CN110259034A - A kind of floor leveling system - Google Patents
A kind of floor leveling system Download PDFInfo
- Publication number
- CN110259034A CN110259034A CN201910604632.1A CN201910604632A CN110259034A CN 110259034 A CN110259034 A CN 110259034A CN 201910604632 A CN201910604632 A CN 201910604632A CN 110259034 A CN110259034 A CN 110259034A
- Authority
- CN
- China
- Prior art keywords
- track
- bar
- floor leveling
- rangefinder
- leveling system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/20—Implements for finishing work on buildings for laying flooring
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of floor leveling systems, comprising: rail assembly mounts component, multiple rangefinders and cutter;Rail assembly includes the first track and the second track, and the first track and the second track are identical relative to the height of the given plane of reference;Mounting component includes mounting bar;The both ends for mounting bar are connect with the first track and the second track respectively;Multiple rangefinders are mounted according to given interval in mounting on bar, and by adjusting the position of rangefinder, the light for issuing the rangefinder is incident upon the installation point of dotted keel, and vertical with surface water plane;Rangefinder be used for measure the preassigned plane of reference to dotted keel installation point distance;Multiple plane of references that cutter is measured according to multiple rangefinders determine the height of dotted keel, and highly cut locally according to this to the distance of dotted keel installation point.Based on floor leveling system of the invention, so that the efficiency of floor leveling greatly promotes, also, cost needed for floor leveling is significantly reduced.
Description
Technical field
The present invention relates to interior decoration technology more particularly to a kind of floor leveling systems.
Background technique
During (house ornamentation) is installed on traditional ground, floor leveling is necessary process.
Fig. 1 is the mounting structure on traditional ground.As shown in Figure 1, house ornamentation worker will include fulgurite and ground heating heat insulation first
Fulgurite/ground-heating thermal insulation layer 15 of layer is laid on building lot face 16, and covering cement sand bed progress is levelling, then re-lays packet
Grounding heat coil tube containing grounding heat coil tube/backfill layer 14, then filled out with cement mortar screeding layer 13 and cement mortar adhesive layer 12
It is flat, then architectural surface, including finished product floor 11, timber floor, ceramic tile or stone material are installed again.
Because this traditional ground installation process is also longer very time-consuming and required arid cycle, in addition,
It is very high to worker personal experience and skill requirement in the installation process of last architectural surface, and the erector of architectural surface
The wage cost of people is higher, moreover, the ground face thickness completed by this mounting process is larger (to lead to ground if hot-water heating layer of mating formation
Face thickness is 10-12cm, causes ground with a thickness of 6-8cm if hot-water heating layer of not mating formation).
For the problems of traditional ground installation, the ground installation using assembled finishing is proposed in the prior art
Method.There is the ground installation structure that assembled finishing is completed by bar shaped keel as shown in Figure 2, and as shown in Figure 3
By dotted keel complete assembled finishing ground installation structure.
The characteristics of both assembleds are fitted up is not carry out floor leveling by cement and mortar at the scene, but pass through
Steel bar shaped keel or dotted keel carry out floor leveling.
Specifically, in Fig. 2, when using steel bar shaped keel 113, be provided with from top to bottom finished product floor 11,
Plate moistureproof cushion 111, grounding heat coil tube and heat preservation integrated layer 112, bar shaped keel 113, floor leveling point 114 and building lot face 16.
In Fig. 3, when using dotted keel, it is provided with finished product floor 11, Dampproof floor board pad 111, floor heating from top to bottom
Coil pipe and heat preservation integrated layer 112, finished product board substrates 116, dotted keel 115 and building lot face 16.
But Fig. 2 and method shown in Fig. 3 still have that ground face thickness is higher (to cause ground thick if hot-water heating layer of mating formation
Degree is more than 10cm) the problem of, simultaneously because the aerial reason of steel bar shaped keel or dotted keel, when user wears high heels, skin
When shoes, furniture move and thing is fallen, easily generates ground echo and neighbours downstairs are impacted.
In addition, there are also certain methods, such as using the dotted keel of inside spin, but has a problem in that there is still a need for from nonlocal factory
Production and transport and dispatching, the price for being folded to single dotted keel are higher.Also, worker needs that type fast leveling device is cooperated to carry out
The height adjustment at scene, the duration that entire adjustment expends are more than installation duration.
In summary: in fitment process, the promotion of floor leveling efficiency and the reduction of floor leveling cost, are this fields
The problem of technical staff's urgent need to resolve.
Summary of the invention
To overcome the above problem in the prior art at least to a certain extent, the present invention provides a kind of floor leveling system
System.
The embodiment of the invention provides a kind of floor leveling systems, floor leveling when for house decoration, comprising:
Rail assembly mounts component, multiple rangefinders, and, cutter;
The rail assembly includes the first track and the second track, and first track is fixedly installed on the first metope, institute
It states the second track and is set to the second metope;First metope and second metope are two walls opposite in decorating house
Face;Also, first track is identical relative to the height of the given plane of reference with second track;First track and institute
It states to be provided on the second track and mounts fixed detent to fixed spacing;
The component that mounts includes mounting bar;The both ends for mounting bar respectively with first track and second rail
Road connection, so that the bar that mounts is in horizontally disposed;
The multiple rangefinder is mounted according to given interval and is mounted on bar in described, by adjusting the position of the rangefinder
It sets, the light for issuing the rangefinder is incident upon the installation point of dotted keel, and vertical with surface water plane;The rangefinder
For measure the preassigned plane of reference to dotted keel installation point distance;
Multiple plane of references that the cutter is measured according to the multiple rangefinder to dotted keel installation point distance,
It determines the height of dotted keel, and is highly cut locally according to this.
Further, in above-mentioned floor leveling system embodiment, in the rail assembly, first track and described
Two tracks are scalable track.
Further, described to mount in component in above-mentioned floor leveling system embodiment, the bar that mounts is scalable set
Bar.
Further, in above-mentioned floor leveling system embodiment, the scalable loop bar is the telescopic loop bar in both ends.
Further, in above-mentioned floor leveling system embodiment, the scalable loop bar include intermediate loop bar and, it is right
Claim the gradually smaller multi-stage expansion section loop bar of multiple bores for being set to the intermediate loop bar two sides.
Further, in above-mentioned floor leveling system embodiment, the component that mounts further includes attachment device, the connection
Device includes bidirectional modulation fixed fastener, two-way bolt, and with the two-way bolted nut;
The bidirectional modulation fixed fastener includes the first transverse slat, starting stave and the second transverse slat;
First transverse slat is connect with the first end of the starting stave;
The second end of the starting stave is connect with second transverse slat;
First transverse slat, the starting stave and second transverse slat form U-type groove;
The bar that mounts is across the U-type groove;
The first end of the two-way bolt passes through second transverse slat and abuts with the bar that mounts;
The second end of the two-way bolt, which is also threadably secured with rangefinder, to be connect;
The depth being threadedly coupled by the two-way bolt with the rangefinder mounts all rangings on bar described in adjustment
Instrument is in same level height.
Further, in above-mentioned floor leveling system embodiment, relative to the intermediate symmetrical telescopic joint of loop bar
Loop bar is provided with identical label;One end that the two-way bolt is threadedly coupled with the rangefinder is provided with multiple detent marks
Note;The indicia matched of the detent label and the setting of telescopic joint loop bar.
Further, in above-mentioned floor leveling system embodiment, the bar that mounts is additionally provided with level meter;It is described to mount bar
Both ends be slidably connected by movable pulley and first track or the second track;
Described every one end for mounting bar is provided with Double-wheel structure.
Further, in above-mentioned floor leveling system embodiment, the rangefinder is laser range finder;
The laser range finder is provided with information transmitting apparatus, and the information transmitting apparatus is used to measure the preparatory of acquisition
The distance of installation point of the specified plane of reference to dotted keel is sent to cutter;
The cutter is provided with information receiver;
The information receiver is used to receive the preassigned plane of reference of measurement acquisition to the installation point of dotted keel
The distance of position, and according to the distance, determine the height of the dotted keel of installation point.
Further, in above-mentioned floor leveling system embodiment, the information transmitting apparatus and the information receiver
It is Bluetooth communication device.
The embodiment of the present invention is used for floor leveling when house decoration, particularly for the finishing for the first time of building.
Floor leveling system embodiment of the present invention includes rail assembly, mounts component, multiple rangefinders and cutter;
Mounting component includes mounting bar;Mount the both ends of bar respectively in rail assembly the first track and the second track connect so that
Bar is mounted in horizontally disposed;Multiple rangefinders are mounted according to given interval in mounting on bar, by adjusting the position of rangefinder, are made
The light that the rangefinder issues is incident upon the installation point of dotted keel, and vertical with surface water plane;Rangefinder is for measuring
The preassigned plane of reference to dotted keel installation point distance;Multiple references that cutter is measured according to multiple rangefinders
Face determines the height of dotted keel, and highly cut locally according to this to the distance of dotted keel installation point.
As can be seen from the above analysis, this floor leveling system for using inventive embodiments, can pacify according to dotted keel
The position decorateeed carries out quick elevation carrection, and scene directly makes the dotted keel of respective heights, without raw from nonlocal factory
It produces, transport and dispenses, greatly reduce the cost of dotted keel.For example, in the specific implementation, it can choose that dotted cost is relatively low
Concrete column carry out live cutting, material cost greatly reduces, economical and practical.In addition, since dotted keel have passed through cutting
Height is adjusted, the height adjustment at scene is carried out using leveling tool without worker, greatly shortens the time of floor leveling process.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not
It can the limitation present invention.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention
Example, and be used to explain the principle of the present invention together with specification.
Fig. 1 is the mounting structure of traditional metope;
Fig. 2 is the structural schematic diagram that keel install decorative wall panels by bonding way in the prior art;
Fig. 3 is the structural schematic diagram that keel install decorative wall panels by screw fashion in the prior art;
Fig. 4 is the step flow chart that floor leveling is carried out using floor leveling method system of the present invention;
Fig. 5 is rail assembly, the in-site installation for mounting component and rangefinder in floor leveling system embodiment of the present invention
Schematic diagram;
Fig. 6 is the schematic diagram of laser range finder installation in floor leveling system embodiment of the present invention;
Fig. 7 is the structural schematic diagram of cutter in floor leveling system embodiment of the present invention.
Fig. 8 is when carrying out floor leveling using floor leveling system embodiment of the present invention, to install pressure on dotted keel
The schematic diagram of plate;
Fig. 9 is that the scalable loop bar of component is mounted in floor leveling system embodiment of the present invention in whole tensional states
Structural schematic diagram;
Figure 10 is in floor leveling system embodiment of the present invention, and the scalable loop bar for mounting component is in the knot of contraction state
Structure schematic diagram;
Figure 11 is in floor leveling system embodiment of the present invention, and the scalable loop bar for mounting component is in the knot of detecting state
Structure schematic diagram;
Figure 12 is to mount the connection relationship diagram of component and rangefinder in floor leveling system embodiment of the present invention;
Figure 13 is the structural schematic diagram of attachment device in floor leveling system embodiment of the present invention
Figure 14 is in floor leveling system embodiment of the present invention, and the two-way bolt of attachment device is provided with the first detent mark
Note, the schematic diagram of the second detent label and third detent label;
Figure 15 is in floor leveling system embodiment of the present invention, and rangefinder is installed to the schematic diagram of attachment device.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be mentioned that some exemplary embodiment quilts before exemplary embodiment is discussed in greater detail
Specific structure and function details disclosed herein are only representative, and are for describing the present invention show
The purpose of example property embodiment.But the present invention can be implemented by many alternative forms, and be not interpreted as
It is limited only by the embodiments set forth herein.
Although it should be understood that may have been used term " first ", " second " etc. herein to describe each unit,
But these units should not be limited by these terms.The use of these items is only for by a unit and another unit
It distinguishes.For example, without departing substantially from the range of exemplary embodiment, it is single that first unit can be referred to as second
Member, and similarly second unit can be referred to as first unit.Term "and/or" used herein above include one of them or
Any and all combinations of more listed associated items.
Term used herein above is not intended to limit exemplary embodiment just for the sake of description specific embodiment.Unless
Context clearly refers else, otherwise singular used herein above "one", " one " also attempt to include plural number.Also answer
When understanding, term " includes " and/or "comprising" used herein above provide stated feature, integer, step, operation,
The presence of unit and/or component, and do not preclude the presence or addition of other one or more features, integer, step, operation, unit,
Component and/or combination thereof.
It is the step flow chart that floor leveling is carried out using floor leveling method system of the present invention referring to Fig. 4, Fig. 4, including
Following steps:
Step S110 sets the first elevation references line.
In one embodiment, the first elevation references line is set as follows:
1) ground of public domain lift car, is determined;
2) reference line, is marked to predetermined altitude from the ground of public domain lift car, and the reference line is set as
First elevation references line.That is, the first elevation references line is on the basis of the ground of public domain lift car.
In one embodiment, the height of the first elevation references line can be counted from the ground of public domain lift car,
At 1 meter, reference line is marked.
Here 1 meter is a selection in specific implementation, but is joined the present invention is not limited to set the first of 1 meter high the height
Line is examined, other numerical value are also within protection scope of the present invention.
Step S120, first between ground finished surface and the first elevation references line after the completion of setting is levelling is highly
Difference.
The step is used to determine distance of the ground finished surface relative to the first elevation references line, that is to say, that completes ground
The height on the ground after levelling.
In one embodiment, the level height of ground finished surface is set as and the ground of the lift car of public domain height
Degree is consistent.
Step S130 measures the second difference in height between the current location and the first elevation references line in building lot face.?
In one embodiment, which can carry out in the following manner:
1) dotted keel installation position, is determined;
2) it, is based on the first elevation references line, by track installation to metope;
3), installation mounts bar between trapped orbit;
4) it, by least one rangefinder, is mounted for example, being installed in one embodiment using laser range finder to described
Bar;
5) laser range finder, is opened, laser range finder detection point is adjusted to the installation point of dotted keel, is carried out high
Degree measurement, obtains the second difference in height.
When carrying out the above-mentioned the 5) rapid operation step by step, laser range finder detection point is adjusted to the installation of dotted keel
Point may include following sub-step:
51) it is vertical with surface water plane to adjust the laser rays that the laser range finder is got, and makes laser rays point dotted
Keel installation point;
52) in laser line projection deviation, with front and back adjust described in mount bar and/or the laser that mounts of left and right adjustment
The position of rangefinder.
Step S140 calculates the setting for the dotted keel placed at the current location in building lot face by following formula
Height h:
H=h2-h1-h3-h4;Wherein,
H is the setting height of dotted keel,
H2 is the second difference in height
H3 is flooring base thickness
H4 is ground practice thickness degree.
In the specific implementation, the setup algorithm of dotted keel level and the calculating equipment cut through in cutter are complete
At.
More specifically, laser range finder is provided with information transmitting apparatus;Cutter is provided with information receiver;Swashing
Further include following steps after optar obtains second difference in height: the second difference in height is sent by information transmitting apparatus
To the information receiver of cutter.Also, information transmitting apparatus simultaneously also sends out the point of the current location in building lot face
It send to the information receiver of cutter.
It is current according to built-in flooring base thickness and ground practice layer THICKNESS CALCULATION after cutter receives the second difference in height
The setting height for the dotted keel placed at position.
Step S150 cuts dotted keel, makes the dotted keel placed at the length and current location of the dotted keel
Setting height it is consistent.
The dotted keel that cutting obtains are placed into corresponding position by step S160.
In the specific implementation, cutting operation is completed by the cutter of cutter.
Step S170 sequentially installs pressure plare and ground floor on the dotted keel of building lot face installation, completes ground
It is levelling.
Referring to Fig. 5, Fig. 5 is in floor leveling system embodiment of the present invention, and rail assembly mounts component and rangefinder
In-site installation schematic diagram.
Floor leveling system provided in an embodiment of the present invention, floor leveling when for house decoration, comprising: track groups
Part mounts component, multiple rangefinders, and, cutter.
Rail assembly includes the first track and the second track, and the first track is fixedly installed on the first metope, and the second track is set
It is placed in the second metope;First metope and the second metope are two metopes opposite in decorating house;Also, the first track and second
Track is identical relative to the height of the given plane of reference.
Mounting component includes mounting bar;The both ends for mounting bar are connect with the first track and the second track respectively, so as to mount
Bar is in horizontally disposed.
Multiple rangefinders are mounted according to given interval in mounting on bar, by adjusting the position of rangefinder, make the rangefinder
The light of sending is incident upon the installation point of dotted keel, and vertical with surface water plane;Rangefinder is predesignated for measuring
The plane of reference to dotted keel installation point distance.
Multiple plane of references that cutter is measured according to multiple rangefinders determine dotted to the distance of dotted keel installation point
The height of keel, and highly cut locally according to this.
As described above, the building lot face 52 in decorating house is the ground fitted up for the first time.Elevator car from public domain
Level height of the compartment ground as room floors finished surface;A meter Gao Du is up measured from carriage ground, height is introduced to indoor, mark
Know one-meter line position on flooring finished surface out, while ground longitude and latitude snap the line determines dotted keel installation position, is embodied
When, using concrete column keel;Trapped orbit 50 is mounted on 1 rice noodles position.Mounting component includes mounting bar 51.By laser ranging
51 both sides of bar that mount of instrument are overlapped on metope trapped orbit 50.Bar is mounted by what laser range finder 53 mounted laser range finder
On 51, and ensure that the laser rays that laser range finder 53 is got is vertical with surface water plane, while laser rays point is in dotted keel
Installation point can front and back adjustment mounts bar 51 and left and right adjustment mounts Laser Measuring if there is laser line projection deviation
53 position of distance meter.
It is shown in floor leveling embodiment of the method for the present invention referring to Fig. 6, Fig. 6, the schematic diagram of laser range finder installation.
From fig. 6, it can be seen that the one end for mounting bar 51 is connected on trapped orbit 50, trapped orbit 50 is mounted on finishing room
On the metope 54 in room.Laser range finder 53, which is mounted on, to be mounted on bar 51.Multiple transverse directions can be had to be telescopic by mounting bar 51
The laser range finder of position-adjustable mounts hole location.Trapped orbit 50 can also stretch on metope 54, meanwhile, mounting bar 51 has
The laser range finder of constant spacing mounts the fixation detent of bar.
Referring to Fig. 7, shows and be used in floor leveling system embodiment of the present invention, the structural schematic diagram of cutter.This is cut
It cuts machine 70 and is provided with stepper motor 71, information receiver 72, from Fig. 7 it can also be seen that the dotted keel 73 of cement of cutting.
In one embodiment, the raw material concrete column of dotted keel can be put into cutter 70, for example, automatic cutting
Machine, which receives laser range finder detection data by information receiver 72 automatically, and calculates the point of concrete column
Concrete column is pushed into cutting slot corresponding size (that is, dotted keel desired height) with stepper motor 71 by shape keel desired height, will
Concrete column cutting is the dotted keel desired height of concrete column.
The schematic diagram that pressure plare is installed on dotted keel is shown referring to Fig. 8, Fig. 8.From figure 8, it is seen that giving room
When room 84 carries out floor leveling, pressure plare 80 is pressed in multiple 82 forming faces of dotted keel.
The present embodiment carries out quick elevation carrection according to the position of dotted keel installation point, and scene directly production is corresponding high
The dotted keel of degree, without greatly reducing the cost of dotted keel from nonlocal plant produced, transport and dispatching.For example, having
When body is implemented, it can choose dotted lower-cost concrete column and carry out live cutting, material cost greatly reduces, economical and practical.
In addition, adjusting height since dotted keel have passed through cutting, scene is carried out using leveling tool without worker
Height adjustment, greatly shorten the time of floor leveling process.
Referring to Fig. 9, Figure 10 and Figure 11, the component that mounts in floor leveling system embodiment of the present invention is done further
It is bright.
In one embodiment, the bar that mounts mounted in component is scalable loop bar.It is set as the benefit of scalable loop bar
It is that can adjust the span for mounting bar at any time according to the width of two opposite face walls of practical decorating house.
In one embodiment, it is scalable to can be one end for above-mentioned scalable loop bar, and it is scalable to may be set to be both ends.
The flexible benefit in both ends is that telescopic rod both ends rail wheel mounting height can be made consistent, when telescopic rod slides on metope track
When, telescopic rod is not easy to generate inclination because left and right height is different.
It is that the scalable loop bar of component is mounted in floor leveling system embodiment of the present invention in all referring to Fig. 9, Fig. 9
The structural schematic diagram of tensional state;Figure 10 is to mount at the scalable loop bar of component in floor leveling system embodiment of the present invention
In the structural schematic diagram of contraction state;Figure 11 is to mount the scalable loop bar of component in floor leveling system embodiment of the present invention
Structural schematic diagram in detecting state.
Scalable loop bar in the embodiment is the telescopic telescopic rod in both ends.The scalable loop bar includes intermediate loop bar
90 and it is symmetrically disposed on the gradually smaller multi-stage expansion section loop bars of multiple bores of intermediate 90 two sides of loop bar, for example, being located at centre
The left side first order casing 91 and left side second level casing 92 in 90 left side of loop bar, the right side first order positioned at 90 right side of intermediate casing
Casing 93 and right side second level casing 94.Wherein, left side first order casing 91 is identical with 93 structure structure of right side first order casing,
Left side second level casing 92 is identical with the right side second level 94 structures of casing.
The component that mounts in floor leveling system embodiment of the present invention is made into one in 2, Figure 13, Figure 14 and Figure 15 referring to Fig.1
Step ground explanation.
Referring to Fig.1 2, it shows in floor leveling system embodiment of the present invention, mounts the connection relationship of component and rangefinder
Schematic diagram.Mounting component includes mounting bar 1201, and for connecting multiple attachment devices 1202 of rangefinder 1204.
Referring to Fig.1 3, it shows in floor leveling system embodiment of the present invention, the structural schematic diagram of attachment device 1202.From
The figure can be seen that attachment device 1202 include bidirectional modulation fixed fastener 12021, two-way bolt 12022, and with two-way spiral shell
Tether the nut 12023 connect.
Wherein, bidirectional modulation fixed fastener 1202 includes the first transverse slat, starting stave and the second transverse slat;First transverse slat and
The first end of one riser connects;The second end of starting stave connect the first transverse slat, starting stave and the second transverse slat with the second transverse slat
Form U-type groove.
Bar 1201 is mounted across U-type groove;The first end of two-way bolt 12022 passes through the second transverse slat and abuts with bar is mounted;It is double
It is also connect to the second end of bolt 12022 with rangefinder 1204 by being screwed for the upper end;
The depth being connect by two-way bolt 12023 with the screw thread of rangefinder 1204, adjustment mount the institute on bar 1201
There is rangefinder 1204 in same level height.
In one embodiment, the depth of thread of two-way bolt 12023 matches telescopic joint position, is provided with different detents
Label.Referring to Fig.1 4.Figure 14 shows the first detent label 120221, the second detent label 120222 and third detent label
120223.Each different detent label can be different color.It is with that in mind that setting detent, which marks: because stretching
Contracting bar reaches maximum value, and the thickness of each section telescopic bar is different, in order to which laser range finder baseplane height off the ground is the same, setting
Two-way bolt 12022 with limit tag line, while the color of each section telescopic bar and the limit for mounting respective heights on fastener
It is identical to identify line color.
Furtherly, the top of two-way bolt 12022 is bidirectional modulation fixed fastener 1202 and telescopic rod fixing end, is twisted double
Two-way 12022 top of bolt is allowed to withstand telescopic rod to the nut 12023 at 12022 middle part of bolt, nut 12023 is hexagon,
In one embodiment, which is a part in two-way 12022 entirety of bolt, and non-individual accessory.Meanwhile Laser Measuring
Screw mother mouth 12041 is arranged at distance meter top, is screwed into two-way bolt 12022 from below, is mounted on according to this attachment device 1202 flexible
The position of bar 1201, the position for the detent for selecting laser range finder top stubborn.
In one embodiment, the color of the color of detent label and the telescopic rod being clamped with current attachment device 1202
It is identical.That is, in order to realize Fast Installation rangefinder, the left side first order casing 91 in intermediate 90 left side of loop bar and right side the
The color of level-one casing 93 is identical, and left side second level casing 92 is identical as the color of right side second level casing 94.If there is more stages
Casing, and so on, guarantee that laser range finder lower part absolute altitude keeps identical with this, is surveyed so as to accurately measure present laser
The actual height of distance meter corresponding position, and data are transferred to automatic cutting device and complete levelling part automatic cutting.
5, Figure 15 is in floor leveling system embodiment of the present invention referring to Fig.1, and rangefinder is installed to the signal of attachment device
Figure.It can be seen from fig. 15 that rangefinder is installed to including bidirectional modulation fixed fastener 12021, two-way bolt 12022, Yi Jiyu
The attachment device 1202 of two-way bolted nut 12023.
In one embodiment, the both ends for mounting bar are connected by movable pulley and the sliding of first track or the second track
It connects;Referring to Fig. 9 or Figure 10, the left end for mounting bar is provided with left side Double-wheel structure 96, and the right end for mounting bar is provided with right side two-wheel
Structure 95;By the structure of " unilateral two-wheel ", guarantee mounts bar and does not occur all around to tilt.Preferably, on telescopic rod top
Level meter can also be installed, just can guarantee that the laser range finder height mounted will not generate variation in this way.
In the specific implementation, rangefinder can be laser range finder;Laser range finder is provided with information transmitting apparatus, cutting
Machine is provided with information receiver.In one embodiment, information transmitting apparatus and information receiver can be Bluetooth communication
Device.In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specific example ",
Or the description of " some examples " etc. means particular features, structures, materials, or characteristics packet described in conjunction with this embodiment or example
Contained at least one embodiment of the present invention or example.In the present specification, schematic expression of the above terms are not necessarily
Refer to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be any one
It can be combined in any suitable manner in a or multiple embodiment or examples.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example
Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned
Embodiment is changed, modifies, replacement and variant.
Claims (10)
1. a kind of floor leveling system, which is characterized in that floor leveling when for house decoration, comprising:
Rail assembly mounts component, multiple rangefinders, and, cutter;
The rail assembly includes the first track and the second track, and first track is fixedly installed on the first metope, and described the
Two tracks are set to the second metope;First metope and second metope are two metopes opposite in decorating house;And
And first track and second track are identical relative to the height of the given plane of reference;First track and described
It is provided on two tracks and mounts fixed detent to fixed spacing;
The component that mounts includes mounting bar;The both ends for mounting bar connect with first track and second track respectively
It connects, so that the bar that mounts is in horizontally disposed;
The multiple rangefinder is mounted according to given interval and is mounted on bar in described, by adjusting the position of the rangefinder, is made
The light that the rangefinder issues is incident upon the installation point of dotted keel, and vertical with surface water plane;The rangefinder is used for
Measure the preassigned plane of reference to dotted keel installation point distance;
Multiple plane of references that the cutter is measured according to the multiple rangefinder are determined to the distance of dotted keel installation point
The height of dotted keel, and highly cut locally according to this.
2. floor leveling system according to claim 1, which is characterized in that
In the rail assembly, first track and second track are scalable track.
3. floor leveling system according to claim 1 or 2, which is characterized in that
Described to mount in component, the bar that mounts is scalable loop bar.
4. floor leveling system according to claim 3, which is characterized in that
The scalable loop bar is the telescopic loop bar in both ends.
5. floor leveling system according to claim 4, which is characterized in that
The scalable loop bar include intermediate loop bar and, be symmetrically disposed on multiple bores of the intermediate loop bar two sides gradually
The multi-stage expansion section loop bar to become smaller.
6. floor leveling system according to claim 5, which is characterized in that
The component that mounts further includes attachment device, and the attachment device includes bidirectional modulation fixed fastener, two-way bolt, and
With the two-way bolted nut;
The bidirectional modulation fixed fastener includes the first transverse slat, starting stave and the second transverse slat;
First transverse slat is connect with the first end of the starting stave;
The second end of the starting stave is connect with second transverse slat;
First transverse slat, the starting stave and second transverse slat form U-type groove;
The bar that mounts is across the U-type groove;
The first end of the two-way bolt passes through second transverse slat and abuts with the bar that mounts;
The second end of the two-way bolt, which is also threadably secured with rangefinder, to be connect;
The depth being threadedly coupled by the two-way bolt with the rangefinder, all rangefinders mounted on bar described in adjustment exist
Same level height.
7. floor leveling system according to claim 6, which is characterized in that
The intermediate symmetrical telescopic joint loop bar of loop bar is provided with identical label;
One end that the two-way bolt is threadedly coupled with the rangefinder is provided with multiple detent labels;
The indicia matched of the detent label and the setting of telescopic joint loop bar.
8. floor leveling system according to claim 1, which is characterized in that
The bar that mounts is additionally provided with level meter;
The both ends for mounting bar are slidably connected by movable pulley and first track or the second track;
Described every one end for mounting bar is provided with Double-wheel structure.
9. floor leveling system according to claim 1, which is characterized in that
The rangefinder is laser range finder;
The laser range finder is provided with information transmitting apparatus, and the information transmitting apparatus is used to measure preassigning for acquisition
The distances of installation point of the plane of reference to dotted keel be sent to cutter;
The cutter is provided with information receiver;
The information receiver is used to receive the preassigned plane of reference of measurement acquisition to the installation point of dotted keel
Distance, and according to the distance, determine the height of the dotted keel of installation point.
10. floor leveling system according to claim 9, which is characterized in that
The information transmitting apparatus and the information receiver are Bluetooth communication device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910604632.1A CN110259034B (en) | 2019-07-05 | 2019-07-05 | Ground leveling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910604632.1A CN110259034B (en) | 2019-07-05 | 2019-07-05 | Ground leveling system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110259034A true CN110259034A (en) | 2019-09-20 |
CN110259034B CN110259034B (en) | 2021-12-24 |
Family
ID=67924751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910604632.1A Active CN110259034B (en) | 2019-07-05 | 2019-07-05 | Ground leveling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110259034B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113738080A (en) * | 2021-09-18 | 2021-12-03 | 上海觅谷空间设计工程有限公司 | Assembly type ground leveling method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0077070B1 (en) * | 1981-10-13 | 1985-01-30 | Schmidt Reuter Ingenieurgesellschaft mbH & Co. KG | Method of and apparatus for setting up levelled column elements of a double floor |
CN202149763U (en) * | 2011-08-09 | 2012-02-22 | 山东兴华建设集团有限公司 | Ground flatness tester |
CN203285027U (en) * | 2013-06-04 | 2013-11-13 | 江苏红蚂蚁装饰设计工程有限公司 | Ground leveling device |
CN104644014A (en) * | 2013-11-22 | 2015-05-27 | 西安易目软件科技有限公司 | Wall absorption mini telescopic rod |
CN105846182A (en) * | 2016-03-29 | 2016-08-10 | 国网山东省电力公司平阴县供电公司 | Compact low-voltage grounding wire |
CN108316606A (en) * | 2017-12-30 | 2018-07-24 | 浙江亚厦装饰股份有限公司 | A kind of ground overhead system and its installation method |
CN208451226U (en) * | 2018-05-31 | 2019-02-01 | 东营宝丰汽车配件有限公司 | A kind of new-energy automobile brake block grinding device |
-
2019
- 2019-07-05 CN CN201910604632.1A patent/CN110259034B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0077070B1 (en) * | 1981-10-13 | 1985-01-30 | Schmidt Reuter Ingenieurgesellschaft mbH & Co. KG | Method of and apparatus for setting up levelled column elements of a double floor |
CN202149763U (en) * | 2011-08-09 | 2012-02-22 | 山东兴华建设集团有限公司 | Ground flatness tester |
CN203285027U (en) * | 2013-06-04 | 2013-11-13 | 江苏红蚂蚁装饰设计工程有限公司 | Ground leveling device |
CN104644014A (en) * | 2013-11-22 | 2015-05-27 | 西安易目软件科技有限公司 | Wall absorption mini telescopic rod |
CN105846182A (en) * | 2016-03-29 | 2016-08-10 | 国网山东省电力公司平阴县供电公司 | Compact low-voltage grounding wire |
CN108316606A (en) * | 2017-12-30 | 2018-07-24 | 浙江亚厦装饰股份有限公司 | A kind of ground overhead system and its installation method |
CN208451226U (en) * | 2018-05-31 | 2019-02-01 | 东营宝丰汽车配件有限公司 | A kind of new-energy automobile brake block grinding device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113738080A (en) * | 2021-09-18 | 2021-12-03 | 上海觅谷空间设计工程有限公司 | Assembly type ground leveling method |
CN113738080B (en) * | 2021-09-18 | 2022-08-30 | 上海觅谷空间设计工程有限公司 | Assembly type ground leveling method |
Also Published As
Publication number | Publication date |
---|---|
CN110259034B (en) | 2021-12-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CY1112581T1 (en) | STRUCTURE FOR PRODUCTION OF FLOOR OR WALL INVESTMENTS | |
CN104032925A (en) | Construction method for CSI residential wall and ground empty space | |
CN205718980U (en) | A kind of prism bar system being quickly accurately positioned laser labelling | |
US7269908B1 (en) | Tool for projecting a visually perceptible plumb line from a proposed location of a fire sprinkler head on a suspended ceiling and method of using | |
CN207714100U (en) | A kind of self-propelled surveying device of the road and bridge of civil engineering | |
CN110259034A (en) | A kind of floor leveling system | |
CN108301529A (en) | A kind of construction method of building heat preservation wall | |
CN110259033A (en) | A kind of floor leveling method | |
JPH01239263A (en) | Auxiliary tool making finish floor level | |
CN210894698U (en) | Range finder hangs dress pole and hangs dress subassembly | |
US6760974B1 (en) | Height determining instrument for poured floors, and method | |
CN209353678U (en) | A kind of aluminum alloy pattern plate level device | |
CN205481437U (en) | Locating template of outer quick -witted support of installation air conditioner | |
CN110259036A (en) | A kind of floor leveling method | |
CN108225263A (en) | The method that a kind of vertical transfer device of absolute altitude and its application measure absolute altitude | |
CN209945338U (en) | Laser range finder for ground leveling | |
CN210894699U (en) | Distancer connecting device and hanging subassembly | |
CN108801235B (en) | Integral steel platform climbs guide post absolute altitude real-time monitoring system and its application method | |
RU2558880C2 (en) | Method of unadjusting mounting of modular wall panels of frame building | |
CN110453578A (en) | A kind of urban road detection robot system | |
CN206459649U (en) | A kind of absolute altitude copies survey device and copies survey system | |
CN109112936A (en) | A kind of surface evenness fining rapid measurement device | |
CN110259035A (en) | A kind of floor leveling system | |
CN103321329A (en) | Finished-product partition ground rail system and construction method thereof | |
CN202450789U (en) | Positioning device for floor embedded part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |