CN109056983A - The construction method of water scenery essay - Google Patents

The construction method of water scenery essay Download PDF

Info

Publication number
CN109056983A
CN109056983A CN201810907684.1A CN201810907684A CN109056983A CN 109056983 A CN109056983 A CN 109056983A CN 201810907684 A CN201810907684 A CN 201810907684A CN 109056983 A CN109056983 A CN 109056983A
Authority
CN
China
Prior art keywords
sculpture
construction method
water scenery
essay
main framing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810907684.1A
Other languages
Chinese (zh)
Inventor
王会玲
张通
胡艳
陈亮
边树旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Construction Decoration Co Ltd
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Construction Decoration Co Ltd
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Decoration Co Ltd, Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Construction Decoration Co Ltd
Priority to CN201810907684.1A priority Critical patent/CN109056983A/en
Publication of CN109056983A publication Critical patent/CN109056983A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/103Naturals or landscape retention bodies, e.g. ponds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C3/00Processes, not specifically provided for elsewhere, for producing ornamental structures
    • B44C3/06Sculpturing

Abstract

The present invention relates to a kind of construction methods of water scenery essay, for constructing under massif environment, comprising: excavate to chisel is carried out brokenly at massif, and under pre-buried drainpipe to road, extend to outside the massif, the broken rock dug out is carried out masonry and forms the pond;Sculpture main framing is welded, and non-woven geotextile is wrapped on sculpture main framing bond and forms sculpture, plastotype is carried out to the sculpture and moulds face;Brushing paint is carried out to the sculpture.The present invention not only has functional and ornamental value, can also guide intermountain flowing water path, avoid plank road ponding problem.

Description

The construction method of water scenery essay
Technical field
The present invention relates to the technical fields of the small scape of artificial essay, refer in particular to a kind of construction method of water scenery essay.
Background technique
Water scenery is the landscape with water for important visual object.The landscape of water is broadly divided into two classes by us, one kind be with The natural water resources such as rivers,lakes and seas are the humanistic environment of background, and another kind of is the artificial works based on water, i.e., artificial water Scape essay, including various ponds, fountain etc..Artificial waterscape essay is stored in the ranges ratios such as the square in city, thorough straight, park green land more Biggish Urban Public Space.Artificial waterscape can beautifying urban environment, adjust local ecological environment, by concrete, reinforcing bar, The modern city that pitch is filled can allow people's direct feeling to natural breath in visual aspects water as a kind of native element. In addition, different artificial waterscapes can build different sound effects in terms of the sense of hearing, to traffic noise in terms of It plays an important role.
But it is corresponding by means of the small-scale artificial waterscape under massif environment, functional poor, building cost height is faced always The problems such as, finally formed visual Landscape and original design intention are far from each other.Firstly, since part designer is for water scenery design Understanding it is excessively unilateral, the maintenance work for resulting in water scenery becomes extremely difficult.Secondly, being dissected from design angle, water scenery design It is a dynamic life entity with greater need for the operation considered water scenery and be necessary not only for from visual appearance.Water scenery cannot be only It is abiotic artificial construction, relies on mechanical equipment, chemical agent maintains itself vigor.Water scenery design is one and water The closely bound up engineering technology of natural ecology needs a large amount of rationality experience, and proposes reasonable technical method.In addition, water scenery The quality at water source must be taken into consideration in design.With becoming increasingly conspicuous for environmental problem, keeps standard compliant water source to become and solve water scenery The key of equipment failure.Meanwhile the final effect of water scenery is maintained dependent on design water.The groundwater level being widely present Decline more makes most water sceneries excessively rely on artificial enrichment, and the intracorporal additional water source of landscape water places one's entire reliance upon Foundation Anti-seepage It keeps.Once careless mistake occur in the construction of impervious barrier and later maintenance, so that big phase at the beginning of the anaphase effect of water scenery and design It is very unlike.Finally, modern water scenery design often lies in form, preferable Acoustic landscape can be generated by having ignored itself, to ambient enviroment Play desirable influence effect.
Summary of the invention
For this purpose, technical problem to be solved by the present invention lies in overcoming in the prior art, functionality is poor, building cost is high Problem, to provide a kind of construction method for the water scenery essay that functional effect is good and building cost is low.
In order to solve the above technical problems, a kind of construction method of water scenery essay of the invention, constructs under massif environment, packet It includes: excavating, and under pre-buried drainpipe to road, and extended to outside the massif to chisel is carried out brokenly at massif, by the broken rock dug out Build and forms the pond;Sculpture main framing is welded, and non-woven geotextile is wrapped on sculpture main framing and is bonded Sculpture is formed, plastotype is carried out to the sculpture and moulds face;Brushing paint is carried out to the sculpture.
In one embodiment of the invention, before the step S1, interim pouring canopy is set up.
In one embodiment of the invention, before the pre-buried drainpipe, first base is cleared up, then will be broken again The rock dug out is built.
In one embodiment of the invention, it is plastered on the inside of the pond using waterproof cement mortar, is then brushed High molecular water-proof paint.
In one embodiment of the invention, after welding sculpture main framing, first pre-buried drainpipe, then geotechnological by nonwoven again Cloth is wrapped on the sculpture main framing.
In one embodiment of the invention, non-woven geotextile is wrapped in the method bonded on sculpture main framing Are as follows: it is bonded using cement mortar.
In one embodiment of the invention, when carrying out plastotype modeling face to the sculpture, using cement mortar in the carving Moulding on main framing is moulded, reprocessabilty makes moulding texture, plastomer and surface delineation close to model.
In one embodiment of the invention, fibrous additional material is added in the cement mortar.
In one embodiment of the invention, the top in the pond is arranged in the sculpture.
The above technical solution of the present invention has the following advantages over the prior art:
The construction method of water scenery essay of the present invention makes landscape effect framework of steel reinforcement, using the lighter nonwoven soil of material The sizing of work cloth, mortar of above cementing;It carved, painted on model after shaping, then carry out architectural surface construction.This hair It is bright that not only there is functional and ornamental value, intermountain flowing water path can also be guided, plank road ponding problem is avoided;In addition, meeting While the primary demand of people, building cost is low, also is compliant with scenic spot whole style, intension expression is clear, functional, not only The ecological environment of landscape is improved, and improves environment design grade.
Detailed description of the invention
In order to make the content of the present invention more clearly understood, it below according to specific embodiments of the present invention and combines Attached drawing, the present invention is described in further detail, wherein
Fig. 1 is the flow chart of the construction method of water scenery essay of the present invention.
Specific embodiment
As shown in Figure 1, for constructing under massif environment, being wrapped the present embodiment provides a kind of construction method of water scenery essay Include following steps: step S1: excavating, and under pre-buried drainpipe to road to chisel is carried out brokenly at massif, and extend to outside the massif, The broken rock dug out build and forms the pond;Step S2: welding sculpture main framing, and non-woven geotextile is wrapped in Bonding is carried out on sculpture main framing and forms sculpture, and plastotype is carried out to the sculpture and moulds face;Step S3: the sculpture is brushed Paint.
The construction method of water scenery essay described in the present embodiment, for constructing under massif environment, in the step S1, to mountain Chisel is carried out brokenly at body to excavate, and due to can use the original landforms of massif, the use of material can be not only reduced, when reducing construction Between, and based on hard rock, the stabilized soil pavement of structure can be increased, under pre-buried drainpipe to road, and It extends to outside the massif, to advantageously ensure that the stable level in the pond, intermountain flowing water path can also be guided, avoided The broken rock dug out is carried out masonry and forms the pond by plank road ponding problem;In the step S2, sculpture main framing is welded, And non-woven geotextile is wrapped on sculpture main framing bond and forms sculpture, the non-woven geotextile is by techniques such as needle thorns Different fibers is allowed to be interweaved together, intertwineing with each other fixation makes fabric specification, allows soft fabric, plentiful, thick and solid, hard Very, therefore the non-woven geotextile has good fabric gap, there is good adhesive force, and fiber softening has certain resist Tearing ability has deformation adaptability well simultaneously, while having good flat drainage ability, soft surface Multiple level, And the adhesive ability of grogs etc. can be increased with good coefficient of friction, plastotype is carried out to the sculpture and moulds face, makes moulding line Reason, plastomer and surface delineation are substantially near model;In the step S3, brushing paint is carried out to the sculpture, so that outside it See uniform, smooth, plentiful and glossy, there is functional and ornamental value, due to the present invention integrate it is practical with watch, arrangement Proper, have that an apt word added to clinch the point is wonderful;And building cost is low, while the primary demand for meeting people, also is compliant with scenic spot whole style, Intension expression is clear, functional.
Before the step S1, interim pouring canopy is set up, it, can be to avoid the shadow of water in work progress by the pouring canopy It rings.In the step S1, before the pre-buried drainpipe, first base is cleared up, then again carries out the broken rock dug out It builds, is not only advantageous to accelerate construction progress, and advantageously ensure that the quality in the pond.1:3 is used on the inside of the pond Waterproof cement mortar is plastered, and high molecular water-proof paint is then brushed, and advantageously ensures that the quality of the cement.Weld sculpture When main framing, reinforcing bar uses diameter for the plain bar of 10mm, and professional sculptors should be asked to carry out welding out sculpture master according to drawing Skeleton.
In the step S2, after welding sculpture main framing, first pre-buried drainpipe, is then wrapped in institute for non-woven geotextile again It states on sculpture main framing, to be conducive to avoid plank road ponding problem.Non-woven geotextile is wrapped on sculpture main framing and is carried out The method of bonding are as follows: bonded using cement mortar, thereby may be ensured that and the non-woven geotextile is firmly wrapped in institute It states on sculpture main framing.When carrying out plastotype modeling face to the sculpture, using the stronger cement mortar of plasticity in the sculpture master Moulding on skeleton, reprocessabilty make moulding texture, plastomer and surface delineation close to model, due to cement mortar engraving property By force, latent good, crack resistance is strong, therefore easily construction, easily paints, the service life is long.It can add in the cement mortar fibrous additional Material reduces crack to increase the strength of surface tension, often carries out preliminary plastotype with M7.5 cement mortar, forms the preliminary of sculpture Shape;Then texture, texture and the superficial feature of sculpture are further meticulously depicted on the surface of plastomer.
In the step S3, brushing paint is carried out to the sculpture.Specifically, essay is completed laggard in plastotype modeling face work Row paintwork.It is painted using professional acrylic paints, the allotment of color is according to the mixing color production theory of color, by profession Painter rule of thumb mixes the color of drawing requirement.Adjustment appearance of coat standard reach appearance uniform, it is smooth, plentiful and It is glossy;Its color should be consistent with the color of design code;The defects of being not allow for lifting, crackle, pin hole.The coating on surface Allow to have the slight sagging for not influencing protective performance, brush mark, corrugation and a small amount of particle dust.Priming, finishing coat and protective paint, and Finishing coat color and ambient enviroment keep coordinating, and reach drawing requirement.
In the present embodiment, the top in the pond is arranged in the sculpture, to be conducive to receive on the massif Water, fall water flow along sculpture, it is not only beautiful, and be conducive to guide intermountain flowing water path, avoid plank road ponding problem.
Obviously, the above embodiments are merely examples for clarifying the description, does not limit the embodiments.For For those of ordinary skill in the art, other different form variations can also be made on the basis of the above description or are become It is dynamic.There is no necessity and possibility to exhaust all the enbodiments.And obvious variation extended from this or change It moves still within the protection scope of the invention.

Claims (9)

1. a kind of construction method of water scenery essay, constructs under massif environment, which comprises the steps of:
Step S1: it excavates, and under pre-buried drainpipe to road, and is extended to outside the massif to chisel is carried out brokenly at massif, by broken chisel Rock out, which build, forms the pond;
Step S2: welding sculpture main framing, and non-woven geotextile is wrapped on sculpture main framing bond and forms sculpture, it is right The sculpture carries out plastotype and moulds face;
Step S3: brushing paint is carried out to the sculpture.
2. the construction method of water scenery essay according to claim 1, it is characterised in that: before the step S1, set up interim Pouring canopy.
3. the construction method of water scenery essay according to claim 1, it is characterised in that: first right before the pre-buried drainpipe Base is cleared up, and then again builds the broken rock dug out.
4. the construction method of water scenery essay according to claim 1, it is characterised in that: use waterproof cement on the inside of the pond Mortar is plastered, and high molecular water-proof paint is then brushed.
5. the construction method of water scenery essay according to claim 1, it is characterised in that: first pre-buried after welding sculpture main framing Then non-woven geotextile is wrapped on the sculpture main framing by drainpipe again.
6. according to claim 1 or the construction method of the 5 water scenery essays, it is characterised in that: non-woven geotextile is wrapped in carving The method bonded on modeling main framing are as follows: bonded using cement mortar.
7. the construction method of water scenery essay according to claim 1, it is characterised in that: carry out plastotype to the sculpture and mould face When, using cement mortar moulding on the sculpture main framing, reprocessabilty keeps moulding texture, plastomer and surface delineation close Model.
8. the construction method of water scenery essay according to claim 7, it is characterised in that: fibroid is added in the cement mortar Additional material.
9. the construction method of water scenery essay according to claim 1, it is characterised in that: the pond is arranged in the sculpture Top.
CN201810907684.1A 2018-08-10 2018-08-10 The construction method of water scenery essay Pending CN109056983A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810907684.1A CN109056983A (en) 2018-08-10 2018-08-10 The construction method of water scenery essay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810907684.1A CN109056983A (en) 2018-08-10 2018-08-10 The construction method of water scenery essay

Publications (1)

Publication Number Publication Date
CN109056983A true CN109056983A (en) 2018-12-21

Family

ID=64683450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810907684.1A Pending CN109056983A (en) 2018-08-10 2018-08-10 The construction method of water scenery essay

Country Status (1)

Country Link
CN (1) CN109056983A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110179191A (en) * 2019-06-03 2019-08-30 安徽天地间文化产业有限公司 A kind of cement artificial tree and terrain effect manufacture craft

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2343202Y (en) * 1998-10-08 1999-10-13 邢文祥 Device for collecting and storing hillside running water
CN201303540Y (en) * 2008-11-17 2009-09-09 浙江省农业厅农作物管理局 Gravity-flow micro-conservation and micro-irrigation system
CN203957674U (en) * 2014-07-03 2014-11-26 夏岩 A kind of imitative bio-landscape sculpture
CN104221520A (en) * 2013-06-13 2014-12-24 广西玉林宏江能源科技有限公司 Three methods for forming artificial fields by using gobi, desert and rocky mountains
CN105774362A (en) * 2014-12-19 2016-07-20 曹铸臣 Method for manufacturing landscape sculpture by adopting foam concrete
CN205444425U (en) * 2016-04-04 2016-08-10 白银宇太苑农业发展有限公司 Deserted mountain poultry pond

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2343202Y (en) * 1998-10-08 1999-10-13 邢文祥 Device for collecting and storing hillside running water
CN201303540Y (en) * 2008-11-17 2009-09-09 浙江省农业厅农作物管理局 Gravity-flow micro-conservation and micro-irrigation system
CN104221520A (en) * 2013-06-13 2014-12-24 广西玉林宏江能源科技有限公司 Three methods for forming artificial fields by using gobi, desert and rocky mountains
CN203957674U (en) * 2014-07-03 2014-11-26 夏岩 A kind of imitative bio-landscape sculpture
CN105774362A (en) * 2014-12-19 2016-07-20 曹铸臣 Method for manufacturing landscape sculpture by adopting foam concrete
CN205444425U (en) * 2016-04-04 2016-08-10 白银宇太苑农业发展有限公司 Deserted mountain poultry pond

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吴金荣: "《土木工程施工》", 30 June 2016 *
徐华: "《室内装饰装修工程》", 31 October 2006 *
王立久: "《建筑材料工艺原理》", 31 March 2006 *
胡晶等: "《园林景观设计与实训》", 30 September 2017 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110179191A (en) * 2019-06-03 2019-08-30 安徽天地间文化产业有限公司 A kind of cement artificial tree and terrain effect manufacture craft

Similar Documents

Publication Publication Date Title
KR100860270B1 (en) Manufacturing method of artificial carving work using cement
CN104233916A (en) Preparation method of color ecological permeable floor
CN110271355A (en) A kind of construction method of plastic stone rockery
CN103485254B (en) A kind of environmental-protection decorative permeable cement road surface preparation method
CN109056983A (en) The construction method of water scenery essay
CN103058597B (en) Material for manufacturing wood color self-compacting concrete
CN104790606A (en) Method for decorating building wall through wall paint and waterproof anti-crack mortar
Liu Practical analysis on the integration of fair-faced concrete decorative elements into modern interior design
CN208917984U (en) Spring water landscape
CN106760244B (en) A kind of roofing modeling function level lean construction method
CN202324300U (en) Combined building brick
CN108412143A (en) Standard decoration hollow body railing and its construction method after a kind of
Onderdonk The Ferro-concrete Style: Reinforced Concrete in Modern Architecture, with Four Hundred Illustrations of European and American Ferro-concrete Design
Faria et al. Traditional Portuguese techniques for application and maintenance of historic renders
Komara Concrete and the engineered picturesque: the Parc des Buttes Chaumont (Paris, 1867)
KR100519616B1 (en) Concrete Color Construct Sculptured Design and Method of Construction the Same
CN106758682B (en) A kind of ecology wooden footway structure and its technique
CN217000562U (en) A real mineral varnish paster for outer wall is decorated
KR101134390B1 (en) Method for constructing artificial rock
CN213142678U (en) Imitative stone material brick that permeates water
KR20110013124A (en) Method for manufacturing artificial rock and its product
KR102511347B1 (en) PRC artificial rock laminate structure and construction method of PRC artificial rock including same
CN103982032B (en) For building, fitting up, the standard member system administered of furniture and ecosphere
CN217298968U (en) Side slope structure constructed by adopting prefabricated RPC hexagonal blocks
CN110259204A (en) A kind of scenic spot dead wood trunk pool construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221

RJ01 Rejection of invention patent application after publication