CN109424191A - Based on to marble, the granite laying process in building - Google Patents

Based on to marble, the granite laying process in building Download PDF

Info

Publication number
CN109424191A
CN109424191A CN201710788960.2A CN201710788960A CN109424191A CN 109424191 A CN109424191 A CN 109424191A CN 201710788960 A CN201710788960 A CN 201710788960A CN 109424191 A CN109424191 A CN 109424191A
Authority
CN
China
Prior art keywords
brush
marble
mortar
cement
granite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710788960.2A
Other languages
Chinese (zh)
Inventor
吴洋忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Meiji Real Estate Marketing Planning Co Ltd
Original Assignee
Chengdu Meiji Real Estate Marketing Planning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Meiji Real Estate Marketing Planning Co Ltd filed Critical Chengdu Meiji Real Estate Marketing Planning Co Ltd
Priority to CN201710788960.2A priority Critical patent/CN109424191A/en
Publication of CN109424191A publication Critical patent/CN109424191A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses based on to marble, the granite laying process in building, including base treatment, sorting, brush cement slurry, paving screed-coat, it is laid with surface layer, the cementation of fissures, maintenance, edge patch these steps of skirting board, first plate brush water-wet is moistened before edge patch, base's watering is drenched, uniform brushing plain-water slurry, 1 ︰, 2 cement mortar edge patch is used in brush, the dimensions of skirting board should be consistent with earth material, and plate seam should be penetrated through with ground.This invention ensures that marble, granite are laid with efficiency and quality, the requirement of service life is met.

Description

Based on to marble, the granite laying process in building
Technical field
The present invention relates to a kind of architectural construction technologies, and in particular to a kind of based on to marble, the granite in building Laying process.
Background technique
Building is based on timber buildings, and the traditional architecture in west is based on masonry structure.Modern building is then with steel Based on reinforced concrete.
Chinese ancient architecture has simple simple and elegant style, is knot with yoke structure mainly using cogongrass, timber as construction material Structure mode (components such as column, beam, a tree, used in making timber for boats, purlin, rafter) is combined according to actual size, shape and the spacing that structure needs.It is this Building structure mode reflects the clear, orderly of ancient times patriarchal society structure and stablizes.Due to wooden material production beam column not Huge inner space is easily formed, ancient architecture just dexterously using outport place, forms garden.Garden is the base of building Our unit, it is both closed and open;Be both it is artificial and naturally, can bow and plant flowers, plants and trees, face upward and serve as a lookout Cloud life becomes the another performance of ancients " harmony between man and nature " idea, also embodies Chinese's not only implicit introversion, but also pioneer and keep forging ahead National character.The groups of building that ancient times somewhat larger building is all made of several gardens, single building and garden are along one Move towards to arrange calmly, it is A distinction should be made between what is primary and what is secondary, there is climax to have transition, become the space for the depth that has levels, has, shows a kind of Chinese and chased after The integrated beauty and deep beauty asked.Wherein palace, the building that temple one kind is more solemn, often one by one along central axes It is longitudinally arranged key construction, monosymmetric arrangement secondary structure, arrangement balancing is unfolded, fascinating.
Ancients can achieve the effect that beauty with the design techniques such as balance, harmonious, symmetrical, light and shade axis very early.Ancient times Weight artistic decoration is built, but uncomplicated, only makees emphasis decoration, such as window hood, lintel, ridge in main portions, layout is mostly to weigh Square to development, skyscraper is not weighed, until there is building pagoda, high building is just able to prevailing after Buddhism is incoming.The one of building Cutting art processing is also all processing to structural system and component, if color, decoration are in conjunction with component, constitute enrich it is gorgeous Art achievements, carved beams and painted rafter, body are graceful and colorful;Couplet written on scrolls and hung on the pillars of a hall horizontal inscribed board, excites interest and charm and reverie is infinite, ancient architecture category It is flouring, including palace, cemetery park, monastery, palace sight, gardens, bridge, tower brake etc..
Prior art low efficiency when being laid with marble, granite, and cause the laying quality of marble, granite Difference can not be aligned and hollowing occurs.
Summary of the invention
The technical problem to be solved by the present invention is to prior arts when being laid with marble, granite low efficiency, Er Qiezao Laying quality at marble, granite is poor, can not be aligned and hollowing occurs, and it is an object of the present invention to provide a kind of based on in building Marble, granite laying process, solve prior art low efficiency when being laid with marble, granite, and cause Dali Stone, the laying quality of granite are poor, can not be aligned and the problem of hollowing occur.
The present invention is achieved through the following technical solutions:
Based on to marble, the granite laying process in building, comprising the following steps:
(1) base treatment: it is real that the various hole gaps of flooring should fill packing with pea gravel concreten in advance, and on inspection without infiltration Leak phenomenon, the clean no-sundries of base, no ponding;
(2) sorting: same room, the standard width of a room in an old-style house should be clear and coherent by almost the same size, uniform color, texture is selected with flower, kind Plate carry out walkthrough to number, store classifiedly;
(3) brush cement slurry: wet base of watering, 0.5 plain-water slurry of the brush ratio of mud, cement slurry should with brush with mortar laying, and There must not be air-dried phenomenon;
(4) it spreads screed-coat: spreading screed-coat with 1 ︰, 3 dry cement mortar, virtual resurfacing thickness is advisable with 25-30mm, is smeared with iron Son makes real floating;
(5) it is laid with surface layer: carrying out stone by walkthrough to number when laying and overlay, T-joining should be directed at, put forth effort to tap with wooden mallet In the middle part of plate, jolt ramming mortar starts slabstone to after being laid with height, after checking that mortar surface matches with slabstone bottom, in mortar table Face is first sprinkled water with watering can in right amount, then uniformly spills one layer of cement powder, and slabstone block alignment paving, quadrangle will land simultaneously when paving, Put forth effort to tap to plain with wooden mallet again, it is desirable that quadrangle is smooth, and gap is aligned in length and breadth, gap width such as without design requirement when, it is right It should not exceed 1mm in granite, marble;
(6) cementation of fissures: paving it is complete for 24 hours after, block faces are without fracture, after hollowing on inspection, crammed with dilute cement paint brush seam it is full, and It uses cloth to wipe with immediately net until without residual ash, stain, completes in rear plate two days and forbid pedestrian and stacked items;
(7) conserve: after topping laying, surface should cover, moisten, and curing time should not be less than 7d;
(8) edge patch skirting board: first moistening plate brush water-wet before edge patch, base is watered drenched, uniform brushing plain-water slurry, 1 ︰, 2 cement mortar edge patch is used in brush, the dimensions of skirting board should be consistent with earth material, and plate seam should be passed through with ground It is logical.
Compared with prior art, the present invention having the following advantages and benefits: this invention ensures that marble, Hua Gang Rock is laid with efficiency and quality, meets the requirement of service life.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment, the present invention is made Further to be described in detail, exemplary embodiment of the invention and its explanation for explaining only the invention, are not intended as to this The restriction of invention.
Embodiment:
Based on to marble, the granite laying process in building, comprising the following steps:
(1) base treatment: it is real that the various hole gaps of flooring should fill packing with pea gravel concreten in advance, and on inspection without infiltration Leak phenomenon, the clean no-sundries of base, no ponding;
(2) sorting: same room, the standard width of a room in an old-style house should be clear and coherent by almost the same size, uniform color, texture is selected with flower, kind Plate carry out walkthrough to number, store classifiedly;
(3) brush cement slurry: wet base of watering, 0.5 plain-water slurry of the brush ratio of mud, cement slurry should with brush with mortar laying, and There must not be air-dried phenomenon;
(4) it spreads screed-coat: spreading screed-coat with 1 ︰, 3 dry cement mortar, virtual resurfacing thickness is advisable with 25-30mm, is smeared with iron Son makes real floating;
(5) it is laid with surface layer: carrying out stone by walkthrough to number when laying and overlay, T-joining should be directed at, put forth effort to tap with wooden mallet In the middle part of plate, jolt ramming mortar starts slabstone to after being laid with height, after checking that mortar surface matches with slabstone bottom, in mortar table Face is first sprinkled water with watering can in right amount, then uniformly spills one layer of cement powder, and slabstone block alignment paving, quadrangle will land simultaneously when paving, Put forth effort to tap to plain with wooden mallet again, it is desirable that quadrangle is smooth, and gap is aligned in length and breadth, gap width such as without design requirement when, it is right It should not exceed 1mm in granite, marble;
(6) cementation of fissures: paving it is complete for 24 hours after, block faces are without fracture, after hollowing on inspection, crammed with dilute cement paint brush seam it is full, and It uses cloth to wipe with immediately net until without residual ash, stain, completes in rear plate two days and forbid pedestrian and stacked items;
(7) conserve: after topping laying, surface should cover, moisten, and curing time should not be less than 7d;
(8) edge patch skirting board: first moistening plate brush water-wet before edge patch, base is watered drenched, uniform brushing plain-water slurry, 1 ︰, 2 cement mortar edge patch is used in brush, the dimensions of skirting board should be consistent with earth material, and plate seam should be passed through with ground It is logical.
This invention ensures that marble, granite are laid with efficiency and quality, the requirement of service life is met.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (1)

1. based on to marble, the granite laying process in building, which comprises the following steps:
(1) base treatment: it is real that the various hole gaps of flooring should fill packing with pea gravel concreten in advance, and ne-leakage is existing on inspection As, the clean no-sundries of base, no ponding;
(2) sorting: same room, the standard width of a room in an old-style house should be by the plates for selecting almost the same size, uniform color, texture smoothness with flower, kind Material carries out walkthrough to number, stores classifiedly;
(3) brush cement slurry: wet base of watering, 0.5 plain-water slurry of the brush ratio of mud, cement slurry should be with brushes with mortar laying, and must not There is air-dried phenomenon;
(4) it spreads screed-coat: spreading screed-coat with 1 ︰, 3 dry cement mortar, virtual resurfacing thickness is advisable with 25-30mm, is clapped with plasterer's trowel It is real to smooth out;
(5) it is laid with surface layer: carrying out stone by walkthrough to number when laying and overlay, T-joining should be directed at, puted forth effort in tapping board with wooden mallet Portion, jolt ramming mortar start slabstone to after being laid with height, after checking that mortar surface matches with slabstone bottom, in mortar surface elder generation It is sprinkled water in right amount with watering can, then uniformly spills one layer of cement powder, slabstone block alignment paving, quadrangle will land simultaneously when paving, then use Wooden mallet is puted forth effort to tap to plain, it is desirable that quadrangle is smooth, and gap is aligned in length and breadth, gap width such as without design requirement when, for flower Gang Yan, marble should not exceed 1mm;
(6) cementation of fissures: paving it is complete for 24 hours after, block faces are without fracture, after hollowing on inspection, crammed with dilute cement paint brush seam it is full, and immediately It uses cloth to wipe with net until without residual ash, stain, completes in rear plate two days and forbid pedestrian and stacked items;
(7) conserve: after topping laying, surface should cover, moisten, and curing time should not be less than 7d;
(8) edge patch skirting board: first moistening plate brush water-wet before edge patch, base is watered drenched, uniform brushing plain-water slurry, side brush Side is inlayed with 1 ︰, 2 cement mortar and is pasted, and the dimensions of skirting board should be consistent with earth material, and plate seam should be penetrated through with ground.
CN201710788960.2A 2017-09-05 2017-09-05 Based on to marble, the granite laying process in building Withdrawn CN109424191A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710788960.2A CN109424191A (en) 2017-09-05 2017-09-05 Based on to marble, the granite laying process in building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710788960.2A CN109424191A (en) 2017-09-05 2017-09-05 Based on to marble, the granite laying process in building

Publications (1)

Publication Number Publication Date
CN109424191A true CN109424191A (en) 2019-03-05

Family

ID=65513905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710788960.2A Withdrawn CN109424191A (en) 2017-09-05 2017-09-05 Based on to marble, the granite laying process in building

Country Status (1)

Country Link
CN (1) CN109424191A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155740A (en) * 2020-01-06 2020-05-15 佛山宏润美嘉建材有限公司 Marble ground construction process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155740A (en) * 2020-01-06 2020-05-15 佛山宏润美嘉建材有限公司 Marble ground construction process

Similar Documents

Publication Publication Date Title
Malacrino Constructing the ancient world: Architectural techniques of the Greeks and Romans
CN103375000B (en) A kind of water-soluble metal fluorocarbon coatings is coated with the construction technology on plucking surface in elasticity
Orlenko et al. Conservation of the residential and public architecture of the 19th-early 20th centuries (on the examples of Kyiv and Cracow)
Dumarçay Construction techniques in South and Southeast Asia: A history
Bonapace et al. Traditional materials and construction technologies used in the Kathmandu valley
Orlenko et al. Modern technologies in restoration of architectural monuments (on the example of St. Volodymyr's Cathedral in Chersonesos)
Ivashko et al. Ways of performance and preservation of monumental art works on the facades of architectural monuments of the 19th-early 20th century
CN103147562A (en) Construction method of ground cement mortar leveling
Ivashko et al. Finishing Materials for Facades and Interiors of Art Nouveau Buildings. Examples of Ukraine and Poland
CN109424191A (en) Based on to marble, the granite laying process in building
CN109424188A (en) The technique of pouring exposed concrete is used in construction
CN109424189A (en) The technique constructed in construction to rolled roofing material waterproof
CN109424152A (en) The technique that ground ornamental slab for paving the floor is laid in construction
Baruch et al. Excavations near the Triple Gate of the Temple Mount, Jerusalem
Turner et al. The Great Tower, Chepstow Castle, Wales
CN107152103A (en) A kind of clear water brick decorative wall
Adam Building materials, construction techniques and chronologies
CN206220388U (en) A kind of engraving structure of plastering of landscape metope
Marchante et al. Characterization of traditional coatings in earthen vernacular architecture in the Limarí Valley: their role in the conservation of built heritage in Chile
Sweek et al. Architectural conservation of an Amun temple in Sudan
Lowther Report on Excavations at Verulamium in 1934
Orlenko et al. RESTORATION AND PRESERVATION PROCEDURE OF ARCHITECTURAL MONUMENTS. RAILWAY STATIONS WITH MONUMENTAL ART OF THE SOCIALIST PERIOD (ON THE EXAMPLES OF UKRAINE AND POLAND).
Ashurst Methods of repairing and consolidating stone buildings
Orlenko et al. The role of the tenement housing development in the urban structure of Western and Central Ukraine during the Secession era
CN109424149A (en) Based on the method to brick wall tiling in building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190305