CN110219357A - Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology - Google Patents

Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology Download PDF

Info

Publication number
CN110219357A
CN110219357A CN201910425323.8A CN201910425323A CN110219357A CN 110219357 A CN110219357 A CN 110219357A CN 201910425323 A CN201910425323 A CN 201910425323A CN 110219357 A CN110219357 A CN 110219357A
Authority
CN
China
Prior art keywords
layer
laid
pipe
permeable
plantation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910425323.8A
Other languages
Chinese (zh)
Inventor
田仲义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhubang Construction Group Co Ltd
Original Assignee
Zhubang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhubang Construction Group Co Ltd filed Critical Zhubang Construction Group Co Ltd
Priority to CN201910425323.8A priority Critical patent/CN110219357A/en
Publication of CN110219357A publication Critical patent/CN110219357A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • C02F1/283Treatment of water, waste water, or sewage by sorption using coal, charred products, or inorganic mixtures containing them
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/66Treatment of water, waste water, or sewage by neutralisation; pH adjustment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/20Heavy metals or heavy metal compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/30Organic compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/001Runoff or storm water
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technologies, wherein biological cleaning stranded belt includes: waterproof geotextile layer;Water storage drainage blanket, aquifer, pervious bed, filter layer and the plantation layer being successively laid with from the bottom to top, plant the upper surface of layer in recessed arc;Water-permeable pipe;Drainage system in the middle part of the plantation layer is set;Wherein, drainage system includes: overflow pipe, and overflow pipe extends the surface of plantation layer;Siphon pipe;And main sewer.Biological cleaning stranded belt of the invention alleviates the generation of urban waterlogging, and when amount of rainfall is larger, when at the middle part of planting soil layer, accumulation is a certain amount of, it will be in extra rainwater suction overfall pipe by siphon pipe, and it is discharged by main sewer, effectively rainwater is timely discharged, to realize the multiple functions such as infiltration, water storage, water purification, backwater, draining, town road is included in a part in sponge city.

Description

Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology
Technical field
The present invention relates to municipal road construction technical field, in particular to a kind of Multifunctional sponge urban municipal road life Object purifies stranded belt and its construction technology.
Background technique
Sponge city is a kind of urban construction new concept that country proposes.National house and town and country construction portion are required to 2020 Year, the area of 20% or more completed region of the city reaches target call, and the area to 80% or more the year two thousand thirty reaches target call.By This can be seen that country improve resident living environment and Urban Water Environment there is an urgent need to sponge city requirement city is being rained When have the function of seeping, be stagnant, store, is net, use, row.Road pavement is about 30% in the specific gravity that entire city is mated formation, and there is rainwater The problem of road surface leads to runoff pollution, water resource waste is washed away, therefore, gives full play to effect of the town road in sponge city It is extremely important.General town road mainly by car lane, non-motorized lane, pavement, in point band, side divide band to form.By In the continuous improvement to town road landscape effect and green percentage, in point band and side divide the width of band to be increasing, In the case where guaranteeing road safety use, band is divided to seem in performance with effect of the side point with infiltration, water storage, water purification, backwater, draining It is very necessary.In current design of municipal road, all dividing strip height are above road table, can not play above-mentioned work at all With, and road surface can be polluted from the rainwater that dividing strip flows out, it will also aggravate the pressure of drainage system.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of Multifunctional sponge urban municipal road biological cleaning is stagnant Band and its construction technology are stayed, has the advantages that integrate infiltration, water storage, water purification, backwater, draining.
In order to achieve the above objectives, technical scheme is as follows:
A kind of Multifunctional sponge urban municipal road biological cleaning stranded belt, comprising:
It is laid on the waterproof geotextile layer of town road dividing strip inner wall;
Water storage drainage blanket, aquifer, pervious bed, filter layer and the plantation layer being successively laid with from the bottom to top, the plantation The upper surface of layer is in recessed arc;
The water-permeable pipe being threaded through in the water storage drainage blanket;And
Drainage system in the middle part of the plantation layer is set;
Wherein, the drainage system includes:
Several overflow pipes uniformly distributed along town road extending direction, the overflow pipe extend the table of the plantation layer Face and at least with plantation layer highest point flush;
One end is suspended in the middle part of plantation layer above minimum point and the other end bypasses the nozzle of the overflow pipe and is arranged in institute State the siphon pipe extended to below the plantation layer in overflow pipe;And
It is connected to the main sewer of each overflow pipe lower end.
Above-mentioned technical proposal is realized, when rainwater is overflowed into dividing strip from town road, due to the blocking by waterproof geotextiles Effect, during rainwater infiltration, does not penetrate into the bottom of town road, that is, is trapped in biological cleaning stranded belt, and rain Water carries out a degree of purification, removal rain water part oil by the soil property of plantation layer and plant first during lower infiltration Dirty and heavy metal, is then sufficiently filtered by filter layer, and the rainwater that aquifer is seeped under making reaches certain cleanliness, When by pervious bed, the silt of filter layer is stopped, prevents its lower seeps from blocking water-permeable pipe, by by aquifer and water storage row Water layer is stored, and excessive rainfall is discharged from water-permeable pipe, this part rainwater may collect in water-storing device, be used for It irrigates and cleans, saved water resource;Since the upper surface of plantation layer is recessed arc, rainwater is flowing into biological cleaning It is difficult to be back on road after stranded belt, so that the generation of urban waterlogging is alleviated, and when amount of rainfall is larger, in planting soil layer When middle part accumulation is a certain amount of, by siphon pipe by extra rainwater suction overfall pipe, and by main sewer discharge, effectively Rainwater is timely discharged, so that the multiple functions such as infiltration, water storage, water purification, backwater, draining are realized, by town road It is included in a part in sponge city.
As a preferred solution of the present invention, the two sides of the plantation layer offer dashpot, paving in the dashpot Equipped with erosion control brush layer, the side that the upper surface of the erosion control brush layer faces away from town road tilts upward setting.
It realizes above-mentioned technical proposal, by the way that erosion control brush layer is arranged, reduces rainwater and planting soil layer is washed away, improve planting soil The stability of layer and the stability of plant growth play preferable buffer function simultaneously because erosion control brush layer is obliquely installed, and Erosion control brush layer itself also has water penetration, facilitates rainwater through in inflow plantation layer.
As a preferred solution of the present invention, the erosion control brush layer is (5-7): the sepiolite of (15-20) by weight ratio It mixes and forms with rubble.
Above-mentioned technical proposal is realized, by the way that sepiolite and rubble are mixed to form a layer erosion control brush layer, due to sepiolite counterweight Metal ion has preferable absorption, and when rainwater passes through erosion control brush layer, the heavy metal ion in rainwater is first by Hai Pao Stone absorption a part, reduces influence of the heavy metal ion to plantation layer, is more conducive to the growth of plant.
As a preferred solution of the present invention, the water storage drainage blanket is (1-3) by weight ratio: the haydite of (6-10) and Rubble mixing composition.
Realize above-mentioned technical proposal, haydite and rubble, which all have preferable water storage performance and formed, is capable of forming certain seam Gap facilitates draining.
As a preferred solution of the present invention, the aquifer is (3-5): (5-8): the silicon of (12-18) by weight ratio Diatomaceous earth, river sand and coarse sand mixing composition.
Realize above-mentioned technical proposal, diatomite and river sand are provided with stronger water storage performance, improve biological cleaning stranded belt Water storage water holding capacity after storing certain rainwater, improve the lower infiltration ability of rainwater after being mixed into coarse sand, enable rainwater Enough quickly discharges.
As a preferred solution of the present invention, the pervious bed includes: the permeable soil being laid on above the aquifer Work cloth and the permeable brick layer being laid on above the permeable geotextiles.
It realizes above-mentioned technical proposal, by water-permeable brick and permeable geotextiles collective effect, the silt in filter layer is carried out Stop, while enabling rainwater fast strikethrough.
As a preferred solution of the present invention, the filter layer includes: the first mistake being arranged in above the pervious bed Filtering layer and the second filter layer being arranged in above first filter layer, first filter layer are 2:(6-8 by weight ratio); (2-4): active carbon, fine sand, clay and the quartz sand mixing of (3-5) form, and second filter layer is laid with by glass fabric It is formed.
Realize above-mentioned technical proposal, active carbon has preferable adsorption filtration ability, has for rainwater purification significant Effect, and fine sand and quartz sand can be stopped and be filtered to the pollutant in rainwater, it will be active by the adhesion strength of clay Charcoal, fine sand and quartz sand are sticked together, so that the first filter layer forms a complete filtration system, while clay also has Preferable adherency filter capacity, realizes the filtering to rainwater, and to planting, layer carries out support and filtering is made by the second filter layer With, prevent plantation layer from mixing with filter layer, while glass fabric intensity with higher, good mechanical performance and compared with Strong corrosion resistance, not cracky.
As a preferred solution of the present invention, it is (3-6): (4-7): (75-85's) that the plantation layer, which includes weight ratio, Flyash, charcoal and planting soil combine the mixed layer to be formed, and are embedded with stalk layer in the mixed layer.
Realize above-mentioned technical proposal, flyash meta-alkalescence, and rainwater is in acidity, in flyash and rainwater progress With, the acid-base property of adjustable plantation layer, meanwhile, the elements such as calcic, potassium, phosphorus, sodium, magnesium, iron, copper, zinc, manganese in flyash can To increase the fertility of soil, apply after flyash can chesson, increase porosity, mitigate the soil weight;Charcoal has more Pore structure, biggish specific surface area and stronger adsorption capacity, can effectively drink up the rain in heavy metal and organic contamination Object, and be conducive to the growth of plant, improve the survival rate of plant and the penetrating power of biological cleaning stranded belt;And stalk layer has Preferable water conservation water-holding capacity, keeps the water replenishment of plant root, is conducive to the growth of plant, and after stalk fermentation rots On the one hand the fertility that soil can be improved, on the other hand can mix, the interlaced shape of fibrous layer with charcoal and planting soil Structure is reticulated, there is preferable filtration, purification effect to rainwater.
As a preferred solution of the present invention, the middle part of the plantation layer is equipped with non-irrigated small stream, is inserted with pipe in the drought small stream Road fixed frame, the pipe fixing bracket include: stop collar and several fixed feets for being fixed on the stop collar, and the siphon pipe is inserted It is connected in the stop collar.
It realizes above-mentioned technical proposal, certain rainwater can be stored in plantation layer surface by the way that non-irrigated small stream is arranged, meanwhile, work as drop When excessive rainfall, rainwater can be drained by non-irrigated small stream, non-irrigated small stream also has certain water purification ability, and preliminary mistake can be carried out to rainwater Filter, and can be by the dirt retention in rainwater inside non-irrigated small stream;And overflow pipe can be limited and be consolidated by pipe fixing bracket It is fixed, and non-irrigated small stream is separated with overflow pipe, facilitate overflow pipe that the rainwater in non-irrigated small stream is discharged.
On the other hand, the present invention also provides a kind of construction technology of biological cleaning stranded belt, the technique includes following step It is rapid:
Step 1: divide the width of band according in design of municipal road points of band and side, determine the width of biological cleaning stranded belt Degree, and carry out the excavation of foundation pit;
Step 2: waterproof geotextiles are laid with along the inner wall of foundation pit and foundation pit is completely covered to form waterproof geotextile layer;
Step 3: the extending direction along town road is laid with water-permeable pipe in the middle position of bottom of foundation ditch;
Step 4: water storage drainage blanket, aquifer, pervious bed and filter layer, detailed process are successively laid from bottom to up are as follows:
Weight ratio is (1-3) by S01: the haydite and rubble of (6-10) pave after mixing in the bottom of foundation pit, and will be permeable Pipe covering, to obtain water storage drainage blanket;
Weight ratio is (3-5): (5-8) by S02: diatomite, river sand and the coarse sand of (12-18) are laid on after being stirred Above water storage drainage blanket, and paves compacting and form aquifer;
S03, permeable geotextiles is laid on aquifer after forming permeable geotextile layer, and water-permeable brick is closely laid on Permeable brick layer is formed above water geotextiles, permeable geotextile layer and permeable brick layer collectively form pervious bed;
Weight ratio is 2:(6-8 by S04);(2-4): after active carbon, fine sand, clay and the quartz sand of (3-5) are stirred It is laid in permeable brick layer, and forms the first filter layer after compacting of tiling, then glass fabric is laid on the first filter layer The second filter layer is formed, the first filter layer and the second filter layer collectively form filter layer;
Step 5: overflow pipe and main sewer are subjected to assembling and are laid in along the extending direction of town road close to foundation pit Medium position;
Step 6: being (3-6): (4-7): after flyash, charcoal and the planting soil of (75-85) are stirred by weight ratio Mixed planting soil is obtained, mixed planting soil is laid on above filter layer and is fixed main sewer, and is being routed to first It is laid with stalk after design height and forms stalk layer, and continues to be laid with mixing planting soil up to the second design height, forms plantation layer, And will plant simultaneously the surface layer finishing of layer in it is recessed when, the distance from bottom grade elevation 22-26cm of concave surface, and in plantation layer Reserve dashpot in two sides;
Step 7: being (5-7) by weight ratio: the rubble and sepiolite of (15-20) are filled in dashpot after mixing and are formed Erosion control brush layer, and surface layer is trimmed to and is tilted upward;
Step 8: siphon pipe is successively threaded through in each overflow pipe, and is suspended at the end of siphon pipe in the middle part of plantation layer Top 2-5cm.
In conclusion the invention has the following beneficial effects:
The embodiment of the present invention is by providing a kind of Multifunctional sponge urban municipal road biological cleaning stranded belt and its applying Work technique, wherein biological cleaning stranded belt includes: to be laid on the waterproof geotextile layer of town road dividing strip inner wall;By down toward On be successively laid with water storage drainage blanket, aquifer, pervious bed, filter layer and plantation layer, it is described plantation layer upper surface be under Recessed arc;The water-permeable pipe being threaded through in the water storage drainage blanket;Drainage system in the middle part of the plantation layer is set;Wherein, The drainage system includes: several overflow pipe uniformly distributed along town road extending direction, and the overflow pipe extends described Plant the surface of layer and the highest point flush at least with plantation layer;One end is suspended above minimum point and another in the middle part of plantation layer One end bypasses the nozzle of the overflow pipe and is arranged in the siphon pipe extended to below the plantation layer in the overflow pipe;With And it is connected to the main sewer of each overflow pipe lower end.When rainwater is overflowed into dividing strip from town road, due to by anti-water and soil The barrier effect of work cloth does not penetrate into the bottom of town road during rainwater infiltration, that is, is trapped in biological cleaning delay In band, and rainwater carries out a degree of purification by the soil property of plantation layer and plant first during lower infiltration, removes rainwater Middle part greasy dirt and heavy metal are then sufficiently filtered by filter layer, and the rainwater that aquifer is seeped under making reaches certain Cleanliness stops the silt of filter layer when by pervious bed, prevents its lower seeps from blocking water-permeable pipe, by by water storage Layer and water storage drainage blanket are stored, and excessive rainfall is discharged from water-permeable pipe, this part rainwater may collect in water storage In device, for irrigating and cleaning, water resource has been saved;Since the upper surface of plantation layer is recessed arc, rainwater exists It is difficult to be back on road after flowing into biological cleaning stranded belt, to alleviate the generation of urban waterlogging, and when amount of rainfall is larger, When at the middle part of planting soil layer, accumulation is a certain amount of, by siphon pipe by extra rainwater suction overfall pipe, and it is total by draining Pipe discharge, is effectively timely discharged rainwater, to realize a variety of function such as infiltration, water storage, water purification, backwater, draining Can, town road is included in a part in sponge city.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the embodiment of the present invention one.
Fig. 2 is the structural schematic diagram of pipe fixing bracket in the embodiment of the present invention one.
Number and corresponding component title represented by letter in figure:
100, waterproof geotextile layer;200, water storage drainage blanket;300, aquifer;400, pervious bed;410, permeable geotextiles; 420, permeable brick layer;500, filter layer;510, the first filter layer;520, the second filter layer;600, layer is planted;601, dashpot; 610, mixed layer;620, stalk layer;630, erosion control brush layer;640, non-irrigated small stream;700, water-permeable pipe;800, drainage system;810, spilling water Pipe;820, siphon pipe;830, main sewer;840, pipe fixing bracket;841, stop collar;842, fixed feet.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment one
A kind of Multifunctional sponge urban municipal road biological cleaning stranded belt, as shown in Figure 1, comprising: be laid on municipal administration The waterproof geotextile layer 100 of road dividing strip inner wall;The water storage drainage blanket 200 that is successively laid with from the bottom to top, aquifer 300, thoroughly Water layer 400, filter layer 500 and plantation layer 600, the upper surface of plantation layer 600 are in recessed arc;It is threaded through water storage drainage blanket Water-permeable pipe 700 in 200;And the drainage system 800 at 600 middle part of plantation layer is set.
It is formed specifically, waterproof geotextile layer 100 covers entire road dividing strip by waterproof geotextiles, waterproof geotextiles exist It is mutually stacked when laying, and seam crossing is at least overlapped 15cm or more, using suture or bonding between adjacent waterproof geotextiles Form is fixed, to guarantee the waterproofness of seam crossing.
Water-permeable pipe 700 uses diameter for the flexible porous tube 700 of 10cm, water-permeable pipe 700 connect water-storing device or It is directly connected to city sewer, the rainwater after filtration, purification is collected by water-storing device, irrigation cleaning can be carried out, is saved About water resource.
Water storage drainage blanket 200 is (1-3) by weight ratio: haydite and the rubble mixing of (6-10) form, and in the present embodiment, adopt The haydite and rubble for being 3:8 with weight ratio, the diameter of haydite are 15-20mm, and the diameter of rubble is 20-30mm, haydite and rubble It all has preferable water storage performance and is formed and be capable of forming certain gap, facilitate draining.
Aquifer 300 is (3-5): (5-8) by weight ratio: diatomite, river sand and the coarse sand mixing of (12-18) form, this In embodiment, aquifer 300 is mixed to form by diatomite, river sand and the coarse sand that weight ratio is 4:8:15, and diatomite and river sand are equal Have stronger water storage performance, improves the water storage water holding capacity of biological cleaning stranded belt, it is certain in storage after being mixed into coarse sand Rainwater after, improve the lower infiltration ability of rainwater, rainwater enable quickly to be discharged.
Pervious bed 400 includes: to be laid on the permeable geotextiles 410 of 300 top of aquifer and be laid on permeable geotextiles The permeable brick layer 420 of 410 tops, permeable geotextiles 410 just have the form for manually rolling paving to pave, and seam crossing is at least overlapped 5cm or more, permeable brick layer 420 are closely tiled by at least two layers laying water-permeable brick that interlocks and are formed, and by two layers of water-permeable brick, lower layer is saturating Gap between water brick is covered by upper layer water-permeable brick, by 410 collective effect of water-permeable brick and permeable geotextiles, to filter layer 500 In silt stopped, while enabling rainwater fast strikethrough.
Filter layer 500 includes: that the first filter layer 510 of 400 top of pervious bed is arranged in and is arranged in the first filter layer 510 Second filter layer 520 of top, the first filter layer 510 are 2:(6-8 by weight ratio);(2-4): the active carbon of (3-5), fine sand, Clay and quartz sand mixing composition, the second filter layer 520 is laid with by glass fabric to be formed, the first filter layer in the present embodiment 510 are made of the active carbon that weight ratio is 2:6:4:4, fine sand, clay and quartz sand mixing;Active carbon, which has, preferably to be adsorbed Filter ability has significant effect for rainwater purification, and fine sand and quartz sand can stop the pollutant in rainwater And filtering, active carbon, fine sand and quartz sand are sticked together by the adhesion strength of clay, so that the first filter layer 510 is formed One complete filtration system, while clay also has preferable adherency filter capacity, realizes the filtering to rainwater, and passes through the Two 520 pairs of filter layer plantation layers 600 carry out support and filtration, prevent mixing with filter layer 500 for plantation layer 600, together When glass fabric intensity with higher, good mechanical performance and stronger corrosion resistance, not cracky.
Planting layer 600 includes weight ratio for (3-6): (4-7): flyash, charcoal and the planting soil of (75-85) combine shape At mixed layer 610, be embedded with stalk layer 620 in mixed layer 610, mixed layer 610 is 5:6:80 by weight ratio in the present embodiment Flyash, charcoal and planting soil mixing composition, plant the upper layer of layer 600 by manual amendment into recessed arc, and arc Concave surface apart from designed elevation 22-26cm, stalk layer 620 with a thickness of 10-20cm, and surface distance designed elevation 1- thereon 1.25m;Flyash meta-alkalescence, and rainwater is in acidity, by neutralizing in flyash and rainwater progress, adjustable plantation layer 600 Acid-base property, meanwhile, the elements such as calcic, potassium, phosphorus, sodium, magnesium, iron, copper, zinc, manganese in flyash can increase the fertility of soil, Apply flyash after can chesson, increase porosity, mitigate the soil weight;Charcoal has porous structure, biggish compares table Area and stronger adsorption capacity, can effectively drink up the rain in heavy metal and organic pollutant, and be conducive to plant Growth, improves the survival rate of plant and the penetrating power of biological cleaning stranded belt;And stalk layer 620 has preferable water conservation water storage Ability keeps the water replenishment of plant root, is conducive to the growth of plant, and the rotten latter aspect of stalk fermentation can be improved On the other hand the fertility of soil can be mixed with charcoal and planting soil, the interlaced formation reticular structure of fibrous layer, to rain Water has preferable filtration, purification effect.
Meanwhile dashpot 601 is offered in the two sides of plantation layer 600, it is equipped with erosion control brush layer 630 in dashpot 601, prevents The side that the upper surface of erosional layer 630 faces away from town road tilts upward setting, and tilt angle is 1-3 °, square erosional layer Close to one end of road lower than road surface, one end far from road and road surface flush;By the way that erosion control brush layer is arranged 630, it reduces rainwater and planting soil layer is washed away, improve the stability of planting soil layer and the stability of plant growth, simultaneously because Erosion control brush layer 630 is obliquely installed, and plays preferable buffer function, and erosion control brush layer 630 itself also has water penetration, facilitates rain Water is through in inflow plantation layer 600.
Erosion control brush layer 630 is (5-7) by weight ratio: sepiolite and the rubble mixing of (15-20) form, in the present embodiment, Erosion control brush layer 630 is made of the sepiolite that weight ratio is 6:16 and rubble mixing, by the way that sepiolite and rubble are mixed to form layer Erosion control brush layer 630, since sepiolite has preferable absorption to heavy metal ion, when rainwater passes through erosion control brush layer 630, Heavy metal ion in rainwater adsorbs a part by sepiolite first, reduces influence of the heavy metal ion to plantation layer 600, more Be conducive to the growth of plant.
Drainage system 800 includes: several overflow pipe 810 uniformly distributed along town road extending direction, and overflow pipe 810 prolongs Stretch out the surface of plantation layer 600 and the highest point flush at least with plantation layer 600;One end is suspended at 600 middle part of plantation layer most Above low spot and the other end bypasses the nozzle of overflow pipe and is arranged in the siphon pipe for extending to 600 lower section of plantation layer in overflow pipe 820;And it is connected to the main sewer 830 of each overflow pipe lower end;The spacing of adjacent overflow pipe 810 is arranged in 2.5-3.2m Between, and the highest point flush of the nozzle of overflow pipe 810 and plantation layer 600, siphon pipe 820 are U-tube or cotton thread, and outstanding The surface 2-5cm of one end distance plantation layer 600 above plantation layer 600 is set, thus when rainwater is more, it can be existing by siphon As the discharge of the ponding in layer 600 will be planted.
Further, it is equipped with non-irrigated small stream 640 at the middle part of plantation layer 600, non-irrigated small stream 640 is laid with by cobblestone to be formed, in non-irrigated small stream Pipe fixing bracket 840 is inserted in 640, as shown in Fig. 2, pipe fixing bracket 840 includes: stop collar 841 and several is fixed on limit The fixed feet 842 of position ring 841, siphon pipe 820 are plugged in stop collar 841, and fixed feet 842 is plugged and fixed in plantation layer 600 On;Certain rainwater can be stored on plantation 600 surface of layer by the way that non-irrigated small stream 640 is arranged, meanwhile, when rainfall is excessive, can lead to It crosses non-irrigated small stream 640 to drain rainwater, non-irrigated small stream 640 also has certain water purification ability, can carry out rainwater preliminary filtering, and can incite somebody to action Dirt retention in rainwater is inside non-irrigated small stream 640;And overflow pipe can be limited and be fixed by pipe fixing bracket 840, And separate non-irrigated small stream 640 with overflow pipe, facilitate overflow pipe that the rainwater in non-irrigated small stream 640 is discharged.
When rainwater is overflowed into dividing strip from town road, due to the barrier effect by waterproof geotextiles, in rainwater infiltration In the process, the bottom of town road is not penetrated into, that is, is trapped in biological cleaning stranded belt, and rainwater is during lower infiltration, A degree of purification is carried out by the soil property of plantation layer 600 and plant first, removes rain water part greasy dirt and heavy metal, then It is sufficiently filtered by filter layer 500, the rainwater that aquifer 300 is seeped under making reaches certain cleanliness, by permeable When layer 400, the silt of filter layer 500 is stopped, prevents its lower seeps from blocking water-permeable pipe 700, by by aquifer 300 and storage Water drainage blanket 200 is stored, and excessive rainfall is discharged from water-permeable pipe 700, this part rainwater may collect in water storage In device, for irrigating and cleaning, water resource has been saved;Since the upper surface of plantation layer 600 is recessed arc, rainwater Be difficult to be back on road after flowing into biological cleaning stranded belt, to alleviate the generation of urban waterlogging, and when amount of rainfall compared with Greatly, when the accumulation of the middle part of planting soil layer is a certain amount of, by siphon pipe 820 by extra rainwater suction overfall pipe, and pass through Main sewer 830 is discharged, and effectively rainwater is timely discharged, to realize infiltration, water storage, water purification, backwater, draining Etc. multiple functions, town road is included in a part in sponge city.
Embodiment two
A kind of construction technology of biological cleaning stranded belt, the technique include the following steps:
Step 1: divide the width of band according in design of municipal road points of band and side, determine the width of biological cleaning stranded belt Degree, and the excavation of foundation pit is carried out, the excavation of foundation pit is by the way of artificial bench excavation.
Step 2: waterproof geotextiles are laid with along the inner wall of foundation pit and foundation pit is completely covered to form waterproof geotextile layer 100, waterproof geotextiles are mutually stacked when being laid with, and seam crossing is at least overlapped 15cm or more, adopts between adjacent waterproof geotextiles It is fixed with the form of suture or bonding, to guarantee the waterproofness of seam crossing.
Step 3: the extending direction along town road is laid with water-permeable pipe 700, water-permeable pipe in the middle position of bottom of foundation ditch 700 use diameter for the flexible porous tube 700 of 10cm, and water-permeable pipe 700 connects water-storing device or is directly connected under city Water channel.
Step 4: successively laying water storage drainage blanket 200, aquifer 300, pervious bed 400 and filter layer 500 from bottom to up, Detailed process are as follows:
Weight ratio is (1-3) by S01: the haydite and rubble of (6-10) pave after mixing in the bottom of foundation pit, and will be permeable Pipe 700 covers, to obtain water storage drainage blanket 200, in the present embodiment, water storage drainage blanket 200 use weight ratio for the haydite of 3:8 with Rubble, the diameter of haydite are 15-20mm, and the diameter of rubble is 20-30mm.
Weight ratio is (3-5): (5-8) by S02: diatomite, river sand and the coarse sand of (12-18) are laid on after being stirred The top of water storage drainage blanket 200, and pave compacting and form aquifer 300, in the present embodiment, aquifer 300 uses weight ratio for 4: Diatomite, river sand and the coarse sand of 8:15.
Permeable geotextiles 410 are laid on aquifer 300 after forming 410 layers of permeable geotextiles by S03, and water-permeable brick is tight Close be laid on above permeable geotextiles 410 forms permeable brick layer 420, and 410 layers of permeable geotextiles and permeable brick layer 420 collectively form Pervious bed 400, permeable geotextiles 410 just have the form for manually rolling paving to pave, and seam crossing is at least overlapped 5cm or more, permeable Brick layer 420 is staggeredly laid with water-permeable brick by least two layers and closely tiles and formed, the seam by two layers of water-permeable brick, between lower layer's water-permeable brick Gap is covered by upper layer water-permeable brick.
Weight ratio is 2:(6-8 by S04);(2-4): after active carbon, fine sand, clay and the quartz sand of (3-5) are stirred It is laid in permeable brick layer 420, and forms the first filter layer 510 after compacting of tiling, then glass fabric is laid on the first mistake The second filter layer 520 is formed on filtering layer 510, the first filter layer 510 and the second filter layer 520 collectively form filter layer 500, this reality It applies the first filter layer 510 in example to be made of active carbon, fine sand, clay and the quartz sand mixing that weight ratio is 2:6:4:4, glass fibers Wei Bu seam crossing when being laid at least is overlapped 5cm.
Step 5: overflow pipe is subjected to assembling with main sewer 830 and is laid in along the extending direction of town road close The medium position of foundation pit, the spacing of adjacent overflow pipe 810 is setting between 2.5-3.2m, and the nozzle and kind of overflow pipe 810 Plant the highest point flush of layer 600.
Step 6: being (3-6): (4-7): after flyash, charcoal and the planting soil of (75-85) are stirred by weight ratio Mixed planting soil is obtained, mixed planting soil is laid on 500 top of filter layer and is fixed main sewer 830, and is being laid with It is laid with stalk after to the first design height and forms stalk layer 620, and continues to be laid with mixing planting soil until the second design height, shape At plantation layer 600, and simultaneously by plant layer 600 surface layer finishing in it is recessed when, the distance from bottom grade elevation 22- of concave surface 26cm, and dashpot 601 is reserved in the two sides of plantation layer 600;The powder that mixed layer 610 is 5:6:80 by weight ratio in the present embodiment Coal ash, charcoal and planting soil mixing composition, stalk layer 620 with a thickness of 10-20cm, and surface distance designed elevation 1- thereon 1.25m。
Step 7: being (5-7) by weight ratio: the rubble and sepiolite of (15-20) are filled in shape in dashpot 601 after mixing At erosion control brush layer 630, and surface layer is trimmed to and is tilted upward, in the present embodiment, erosion control brush layer 630 is the sea of 6:16 by weight ratio Afrodite and rubble mixing composition.
Step 8: siphon pipe 820 is successively threaded through in each overflow pipe, and the end of siphon pipe 820 is made to be suspended at plantation 600 middle part top 2-5cm of layer, plugs pipe fixing bracket 840 at the middle part of plantation layer 600, and siphon pipe 820 is plugged on pipeline It is fixed in fixed frame 840.
Step 9: the middle part for selecting diameter to be laid on plantation layer 600 for the cobblestone of 3-7cm forms non-irrigated small stream 640, non-irrigated small stream 640 total height is less than 12cm, and width is less than the overall width 1/5 of biological cleaning stranded belt.
It is a variety of to realize infiltration, water storage, water purification, backwater, draining etc. for the biological cleaning stranded belt made of above-mentioned technique Function.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (10)

1. a kind of Multifunctional sponge urban municipal road biological cleaning stranded belt characterized by comprising
It is laid on the waterproof geotextile layer of town road dividing strip inner wall;
Water storage drainage blanket, aquifer, pervious bed, filter layer and the plantation layer being successively laid with from the bottom to top, the plantation layer Upper surface is in recessed arc;
The water-permeable pipe being threaded through in the water storage drainage blanket;And
Drainage system in the middle part of the plantation layer is set;
Wherein, the drainage system includes:
Several overflow pipes uniformly distributed along town road extending direction, the overflow pipe extend the surface of the plantation layer simultaneously At least with plantation layer highest point flush;
One end is suspended in the middle part of plantation layer above minimum point and the other end bypasses the nozzle of the overflow pipe and is arranged in described overflow The siphon pipe below the plantation layer is extended in flow tube;And
It is connected to the main sewer of each overflow pipe lower end.
2. Multifunctional sponge urban municipal road biological cleaning stranded belt according to claim 1, which is characterized in that institute The two sides for stating plantation layer offer dashpot, and erosion control brush layer, the upper surface court of the erosion control brush layer are equipped in the dashpot Setting is tilted upward to the side away from town road.
3. Multifunctional sponge urban municipal road biological cleaning stranded belt according to claim 2, which is characterized in that institute It is (5-7) that erosion control brush layer, which is stated, by weight ratio: sepiolite and the rubble mixing of (15-20) form.
4. Multifunctional sponge urban municipal road biological cleaning stranded belt according to claim 1, which is characterized in that institute It is (1-3) that water storage drainage blanket, which is stated, by weight ratio: haydite and the rubble mixing of (6-10) form.
5. Multifunctional sponge urban municipal road biological cleaning stranded belt according to claim 1, which is characterized in that institute It is (3-5): (5-8) that aquifer, which is stated, by weight ratio: diatomite, river sand and the coarse sand mixing of (12-18) form.
6. Multifunctional sponge urban municipal road biological cleaning stranded belt according to claim 1, which is characterized in that institute Stating pervious bed includes: to be laid on the permeable geotextiles above the aquifer and be laid on above the permeable geotextiles Permeable brick layer.
7. Multifunctional sponge urban municipal road biological cleaning stranded belt according to claim 2, which is characterized in that institute Stating filter layer includes: the first filter layer above the pervious bed is arranged in and is arranged in above first filter layer second Filter layer, first filter layer are 2:(6-8 by weight ratio);(2-4): active carbon, fine sand, clay and the quartz sand of (3-5) Mixing composition, second filter layer is laid with by glass fabric to be formed.
8. Multifunctional sponge urban municipal road biological cleaning stranded belt according to claim 1, which is characterized in that institute Stating plantation layer includes weight ratio for (3-6): (4-7): flyash, charcoal and the planting soil of (75-85) combine the mixing to be formed Layer, stalk layer is embedded in the mixed layer.
9. Multifunctional sponge urban municipal road biological cleaning stranded belt according to claim 1, which is characterized in that institute The middle part for stating plantation layer is equipped with non-irrigated small stream, is inserted with pipe fixing bracket in the drought small stream, the pipe fixing bracket include: stop collar and Several fixed feets for being fixed on the stop collar, the siphon pipe are plugged in the stop collar.
10. a kind of construction technology of biological cleaning stranded belt, which is characterized in that the technique includes the following steps:
Step 1: dividing the width of band according in design of municipal road points of band and side, determine the width of biological cleaning stranded belt, and Carry out the excavation of foundation pit;
Step 2: waterproof geotextiles are laid with along the inner wall of foundation pit and foundation pit is completely covered to form waterproof geotextile layer;
Step 3: the extending direction along town road is laid with water-permeable pipe in the middle position of bottom of foundation ditch;
Step 4: water storage drainage blanket, aquifer, pervious bed and filter layer, detailed process are successively laid from bottom to up are as follows:
Weight ratio is (1-3) by S01: the haydite and rubble of (6-10) pave after mixing in the bottom of foundation pit, and water-permeable pipe is covered Lid, to obtain water storage drainage blanket;
Weight ratio is (3-5): (5-8) by S02: diatomite, river sand and the coarse sand of (12-18) are laid on water storage after being stirred Above drainage blanket, and paves compacting and form aquifer;
Permeable geotextiles are laid on aquifer after forming permeable geotextile layer, water-permeable brick are closely laid on to permeable soil by S03 Permeable brick layer is formed above work cloth, permeable geotextile layer and permeable brick layer collectively form pervious bed;
Weight ratio is 2:(6-8 by S04);(2-4): active carbon, fine sand, clay and the quartz sand of (3-5) are laid with after being stirred The first filter layer is formed in permeable brick layer, and after compacting of tiling, then glass fabric is laid on the first filter layer and is formed Second filter layer, the first filter layer and the second filter layer collectively form filter layer;
Step 5: overflow pipe and main sewer are subjected to assembling and are laid in foundation pit along the extending direction of town road Portion position;
Step 6: being (3-6): (4-7) by weight ratio: flyash, charcoal and the planting soil of (75-85) obtain after being stirred Mixed planting soil is laid on above filter layer and is fixed main sewer, and is being routed to the first design by mixed planting soil It is laid with stalk after height and forms stalk layer, and continues to be laid with mixing planting soil until the second design height, forms plantation layer, and same When by plant layer surface layer finishing in it is recessed when, the distance from bottom grade elevation 22-26cm of concave surface, and plantation layer two sides Reserved dashpot;
Step 7: being (5-7) by weight ratio: the rubble and sepiolite of (15-20) are filled in dashpot after mixing and form erosion control Brush layer, and surface layer is trimmed to and is tilted upward;
Step 8: siphon pipe is successively threaded through in each overflow pipe, and the end of siphon pipe is made to be suspended at top in the middle part of plantation layer 2-5cm。
CN201910425323.8A 2019-05-21 2019-05-21 Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology Pending CN110219357A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910425323.8A CN110219357A (en) 2019-05-21 2019-05-21 Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910425323.8A CN110219357A (en) 2019-05-21 2019-05-21 Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology

Publications (1)

Publication Number Publication Date
CN110219357A true CN110219357A (en) 2019-09-10

Family

ID=67821581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910425323.8A Pending CN110219357A (en) 2019-05-21 2019-05-21 Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology

Country Status (1)

Country Link
CN (1) CN110219357A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111320281A (en) * 2020-03-12 2020-06-23 中国科学院东北地理与农业生态研究所 Ecological interception dam suitable for drainage purification of farmland in cold region and construction method and application thereof
CN111792734A (en) * 2020-05-27 2020-10-20 江苏龙腾工程设计股份有限公司 Multistage overall process sponge rainwater biological detention pond
CN112243738A (en) * 2020-10-23 2021-01-22 王晓军 Roof greening system for energy-saving building
CN112681476A (en) * 2020-12-14 2021-04-20 野趣生境环境设计(成都)研究院(有限合伙) Rainwater garden beneficial to improving biodiversity and construction method thereof
CN113279299A (en) * 2021-06-16 2021-08-20 重庆具得建筑工程有限公司 Water-permeable municipal road and construction process thereof
CN114982519A (en) * 2022-07-06 2022-09-02 中铁第六勘察设计院集团有限公司 Shrub and grass greening flowerpot type structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005045146A1 (en) * 2003-11-06 2005-05-19 Autostrade S.P.A. Ecological road unit
CN103371069A (en) * 2012-04-26 2013-10-30 交通运输部科学研究院 Cascading type ecological planting tank for road surface runoff collection, purification and utilization
CN203834628U (en) * 2014-05-05 2014-09-17 浙江六通塑胶有限公司 Water draining channel
CN105862549A (en) * 2016-04-15 2016-08-17 东南大学 Biologicalpurificationretention belt for sponge-type city municipal road and construction method of biologicalpurificationretention belt
CN106698813A (en) * 2016-11-30 2017-05-24 中冶华天工程技术有限公司 Functional rainwater garden applicable to sponge community
CN107587577A (en) * 2017-09-13 2018-01-16 沈阳建筑大学 Band is detained in a kind of sunk type biological cleaning
CN107739258A (en) * 2017-11-30 2018-02-27 蒋文兰 Sepiolite mine tailing saline land greening tree planting soil conditioner

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005045146A1 (en) * 2003-11-06 2005-05-19 Autostrade S.P.A. Ecological road unit
CN103371069A (en) * 2012-04-26 2013-10-30 交通运输部科学研究院 Cascading type ecological planting tank for road surface runoff collection, purification and utilization
CN203834628U (en) * 2014-05-05 2014-09-17 浙江六通塑胶有限公司 Water draining channel
CN105862549A (en) * 2016-04-15 2016-08-17 东南大学 Biologicalpurificationretention belt for sponge-type city municipal road and construction method of biologicalpurificationretention belt
CN106698813A (en) * 2016-11-30 2017-05-24 中冶华天工程技术有限公司 Functional rainwater garden applicable to sponge community
CN107587577A (en) * 2017-09-13 2018-01-16 沈阳建筑大学 Band is detained in a kind of sunk type biological cleaning
CN107739258A (en) * 2017-11-30 2018-02-27 蒋文兰 Sepiolite mine tailing saline land greening tree planting soil conditioner

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111320281A (en) * 2020-03-12 2020-06-23 中国科学院东北地理与农业生态研究所 Ecological interception dam suitable for drainage purification of farmland in cold region and construction method and application thereof
CN111792734A (en) * 2020-05-27 2020-10-20 江苏龙腾工程设计股份有限公司 Multistage overall process sponge rainwater biological detention pond
CN111792734B (en) * 2020-05-27 2021-06-22 江苏龙腾工程设计股份有限公司 Multistage overall process sponge rainwater biological detention pond
CN112243738A (en) * 2020-10-23 2021-01-22 王晓军 Roof greening system for energy-saving building
CN112243738B (en) * 2020-10-23 2023-08-25 中亿丰建设集团股份有限公司 Roof greening system for energy-saving building
CN112681476A (en) * 2020-12-14 2021-04-20 野趣生境环境设计(成都)研究院(有限合伙) Rainwater garden beneficial to improving biodiversity and construction method thereof
CN113279299A (en) * 2021-06-16 2021-08-20 重庆具得建筑工程有限公司 Water-permeable municipal road and construction process thereof
CN114982519A (en) * 2022-07-06 2022-09-02 中铁第六勘察设计院集团有限公司 Shrub and grass greening flowerpot type structure and construction method thereof
CN114982519B (en) * 2022-07-06 2024-10-22 中铁第六勘察设计院集团有限公司 Grass-irrigation green flowerpot type structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN110219357A (en) Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology
CN105862549B (en) Band and its construction method are detained in biological cleaning for sponge urban municipal road
CN207727714U (en) Sponge urban ecology filtration system
CN108729326A (en) Self-purification drainage system for the strand highway construction of sponge city
CN110249844A (en) A kind of shade tree tree pond with drainage device
CN110016886B (en) Riverway near natural ecological embankment
CN207047636U (en) A kind of novel water permeable ground
CN105621617B (en) A kind of pavement runoff Integral purifier
CN204690903U (en) Community system for reclaiming rainwater
CN208649827U (en) Self-purification drainage system for the strand highway construction of sponge city
CN207776053U (en) It is a kind of for sponge urban construction without catch-basin drainage system
CN208379724U (en) The Rain Garden of Collapsible Loess District
CN110629619A (en) Sponge type green land construction structure technology
CN211283925U (en) Formula of sinking buffering area highway runoff purifier
CN205242598U (en) Online ecological vegetation infiltration shallow ridges
CN208563030U (en) A kind of sponge city Route for pedestrians infiltration structure
CN107044081A (en) Environmental street drainage structure
CN110145014A (en) A kind of ecological pavement shunting water guide function with municipal administration
CN106638919B (en) A kind of urban road rainwater recycling system and construction method
CN206428785U (en) It is a kind of to remove the Multifunctional rain management and control facility become silted up
CN104294905A (en) Pervious concrete pavement system with filter material well
CN104452941A (en) Rainwater collection and permeation system preventing settlement deformation of ground
CN108915063B (en) Shallow grass planting ditch with sewage intercepting and purifying functions for sponge city
CN107023066A (en) Ecoscape retaining greenery patches structure
JP2802282B2 (en) Rechargeable storage facility

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190910

RJ01 Rejection of invention patent application after publication