 메꾸어 주므로 모형의 유지 강도 에 도움이 되며 방수효과에 탁월하다. 발라진 몰탈이 양생 되면 그곳 모형에 알맞게 각종도장 마감재나 색상도장 한다.Once the above working process is completed, paint the water-soluble primer once to make the mixed mortar better adhere to the model, and then cement 20% cement cement 10% sand 40% loess or stone powder as required by the landlord on the wire mesh fixed to the paper. 20% Water-soluble adhesive 5% Waterproofing solution 4% Antioxidant solution Mixing ratio 1% Mix the mortar mixed with water and spread it thinly (20mm ~ 50mm) and apply or spray it to make various textures. In order to express the texture of the surface of the wood, it is a rubber sheet model with good elasticity and good deformation. It is prepared in advance and pressed on the plaster mortar to express the texture and dry it. Then, cement or ocher mortar 90% water-soluble adhesive 3 % Waterproof solution 6% Antioxidant solution is diluted with water very thinly, and it is applied by brush or spray on dried mortar. This work fills in the fine bubbles between the mortar model surface, which helps the model's holding strength and is excellent in waterproofing effect. Once the coated mortar is cured, various paint finishes or colors are painted to suit the model.

상기한 공정으로 조형물은 완공하나, 조형건축물은 전기, 상하수도설비, 냉난방설비, 창호, 문짝, 문틀, 등은 기본으로 하며, 필요한 부분은 선 시공하나 후 시공도 가능하며 상황조건에 따라 맞춘다. Sculpture is completed by the above process, but the building is basically electric, water and sewage equipment, heating and cooling equipment, windows, doors, doors, door frames, etc., the necessary parts are pre-installed, but also after the construction can be adjusted according to the conditions.

여기서 내부벽체시공은 외부모형의 제작 공정과 같다. Here, the interior wall construction is the same as the manufacturing process of the external model.

본 발명은 조형건축이나 조형물 건축에 당장 실시할 수 있는 것으로 산업상 이용가능성이 크다 할 것이다.Industrial Applicability The present invention can be implemented immediately in molding architecture and sculpture construction.

도 1은 본 발명의 조형물 시공을 실시하기 위한 공정도.1 is a process chart for performing the sculpture construction of the present invention.

도 2는 본 발명의 조형건축물을 실시하기 위한 공정도.2 is a process chart for implementing the modeling building of the present invention.

도 3은 본 발명의 요부구성상태 예시도.Figure 3 is an exemplary view showing the main components of the present invention.

도 4는 본 발명의 벽돌구성상태 예시도.Figure 4 is an exemplary view showing a brick configuration of the present invention.

도면 중 주요 부호에 대한 설명Description of the main symbols in the drawings

10: 기본골격 20: 지주 30: 지지대10: basic skeleton 20: prop 30: support

40: 합판 50: 종이재 60: 철망40: plywood 50: paper material 60: wire mesh

70: 혼합몰탈 80: 표면마감재 90: 페인트70: mixed mortar 80: surface finish 90: paint

100: 단열재100: insulation

101: 볏짚 102: 숯 103: 황토101: straw 102: charcoal 103: loess

104: 모래 105: 자갈104: sand 105: gravel

Claims (6)

각종 조형물을 시공함에 있어서,In constructing various sculptures, 조형물의 자리 잡기 위한 터파기 후 트러스 지주 보 바닥 외 기초구조를 시공함에 있어 조형물의 규모와 하중, 지진내구성, 기후 조건, 건축 환경에 따라 조형물의 전체형태를 유지하며 잡아 줄 수 있는 기본골격(뼈대)(10) 즉 전체모형 기초 틀은 철재, 철근콘크리트, 목재 등 각종 다양한 자재를 활용하는 복합시공 구조로 하는 기본골격시공공정인 제1공정과,Basic skeleton that can hold and hold the overall shape of the sculpture according to the size, load, earthquake durability, climatic conditions, and construction environment in the construction of the truss strut beam floor after the excavation to locate the sculpture. (10) In other words, the overall model foundation frame is the first step, which is a basic skeleton construction process with a composite construction structure using various materials such as steel, reinforced concrete, wood, 상기 제1공정인 기본골격시공공정에서 얻어진 기본골격(10)에 건축폐자재 중 주로 목재 각재를 사용하여 원하는 모형에 맞추어 기본틀을 세로로 세워 지주(20)를 구성하고 모형의 외형 쪽으로 세부적인 모형을 만들기 위하여 전체 외부모형을 잡아주기 위한 지지대(30)를 가로로 설치하여 폐 목각재를 부착하여 세부모형에 필요한 기본틀을 잡는 모형 기본틀 구성공정인 제2공정과,The basic framework (10) obtained in the basic skeleton construction process, which is the first process, mainly uses wood lumber among the construction waste materials to form a strut 20 vertically in accordance with a desired model to form a strut 20 and the detailed side of the model. The second step, which is a model basic frame construction process of installing a support 30 to hold the entire external model horizontally to make a model and attaching a waste wood carving material to hold the basic frame necessary for the detailed model; 상기 제2공정인 모형 기본틀 구성공정에서 구성된 모형 기본틀에 폐 합판(40)을 10~20cm 정도로 길게 절단재단 하여 서로 연결하여 부착하는 기본틀보강공정인 제3공정과, A third step, which is a basic frame reinforcing step of attaching and cutting the waste plywood 40 to a model base frame constructed in the second step of the basic frame forming process, which is the second step, by cutting cutting the length of about 10 to 20 cm; 상기 제3공정인 기본틀보강공정에서 보강된 기본틀에 생활 재활용자재인 종이재(50)를 물을 뿌려 부드럽게 한 종이재(50) 끝을 10cm 정도 겹쳐가며 원하는 모형이 나오도록 부착하고 종이재(50) 이음 부분에 마스킹테이프로 이음 부분이 잘 고정되도록 부쳐서 원하는 조형형상을 완성하는 기초조형형성공정인 제4공정과,10cm overlapping the end of the paper material 50, which is made by sprinkling water on the paper material 50, which is a household recycled material, on the base frame reinforced by the basic frame reinforcement process, which is the third process, is attached and attached to the desired model. (50) a fourth step, which is a basic molding forming step of attaching the joint to the joint with a masking tape to fix the desired molding; 상기 제4공정인 기초조형형성공정에서 완성된 기초조형 외부에 철사로 된 철망(60)을 고정하는 철망 고정공정인 제5공정과,A fifth process, which is a wire mesh fixing process of fixing the wire mesh 60 made of wire to the outside of the basic molding completed in the basic molding forming process as the fourth process; 상기 제5공정인 철망 고정공정에서 철망(60)이 고정된 상태에서 수용성 프라이머를 1회 도포하고 시멘트20%, 압착시멘트10%, 모래40%, 황토 또는 석분20%, 수용성접착제5%, 방수액4%, 항산화용액1%의 혼합비율 섞여진 혼합몰탈(70)을 미장 하거나 에어로 뿜는 방법으로 두께 20mm~50mm를 도포하는 혼합몰탈 도포공정인 제6공정과,In the fifth step of fixing the wire mesh, the water-soluble primer is applied once in the fixed state of the wire mesh 60, and cement 20%, pressurized cement 10%, sand 40%, ocher or stone powder 20%, water-soluble adhesive 5%, water-proof solution 6th step which is a mixed mortar coating process which coats 20mm ~ 50mm in thickness by plastering or air-blending mixed mortar 70 mixed with 4% and 1% of antioxidant solution, 상기 제6공정인 혼합몰탈 도포공정에서 도포된 혼합몰탈(70)의 표면에 각종 재질감을 표현하기 위한 무늬가 새겨진 고무판으로 된 형틀로 눌러서 표면무늬를 형성하는 표면무늬형성공정인 제7공정과,A seventh step, which is a surface pattern forming step of forming a surface pattern by pressing a mold made of a rubber plate engraved with a pattern for expressing various textures on the surface of the mixed mortar 70 coated in the sixth step; 상기 제7공정인 표면무늬형성공정에서 표면에 무늬가 형성되어 양생된 혼합몰탈(70)의 표면에 시멘트나 황토몰탈90%, 수용성접착제3%, 방수액6%, 항산화용액1%를 물로 아주 묽게 개어서 된 표면마감재(80)를 붓으로 칠하거나 에어로 뿜는 방법으로 도포하는 마감처리공정인 제8공정과,In the surface pattern forming process, the seventh step, 90% of cement or ocher mortar, a water-soluble adhesive 3%, a waterproofing solution 6%, and an antioxidant solution 1% are very diluted with water on the surface of the mixed mortar 70 cured with a pattern. An eighth process, which is a finishing process of applying the surface finish material 80 which has been refurbished by painting with a brush or blowing by air; 상기 제8공정인 마감처리공정에서 도포한 표면마감재(80)가 양생되면 모형에 알맞은 색상의 페인트(90)로 페인팅하는 페인팅공정인 제9공정으로 이루어짐을 특징으로 하는 재활용자재를 이용한 조형물 시공방법.When the surface finish material 80 applied in the finishing process, the eighth process is cured, the construction method using the recycled material, characterized in that the ninth process, which is a painting process for painting with paint 90 of a color suitable for the model . 각종 조형건축물을 시공함에 있어서,In constructing various molding buildings, 조형건축물의 자리 잡기 위한 터파기 후 트러스 지주 보 바닥 외 기초구조를 시공함에 있어 조형건축물의 규모와 하중, 지진내구성, 기후 조건, 건축 환경에 따라 조형건축물의 전체형태를 유지하며 잡아 줄 수 있는 기본골격(뼈대)(10) 즉 전체모형 기초 틀은 철재, 철근콘크리트, 목재 등 각종 다양한 자재를 활용하는 복합시공 구조로 하는 기본골격시공공정과,Basic structure that can hold and hold the overall shape of the building according to the scale, load, earthquake durability, climatic condition, and construction environment of the building in the construction of the truss support beam and the foundation after the excavation to locate the building. Skeleton (skeleton) (10) That is, the overall model foundation frame is a basic skeletal construction process of a composite construction structure using a variety of materials, such as steel, reinforced concrete, wood, 상기 기본골격시공공정에서 얻어진 기본골격(10)에 건축폐자재 중 주로 목재 각재를 사용하여 원하는 모형에 맞추어 기본틀을 세로로 세워 지주(20)를 구성하고 모형의 외형 쪽으로 세부적인 모형을 만들기 위하여 전체 외부모형을 잡아주기 위한 지지대(30)를 가로로 설치하여 목각재를 부착하고 세부모형에 필요한 기본틀을 잡는 모형 기본틀 구성공정과,In order to construct the strut 20 vertically in accordance with the desired model by using wood lumber in the basic skeleton (10) obtained in the basic skeletal construction process to make a detailed model toward the appearance of the model The process of constructing a model base frame for attaching a woodcarving material by horizontally installing a support 30 to hold the entire external model and holding a base frame necessary for a detailed model, 상기 모형 기본틀 구성공정에서 세로로 세워져서 기본틀을 구성하는 지주(20) 사이에 단열과 방음을 위한 단열재(100)를 별도의 블럭으로 제작하여 쌓거나 반죽한 상태에서 직접 쌓아서 구성하는 단열재시공공정과, Insulation material construction that is directly stacked in the state of building or kneading by making a separate block between the struts 20 erected vertically in the model base frame construction process constituting the base frame insulated and soundproofing in a separate block Fair, 상기 단열재 시공공정에서 세로로 세워진 기본틀 목각재로 된 지주(20) 사이에 단열시공한 모형 기본틀에 폐 합판(40)을 10~20cm 정도로 길게 절단재단 하여 서로 연결하여 부착하는 기본틀보강공정과, Basic frame reinforcing process for cutting and cutting the closed plywood (40) to about 10 ~ 20cm long in the model base frame insulated between the struts (20) made of the basic frame woodcarving vertically erected in the insulation material construction process. and, 상기 기본틀보강공정에서 보강된 기본틀에 생활 재활용자재인 종이박스 폐 종이재(50)를 물을 뿌려 부드럽게 한 종이재(50) 끝을 10cm정도 겹쳐가며 원하는 모형이 나오도록 부착하고 종이재(50) 이음 부분에 마스킹테이프로 이음 부분이 잘 고정되도록 부쳐서 원하는 조형형상을 완성하는 기초조형형성공정과,On the base frame reinforced by the basic frame reinforcement process, the paper box 50, which is a recycled material of the household waste paper, was sprinkled with water and attached to the desired model by overlapping the ends of the paper 50, which is softened by about 10 cm. 50) the basic molding forming process of attaching the joint to the joint with a masking tape to secure the desired molding; 상기 기초조형형성공정에서 완성된 기초조형 외부에 철사로 된 철망(60)을 고정하는 철망 고정공정과,A wire mesh fixing process of fixing the wire mesh 60 made of wire to the outside of the basic molding completed in the basic molding forming process; 상기 철망 고정공정에서 철망(60)이 고정된 상태에서 수용성 프라이머를 1회 도포하고 시멘트20%, 압착시멘트10%, 모래40%, 황토 또는 석분20%, 수용성접착제5%, 방수액4%, 항산화용액1%의 혼합비율로 섞여진 혼합몰탈(70)을 미장 하거나 에어로 뿜는 방법으로 두께 20mm~50mm를 도포하는 혼합몰탈 도포공정과,In the wire mesh fixing process, the water-soluble primer is applied once with the wire mesh 60 fixed, and cement 20%, pressurized cement 10%, sand 40%, ocher or stone powder 20%, water-soluble adhesive 5%, waterproofing solution 4%, antioxidant A mixed mortar coating process of applying a thickness of 20 mm to 50 mm by plastering or air-mixing the mixed mortar 70 mixed at a mixing ratio of 1% of the solution; 상기 혼합몰탈 도포공정에서 도포된 혼합몰탈(70)의 표면에 각종 재질감을 표현하기 위한 무늬가 새겨진 고무판으로 된 형틀로 눌러서 표면무늬를 형성하는 표면무늬형성공정과,A surface pattern forming process of forming a surface pattern by pressing a mold made of a rubber plate engraved with a pattern for expressing various textures on the surface of the mixed mortar 70 coated in the mixing mortar coating process; 상기 표면무늬형성공정에서 표면에 무늬가 형성되어 양생된 혼합몰탈(70)의 표면에 시멘트나 황토몰탈90%, 수용성접착제3%, 방수액6%, 항산화용액1%를 물로 아주 묽게 개어서 된 표면마감재(80)를 붓으로 칠하거나 에어로 뿜는 방법으로 도포하는 마감처리공정과,A surface finish material formed by diluting 90% of cement or ocher mortar, 3% of water-soluble adhesive, 6% of waterproofing solution, and 1% of antioxidant solution on the surface of the mixed mortar 70 cured by forming a pattern on the surface in the surface pattern forming process. A finishing process of applying 80 by brushing or air blowing; 상기 마감처리공정에서 도포한 표면마감재(80)가 양생되면 모형에 알맞은 색상의 페인트(90)로 페인팅하는 페인팅공정과, A painting process of painting with paint 90 having a color suitable for the model when the surface finish material 80 applied in the finishing process is cured, 전기, 상하수도설비, 냉난방설비, 창호, 문짝, 문틀 등을 설치하는 건축설비공정과,Building equipment process for installing electricity, water and sewage equipment, air-conditioning equipment, windows, doors, door frames, etc. 실내장식공정을 더 포함함을 특징으로 하는 재활용자재를 이용한 조형건축물 시공방법.A method of constructing a building using recycled materials, characterized in that it further comprises an interior decoration process. 삭제delete 제2항에 있어서,3. The method of claim 2, 상기 단열재(100) 시공공정은 10cm 미만으로 자른 볏짚(101) 95%와 부스러기 숫(102) 5%를 수용성본드제와 혼합된 물에 담궜다가 적당히 물기를 빼는 볏짚혼합물 조성단계와, 황토(103) 70%, 모래(104) 20%, 자갈(105) 8%, 응고제 2%를 혼합한 후 물 90%에 수용성본드 7%, 방수액 2%, 황산화용액 1%를 혼합한 물과 교반하는 황토혼합물조성단계와, 상기 볏짚혼합물혼합단계에서 얻어진 볏짚혼합물 60%와 황토혼합물혼합단계에서 황토혼합물 40%를 다시 혼합하여 교반된 혼합물을, 미리 제작된 육면체형 블록 틀 안에다 얇은 종이와 얇은 나일론그물망을 겹쳐서 깔고 넣은 다음, 블록 틀 위로 올라온 종이와 그물망을 보자기 싸듯 덮고 블록 틀 뚜껑을 닫아 바닥에 탁탁 쳐서 다진 후 틀을 제거하여 건조시켜 만든 블록을 상기지주(20) 사이에 적층 함을 특징으로 하는 재활용자재를 이용한 조형건축물 시공방법.The insulating material 100 construction process is a straw straw mixture composition step of immersing 95% of rice straw cut to less than 10cm and 5% of crumbs (102) in water mixed with a water-soluble bond and draining the water appropriately, ocher (103) 70%, sand (104) 20%, gravel (105) 8%, coagulant 2%, 90% water, 7% water-soluble bond, 2% waterproofing solution, 1% sulfated solution The mixture is mixed with 60% rice straw mixture obtained in the rice straw mixture mixing step and the ocher mixture 40% in the ocher mixture mixing step, and the mixture is stirred into a thin paper and thin nylon net in a prefabricated hexagonal block frame. After overlapping and placing, and covering the paper and the nets raised on the block frame like a wrapping cloth, close the block frame lid and tapping on the floor, chopped and removed by removing the frame, characterized in that the laminated block between the holding (20) Recycled Materials How formative building with construction. 제1항에 있어서,The method of claim 1, 상기 기초조형형성공정을, 기본틀과는 별도의 외형형틀을 만들어서 나일론 그물망을 깔고 석고와 가루본드를 혼합한 것을 뿌린 다음, 그 위에 폐 종이를 잘게 썰어 물에 분해하여 물기를 빼고 수용성 본드와 혼합하여 반죽한 종이를 1.5cm정도로 붙이고, 그 위에 폐목재에 결합한 철사그물망을 얹고 철사그물망이 내장되도록 반죽한 종이를 채워서 건조하여 기초조형을 별도로 양생하여 조립함을 특징으로 하는 재활용자재를 이용한 조형물 시공방법.The basic molding process is made of a separate form from the base frame, laid with a nylon mesh and sprinkled with a mixture of gypsum and powder bond, and then finely shredded waste paper and decomposed into water to remove water and mixed with a water-soluble bond Attach the kneaded paper to about 1.5cm, put the wire netting combined with the waste wood on top of it, fill it with the kneaded paper so that the wire netting is embedded, and dry it. Way. 제2항에 있어서, 3. The method of claim 2, 상기 기초조형형성공정을, 기본틀과는 별도의 외형형틀을 만들어서 나일론 그물망을 깔고 석고와 가루본드를 혼합한 것을 뿌린 다음, 그 위에 폐 종이를 잘게 썰어 물에 분해하여 물기를 빼고 수용성 본드와 혼합하여 반죽한 종이를 1.5cm정도로 붙이고, 그 위에 폐목재에 결합한 철사그물망을 얹고 철사그물망이 내장되도록 반죽한 종이를 채워서 건조하여 기초조형을 별도로 양생하여 조립함을 특징으로 하는 재활용자재를 이용한 조형건축물 시공방법.The basic molding process is made of a separate form from the base frame, laid with a nylon mesh and sprinkled with a mixture of gypsum and powder bond, and then finely shredded waste paper and decomposed into water to remove water and mixed with a water-soluble bond Attach the kneaded paper to about 1.5cm, put the wire mesh connected to the waste wood on top of it, fill it with the kneaded paper so that the wire mesh is embedded, dry it, and cure the basic molding separately. Construction method.
KR1020090128169A 2009-12-21 2009-12-21 Using waste materials architectural molding composition construction methods and the structural and composition KR101287150B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090128169A KR101287150B1 (en) 2009-12-21 2009-12-21 Using waste materials architectural molding composition construction methods and the structural and composition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090128169A KR101287150B1 (en) 2009-12-21 2009-12-21 Using waste materials architectural molding composition construction methods and the structural and composition

Publications (2)

Publication Number Publication Date
KR20110071558A KR20110071558A (en) 2011-06-29
KR101287150B1 true KR101287150B1 (en) 2013-07-17

Family

ID=44402636

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090128169A KR101287150B1 (en) 2009-12-21 2009-12-21 Using waste materials architectural molding composition construction methods and the structural and composition

Country Status (1)

Country Link
KR (1) KR101287150B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220109510A (en) 2021-01-28 2022-08-05 조광만 Architecture Molding Capable of Operating with a Sterilizing Device

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101287150B1 (en) * 2009-12-21 2013-07-17 이강혁 Using waste materials architectural molding composition construction methods and the structural and composition
KR101450234B1 (en) * 2014-03-07 2014-10-13 주식회사 두리이앤씨 Artificial Sculpture Constructed Precast Method and Its Construction Method
KR101455318B1 (en) * 2014-03-07 2014-10-27 주식회사 두리이앤씨 Artificial Sculpture Having Waterproof Structure and Its Construction Method
KR200479161Y1 (en) 2014-08-14 2015-12-24 강연호 Joint for making junk toy
CN115179684A (en) * 2022-05-20 2022-10-14 中电建十一局工程有限公司 Novel water conservancy landscape engineering construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200186814Y1 (en) * 1999-11-25 2000-06-15 김홍종 construction of in a door or outerdoor formative decoractions structure thereof
KR20010048204A (en) * 1999-11-25 2001-06-15 김홍종 construction of in a door or outerdoor formative decorations using wast materials and structure thereof
KR20110071558A (en) * 2009-12-21 2011-06-29 이강혁 Using waste materials architectural molding composition construction methods and the structural and composition

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200186814Y1 (en) * 1999-11-25 2000-06-15 김홍종 construction of in a door or outerdoor formative decoractions structure thereof
KR20010048204A (en) * 1999-11-25 2001-06-15 김홍종 construction of in a door or outerdoor formative decorations using wast materials and structure thereof
KR20110071558A (en) * 2009-12-21 2011-06-29 이강혁 Using waste materials architectural molding composition construction methods and the structural and composition

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220109510A (en) 2021-01-28 2022-08-05 조광만 Architecture Molding Capable of Operating with a Sterilizing Device

Also Published As

Publication number Publication date
KR20110071558A (en) 2011-06-29

Similar Documents

Publication Publication Date Title
KR101287150B1 (en) Using waste materials architectural molding composition construction methods and the structural and composition
CN104773023B (en) The close net of barricade adhesion type steelframe now moulds GRC artificial hillocks and its construction method
CN101307629B (en) Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method
KR100860270B1 (en) Manufacturing method of artificial carving work using cement
CN102535846B (en) One-step forming construction process for integrally pouring housing construction
CN102834570A (en) Composite building and panel systems
CN107532421A (en) Interlocking structure block bracing means and modular architectural system
CN202090469U (en) Multifunctional die wallboard structural system for fast house building
CN204774343U (en) Barricade adheres to close net of formula steelframe and moulds GRC artificial hillock at present
CN207194353U (en) A kind of prefabricated thermal insulation water-proof decorative external wall panel structure
CN201512913U (en) Enhanced polyurethane thermal-insulation decorative sheet
CN109989497A (en) A kind of ecological integrated assembled type wall body structure and house based on New Building Materials
KR200291948Y1 (en) Epoxy mortar block
JP5785185B2 (en) Manufacturing method and greening method of moss panel for greening
CN201162277Y (en) Assembly type integrated house component and assembly type integrated house
CN101481927A (en) Assembled integrated house component and building method of integrated house
CN207988401U (en) Decorative model skin texture undisguisedly expects non-bearing hanging plate
CN208072834U (en) A kind of imitative stone decoration board of exterior wall
KR100519616B1 (en) Concrete Color Construct Sculptured Design and Method of Construction the Same
CN207974469U (en) A kind of European high-strength cement base artificial stone of assembled
JP6748585B2 (en) Natural stone-like shaped body manufacturing method
KR101172007B1 (en) Making method of imitation stone
KR102511347B1 (en) PRC artificial rock laminate structure and construction method of PRC artificial rock including same
KR20090103433A (en) Decorative Plate having 3D Wood Texture and Method thereof
CN205935494U (en) Prefabricated component is decorated to imitative stone

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160527

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170711

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180628

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190722

Year of fee payment: 7