CN107554178A - A kind of artificial hillock construction method - Google Patents

A kind of artificial hillock construction method Download PDF

Info

Publication number
CN107554178A
CN107554178A CN201710965128.5A CN201710965128A CN107554178A CN 107554178 A CN107554178 A CN 107554178A CN 201710965128 A CN201710965128 A CN 201710965128A CN 107554178 A CN107554178 A CN 107554178A
Authority
CN
China
Prior art keywords
artificial hillock
concrete layer
concrete
timber
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710965128.5A
Other languages
Chinese (zh)
Other versions
CN107554178B (en
Inventor
余晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Yi Jia Construction Co Ltd
Original Assignee
Shaoxing Yi Jia Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Yi Jia Construction Co Ltd filed Critical Shaoxing Yi Jia Construction Co Ltd
Priority to CN201710965128.5A priority Critical patent/CN107554178B/en
Publication of CN107554178A publication Critical patent/CN107554178A/en
Application granted granted Critical
Publication of CN107554178B publication Critical patent/CN107554178B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to building engineering field, discloses a kind of artificial hillock construction method, comprises the following steps:A, base is rammed solid:Side wall is coated with to timber fixation on base according to the contour line of artificial hillock massif bottom surface of flax silk, concreting concrete layer is used on base, and concrete layer coats timber;B, artificial hillock skeleton is manufactured:By artificial hillock mountain peak absolute altitude installation support pin on concrete layer, and in support pin outer cladding flax silk;Moulding reinforced frame is installed on concrete layer simultaneously, and in moulding reinforced frame outer cladding flax silk;Lid expanded metal lath is installed on moulding reinforced frame;C, mould:Concreting is used on concrete layer in lid expanded metal lath into artificial hillock body;D, modeling coloring is criticized.The present invention has advantages below and effect:Timber, support pin and reinforcing bar and the moisture and oxygen reaction that are entered by concrete crack are avoided by the cladding of flax silk, ensure the support strength of timber and reinforcing bar, improves the service life of artificial hillock.

Description

A kind of artificial hillock construction method
Technical field
The present invention relates to building engineering field, more particularly to a kind of artificial hillock construction method.
Background technology
Artificial hillock has many Landscaping functions, such as forms the main scape or landform skeleton in gardens, and division and tissue gardens are empty Between, arrangement garden, revetment, bank protection, earth-retaining, natural style flower stand is set.Simultaneously can also be with garden architecture, garden road, place and garden Woods plant society, so as to reducing artificial atmospher, increases the nature joy of life, garden architecture is merged to scenery with hills and waters into changeful view In environment.
At present, notification number is that CN202225672U Chinese utility model patent discloses a kind of concrete rockery, and it is wrapped Include by the artificial hillock frame body of more frameworks of steel reinforcement splicing shaping, inside the artificial hillock frame body on be provided with main support rod, in artificial hillock frame Support body outer layer is provided with metal net layer and the concrete layer being covered on metal net layer.
Concrete is to make binder materials with cement, sand, masonry aggregate, is coordinated by a certain percentage with water, agitated and obtained. But the ratio of water is adjusted anyway, because the addition of sand, stone causes concrete to produce gap after solidification is poured, is had ventilative Performance.Above-mentioned technical proposal, it is embedded in the reinforcing bar in concrete and is in alkaline medium, newly-laid concrete pH value is about 12.5 or more Height, so as to cause steel bar corrosion;Simultaneously because concrete produces gap, therefore the moisture in air passes through gap and steel with oxygen Muscle is reacted so as to accelerate steel bar corrosion.
Reinforcing bar can be replaced in existing concrete artificial hillock manufacturing process with timber, but similarly because concrete produces gap, it is empty Moisture in gas is reacted with oxygen by gap and timber, causes timber to rot.Steel bar corrosion or timber rot all The decrease of support strength inside artificial hillock is caused, so as to reduce the service life of artificial hillock.
The content of the invention
It is an object of the invention to provide a kind of artificial hillock construction method, and it avoids timber, support pin by the cladding of flax silk With reinforcing bar and the moisture and oxygen reaction that are entered by concrete crack, ensure the support strength of timber and reinforcing bar, improve artificial hillock Service life.
The present invention above-mentioned technical purpose technical scheme is that:A kind of artificial hillock construction method, bag Include following steps:
A, base is rammed solid:Side wall is coated with to timber fixation on base according to the contour line of artificial hillock massif bottom surface of flax silk, Concreting concrete layer is used on base, and concrete layer coats timber;
B, artificial hillock skeleton is manufactured:By artificial hillock mountain peak absolute altitude installation support pin on concrete layer, and in support pin outer cladding Flax silk;Moulding reinforced frame is installed on concrete layer simultaneously, and in moulding reinforced frame outer cladding flax silk;Pacify on moulding reinforced frame Capping expanded metal lath;
C, mould:Coated first on the support pin and moulding reinforced frame for be coated with flax silk with calcium plaster, then in lid steel plate Concreting is used on concrete layer in net into artificial hillock body;
D, modeling coloring is criticized:First smeared on artificial hillock outer body wall with the first cement river sand mixed liquor, then with the second cement river Husky mixed liquor is smeared, finally rag, coloring, maintenance on artificial hillock outer body wall.
By using above-mentioned technical proposal, in timber outer cladding flax silk, the timber for avoiding being arranged in concrete layer is with leading to The moisture and oxygen reaction of concrete crack entrance are crossed, so as to avoid timber from rotting;In support pin and moulding reinforced frame outsourcing Cover flax silk, avoid be arranged on artificial hillock it is intrinsic support pin and moulding reinforced frame with by concrete crack enter moisture with Oxygen reaction, so as to avoid supporting pin to rot and moulding reinforced frame corrosion.Flax silk can not only waterproof air-isolation, and have There is good tack, concrete is attached on flax silk, so as to improve concrete and timber, support pin or moulding steel Degree of being connected firmly between ledges.
The present invention is further arranged to, and the casting method of concrete layer is in the step A:Ring is poured on base first Shape concrete, annular concrete coat timber, metalling are then laid on the base in annular concrete, then in rubble The crisscross reinforcing bar of installation in annular concrete on layer, and reinforcing bar outer cladding flax silk, finally by the sky in annular concrete Concrete layer is made with concreting in gap.
The sound construction degree of artificial hillock is not only considered in the manufacturing process of artificial hillock, and to consider the installation in artificial hillock and base Firmness.By using above-mentioned technical proposal, the upper end of timber is fixed in annular concrete, and the lower end of timber is fixed on base In ground, artificial hillock and the degree of firmly installing in base are improved by the setting of timber;The rubble of metalling is morcelled in the middle part of process of deployment Stone can be embedded in base, and artificial hillock and base are improved in the gap between rubble and rubble by Concrete Filled by the setting of rubble The degree of firmly installing on ground.Due to being provided with crisscross reinforcing bar in concrete layer, the addition of reinforcing bar can improve concrete layer Sound construction degree.And reinforcing bar outer cladding flax silk, the cladding of flax silk can equally avoid the reinforcing bar that is arranged in concrete layer with The moisture and oxygen reaction entered by concrete crack, so as to avoid steel bar corrosion, improves the sound construction degree of concrete layer.
The present invention is further arranged to, and the concrete is formed by the configuration of following raw material:Cement, water, sand, building stones and glass Fiber.
Concrete is to make binder materials with cement, sand, masonry aggregate, is coordinated by a certain percentage with water, agitated and obtained. But the ratio of water is adjusted anyway, because the addition of sand, stone causes concrete to produce gap, there is permeability.Coagulation The presence in native gap can make the moisture in the outer air of artificial hillock enter artificial hillock by gap penetration with oxygen, with the timber or steel in artificial hillock Muscle reacts, so as to cause timber to rot, steel bar corrosion.By using above-mentioned technical proposal, added during concrete configuration Glass fibre, glass fibre add can sand, the gap of stone in fill concrete, so as to improve the density of concrete.It is mixed It is higher to coagulate the density of soil, pours that the concrete crack of completion is smaller, by gap penetrate artificial hillock moisture and oxygen it is then smaller, Timber and reinforcing bar in artificial hillock be not then perishable, corrosion.Fiberglass machine intensity is high simultaneously, the addition of glass fibre The firmness of concreting object can be improved.
The present invention is further arranged to, and concrete layer carries out jolt ramming in fixed-type to concrete layer in the step A, The operating method of jolt ramming is:Applied and vibrated along timber with vibrating spear, the vibrating spear swapping process that vibrates should soon be inserted and pulled out slowly, completion of vibrating Concrete layer is gone into bubble, warehouse, leveling with tamping plate afterwards.
Load bearing construction basis of the concrete layer as artificial hillock, will not only consider the firmness of concrete layer, and to consider The flatness of concrete layer.Concrete due to bubble can be produced in casting process including sand, stone, therefore concrete, bubble In the presence of the firmness that can influence concrete layer.Because follow-up support pin and moulding reinforced frame are on the basis of concrete layer Face, if therefore concrete layer upper surface out-of-flatness, can influence to support the installation of pin and moulding reinforced frame, so as to influence vacation Mountain it is moulded.By using above-mentioned technical proposal, applied and vibrated along timber by vibrating spear, and vibrating spear vibrates and plugged Journey should soon be inserted and pulled out slowly, and vibrating spear answers first quick insertion in process of vibrating, so as to improve the area that vibrates;In process of vibrating It should slowly extract, bubble is formed so as to avoid vibrating spear from mixing air in withdrawal process;Applying for vibrating spear is vibrated and can had Effect removes the bubble in concrete layer, so as to improve the firmness of concrete layer.Concrete layer is gone with tamping plate after the completion of vibrating Bubble, warehouse, leveling, so as to ensure the flatness of concrete layer upper surface, concrete layer upper surface is avoided bubble occur.
The present invention is further arranged to, and the manufacture method of moulding reinforced frame is in the step B:Bar list clean first Face, then by bar straightening, cut-out, moulding reinforced frame finally is made in steel bar continuous welding with welding rod.
The firmness of moulding reinforced frame can influence the overall firmness of artificial hillock.It is clean first by using above-mentioned technical proposal Net rebar surface, rebar surface is avoided floating rust to be inherently present, if the moisture in the outer air of artificial hillock passes through gap penetration with oxygen Enter artificial hillock, then can reinforcing bar as early as possible corrosion;Then by bar straightening, cut-out, local buckling can not occur in reinforcing bar, once reinforcing bar goes out Existing local buckling, then can influence the overall stress of reinforcing bar, once there is reinforcing bar entirety discontinuity, can cause at stress increasing Reinforcing bar dialysis, so as to reduce artificial hillock internal structure firmness;Moulding reinforced frame finally is made in steel bar continuous welding with welding rod, Continuous sequence can ensure the firmness of reinforcement welding, avoid the occurrence of it is lack of penetration, have stomata or slag inclusion.
The present invention is further arranged to, and calcium plaster is formed by the configuration of following raw material in the step C:Gypsum, water and epoxy Resin.
By using above-mentioned technical proposal, gypsum is coated on the flax silk being coated on outside support pin and moulding reinforced frame Slurry, the setting of calcium plaster can also be avoided that support pin and moulding reinforced frame pass through with the moisture in the outer air of artificial hillock with oxygen Gap penetration enters artificial hillock reaction.Calcium plaster includes epoxy resin, and epoxy resin not only has closely knit, water resistant, intensity height, simultaneously Strong with adhesive force, it can reduce support pin and moulding reinforced frame and moisture, oxygen reaction, and can preferably adhere to Between flax silk and concrete, so as to improve support pin and the degree of being connected firmly of moulding reinforced frame and concrete.
The present invention is further arranged to, and the first cement river sand mixed liquor is formed by the configuration of following raw material in the step D:Water Mud, river sand, yellow mud, water and hemp cut, the second cement river sand mixed liquor are formed by the configuration of following raw material:Yellow mud, cement, Shui Hehe It is husky.
By using above-mentioned technical proposal, first smeared first on artificial hillock outer body wall with the first cement river sand mixed liquor One time, because the first cement river sand mixed liquor includes cement, river sand, yellow mud, river sand, yellow mud can be coated in artificial hillock by cement On outer body wall, so that artificial hillock body lifelike image;Also include hemp cut, the addition of hemp cut in first cement river sand mixed liquor The intensity of artificial hillock can be improved, avoids artificial hillock from ftractureing.With the second cement river sand after the first cement river sand mixed liquor is smeared one time Mixed liquor smears multipass.Second cement river sand mixed liquor only includes yellow mud, cement and river sand, and the second cement river sand mixed liquor can It is uneven when smearing to make up the first cement river sand mixed liquor, makes artificial hillock mass colouring uniform.
The present invention is further arranged to, and the operating method of rag is in the step D:Laser engraving is used on artificial hillock from vacation The contour line that the mountain foot of the hill tapers successively to artificial hillock mountain top, and the depth of contour line is sequentially reduced from the artificial hillock foot of the hill to artificial hillock mountain top.
Contour line is either carved characters or carved in existing artificial hillock manufacturing process on artificial hillock, it is carved using icking tool mostly To carve, icking tool engraving requires high to user's dynamics, once overexertion, can form slight crack so as to influence the firmness of artificial hillock. By using above-mentioned technical proposal, using laser engraving, not only carving efficiency is high and simple to operate for laser engraving, and can Reduction produces gap during engraving, so as to influence the firmness of artificial hillock.Simultaneously during laser engraving contour line, profile The depth of line is sequentially reduced from the artificial hillock foot of the hill to artificial hillock mountain top, because its cross-sectional area of the artificial hillock foot of the hill is more than the transversal of artificial hillock mountain top Area, therefore the firmness at the artificial hillock foot of the hill is more than the firmness on artificial hillock mountain top, so as to which deeper contour line is carved simultaneously in the artificial hillock foot of the hill Slight crack will not be produced, the depth of contour line is sequentially reduced from the artificial hillock foot of the hill to artificial hillock mountain top can make artificial hillock visually tall and big and true True feeling.
The present invention is further arranged to, and the pigment coloured in the step D is formed by the configuration of following raw material:Coloring earth, White cement, 107 glue, water and ethylene-vinyl acetate copolymer.
The pigment coated on artificial hillock lateral wall is easily faded by blowing and raining.It is former by using above-mentioned technical proposal, pigment Material includes ethylene-vinyl acetate copolymer, and ethylene-vinyl acetate copolymer has preferable water resistance, and it can reduce pigment Faded by the effect of sleet;And ethylene-vinyl acetate copolymer has preferable corrosion resistance, its can reduce pigment by Corrode to chemicals such as grease, acid, alkali and fade.Pigment crude includes 107 glue simultaneously, and 107 glue scientific names are polyvinyl alcohol contracting first Aldehyde adhesive, the addition of 107 glue can improve the tack of pigment, so that pigment can preferably be coated in artificial hillock lateral wall On.
The present invention is further arranged to, and is coated and conserved with organosilicon on the artificial hillock body after the completion of being coloured in the step D.
By using above-mentioned technical proposal, coated on the artificial hillock body after the completion of coloring with organosilicon, organosilicon is not only High temperature resistant and low temperature resistant, reduces pigment and artificial hillock lateral wall produces slight crack because of the temperature difference;Organosilicon has weatherability simultaneously, no Easily decomposed by ultraviolet light and ozone, organosilicon have heat endurance more more preferable than other high polymer materials and it is resistance to irradiation and it is resistance to Time ability, service life in organosilicon under natural environment up to decades, avoid organosilicon protective layer because exposure out of doors and Decompose;And organosilicon has resistance to oxidation stability, fire retardant, hydrophobic, corrosion-resistant, so as to avoid artificial hillock cracking from improving the firm of artificial hillock Degree.
In summary, the invention has the advantages that:
1st, avoid timber, support pin and reinforcing bar and the moisture and oxygen that enter by concrete crack anti-by the cladding of flax silk Answer, ensure the support strength of timber and reinforcing bar, improve the service life of artificial hillock;
2nd, add glass fibre during concrete configuration, glass fibre add can sand, the gap of stone in fill concrete, So as to improve the density of concrete;The density of concrete is higher, and it is smaller to pour the concrete crack of completion, saturating by gap Enter that moisture and the oxygen of artificial hillock are then smaller, the timber and reinforcing bar in artificial hillock be not then perishable, corrosion;Glass fibre simultaneously High mechanical strength, the addition of glass fibre can improve the firmness of concreting object;
3rd, calcium plaster includes epoxy resin, and epoxy resin not only has that closely knit, water resistant, intensity are high, while has that adhesive force is strong, It can reduce support pin and moulding reinforced frame and moisture, oxygen reaction, and can preferably be attached to flax silk and coagulation Between soil, so as to improve support pin and the degree of being connected firmly of moulding reinforced frame and concrete;
4th, pigment crude includes ethylene-vinyl acetate copolymer, and ethylene-vinyl acetate copolymer has preferable water resistance, its Pigment can be reduced to be faded by the effect of sleet;And ethylene-vinyl acetate copolymer has preferable corrosion resistance, its energy Pigment is enough reduced by chemicals such as grease, acid, alkali to be corroded and fade;
5th, coated on the artificial hillock body after the completion of coloring with organosilicon, organosilicon not only high temperature resistant but also low temperature resistant, reduce face Material and artificial hillock lateral wall produce slight crack because of the temperature difference;And organosilicon has resistance to oxidation stability, fire retardant, hydrophobic, corrosion-resistant, so as to Artificial hillock cracking is avoided to improve the firmness of artificial hillock.
Embodiment
A kind of artificial hillock construction method, comprises the following steps:
A, base is rammed solid:First according to the bearing capacity of base soil and the weight configuration artificial hillock massif of massif, artificial hillock is being poured The timber that side wall is first coated with to flax silk before massif is fixed according to the contour line of design artificial hillock massif bottom surface on base.Then exist Annular concrete is poured on base, annular concrete coats timber.Then 10cm is laid on the base in annular concrete Metalling, then crisscross reinforcing bar, and reinforcing bar outer cladding flax silk are installed in the annular concrete on metalling.Finally will Concrete layer is made with concreting in space in annular concrete, and the cross dimensions on annular concrete basis is 50cm x 60cm, thickness 40cm.
Concrete layer carries out jolt ramming in fixed-type to concrete layer, and the operating method of jolt ramming is:
(1)Concrete layer starts vibrating spear in fixed-type and enters concrete layer and apply to shake, insertion depth preferably from base 30-50mm, It is unable to collision slab, reinforcing bar, built-in fitting, transmission rod etc.;Vibrating spear should soon be inserted and pulled out slowly, must not be pulled out soon;First along timber 10cm or so A shake is carried out with 30cm spacing, center section is at the uniform velocity advanced at interval of 50-60cm with 1 m/min or so of speed, is implemented complete Wide complete thick normally vibrates, and often drags the 1m that shakes to reinsert once;
(2)After concrete layer is vibrated with vibrating spear, using 1.1kg tamping plates, further leveling, warehouse, top layer bubble is driven out of, Improve surface quality.
Wherein concrete mixture whipping process is:
(1)Concrete material uses the mixer equipped with metering computer to carry out concentrated compactness, to ensure that the quality of concrete material is equal Even stabilization, concrete material mass percent are:Cement 25%, building stones 40%, sand 15%, water 15%, glass fibre 5%;It allows to miss Poor control accuracy is:Cement ± 1%, water ± 1%, sand ± 2%, building stones ± 2%, glass fibre ± 1%;
(2)It is appropriate to increase cement and corresponding water and sand, and proper extension mixing time when mixer stirs first set concrete; Compound must stir, and apparent color is consistent;Mixing time should be no less than 40s from feeding intake to finish to discharging, and examine at any time Look into the slump.
B, artificial hillock skeleton is manufactured:By artificial hillock mountain peak absolute altitude installation support pin on concrete layer, and outside support pin Coat flax silk;Moulding reinforced frame is installed on concrete layer simultaneously, and in moulding reinforced frame outer cladding flax silk;In moulding reinforced frame Upper installation lid expanded metal lath.
The manufacture method of wherein moulding reinforced frame is:
(1)Reinforcing bar muscle makes:Rebar surface should cleaning, must clean out, can tie before the greasy dirt of adhesion, soil, floating rust use Close cold-drawing process derusting;Bar straightening, can mechanically or manually straightening, the reinforcing bar after straightening must not have local buckling, dog leg, Minor undulations, its injurious surface mark should not make steel area reduce 5%;Bar cutting should according to reinforcing bar number, diameter, length and quantity, Length is arranged in pairs or groups, and break short material after the long material that first breaks, and reduces as far as possible and shortens reinforcing bar brachycephaly, with saving steel;
(2)Reinforcement welding:Continuous sequence is answered after seam crossing backing plate striking, and end reinforced fusion should be made, prevent it is lack of penetration, have Stomata or slag inclusion;It can stop to weld scarfing cinder once, after weldering is flat, then weld the welding of reinforcement, its height should be not more than 3m;Weld seam table Face is not answered defective and weakens phenomenon, 0.1 times of reinforcing steel bar center displacement of the lines no more than bar diameter in joint.
C, mould:Coated with calcium plaster on the support pin and moulding reinforced frame for be coated with flax silk, then covered first Concreting is used on concrete layer in expanded metal lath into artificial hillock body.
Wherein calcium plaster material quality percentage is:Gypsum 60%, water 30%, epoxy resin 10%;Its allowable error control essence Spend and be:Gypsum ± 2%, water ± 1%, epoxy resin ± 1%.
D, modeling coloring is criticized:First smeared on artificial hillock outer body wall with the first cement river sand mixed liquor, then with the second water Mud river sand mixed liquor is smeared, finally rag, coloring, maintenance on artificial hillock outer body wall.
Wherein the first cement river sand mixed liquor material quality percentage is:Cement 13%, river sand 26%, water 45%, yellow mud 10%, Hemp cut 6%;Its allowable error control accuracy is:Cement ± 1%, river sand ± 1%, water ± 2%, yellow mud ± 1%, hemp cut ± 1%.Second water Mud river sand mixed liquor material quality percentage is:Cement 15%, river sand 30%, water 45%, yellow mud 10%;Its allowable error control accuracy For:Cement ± 1%, river sand ± 1%, water ± 2%, yellow mud ± 1%.
The operating method of wherein rag is:Tapered successively from the artificial hillock foot of the hill to artificial hillock mountain top with laser engraving on artificial hillock Contour line, and the depth of contour line is sequentially reduced from the artificial hillock foot of the hill to artificial hillock mountain top.Emphasis is modified in the artificial hillock foot of the hill and vacation simultaneously In the middle part of mountain massif, the artificial hillock foot of the hill should show rough, have the vestige of artificial destruction, weathering, and leave the region of plant growth.Pursue Texture it is true, different faces, stiffening force sense and angle should be made, with enrich moulding, pay attention to level.
The pigment crude mass percent wherein coloured is:Coloring earth 55%, white cement 10%, 107 glue 8%, ethene-vinegar Sour ethylene copolymer 7%, water 20%;Its allowable error control accuracy is:Coloring earth ± 2%, white cement ± 1%, 107 glue ± 1%, Ethylene-vinyl acetate copolymer ± 1%, water ± 1%.
Coated and conserved with organosilicon on artificial hillock body after the completion of coloring.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (10)

  1. A kind of 1. artificial hillock construction method, it is characterised in that:Comprise the following steps:
    A, base is rammed solid:Side wall is coated with to timber fixation on base according to the contour line of artificial hillock massif bottom surface of flax silk, Concreting concrete layer is used on base, and concrete layer coats timber;
    B, artificial hillock skeleton is manufactured:By artificial hillock mountain peak absolute altitude installation support pin on concrete layer, and in support pin outer cladding Flax silk;Moulding reinforced frame is installed on concrete layer simultaneously, and in moulding reinforced frame outer cladding flax silk;Pacify on moulding reinforced frame Capping expanded metal lath;
    C, mould:Coated first on the support pin and moulding reinforced frame for be coated with flax silk with calcium plaster, then in lid steel plate Concreting is used on concrete layer in net into artificial hillock body;
    D, modeling coloring is criticized:First smeared on artificial hillock outer body wall with the first cement river sand mixed liquor, then with the second cement river Husky mixed liquor is smeared, finally rag, coloring, maintenance on artificial hillock outer body wall.
  2. 2. a kind of artificial hillock construction method according to claim 1, it is characterized in that:Concrete layer pours in the step A Method is:Annular concrete is poured on base first, annular concrete coats timber, then the base in annular concrete Laying metalling on the ground, then crisscross reinforcing bar, and reinforcing bar outer cladding fiber crops are installed in the annular concrete on metalling Silk, is finally made concrete layer by the space in annular concrete with concreting.
  3. 3. a kind of artificial hillock construction method according to claim 1 or 2, it is characterized in that:The concrete is matched somebody with somebody by following raw material Put and form:Cement, water, sand, building stones and glass fibre.
  4. 4. a kind of artificial hillock construction method according to claim 1, it is characterized in that:Concrete layer is in fixation in the step A Jolt ramming is carried out to concrete layer in shaping, the operating method of jolt ramming is:Applied and vibrated along timber with vibrating spear, vibrating spear vibrates slotting The process of pulling out should soon be inserted and pulled out slowly, and concrete layer is gone into bubble, warehouse, leveling with tamping plate after the completion of vibrating.
  5. 5. a kind of artificial hillock construction method according to claim 1, it is characterized in that:The system of moulding reinforced frame in the step B The method of making is:Rebar surface clean first, then by bar straightening, cut-out, finally steel bar continuous welding is made with welding rod and made Shaped steel ledges.
  6. 6. a kind of artificial hillock construction method according to claim 1, it is characterized in that:Calcium plaster is by following original in the step C Material configuration forms:Gypsum, water and epoxy resin.
  7. 7. a kind of artificial hillock construction method according to claim 1, it is characterized in that:The first cement river sand mixes in the step D Liquid is closed to be formed by the configuration of following raw material:Cement, river sand, yellow mud, water and hemp cut, the second cement river sand mixed liquor are matched somebody with somebody by following raw material Put and form:Yellow mud, cement, water and river sand.
  8. 8. a kind of artificial hillock construction method according to claim 1, it is characterized in that:The operating method of rag in the step D For:The contour line tapered successively from the artificial hillock foot of the hill to artificial hillock mountain top with laser engraving on artificial hillock, and the depth of contour line is from vacation The mountain foot of the hill to artificial hillock mountain top is sequentially reduced.
  9. 9. a kind of artificial hillock construction method according to claim 1, it is characterized in that:The pigment coloured in the step D by with Lower raw material configuration forms:Coloring earth, white cement, 107 glue, water and ethylene-vinyl acetate copolymer.
  10. 10. a kind of artificial hillock construction method according to claim 1, it is characterized in that:Vacation after the completion of being coloured in the step D Coated and conserved with organosilicon on the body of Yamamoto.
CN201710965128.5A 2017-10-17 2017-10-17 Rockery construction method Active CN107554178B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710965128.5A CN107554178B (en) 2017-10-17 2017-10-17 Rockery construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710965128.5A CN107554178B (en) 2017-10-17 2017-10-17 Rockery construction method

Publications (2)

Publication Number Publication Date
CN107554178A true CN107554178A (en) 2018-01-09
CN107554178B CN107554178B (en) 2020-05-22

Family

ID=60986249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710965128.5A Active CN107554178B (en) 2017-10-17 2017-10-17 Rockery construction method

Country Status (1)

Country Link
CN (1) CN107554178B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109572304A (en) * 2018-12-24 2019-04-05 元成环境股份有限公司 A kind of color method increasing plastic stone rockery fidelity
CN110259204A (en) * 2019-07-22 2019-09-20 上海宝冶建筑装饰有限公司 A kind of scenic spot dead wood trunk pool construction method
CN110271355A (en) * 2019-07-22 2019-09-24 上海宝冶建筑装饰有限公司 A kind of construction method of plastic stone rockery
CN110315901A (en) * 2019-05-15 2019-10-11 杭州市园林工程有限公司 A kind of garden rockery landscape construction method
CN110341368A (en) * 2019-08-02 2019-10-18 无锡市天合景观工程有限公司 Courtyard landscape design manually stacks diamond stone artificial hillock construction technology
CN110402748A (en) * 2019-08-27 2019-11-05 湖南农业大学 A kind of method of large-scale simulation Gu miniature gardening rapid shaping production
CN111347819A (en) * 2020-04-26 2020-06-30 岩土科技股份有限公司 Large-scale landscape rockery construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0347702A (en) * 1989-07-14 1991-02-28 Minoru Sakamoto Manufacture of natural state rock made of concrete in which grass growing on mountain, flower and tree are planted
CN201567579U (en) * 2009-12-04 2010-09-01 标力建设集团有限公司 Foundation pit supporting structure of gantry pine pile anchored rod
CN102343760A (en) * 2010-07-30 2012-02-08 黄华军 Method for manufacturing rockery from low alkalinity glass fiber cement through stone shaping
CN103821109A (en) * 2014-03-04 2014-05-28 重庆市排水有限公司 Water pool expansion joint water leakage repairing method
CN205018081U (en) * 2015-09-23 2016-02-10 深圳市江天包装材料有限公司 Special stake of bottom culture
CN205705937U (en) * 2016-06-24 2016-11-23 南京园林建设总公司 A kind of anticorrosion artificial hillock
CN206150025U (en) * 2016-10-26 2017-05-10 天津海泰市政绿化有限公司 Gardens are with an arbor winter protection section of thick bamboo
CN107021697A (en) * 2017-04-05 2017-08-08 浙江新纪元文化休闲有限公司 For the preparation method of the material, artificial hillock and artificial hillock that make artificial hillock
CN107032659A (en) * 2017-05-31 2017-08-11 安徽梅兰园林景观工程有限公司 A kind of garden landscape artificial hillock and preparation method thereof
CN107189270A (en) * 2017-06-20 2017-09-22 郑州铁路职业技术学院 The outer rock stratum of fluorescence and preparation method and the antificielle landscape using the outer rock stratum of the fluorescence

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0347702A (en) * 1989-07-14 1991-02-28 Minoru Sakamoto Manufacture of natural state rock made of concrete in which grass growing on mountain, flower and tree are planted
CN201567579U (en) * 2009-12-04 2010-09-01 标力建设集团有限公司 Foundation pit supporting structure of gantry pine pile anchored rod
CN102343760A (en) * 2010-07-30 2012-02-08 黄华军 Method for manufacturing rockery from low alkalinity glass fiber cement through stone shaping
CN103821109A (en) * 2014-03-04 2014-05-28 重庆市排水有限公司 Water pool expansion joint water leakage repairing method
CN205018081U (en) * 2015-09-23 2016-02-10 深圳市江天包装材料有限公司 Special stake of bottom culture
CN205705937U (en) * 2016-06-24 2016-11-23 南京园林建设总公司 A kind of anticorrosion artificial hillock
CN206150025U (en) * 2016-10-26 2017-05-10 天津海泰市政绿化有限公司 Gardens are with an arbor winter protection section of thick bamboo
CN107021697A (en) * 2017-04-05 2017-08-08 浙江新纪元文化休闲有限公司 For the preparation method of the material, artificial hillock and artificial hillock that make artificial hillock
CN107032659A (en) * 2017-05-31 2017-08-11 安徽梅兰园林景观工程有限公司 A kind of garden landscape artificial hillock and preparation method thereof
CN107189270A (en) * 2017-06-20 2017-09-22 郑州铁路职业技术学院 The outer rock stratum of fluorescence and preparation method and the antificielle landscape using the outer rock stratum of the fluorescence

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
段志勇: "《电气设备安装运行维修实用技术丛书-电气设备安装及调试(第二版)》", 31 March 2013 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109572304A (en) * 2018-12-24 2019-04-05 元成环境股份有限公司 A kind of color method increasing plastic stone rockery fidelity
CN109572304B (en) * 2018-12-24 2020-10-02 元成环境股份有限公司 Coloring method for increasing simulation degree of plastic-stone rockery
CN110315901A (en) * 2019-05-15 2019-10-11 杭州市园林工程有限公司 A kind of garden rockery landscape construction method
CN110259204A (en) * 2019-07-22 2019-09-20 上海宝冶建筑装饰有限公司 A kind of scenic spot dead wood trunk pool construction method
CN110271355A (en) * 2019-07-22 2019-09-24 上海宝冶建筑装饰有限公司 A kind of construction method of plastic stone rockery
CN110341368A (en) * 2019-08-02 2019-10-18 无锡市天合景观工程有限公司 Courtyard landscape design manually stacks diamond stone artificial hillock construction technology
CN110402748A (en) * 2019-08-27 2019-11-05 湖南农业大学 A kind of method of large-scale simulation Gu miniature gardening rapid shaping production
CN111347819A (en) * 2020-04-26 2020-06-30 岩土科技股份有限公司 Large-scale landscape rockery construction method

Also Published As

Publication number Publication date
CN107554178B (en) 2020-05-22

Similar Documents

Publication Publication Date Title
CN107554178A (en) A kind of artificial hillock construction method
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN100410470C (en) Permanently waterproof and green roofing
CN107165251A (en) A kind of construction method of drainage system
CN105332386B (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN109944265A (en) The method for carrying out foundation construction using concrete light scutum
CN107237448A (en) A kind of prefabricated interior fill concrete wallboard and its manufacture method
CN207063141U (en) A kind of thermal-insulating waterproof building structure
CN110439002A (en) A kind of interim horizontal structure of inner support is used as the method for permanent structure beam slab
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN109057066A (en) A kind of flexible connection anti-seismic structure and construction method
CN108412143A (en) Standard decoration hollow body railing and its construction method after a kind of
Hanses Basics Concrete Construction
CN107586068B (en) Upright column concrete and construction method of concrete upright column
CN108086154A (en) A kind of gradient function concrete towers rod structure and its construction method
CN109914801A (en) A kind of vertical entire body Slate hanging construction method of alien invasion
Ashurst Methods of repairing and consolidating stone buildings
CN110315901A (en) A kind of garden rockery landscape construction method
CN211646459U (en) One-time pouring decorative concrete retaining wall structure for wading
CN109577321A (en) A kind of tubular pole stake top filling core construction method
CN109577320A (en) A kind of tubular pole stake top filling core construction method
CN102650159B (en) Construction technology for fair-faced concrete wall with rope rib mark-texturized surface
CN113323112B (en) Large-scale soil relic tissue-free natural drainage structure and construction method thereof
CN217419931U (en) High anti-seepage concrete structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant