CN110259033A - A kind of floor leveling method - Google Patents

A kind of floor leveling method Download PDF

Info

Publication number
CN110259033A
CN110259033A CN201910604625.1A CN201910604625A CN110259033A CN 110259033 A CN110259033 A CN 110259033A CN 201910604625 A CN201910604625 A CN 201910604625A CN 110259033 A CN110259033 A CN 110259033A
Authority
CN
China
Prior art keywords
height
keel
dotted keel
dotted
floor leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910604625.1A
Other languages
Chinese (zh)
Other versions
CN110259033B (en
Inventor
郭辉
张轶然
王子诚
王燕妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deformable Building Block (beijing) Decoration Engineering Co Ltd
Original Assignee
Deformable Building Block (beijing) Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deformable Building Block (beijing) Decoration Engineering Co Ltd filed Critical Deformable Building Block (beijing) Decoration Engineering Co Ltd
Priority to CN201910604625.1A priority Critical patent/CN110259033B/en
Publication of CN110259033A publication Critical patent/CN110259033A/en
Application granted granted Critical
Publication of CN110259033B publication Critical patent/CN110259033B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of floor leveling methods, comprising: the first elevation references line of setting;Set the first difference in height between ground finished surface and the first elevation references line;Measure the second difference in height between the current location and the first elevation references line in building lot face;Calculate the setting height for the dotted keel placed at the current location in building lot face;Cut the setting height for the dotted keel placed at dotted keel to current location;The dotted keel that cutting obtains are placed into corresponding position;Pressure plare and ground floor are sequentially installed on the dotted keel of building lot face installation, complete floor leveling.This invention simplifies the costs of dotted keel, also, carry out the height adjustment at keel scene using leveling tool without worker, greatly shorten the time of floor leveling process.

Description

A kind of floor leveling method
Technical field
The present invention relates to interior decoration technology more particularly to a kind of floor leveling methods.
Background technique
During (house ornamentation) is installed on traditional ground, floor leveling is necessary process.
Fig. 1 is the mounting structure on traditional ground.As shown in Figure 1, house ornamentation worker will include fulgurite and ground heating heat insulation first Fulgurite/ground-heating thermal insulation layer 15 of layer is laid on building lot face 16, and covering cement sand bed progress is levelling, then re-lays packet Grounding heat coil tube containing grounding heat coil tube/backfill layer 14, then filled out with cement mortar screeding layer 13 and cement mortar adhesive layer 12 It is flat, then architectural surface, including finished product floor 11, timber floor, ceramic tile or stone material are installed again.
Because this traditional ground installation process is also longer very time-consuming and required arid cycle, in addition, It is very high to worker personal experience and skill requirement in the installation process of last architectural surface, and the erector of architectural surface The wage cost of people is higher, moreover, the ground face thickness completed by this mounting process is larger (to lead to ground if hot-water heating layer of mating formation Face thickness is 10-12cm, causes ground with a thickness of 6-8cm if hot-water heating layer of not mating formation).
For the problems of traditional ground installation, the ground installation using assembled finishing is proposed in the prior art Method.There is the ground installation structure that assembled finishing is completed by bar shaped keel as shown in Figure 2, and as shown in Figure 3 By dotted keel complete assembled finishing ground installation structure.
The characteristics of both assembleds are fitted up is not carry out floor leveling by cement and mortar at the scene, but pass through Steel bar shaped keel or dotted keel carry out floor leveling.
Specifically, in Fig. 2, when using steel bar shaped keel 113, be provided with from top to bottom finished product floor 11, Plate moistureproof cushion 111, grounding heat coil tube and heat preservation integrated layer 112, bar shaped keel 113, floor leveling point 114 and building lot face 16.
In Fig. 3, when using dotted keel, it is provided with finished product floor 11, Dampproof floor board pad 111, floor heating from top to bottom Coil pipe and heat preservation integrated layer 112, finished product board substrates 116, dotted keel 115 and building lot face 16.
But Fig. 2 and method shown in Fig. 3 still have that ground face thickness is higher (to cause ground thick if hot-water heating layer of mating formation Degree is more than 10cm) the problem of, simultaneously because the aerial reason of steel bar shaped keel or dotted keel, when user wears high heels, skin When shoes, furniture move and thing is fallen, easily generates ground echo and neighbours downstairs are impacted.
In addition, there are also certain methods, such as using the dotted keel of inside spin, but has a problem in that there is still a need for from nonlocal factory Production and transport and dispatching, the price for being folded to single dotted keel are higher.Also, worker needs that type fast leveling device is cooperated to carry out The height adjustment at scene, the duration that entire adjustment expends are more than installation duration.
In summary: in fitment process, the promotion of floor leveling efficiency and the reduction of floor leveling cost, are this fields The problem of technical staff's urgent need to resolve.
Summary of the invention
To overcome the above problem in the prior art at least to a certain extent, the present invention provides a kind of floor leveling method And dotted keel cut method.
The present invention provides a kind of floor leveling methods, comprising: the first elevation references line of setting;Set it is levelling after the completion of The first difference in height between ground finished surface and the first elevation references line;Measure building lot face current location with it is described The second difference in height between first elevation references line;It is placed at current location by following formula calculating building lot face The setting height of dotted keel: the setting height of dotted keel=second the-the first difference in height of difference in height-flooring base thickness-ground Face way thickness degree;Dotted keel are cut, the dotted keel placed at the length and the current location of the dotted keel are made Setting height it is consistent;The dotted keel that cutting obtains are placed into corresponding position;It is sequentially installed on all dotted keel Pressure plare and ground floor complete floor leveling.
Further, in above-mentioned floor leveling method, the first elevation references line of the setting includes the following steps:
Determine the ground of public domain lift car;
To predetermined altitude from the ground of the public domain lift car, reference line is marked, and the reference line is set For the first elevation references line.
Further, in above-mentioned floor leveling method, the level height of the ground finished surface and the electricity of public domain The ground level of terraced carriage is consistent.
Further, in above-mentioned floor leveling method, the current location and described first in the measurement building lot face The second difference in height between elevation references line includes:
Determine dotted keel installation position;
Based on the first elevation references line, trapped orbit is installed to metope;
Installation mounts bar between trapped orbit;
At least one laser range finder is installed to described and mounts bar;
Laser range finder is opened, laser range finder detection point is adjusted to the installation point of dotted keel, carries out height Measurement obtains the second difference in height.
Further, described that laser range finder detection point is adjusted to dotted keel in above-mentioned floor leveling method Installation point include:
It is vertical with surface water plane to adjust the laser rays that the laser range finder is got, and makes laser rays point in dotted keel Point is installed;
In laser line projection deviation, with front and back adjust described in mount bar and/or the Laser Measuring that mounts of left and right adjustment The position of distance meter.
Further, it in above-mentioned floor leveling method, the setup algorithm of the dotted keel level and cuts through Cutter is completed.
Further, in above-mentioned floor leveling method, the laser range finder is provided with information transmitting apparatus;
The cutter is provided with information receiver;
Further include following steps after the laser range finder obtains second difference in height:
Second difference in height is sent to the information receiver of cutter by the information transmitting apparatus.
Further, in above-mentioned floor leveling method, the method also includes:
The point of the current location in the building lot face is sent to and cuts by the information transmitting apparatus of the laser range finder Cut the information receiver of machine;
The cutter is that the point of the current location matches the dotted keel of respective heights.
Further, in above-mentioned floor leveling method, the information transmitting apparatus of the laser range finder and the cutting The information receiver of machine is bluetooth equipment.
Further, in above-mentioned floor leveling method, the dotted keel are the dotted keel of concrete column.
The present invention has the following technical effect that
Quick elevation carrection is carried out according to the position of dotted keel installation point, scene directly makes the dotted of respective heights Keel, without greatly reducing the cost of dotted keel from nonlocal plant produced, transport and dispatching.For example, being embodied When, it can choose dotted lower-cost concrete column and carry out live cutting, material cost greatly reduces, economical and practical.
In addition, adjusting height since dotted keel have passed through cutting, scene is carried out using leveling tool without worker Keel level adjustment, greatly shortens the time of floor leveling process.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not It can the limitation present invention.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention Example, and be used to explain the principle of the present invention together with specification.
Fig. 1 is the mounting structure of traditional metope;
Fig. 2 is the structural schematic diagram that keel install decorative wall panels by bonding way in the prior art;
Fig. 3 is the structural schematic diagram that keel install decorative wall panels by screw fashion in the prior art;
Fig. 4 is the step flow chart of floor leveling embodiment of the method for the present invention;
Fig. 5 is to repair the house within doors to be installed, using one embodiment of floor leveling method of the present invention, in the second height of measurement Operation principle schematic diagram when poor;
Fig. 6 is the schematic diagram of laser range finder installation in floor leveling embodiment of the method for the present invention;
Fig. 7 is the structural schematic diagram of the cutter for floor leveling method one embodiment of the present invention;
Fig. 8 is that the schematic diagram of pressure plare is installed on dotted keel in floor leveling embodiment of the method for the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be mentioned that some exemplary embodiment quilts before exemplary embodiment is discussed in greater detail
Specific structure and function details disclosed herein are only representative, and are for describing the present invention show The purpose of example property embodiment.But the present invention can be implemented by many alternative forms, and be not interpreted as It is limited only by the embodiments set forth herein.
Although it should be understood that may have been used term " first ", " second " etc. herein to describe each unit, But these units should not be limited by these terms.The use of these items is only for by a unit and another unit It distinguishes.For example, without departing substantially from the range of exemplary embodiment, it is single that first unit can be referred to as second Member, and similarly second unit can be referred to as first unit.Term "and/or" used herein above include one of them or Any and all combinations of more listed associated items.
Term used herein above is not intended to limit exemplary embodiment just for the sake of description specific embodiment.Unless Context clearly refers else, otherwise singular used herein above "one", " one " also attempt to include plural number.Also answer When understanding, term " includes " and/or "comprising" used herein above provide stated feature, integer, step, operation, The presence of unit and/or component, and do not preclude the presence or addition of other one or more features, integer, step, operation, unit, Component and/or combination thereof.
The step flow chart of floor leveling embodiment of the method for the present invention is shown, is included the following steps: referring to Fig. 4, Fig. 4
Step S110 sets the first elevation references line.
In one embodiment, the first elevation references line is set as follows:
1) ground of public domain lift car, is determined;
2) reference line, is marked to predetermined altitude from the ground of public domain lift car, and the reference line is set as First elevation references line.That is, the first elevation references line is on the basis of the ground of public domain lift car.
In one embodiment, the height of the first elevation references line can be counted from the ground of public domain lift car, At 1 meter, reference line is marked.
Here 1 meter is a selection in specific implementation, but is joined the present invention is not limited to set the first of 1 meter high the height Line is examined, other numerical value are also within protection scope of the present invention.
Step S120, first between ground finished surface and the first elevation references line after the completion of setting is levelling is highly Difference.
The step is used to determine distance of the ground finished surface relative to the first elevation references line, that is to say, that completes ground The height on the ground after levelling.
In one embodiment, the level height of ground finished surface is set as and the ground of the lift car of public domain height Degree is consistent.
Step S130 measures the second difference in height between the current location and the first elevation references line in building lot face.? In one embodiment, which can carry out in the following manner:
1) dotted keel installation position, is determined;
2) it, is based on the first elevation references line, by track installation to metope;
3), installation mounts bar between trapped orbit;
4), at least one laser range finder is installed to described and mounts bar;
5) laser range finder, is opened, laser range finder detection point is adjusted to the installation point of dotted keel, is carried out high Degree measurement, obtains the second difference in height.
When carrying out the above-mentioned the 5) rapid operation step by step, laser range finder detection point is adjusted to the installation of dotted keel Point may include following sub-step:
It is vertical with surface water plane that step 51) adjusts the laser rays that the laser range finder is got, and laser rays point is made to exist Dotted keel installation point;
Step 52) in laser line projection deviation, with front and back adjust described in mount bar and/or left and right adjustment mount described in The position of laser range finder.
Referring to Fig. 5, Fig. 5 is shown to repair the house within doors to be installed, using one embodiment of floor leveling method of the present invention, Measure used mode when the second difference in height.
Building lot face 52 in decorating house is the ground fitted up for the first time.Lift car ground conduct from public domain The level height of room floors finished surface;A meter Gao Du is up measured from carriage ground, height is introduced into interior, identifies indoor ground One-meter line position on the finished surface of face, while ground longitude and latitude snap the line determines dotted keel installation position, when it is implemented, using cement Column keel;Trapped orbit 50 is mounted on 1 rice noodles position;The bar 51 that mounts of laser range finder is stretched, both sides are overlapped on On metope trapped orbit 50.Laser range finder 53 is mounted into the mounting on bar 51 of laser range finder, and ensures laser ranging The laser rays that instrument 53 is got is vertical with surface water plane, while laser rays point is in the installation point of dotted keel, if there is swashing Light delivery system error, can front and back adjustment mount bar 51 and left and right 53 position of laser range finder that mounts of adjustment.
It is shown in floor leveling embodiment of the method for the present invention referring to Fig. 6, Fig. 6, the schematic diagram of laser range finder installation.
From fig. 6, it can be seen that the one end for mounting bar 51 is connected on trapped orbit 50, trapped orbit 50 is mounted on finishing room On the metope 54 in room.Laser range finder 53, which is mounted on, to be mounted on bar 51.Multiple transverse directions can be had to be telescopic by mounting bar 51 The laser range finder of position-adjustable mounts hole location.Trapped orbit 50 can also stretch on metope 54, meanwhile, mounting bar 51 has The laser range finder of constant spacing mounts the fixation detent of bar.
Step S140 calculates the setting for the dotted keel placed at the current location in building lot face by following formula Height h:
H=h2-h1-h3-h4;Wherein,
H is the setting height of dotted keel,
H2 is the second difference in height
H3 is flooring base thickness
H4 is ground practice thickness degree.
In the specific implementation, the setup algorithm of dotted keel level and the calculating equipment cut through in cutter are complete At.
More specifically, laser range finder is provided with information transmitting apparatus;Cutter is provided with information receiver;Swashing Further include following steps after optar obtains second difference in height: the second difference in height is sent by information transmitting apparatus To the information receiver of cutter.Also, information transmitting apparatus simultaneously also sends out the point of the current location in building lot face It send to the information receiver of cutter.
It is current according to built-in flooring base thickness and ground practice layer THICKNESS CALCULATION after cutter receives the second difference in height The setting height for the dotted keel placed at position.
Step S150 cuts dotted keel, makes the dotted keel placed at the length and current location of the dotted keel Setting height it is consistent.
In the specific implementation, cutting operation is completed by the cutter of cutter.
Referring to Fig. 7, the structural schematic diagram of the cutter for floor leveling method one embodiment of the present invention is shown.It should Cutter 70 is provided with stepper motor 71, information receiver 72, from Fig. 7 it can also be seen that the dotted keel 73 of cement of cutting.
In one embodiment, the raw material concrete column of dotted keel can be put into cutter 70, for example, automatic cutting Machine, which receives laser range finder detection data by information receiver 72 automatically, and calculates the point of concrete column Concrete column is pushed into cutting slot corresponding size (that is, dotted keel desired height) with stepper motor 71 by shape keel desired height, will Concrete column cutting is the dotted keel desired height of concrete column.
The dotted keel that cutting obtains are placed into corresponding position by step S160.
Step S170 sequentially installs pressure plare and ground floor on the dotted keel of building lot face installation, completes ground It is levelling.The schematic diagram that pressure plare is installed on dotted keel is shown referring to Fig. 8, Fig. 8.From figure 8, it is seen that giving house 84 When carrying out floor leveling, pressure plare 80 is pressed in multiple 82 forming faces of dotted keel.
The present embodiment carries out quick elevation carrection according to the position of dotted keel installation point, and scene directly production is corresponding high The dotted keel of degree, without greatly reducing the cost of dotted keel from nonlocal plant produced, transport and dispatching.For example, having When body is implemented, it can choose dotted lower-cost concrete column and carry out live cutting, material cost greatly reduces, economical and practical.
In addition, adjusting height since dotted keel have passed through cutting, scene is carried out using leveling tool without worker Height adjustment, greatly shorten the time of floor leveling process.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is included at least one embodiment or example of the invention.In the present specification, schematic expression of the above terms are not Centainly refer to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be any One or more embodiment or examples in can be combined in any suitable manner.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned Embodiment is changed, modifies, replacement and variant.

Claims (10)

1. a kind of floor leveling method characterized by comprising
Set the first elevation references line;
Set it is levelling after the completion of ground finished surface and the first elevation references line between the first difference in height;
Measure the second difference in height between the current location and the first elevation references line in building lot face;
The setting height for the dotted keel placed at the current location in building lot face: dotted keel is calculated by following formula Setting height=second the-the first difference in height of difference in height-flooring base thickness-ground practice thickness degree;
Dotted keel are cut, the setting height for the dotted keel placed at the length and the current location of the dotted keel is made It is consistent;
The dotted keel that cutting obtains are placed into corresponding position;
Pressure plare and ground floor are sequentially installed on the dotted keel of building lot face installation, complete floor leveling.
2. floor leveling method according to claim 1, which is characterized in that the first elevation references line of the setting includes such as Lower step:
Determine the ground of public domain lift car;
To predetermined altitude from the ground of the public domain lift car, reference line is marked, and the reference line is set as the One elevation references line.
3. floor leveling method according to claim 1, which is characterized in that
The level height of the ground finished surface is consistent with the ground level of the lift car of public domain.
4. floor leveling method according to claim 1, which is characterized in that
It is described measurement building lot face current location and the first elevation references line between the second difference in height include:
Determine dotted keel installation position;
Based on the first elevation references line, trapped orbit is installed to metope;
Installation mounts bar between trapped orbit;
At least one laser range finder is installed to described and mounts bar;
Laser range finder is opened, laser range finder detection point is adjusted to the installation point of dotted keel, carries out elevation carrection, Obtain the second difference in height.
5. floor leveling method according to claim 4, which is characterized in that described by laser range finder detection point adjustment Include: for the installation point of dotted keel
It is vertical with surface water plane to adjust the laser rays that the laser range finder is got, and makes laser rays point in dotted keel installation Point;
In laser line projection deviation, with front and back adjust described in mount bar and/or the laser range finder that mounts of left and right adjustment Position.
6. floor leveling method according to claim 4 or 5, which is characterized in that
The setup algorithm of the dotted keel level and cut through cutter completion.
7. floor leveling method according to claim 6, which is characterized in that
The laser range finder is provided with information transmitting apparatus;
The cutter is provided with information receiver;
Further include following steps after the laser range finder obtains second difference in height:
Second difference in height is sent to the information receiver of cutter by the information transmitting apparatus.
8. floor leveling method according to claim 7, which is characterized in that the method also includes:
The point of the current location in the building lot face is sent to cutter by the information transmitting apparatus of the laser range finder Information receiver;
The cutter is that the point of the current location matches the dotted keel of respective heights.
9. floor leveling method according to claim 7, which is characterized in that
The information receiver of the information transmitting apparatus of the laser range finder and the cutter is bluetooth equipment.
10. floor leveling method according to claim 1, which is characterized in that
The dotted keel are the dotted keel of concrete column.
CN201910604625.1A 2019-07-05 2019-07-05 Ground leveling method Active CN110259033B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910604625.1A CN110259033B (en) 2019-07-05 2019-07-05 Ground leveling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910604625.1A CN110259033B (en) 2019-07-05 2019-07-05 Ground leveling method

Publications (2)

Publication Number Publication Date
CN110259033A true CN110259033A (en) 2019-09-20
CN110259033B CN110259033B (en) 2022-04-15

Family

ID=67924753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910604625.1A Active CN110259033B (en) 2019-07-05 2019-07-05 Ground leveling method

Country Status (1)

Country Link
CN (1) CN110259033B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738080A (en) * 2021-09-18 2021-12-03 上海觅谷空间设计工程有限公司 Assembly type ground leveling method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0077070B1 (en) * 1981-10-13 1985-01-30 Schmidt Reuter Ingenieurgesellschaft mbH & Co. KG Method of and apparatus for setting up levelled column elements of a double floor
CN202149763U (en) * 2011-08-09 2012-02-22 山东兴华建设集团有限公司 Ground flatness tester
CN203285027U (en) * 2013-06-04 2013-11-13 江苏红蚂蚁装饰设计工程有限公司 Ground leveling device
CN109057356A (en) * 2018-08-02 2018-12-21 上海聚通装饰集团有限公司 A kind of fine leveling method of ground flat degree
CN208451226U (en) * 2018-05-31 2019-02-01 东营宝丰汽车配件有限公司 A kind of new-energy automobile brake block grinding device
CN209025402U (en) * 2018-08-28 2019-06-25 杨兴礼 A kind of leveling unit of ground or wall-surface leveling device tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0077070B1 (en) * 1981-10-13 1985-01-30 Schmidt Reuter Ingenieurgesellschaft mbH & Co. KG Method of and apparatus for setting up levelled column elements of a double floor
CN202149763U (en) * 2011-08-09 2012-02-22 山东兴华建设集团有限公司 Ground flatness tester
CN203285027U (en) * 2013-06-04 2013-11-13 江苏红蚂蚁装饰设计工程有限公司 Ground leveling device
CN208451226U (en) * 2018-05-31 2019-02-01 东营宝丰汽车配件有限公司 A kind of new-energy automobile brake block grinding device
CN109057356A (en) * 2018-08-02 2018-12-21 上海聚通装饰集团有限公司 A kind of fine leveling method of ground flat degree
CN209025402U (en) * 2018-08-28 2019-06-25 杨兴礼 A kind of leveling unit of ground or wall-surface leveling device tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738080A (en) * 2021-09-18 2021-12-03 上海觅谷空间设计工程有限公司 Assembly type ground leveling method
CN113738080B (en) * 2021-09-18 2022-08-30 上海觅谷空间设计工程有限公司 Assembly type ground leveling method

Also Published As

Publication number Publication date
CN110259033B (en) 2022-04-15

Similar Documents

Publication Publication Date Title
CN104032925B (en) CSI house wall ground Stilt layer construction method
CY1112581T1 (en) STRUCTURE FOR PRODUCTION OF FLOOR OR WALL INVESTMENTS
CN110259033A (en) A kind of floor leveling method
CN108301529A (en) A kind of construction method of building heat preservation wall
GB0814988D0 (en) (Wall) surface level
Van Renterghem et al. Road traffic noise reduction by vegetated low noise barriers in urban streets
US7269908B1 (en) Tool for projecting a visually perceptible plumb line from a proposed location of a fire sprinkler head on a suspended ceiling and method of using
CN106437093B (en) Building decoration concealed installation ceramic tile baseboard structure and construction process thereof
CN110259036A (en) A kind of floor leveling method
CN105587127A (en) Method for locating outer wall prefabricated hanging plate based on laser line marking instrument
CN110029761A (en) A kind of curtain wall Fast Installation attachment device and its construction method
WO2010065034A2 (en) Insulated exterior cladding system
CN110259034A (en) A kind of floor leveling system
CN108534680A (en) A kind of eminence component physical size measuring device and its application method
JPH01239263A (en) Auxiliary tool making finish floor level
CA3028686A1 (en) A machine and method of manufacture for eifs panels
Díaz et al. The reverberation time of furnished rooms in dwellings
CN207812948U (en) A kind of floor sound insulating structure
CN210894698U (en) Range finder hangs dress pole and hangs dress subassembly
CN110259035A (en) A kind of floor leveling system
CN107017590A (en) A kind of electric box built-in process
RU2558880C2 (en) Method of unadjusting mounting of modular wall panels of frame building
CN209945338U (en) Laser range finder for ground leveling
CN210880326U (en) Ground drilling device
CN209817345U (en) Adjusting rod for adjusting height of supporting point-shaped keel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant