CN109424189A CN201710743785.5A CN201710743785A CN109424189A CN 109424189 A CN109424189 A CN 109424189A CN 201710743785 A CN201710743785 A CN 201710743785A CN 109424189 A CN109424189 A CN 109424189A
Authority
CN
China
Prior art keywords
paving
ridge
construction
coiled material
malthoid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710743785.5A
Other languages
Chinese (zh)
Inventor
吴洋忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Meiji Real Estate Marketing Planning Co Ltd
Original Assignee
Chengdu Meiji Real Estate Marketing Planning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Meiji Real Estate Marketing Planning Co Ltd filed Critical Chengdu Meiji Real Estate Marketing Planning Co Ltd
Priority to CN201710743785.5A priority Critical patent/CN109424189A/en
Publication of CN109424189A publication Critical patent/CN109424189A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • E04D13/1687Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure the insulating material having provisions for roof drainage
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • E04D13/1687Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure the insulating material having provisions for roof drainage
    • E04D13/1693Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure the insulating material having provisions for roof drainage the upper surface of the insulating material forming an inclined surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses the techniques constructed in construction to rolled roofing material waterproof, using asphalt felt, modified bituminous pitch coiled material, the flexible waterproof materials such as EPDM waterproof rolled sheet paste the roof covering for forming whole piece waterproof, the macromolecules class coiled material such as EPDM needs compatible adhesive to paste, construction of leveling blanket uses 1:3 cement mortar, 10~13mm of thickness, screed-coat is answered smooth closely knit after construction, prominent roof structure connection and corner should be made into obtuse angle or arc-shaped, screed-coat should stay dividing joint, slit width 20mm, vertically and horizontally maximum spacing is not more than 6m, the malthoid item of width 250mm is welded on sealing, 1~2 day brush adhesive bitument primer before paving malthoid, before paving asphalt felt coiled material, malthoid surface should be removed and dispense material, 1~1.5mm asphalt adhesive is spread with oil process is poured, in ridge nail Coiled material is hammered into screed-coat and is fixed, is the paving from ridge to cornice perpendicular to the paving of ridge direction.The simple process can guarantee construction quality, will not occur the phenomenon that leak after prolonged use.

Description

The technique constructed in construction to rolled roofing material waterproof
Technical field
The present invention relates to a kind of architectural construction technologies, and in particular to one kind carries out rolled roofing material waterproof in construction The technique of construction.
Background technique
Building is based on timber buildings, and the traditional architecture in west is based on masonry structure.Modern building is then with steel Based on reinforced concrete.
Chinese ancient architecture has simple simple and elegant style, is knot with yoke structure mainly using cogongrass, timber as construction material Structure mode (components such as column, beam, a tree, used in making timber for boats, purlin, rafter) is combined according to actual size, shape and the spacing that structure needs.It is this Building structure mode reflects the clear, orderly of ancient times patriarchal society structure and stablizes.Due to wooden material production beam column not Huge inner space is easily formed, ancient architecture just dexterously using outport place, forms garden.Garden is the base of building Our unit, it is both closed and open;Be both it is artificial and naturally, can bow and plant flowers, plants and trees, face upward and serve as a lookout Cloud life becomes the another performance of ancients " harmony between man and nature " idea, also embodies Chinese's not only implicit introversion, but also pioneer and keep forging ahead National character.The groups of building that ancient times somewhat larger building is all made of several gardens, single building and garden are along one Move towards to arrange calmly, it is A distinction should be made between what is primary and what is secondary, there is climax to have transition, become the space for the depth that has levels, has, shows a kind of Chinese and chased after The integrated beauty and deep beauty asked.Wherein palace, the building that temple one kind is more solemn, often one by one along central axes It is longitudinally arranged key construction, monosymmetric arrangement secondary structure, arrangement balancing is unfolded, fascinating.
Ancients can achieve the effect that beauty with the design techniques such as balance, harmonious, symmetrical, light and shade axis very early.Ancient times Weight artistic decoration is built, but uncomplicated, only makees emphasis decoration, such as window hood, lintel, ridge in main portions, layout is mostly to weigh Square to development, skyscraper is not weighed, until there is building pagoda, high building is just able to prevailing after Buddhism is incoming.The one of building Cutting art processing is also all processing to structural system and component, if color, decoration are in conjunction with component, constitute enrich it is gorgeous Art achievements, carved beams and painted rafter, body are graceful and colorful;Couplet written on scrolls and hung on the pillars of a hall horizontal inscribed board, excites interest and charm and reverie is infinite, ancient architecture category It is flouring, including palace, cemetery park, monastery, palace sight, gardens, bridge, tower brake etc..
And the rolled roofing material Waterproof Construction Technique built at present is complicated, and low efficiency, quality are also poor, after long-time use It also will cause house leak.
Summary of the invention
The rolled roofing material Waterproof Construction Technique complexity that the technical problem to be solved by the present invention is to build at present, and efficiency Low, quality is also poor, also will cause house leak after long-time use, and it is an object of the present invention to provide one kind rolls up roofing in construction The technique that material waterproof is constructed, the rolled roofing material Waterproof Construction Technique for solving to build at present is complicated, and low efficiency, quality Difference, the problem of also will cause house leak after long-time use.
The present invention is achieved through the following technical solutions:
The technique constructed in construction to rolled roofing material waterproof, prepared roofing are using asphalt felt, modification The flexible waterproof materials such as asphalt felt, EPDM waterproof rolled sheet paste the roof covering for forming whole piece waterproof, asphalt adhesive Viscous coiled material is mostly heat paving, and the macromolecules class coiled material such as EPDM needs compatible adhesive to paste, and construction of leveling blanket uses 1:3 cement Mortar, 10~13mm of thickness, screed-coat is answered smooth closely knit after construction, and prominent roof structure connection and corner should be made into blunt Angle is arc-shaped, and screed-coat should stay dividing joint, and slit width 20mm, vertically and horizontally maximum spacing is not more than 6m, welds width 250mm's on sealing Malthoid item spreads 1~2 day brush adhesive bitument primer before malthoid, before paving asphalt felt coiled material, should remove malthoid surface and dispense material, with pouring Oil process spread 1~1.5mm asphalt adhesive, paving malthoid direction should whether vibrated according to the slope of roof or roofing and determine, roofing slope Degree is less than 3%, or even within 15%, Ying Caiyong is parallel to the direction paving of ridge, i.e., since cornice, coiled material long side is parallel In ridge, long side overlapping splice Parallel to the flow direction, short side overlapping splice is answered along cardinal wind if the slope of roof is greater than 15% Perpendicular to the paving of ridge direction, and coiled material is hammered into screed-coat with nail in ridge and is fixed, spread perpendicular to ridge direction Patch is the paving from ridge to cornice.
Compared with prior art, the present invention having the following advantages and benefits: the simple process can guarantee to construct The phenomenon that leak will not occur after prolonged use in quality.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment, the present invention is made Further to be described in detail, exemplary embodiment of the invention and its explanation for explaining only the invention, are not intended as to this The restriction of invention.
Embodiment:
The technique constructed in construction to rolled roofing material waterproof, prepared roofing are using asphalt felt, modification The flexible waterproof materials such as asphalt felt, EPDM waterproof rolled sheet paste the roof covering for forming whole piece waterproof, asphalt adhesive Viscous coiled material is mostly heat paving, and the macromolecules class coiled material such as EPDM needs compatible adhesive to paste, and construction of leveling blanket uses 1:3 cement Mortar, 10~13mm of thickness, screed-coat is answered smooth closely knit after construction, and prominent roof structure connection and corner should be made into blunt Angle is arc-shaped, and screed-coat should stay dividing joint, and slit width 20mm, vertically and horizontally maximum spacing is not more than 6m, welds width 250mm's on sealing Malthoid item spreads 1~2 day brush adhesive bitument primer before malthoid, before paving asphalt felt coiled material, should remove malthoid surface and dispense material, with pouring Oil process spread 1~1.5mm asphalt adhesive, paving malthoid direction should whether vibrated according to the slope of roof or roofing and determine, roofing slope Degree is less than 3%, or even within 15%, Ying Caiyong is parallel to the direction paving of ridge, i.e., since cornice, coiled material long side is parallel In ridge, long side overlapping splice Parallel to the flow direction, short side overlapping splice is answered along cardinal wind if the slope of roof is greater than 15% Perpendicular to the paving of ridge direction, and coiled material is hammered into screed-coat with nail in ridge and is fixed, spread perpendicular to ridge direction Patch is the paving from ridge to cornice.
The simple process can guarantee construction quality, will not occur the phenomenon that leak after prolonged use.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (1)

1. the technique constructed in construction to rolled roofing material waterproof, which is characterized in that prepared roofing is using pitch The roofing that the flexible waterproof materials such as malthoid, modified bituminous pitch coiled material, EPDM waterproof rolled sheet are pasted into whole piece waterproof covers Layer, pitch gluing coiled material are mostly heat paving, and the macromolecules class coiled material such as EPDM needs compatible adhesive to paste, and construction of leveling blanket is adopted With 1:3 cement mortar, 10~13mm of thickness, screed-coat is answered smooth closely knit after construction, prominent roof structure connection and corner Place should be made into obtuse angle or arc-shaped, and screed-coat should stay dividing joint, slit width 20mm, and vertically and horizontally maximum spacing is not more than 6m, on sealing The malthoid item of width 250mm is welded, 1~2 day brush adhesive bitument primer before paving malthoid before paving asphalt felt coiled material, should remove malthoid surface Dispense material, with pour oil process paving 1~1.5mm asphalt adhesive, paving malthoid direction should it is whether vibrated according to the slope of roof or roofing and It determining, for the slope of roof less than 3%, or even within 15%, Ying Caiyong is parallel to the direction paving of ridge, i.e., since cornice, Coiled material long side is parallel to ridge, and long side overlapping splice Parallel to the flow direction, short side overlapping splice is along cardinal wind, if the slope of roof is big , then should be perpendicular to the paving of ridge direction in 15%, and coiled material is hammered into screed-coat with nail in ridge and is fixed, perpendicular to The paving of ridge direction is the paving from ridge to cornice.
CN201710743785.5A 2017-08-25 2017-08-25 The technique constructed in construction to rolled roofing material waterproof Withdrawn CN109424189A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710743785.5A CN109424189A (en) 2017-08-25 2017-08-25 The technique constructed in construction to rolled roofing material waterproof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710743785.5A CN109424189A (en) 2017-08-25 2017-08-25 The technique constructed in construction to rolled roofing material waterproof

Publications (1)

Publication Number Publication Date
CN109424189A true CN109424189A (en) 2019-03-05

Family

ID=65500590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710743785.5A Withdrawn CN109424189A (en) 2017-08-25 2017-08-25 The technique constructed in construction to rolled roofing material waterproof

Country Status (1)

Country Link
CN (1) CN109424189A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021638A (en) * 2019-05-20 2020-04-17 安徽省中功立业建设工程有限责任公司 Anti-seepage method for constructional engineering
CN113775117A (en) * 2021-09-24 2021-12-10 宁波益富乐生物科技有限公司 Building roof waterproof structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021638A (en) * 2019-05-20 2020-04-17 安徽省中功立业建设工程有限责任公司 Anti-seepage method for constructional engineering
CN113775117A (en) * 2021-09-24 2021-12-10 宁波益富乐生物科技有限公司 Building roof waterproof structure and construction method thereof

Similar Documents

Publication Publication Date Title
Ching A visual dictionary of architecture
CN109424189A (en) The technique constructed in construction to rolled roofing material waterproof
CN109424788A (en) Pipe layer skill when based on to underground pipeline construction
Chuki et al. A review on traditional architecture houses in Buddhist culture
CN109424149A (en) Based on the method to brick wall tiling in building
CN109424185A (en) Form construction technology in construction
CN109424121A (en) Based on the technique for carrying out concreting to column class formation under construction
CN109425464A (en) Closed-water test method is carried out to pipeline after building underground piping is embedded
CN109424201A (en) Center pillar hoisting is built in single industrial premises
CN208502089U (en) A kind of adjustable bark roofing of cornice
CN109424198A (en) Concrete pre-stress construction technology in construction
CN109424190A (en) Based on the cross beam construction technology to oval superstructure
Luo et al. Analysis of building materials for wind and rain bridge
CN109424191A (en) Based on to marble, the granite laying process in building
CN109423995A (en) The molding method of pile body in building construction
CN109424070A (en) The technique constructed in construction to lift slab
Lin Study on Modern Veranda Style Architecture of Yantai Mountain in Fuzhou under the Fusion of Chinese and Western Culture
CN202324411U (en) Closed construction structure for preventing rainwater from entering indoor from tower crane out-roofing hole
CN109423994A (en) The method of in situ pile in building construction
Gao Research on the Exterior Decoration Performance of Harbin Russian-style Buildings Based on Architectural Language
Lugli et al. Provenance of the transparent gypsum crystals (Lapis specularis) and gypsum mortars in the windows from the churches of Rome: S. Sabina sull'Aventino and S. Giorgio al Velabro
Ahlborn The Spanish Churches of Central Luzon (I)
Sulaiman et al. Heritage Landmark of the Royal Town of Klang: Balai Bomba Klang Selatan
Bilgin ARCHITECTURAL CHARACTERISTICS AND CONSTRUCTION TECHNIQUES OF WOODEN MOSQUES IN THE EASTERN BLACK SEA REGION IN TURKEY
Geng et al. Zhuang Landscape Architecture Evolvement in Guangxi: The Example of Coastal City Nanning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190305