CN109056983A - The construction method of water scenery essay - Google Patents
The construction method of water scenery essay Download PDFInfo
- Publication number
- CN109056983A CN109056983A CN201810907684.1A CN201810907684A CN109056983A CN 109056983 A CN109056983 A CN 109056983A CN 201810907684 A CN201810907684 A CN 201810907684A CN 109056983 A CN109056983 A CN 109056983A
- Authority
- CN
- China
- Prior art keywords
- sculpture
- construction method
- water scenery
- essay
- main framing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
- E03F5/103—Naturals or landscape retention bodies, e.g. ponds
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B44—DECORATIVE ARTS
- B44C—PRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
- B44C3/00—Processes, not specifically provided for elsewhere, for producing ornamental structures
- B44C3/06—Sculpturing
Abstract
The present invention relates to a kind of construction methods of water scenery essay, for constructing under massif environment, comprising: excavate to chisel is carried out brokenly at massif, and under pre-buried drainpipe to road, extend to outside the massif, the broken rock dug out is carried out masonry and forms the pond;Sculpture main framing is welded, and non-woven geotextile is wrapped on sculpture main framing bond and forms sculpture, plastotype is carried out to the sculpture and moulds face;Brushing paint is carried out to the sculpture.The present invention not only has functional and ornamental value, can also guide intermountain flowing water path, avoid plank road ponding problem.
Description
Technical field
The present invention relates to the technical fields of the small scape of artificial essay, refer in particular to a kind of construction method of water scenery essay.
Background technique
Water scenery is the landscape with water for important visual object.The landscape of water is broadly divided into two classes by us, one kind be with
The natural water resources such as rivers,lakes and seas are the humanistic environment of background, and another kind of is the artificial works based on water, i.e., artificial water
Scape essay, including various ponds, fountain etc..Artificial waterscape essay is stored in the ranges ratios such as the square in city, thorough straight, park green land more
Biggish Urban Public Space.Artificial waterscape can beautifying urban environment, adjust local ecological environment, by concrete, reinforcing bar,
The modern city that pitch is filled can allow people's direct feeling to natural breath in visual aspects water as a kind of native element.
In addition, different artificial waterscapes can build different sound effects in terms of the sense of hearing, to traffic noise in terms of
It plays an important role.
But it is corresponding by means of the small-scale artificial waterscape under massif environment, functional poor, building cost height is faced always
The problems such as, finally formed visual Landscape and original design intention are far from each other.Firstly, since part designer is for water scenery design
Understanding it is excessively unilateral, the maintenance work for resulting in water scenery becomes extremely difficult.Secondly, being dissected from design angle, water scenery design
It is a dynamic life entity with greater need for the operation considered water scenery and be necessary not only for from visual appearance.Water scenery cannot be only
It is abiotic artificial construction, relies on mechanical equipment, chemical agent maintains itself vigor.Water scenery design is one and water
The closely bound up engineering technology of natural ecology needs a large amount of rationality experience, and proposes reasonable technical method.In addition, water scenery
The quality at water source must be taken into consideration in design.With becoming increasingly conspicuous for environmental problem, keeps standard compliant water source to become and solve water scenery
The key of equipment failure.Meanwhile the final effect of water scenery is maintained dependent on design water.The groundwater level being widely present
Decline more makes most water sceneries excessively rely on artificial enrichment, and the intracorporal additional water source of landscape water places one's entire reliance upon Foundation Anti-seepage
It keeps.Once careless mistake occur in the construction of impervious barrier and later maintenance, so that big phase at the beginning of the anaphase effect of water scenery and design
It is very unlike.Finally, modern water scenery design often lies in form, preferable Acoustic landscape can be generated by having ignored itself, to ambient enviroment
Play desirable influence effect.
Summary of the invention
For this purpose, technical problem to be solved by the present invention lies in overcoming in the prior art, functionality is poor, building cost is high
Problem, to provide a kind of construction method for the water scenery essay that functional effect is good and building cost is low.
In order to solve the above technical problems, a kind of construction method of water scenery essay of the invention, constructs under massif environment, packet
It includes: excavating, and under pre-buried drainpipe to road, and extended to outside the massif to chisel is carried out brokenly at massif, by the broken rock dug out
Build and forms the pond;Sculpture main framing is welded, and non-woven geotextile is wrapped on sculpture main framing and is bonded
Sculpture is formed, plastotype is carried out to the sculpture and moulds face;Brushing paint is carried out to the sculpture.
In one embodiment of the invention, before the step S1, interim pouring canopy is set up.
In one embodiment of the invention, before the pre-buried drainpipe, first base is cleared up, then will be broken again
The rock dug out is built.
In one embodiment of the invention, it is plastered on the inside of the pond using waterproof cement mortar, is then brushed
High molecular water-proof paint.
In one embodiment of the invention, after welding sculpture main framing, first pre-buried drainpipe, then geotechnological by nonwoven again
Cloth is wrapped on the sculpture main framing.
In one embodiment of the invention, non-woven geotextile is wrapped in the method bonded on sculpture main framing
Are as follows: it is bonded using cement mortar.
In one embodiment of the invention, when carrying out plastotype modeling face to the sculpture, using cement mortar in the carving
Moulding on main framing is moulded, reprocessabilty makes moulding texture, plastomer and surface delineation close to model.
In one embodiment of the invention, fibrous additional material is added in the cement mortar.
In one embodiment of the invention, the top in the pond is arranged in the sculpture.
The above technical solution of the present invention has the following advantages over the prior art:
The construction method of water scenery essay of the present invention makes landscape effect framework of steel reinforcement, using the lighter nonwoven soil of material
The sizing of work cloth, mortar of above cementing;It carved, painted on model after shaping, then carry out architectural surface construction.This hair
It is bright that not only there is functional and ornamental value, intermountain flowing water path can also be guided, plank road ponding problem is avoided;In addition, meeting
While the primary demand of people, building cost is low, also is compliant with scenic spot whole style, intension expression is clear, functional, not only
The ecological environment of landscape is improved, and improves environment design grade.
Detailed description of the invention
In order to make the content of the present invention more clearly understood, it below according to specific embodiments of the present invention and combines
Attached drawing, the present invention is described in further detail, wherein
Fig. 1 is the flow chart of the construction method of water scenery essay of the present invention.
Specific embodiment
As shown in Figure 1, for constructing under massif environment, being wrapped the present embodiment provides a kind of construction method of water scenery essay
Include following steps: step S1: excavating, and under pre-buried drainpipe to road to chisel is carried out brokenly at massif, and extend to outside the massif,
The broken rock dug out build and forms the pond;Step S2: welding sculpture main framing, and non-woven geotextile is wrapped in
Bonding is carried out on sculpture main framing and forms sculpture, and plastotype is carried out to the sculpture and moulds face;Step S3: the sculpture is brushed
Paint.
The construction method of water scenery essay described in the present embodiment, for constructing under massif environment, in the step S1, to mountain
Chisel is carried out brokenly at body to excavate, and due to can use the original landforms of massif, the use of material can be not only reduced, when reducing construction
Between, and based on hard rock, the stabilized soil pavement of structure can be increased, under pre-buried drainpipe to road, and
It extends to outside the massif, to advantageously ensure that the stable level in the pond, intermountain flowing water path can also be guided, avoided
The broken rock dug out is carried out masonry and forms the pond by plank road ponding problem;In the step S2, sculpture main framing is welded,
And non-woven geotextile is wrapped on sculpture main framing bond and forms sculpture, the non-woven geotextile is by techniques such as needle thorns
Different fibers is allowed to be interweaved together, intertwineing with each other fixation makes fabric specification, allows soft fabric, plentiful, thick and solid, hard
Very, therefore the non-woven geotextile has good fabric gap, there is good adhesive force, and fiber softening has certain resist
Tearing ability has deformation adaptability well simultaneously, while having good flat drainage ability, soft surface Multiple level,
And the adhesive ability of grogs etc. can be increased with good coefficient of friction, plastotype is carried out to the sculpture and moulds face, makes moulding line
Reason, plastomer and surface delineation are substantially near model;In the step S3, brushing paint is carried out to the sculpture, so that outside it
See uniform, smooth, plentiful and glossy, there is functional and ornamental value, due to the present invention integrate it is practical with watch, arrangement
Proper, have that an apt word added to clinch the point is wonderful;And building cost is low, while the primary demand for meeting people, also is compliant with scenic spot whole style,
Intension expression is clear, functional.
Before the step S1, interim pouring canopy is set up, it, can be to avoid the shadow of water in work progress by the pouring canopy
It rings.In the step S1, before the pre-buried drainpipe, first base is cleared up, then again carries out the broken rock dug out
It builds, is not only advantageous to accelerate construction progress, and advantageously ensure that the quality in the pond.1:3 is used on the inside of the pond
Waterproof cement mortar is plastered, and high molecular water-proof paint is then brushed, and advantageously ensures that the quality of the cement.Weld sculpture
When main framing, reinforcing bar uses diameter for the plain bar of 10mm, and professional sculptors should be asked to carry out welding out sculpture master according to drawing
Skeleton.
In the step S2, after welding sculpture main framing, first pre-buried drainpipe, is then wrapped in institute for non-woven geotextile again
It states on sculpture main framing, to be conducive to avoid plank road ponding problem.Non-woven geotextile is wrapped on sculpture main framing and is carried out
The method of bonding are as follows: bonded using cement mortar, thereby may be ensured that and the non-woven geotextile is firmly wrapped in institute
It states on sculpture main framing.When carrying out plastotype modeling face to the sculpture, using the stronger cement mortar of plasticity in the sculpture master
Moulding on skeleton, reprocessabilty make moulding texture, plastomer and surface delineation close to model, due to cement mortar engraving property
By force, latent good, crack resistance is strong, therefore easily construction, easily paints, the service life is long.It can add in the cement mortar fibrous additional
Material reduces crack to increase the strength of surface tension, often carries out preliminary plastotype with M7.5 cement mortar, forms the preliminary of sculpture
Shape;Then texture, texture and the superficial feature of sculpture are further meticulously depicted on the surface of plastomer.
In the step S3, brushing paint is carried out to the sculpture.Specifically, essay is completed laggard in plastotype modeling face work
Row paintwork.It is painted using professional acrylic paints, the allotment of color is according to the mixing color production theory of color, by profession
Painter rule of thumb mixes the color of drawing requirement.Adjustment appearance of coat standard reach appearance uniform, it is smooth, plentiful and
It is glossy;Its color should be consistent with the color of design code;The defects of being not allow for lifting, crackle, pin hole.The coating on surface
Allow to have the slight sagging for not influencing protective performance, brush mark, corrugation and a small amount of particle dust.Priming, finishing coat and protective paint, and
Finishing coat color and ambient enviroment keep coordinating, and reach drawing requirement.
In the present embodiment, the top in the pond is arranged in the sculpture, to be conducive to receive on the massif
Water, fall water flow along sculpture, it is not only beautiful, and be conducive to guide intermountain flowing water path, avoid plank road ponding problem.
Obviously, the above embodiments are merely examples for clarifying the description, does not limit the embodiments.For
For those of ordinary skill in the art, other different form variations can also be made on the basis of the above description or are become
It is dynamic.There is no necessity and possibility to exhaust all the enbodiments.And obvious variation extended from this or change
It moves still within the protection scope of the invention.
Claims (9)
1. a kind of construction method of water scenery essay, constructs under massif environment, which comprises the steps of:
Step S1: it excavates, and under pre-buried drainpipe to road, and is extended to outside the massif to chisel is carried out brokenly at massif, by broken chisel
Rock out, which build, forms the pond;
Step S2: welding sculpture main framing, and non-woven geotextile is wrapped on sculpture main framing bond and forms sculpture, it is right
The sculpture carries out plastotype and moulds face;
Step S3: brushing paint is carried out to the sculpture.
2. the construction method of water scenery essay according to claim 1, it is characterised in that: before the step S1, set up interim
Pouring canopy.
3. the construction method of water scenery essay according to claim 1, it is characterised in that: first right before the pre-buried drainpipe
Base is cleared up, and then again builds the broken rock dug out.
4. the construction method of water scenery essay according to claim 1, it is characterised in that: use waterproof cement on the inside of the pond
Mortar is plastered, and high molecular water-proof paint is then brushed.
5. the construction method of water scenery essay according to claim 1, it is characterised in that: first pre-buried after welding sculpture main framing
Then non-woven geotextile is wrapped on the sculpture main framing by drainpipe again.
6. according to claim 1 or the construction method of the 5 water scenery essays, it is characterised in that: non-woven geotextile is wrapped in carving
The method bonded on modeling main framing are as follows: bonded using cement mortar.
7. the construction method of water scenery essay according to claim 1, it is characterised in that: carry out plastotype to the sculpture and mould face
When, using cement mortar moulding on the sculpture main framing, reprocessabilty keeps moulding texture, plastomer and surface delineation close
Model.
8. the construction method of water scenery essay according to claim 7, it is characterised in that: fibroid is added in the cement mortar
Additional material.
9. the construction method of water scenery essay according to claim 1, it is characterised in that: the pond is arranged in the sculpture
Top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810907684.1A CN109056983A (en) | 2018-08-10 | 2018-08-10 | The construction method of water scenery essay |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810907684.1A CN109056983A (en) | 2018-08-10 | 2018-08-10 | The construction method of water scenery essay |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109056983A true CN109056983A (en) | 2018-12-21 |
Family
ID=64683450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810907684.1A Pending CN109056983A (en) | 2018-08-10 | 2018-08-10 | The construction method of water scenery essay |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109056983A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110179191A (en) * | 2019-06-03 | 2019-08-30 | 安徽天地间文化产业有限公司 | A kind of cement artificial tree and terrain effect manufacture craft |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2343202Y (en) * | 1998-10-08 | 1999-10-13 | 邢文祥 | Device for collecting and storing hillside running water |
CN201303540Y (en) * | 2008-11-17 | 2009-09-09 | 浙江省农业厅农作物管理局 | Gravity-flow micro-conservation and micro-irrigation system |
CN203957674U (en) * | 2014-07-03 | 2014-11-26 | 夏岩 | A kind of imitative bio-landscape sculpture |
CN104221520A (en) * | 2013-06-13 | 2014-12-24 | 广西玉林宏江能源科技有限公司 | Three methods for forming artificial fields by using gobi, desert and rocky mountains |
CN105774362A (en) * | 2014-12-19 | 2016-07-20 | 曹铸臣 | Method for manufacturing landscape sculpture by adopting foam concrete |
CN205444425U (en) * | 2016-04-04 | 2016-08-10 | 白银宇太苑农业发展有限公司 | Deserted mountain poultry pond |
-
2018
- 2018-08-10 CN CN201810907684.1A patent/CN109056983A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2343202Y (en) * | 1998-10-08 | 1999-10-13 | 邢文祥 | Device for collecting and storing hillside running water |
CN201303540Y (en) * | 2008-11-17 | 2009-09-09 | 浙江省农业厅农作物管理局 | Gravity-flow micro-conservation and micro-irrigation system |
CN104221520A (en) * | 2013-06-13 | 2014-12-24 | 广西玉林宏江能源科技有限公司 | Three methods for forming artificial fields by using gobi, desert and rocky mountains |
CN203957674U (en) * | 2014-07-03 | 2014-11-26 | 夏岩 | A kind of imitative bio-landscape sculpture |
CN105774362A (en) * | 2014-12-19 | 2016-07-20 | 曹铸臣 | Method for manufacturing landscape sculpture by adopting foam concrete |
CN205444425U (en) * | 2016-04-04 | 2016-08-10 | 白银宇太苑农业发展有限公司 | Deserted mountain poultry pond |
Non-Patent Citations (4)
Title |
---|
吴金荣: "《土木工程施工》", 30 June 2016 * |
徐华: "《室内装饰装修工程》", 31 October 2006 * |
王立久: "《建筑材料工艺原理》", 31 March 2006 * |
胡晶等: "《园林景观设计与实训》", 30 September 2017 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110179191A (en) * | 2019-06-03 | 2019-08-30 | 安徽天地间文化产业有限公司 | A kind of cement artificial tree and terrain effect manufacture craft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100860270B1 (en) | Manufacturing method of artificial carving work using cement | |
CN104233916A (en) | Preparation method of color ecological permeable floor | |
CN110271355A (en) | A kind of construction method of plastic stone rockery | |
CN103485254B (en) | A kind of environmental-protection decorative permeable cement road surface preparation method | |
CN109056983A (en) | The construction method of water scenery essay | |
CN103058597B (en) | Material for manufacturing wood color self-compacting concrete | |
CN104790606A (en) | Method for decorating building wall through wall paint and waterproof anti-crack mortar | |
Liu | Practical analysis on the integration of fair-faced concrete decorative elements into modern interior design | |
CN208917984U (en) | Spring water landscape | |
CN106760244B (en) | A kind of roofing modeling function level lean construction method | |
CN202324300U (en) | Combined building brick | |
CN108412143A (en) | Standard decoration hollow body railing and its construction method after a kind of | |
Onderdonk | The Ferro-concrete Style: Reinforced Concrete in Modern Architecture, with Four Hundred Illustrations of European and American Ferro-concrete Design | |
Faria et al. | Traditional Portuguese techniques for application and maintenance of historic renders | |
Komara | Concrete and the engineered picturesque: the Parc des Buttes Chaumont (Paris, 1867) | |
KR100519616B1 (en) | Concrete Color Construct Sculptured Design and Method of Construction the Same | |
CN106758682B (en) | A kind of ecology wooden footway structure and its technique | |
CN217000562U (en) | A real mineral varnish paster for outer wall is decorated | |
KR101134390B1 (en) | Method for constructing artificial rock | |
CN213142678U (en) | Imitative stone material brick that permeates water | |
KR20110013124A (en) | Method for manufacturing artificial rock and its product | |
KR102511347B1 (en) | PRC artificial rock laminate structure and construction method of PRC artificial rock including same | |
CN103982032B (en) | For building, fitting up, the standard member system administered of furniture and ecosphere | |
CN217298968U (en) | Side slope structure constructed by adopting prefabricated RPC hexagonal blocks | |
CN110259204A (en) | A kind of scenic spot dead wood trunk pool construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |
|
RJ01 | Rejection of invention patent application after publication |