CN105862549B - Band and its construction method are detained in biological cleaning for sponge urban municipal road - Google Patents

Band and its construction method are detained in biological cleaning for sponge urban municipal road Download PDF

Info

Publication number
CN105862549B
CN105862549B CN201610237192.7A CN201610237192A CN105862549B CN 105862549 B CN105862549 B CN 105862549B CN 201610237192 A CN201610237192 A CN 201610237192A CN 105862549 B CN105862549 B CN 105862549B
Authority
CN
China
Prior art keywords
band
detained
water purification
layer
municipal road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610237192.7A
Other languages
Chinese (zh)
Other versions
CN105862549A (en
Inventor
顾兴宇
王晓威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI CITY ROAD AND BRIDGE TECHNOLOGY Co.,Ltd.
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201610237192.7A priority Critical patent/CN105862549B/en
Publication of CN105862549A publication Critical patent/CN105862549A/en
Application granted granted Critical
Publication of CN105862549B publication Critical patent/CN105862549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements
    • E03F5/0404Gullies for use in roads or pavements with a permanent or temporary filtering device; Filtering devices specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins

Abstract

The invention discloses a kind of biological cleaning for sponge urban municipal road to be detained band and its construction method.The waterproof geotextiles that band includes being successively set on from bottom to up in sponge urban municipal road dividing strip are detained in the biological cleaning, rubble water purification layer, permeable geotextiles, conditioned soil water purification layer, erosion control brush layer, it is arranged on the overflow well in dividing strip center, the collector pipe in the rubble water purification layer is disposed longitudinally on along sponge urban municipal road, the transverse connecting pipe connected with the overflow bottom, overflow well runs through waterproof geotextiles, rubble water purification layer, permeable geotextiles, conditioned soil water purification layer and erosion control brush layer, and connected with collector pipe, the transverse connecting pipe is laterally set along sponge urban municipal road.Band is detained in the biological cleaning of the present invention has draining, infiltration, backwater, water storage, the function of water purification, available for town road and the arterial highway of surrounding city, town road is become sponge urban municipal road, promotes the development in sponge city.

Description

Band and its construction method are detained in biological cleaning for sponge urban municipal road
Technical field
The present invention relates to a kind of town road biological cleaning to be detained band and its construction method, can apply sponge Municipal road Road is built, and belongs to field of road.
Background technology
Sponge city is a kind of urban construction new concept that country proposes.National house and town and country construction portion are required to 2020 Year, the area of completed region of the city more than 20% reaches target call, and the area to the year two thousand thirty more than 80% reaches target call.By This can be seen that country improve resident living environment and Urban Water Environment there is an urgent need to sponge city requirement city is being rained When with ooze, it is stagnant, store, net, use, the function of row.Road pavement is about 30% in the proportion that whole city is mated formation, and there is rainwater The problem of road surface causes runoff pollution, water resource waste is washed away, therefore, gives full play to effect of the town road in sponge city It is extremely important.In general town road mainly by car lane, bicycle lane, pavement, in point band, side divide band to form.By In the continuous improvement to town road landscape effect and green percentage, in point band and side divide the width of band constantly increasing, In the case of ensureing road safety use, band is divided to seem with effect of the side point with infiltration, water storage, water purification, backwater, draining in performance It is very necessary.In current design of municipal road, all dividing strips are highly above road table, can not play above-mentioned work at all With, and road surface can be polluted from the rainwater of dividing strip outflow, it will also aggravate the pressure of drainage system.
In order to which town road to be changed into the part in sponge city, improve city water resource environment, it is proposed that one kind is used for Band is detained in the biological cleaning of sponge urban municipal road.Sponge the idea of the city proposed that 2014 in Nanning City in 2013 first And Shenzhen has carried out desk study, desk study practice is just started in each experimental city at present.Sponge city is a system Engineering, it is the integrated planning design in a region.Such as Nanning City, the bright new district in Shenzhen, it is that the planning in one big region is set Meter, but they do not do specific design to accounting for city area of mating formation close to 30% road.With sponge urban municipal road phase Corresponding is low influence road, in low influence highway layout at home and abroad, it is proposed that using drainage pavement, opening kerbstone, under The requirement of female greenbelt, realizes the function of road drainage, is but not carried out the function of infiltration, water storage, water purification, backwater.Hair Bright patent《A kind of ecology filter ditch and its design method》A kind of ecology filter ditch is disclosed, by the work of the filtering of planting soil and gravel With reduction urban road runoff pollution, it is evident that the reduction of planting soil and gravel is limited in one's ability, can only filter the pollution of big particle diameter Thing.Jiangsu Province sponge city experimental city Zhengjiang City, it is the model city of national sponge urban construction, Zhenjiang is in sponge city city In political affairs road construction, porous asphalt pavement, opening kerbstone, up concave type greenbelt, overflow well are employed, following several respects be present Problem:(1) table rainfall runoff in road is directly entered drainage pipeline networks, cannot purify and store;(2) water resource waste, can not obtain Using.(3) overflow well is identical with earth's surface absolute altitude, and rainwater is directly entered overflow well after entering greenbelt, both easily causes overflow well Block, while greenbelt can not play a part of backwater, water storage, infiltration.
The content of the invention
Technical problem:The present invention provides a kind of is used for sponge city with infiltration, water storage, water purification, backwater, drain function Band is detained in the biological cleaning of town road, while provides the construction method that band is detained in a kind of biological cleaning.
Technical scheme:The present invention be used for sponge urban municipal road biological cleaning delay band, including from bottom to up according to The secondary waterproof geotextiles being arranged in sponge urban municipal road dividing strip, rubble water purification layer, permeable geotextiles, conditioned soil water purification Layer, erosion control brush layer, it is arranged on the central overflow well of dividing strip, is disposed longitudinally on the rubble water purification along sponge urban municipal road Collector pipe, the transverse connecting pipe that connect with the overflow bottom in layer, waterproof geotextiles are detained with excavation along biological cleaning The whole border laying of foundation ditch, the overflow well is through waterproof geotextiles, rubble water purification layer, permeable geotextiles, conditioned soil water purification Layer and erosion control brush layer, and connected with collector pipe, the transverse connecting pipe is laterally set along sponge urban municipal road.
Further, biological cleaning of the present invention is detained in band, the erosion control brush layer by 2~5cm 10~20mm rubble groups Into the conditioned soil water purification layer, rubble water purification layer and permeable geotextiles composition rainwater purification layer.
Further, biological cleaning of the present invention is detained in band, the conditioned soil water purification layer by fertile soil, charcoal, fine sand, Planting soil is according to mass ratio 5: (3~7): (15~25): (65~73) mix, thickness are 0.8~1.2m;Described rubble Water purification layer is made up of 20~30cm of thickness 10~20mm grade Stone;The overhead height of described overflow well is less than road surface 7~10cm of designed elevation, by the rain perforaled strainer with filtering function and draining well construction.
Further, biological cleaning of the present invention is detained in band, and described charcoal particle diameter is 30~60 mesh, and phosphorus content is more than 95%, described fertile soil is to be containing soil of the residual leaf of timbered deadwood through long-time putrid fermentation, described fine sand particle diameter 0.8~2mm, described planting soil are the normal soil for being adapted to plant growth.
Further, biological cleaning of the present invention is detained in band, and the collector pipe is the flexible porous of a diameter of 8~10cm Manage, described permeable geotextiles are to be oozed with filtering and chemosmotic geotextiles, described waterproof geotextiles for prevention rainwater Saturating geotextiles.
The method of band, including following step are detained in the above-mentioned biological cleaning for sponge urban municipal road of construction of the present invention Suddenly:
1) divide the width of band according in design of municipal road points of band and side, it is determined that biology is detained the width of band, and carry out The excavation of band is detained in biological cleaning;
2) build overflow well by laying bricks or stones, and set transverse connecting pipe to be connected with the gully on bicycle lane in its underpart;
3) along interface laying waterproof geotextiles are excavated, at least overlapping 15cm of seam crossing of two waterproof geotextiles, suture must It must be carried out continuously, suture needle is apart from edge at least 3cm;
4) it is detained band longitudinal direction along biology and lays collector pipe;
5) construct successively from bottom to up rubble water purification layer, permeable geotextiles, conditioned soil water purification layer, obtain water purification layer;
6) pave 10~20mm rubbles of the particle diameters such as uniform thickness in conditioned soil water purification layer concave surface, and thickness is 2~ 5cm, erosion control brush layer is obtained, concave surface bottom is away from 12~18cm of grade elevation.
Further, in the inventive method, in the step 1), biology is detained with by the way of artificial bench excavation, Every grade of shoulder height is 40~60cm, and width is 40~60cm, and cutting depth is 1.25~1.65m.
Further, in the inventive method, in the step 2), the overhead height of overflow well is less than Pavement Design absolute altitude 7 ~10cm, and rain perforaled strainer is installed.
Further, in the inventive method, the idiographic flow of the step 5) is:
1. 10~20mm rubbles of the particle diameters such as 20~30cm are inserted into biology is detained band, and using manually shakeouing, obtains broken Stone water purification layer;
2. being spread using artificial rolling, permeable geotextiles, at least overlapping 15cm of seam crossing, suture are laid at the top of rubble water purification layer It must be carried out continuously, suture needle is apart from edge at least 3cm;
3. according to parts by weight:5 parts of fertile soil, 3~7 parts of charcoal, 15~25 parts of fine sand, 65~73 parts of planting soil, one Rise and add compulsory mixer or Double-horizontal-shaft trough and paddle mixer, taken out after mixing and stirring, be purified conditioned soil;
4. purification conditioned soil is backfilled into biology is detained band, coefficient of loose laying is 1.1~1.2 so that compactness reaches 65% ~75%, the thickness after compacting is 0.8~1.2m, and top layer is trimmed to up concave type, concave surface distance from bottom grade elevation 17~ 20cm, obtain conditioned soil water purification layer.
Present invention purification is detained band by erosion control brush layer, water purification layer, collector pipe, overflow well, transverse connecting pipe, permeable geotechnique Cloth, waterproof geotextiles composition, collector pipe is a diameter of 8~10cm flexible porous tube, and the overflow well is that internal diameter is 60cm's Gully, bottom set transverse connecting pipe, described permeable geotextiles be with filtering and chemosmotic geotextiles, it is described Waterproof geotextiles are to prevent the geotextiles of rain penetration.Overflow well is by the rain perforaled strainer with filtering function and draining well construction. Heretofore described town road can be the town road for dividing band containing side, provincial highway, the national highway of band be divided containing side, band is divided in side Width is not preferably less than 2.5m.
Containing charcoal, fertile soil, fine sand in conditioned soil water purification layer of the present invention, it is detained in biology in band first using biology Charcoal improved soil technology, the heavy metal contaminants in rainwater can not only be cut down well, and be advantageous to the growth of plant, carry The survival rate of high plant, and improve the penetrating power that band is detained in biological cleaning.Band knot is detained in corresponding new biological cleaning Structure can be used for sponge urban municipal road drainage system, and integrate draining, infiltration, water storage, backwater, water purification function are in one.
Band is detained in the biological cleaning of the present invention makes town road be provided with draining, infiltration, backwater, water storage, the function of water purification, Do not influence the safe handling of road simultaneously, common town road is become sponge urban municipal road.As sponge Municipal Road, draining that need to be to sponge urban municipal road, infiltration, backwater, water storage, the ability of water purification are evaluated.Using heavy rain flood Water management model, infiltration coefficient experiment, the observation of field test road, the experiment of pollutant fluxes merit rating, to sponge Municipal The draining of road, infiltration, backwater, water storage, water purification ability are evaluated, by with common town road comparative analysis result table It is bright, sponge urban municipal road of the invention have very effective drainability, infiltration ability, backwater ability, water-holding capacity, Water purification ability, town road is set to be changed into the part in sponge city, available for newly-built or reconstruction town road construction.
Beneficial effect:The present invention compared with prior art, has advantages below:
Sponge city is in starting stage, the built sponge urban road in the country and other countries' phase in the world in China The low influence road closed, draining and the water storage function of road are only considered emphatically, especially ignore the water purification function of road itself.This Invent has with the essential difference of existing sponge urban road:
(1) backwater and infiltration ability are improved.Biological cleaning is detained with interior setting overflow well, current existing overflow well absolute altitude Identical with earth's surface, rainwater is directly entered overflow well after entering greenbelt.Overflow well top surface absolute altitude of the present invention is higher than native table 8cm, rain Water enters biological cleaning and is detained in band, first permeates so that band is detained in biological cleaning can permeate, store more rainwater, as far as possible Performance biology be detained band effect.Only rainfall intensity is very big, i.e., biological cleaning be detained band inner product water depth reach 5~ After 8cm, just by overflow well draining, it is therefore prevented that rainwater is excessive to flood biological cleaning delay band;
(2) purifying rainwater, rain water pollutant is cut down.Due to caused greasy dirt during pavement usage and other heavy metals Pollution, pollution runoff is formed after rain drop erosion, if being directly discharged into Storm Sewer Network, will undoubtedly cause water resource pollution.At present It is planting soil and rubble that some biologies, which are detained with what is used, and planting soil and rubble have certain detergent power, but cut down pollution Thing it is limited in one's ability.The present invention employs conditioned soil purifying layer first, is made up of charcoal, fertile soil, fine sand, planting soil, raw Thing charcoal has loose structure, larger specific surface area and very strong adsorption capacity, the weight in very effective can drinking up the rain Metal and organic pollution.Containing humus in fertile soil, humus heavy metal pollutant also has good adsorption capacity, from And the pollutant in purifying rainwater, protect water body.Rainwater after improved native water purification layer purification, may take away in improvement soil layer Soil particle, if being directly entered collector pipe easily causes blocking.Therefore, one layer of permeable geotextiles are provided with improvement soil layer bottom, And 25cm metalling, further purifying rainwater are set under geotextiles.
(3) conditioned soil purifying layer is designed with beneficial to plant growth, improves the survival rate of plant.Added in conditioned soil purifying layer Charcoal, fertile soil, fine sand, planting soil, the characteristics of loose structure of charcoal, specific surface area are big and adsorption capacity is strong, energy Enough increase the effect of soil fertility, preservation of fertility.Fertile soil is the soil for being especially suitable for plant growth in itself, contains plant The various nutritional ingredients of growth.The addition of fine sand can effectively strengthen the root respiration of plant, so as to be advantageous to plant life It is long, improve the survival rate of plant;
(4) penetrating power that band is detained in biological cleaning is improved.Fine sand is added in conditioned soil purifying layer of the present invention, fine sand can To improve the infiltration coefficient of soil, accelerate rainwater infiltration speed so that biological cleaning is detained band and stores and purify more rainwater;
(5) rainwater after collection and purification.After flexible porous tube collects improved native water purification layer and rubble water purification layer purification Rainwater, water-storing device can be set at a certain distance from, the rainwater being collected into is used to clean road surface or pours plant, has saved water money Source;
(6) urban waterlogging is alleviated.Common town road uses the drainage pattern of catch-basin, and drainage pattern is single, And catch-basin is very easy to block, and causes discharge pressure big, it result in numerous cities and produce waterlogging.The biological cleaning of the present invention is stagnant It is up concave type dividing strip to stay band, and kerbstone is arranged into the kerbstone that is open, then the rainwater on road surface can be directly entered biological cleaning delay Band, it is detained through biological cleaning with a series of draining, infiltration, water storage, backwater and water purification function, not only alleviates urban waterlogging, And realize the function in sponge city;
Brief description of the drawings
Fig. 1 is the structural representation that band is detained in biological cleaning of the present invention.
In figure:1- overflow wells, 2- collector pipes, 3- rubble water purification layers, 4- waterproof geotextiles, 5- conditioned soil water purification layers, 6- are saturating Bandwidth is detained in water geotextiles, 7- erosion control brush layers, 8- transverse connecting pipes, b- biological cleanings, and band depth, d- are detained in H- biological cleanings Overflow well diameter.
Embodiment
For a better understanding of the present invention, with reference to embodiment and Figure of description in the present invention is furture elucidated Hold, but present disclosure is not limited solely to the following examples.
Embodiment 1:
As shown in drawings, biological cleaning is detained band by erosion control brush layer 7, conditioned soil water purification layer 5, waterproof geotextiles 4, permeable soil Work cloth 6, rubble water purification layer 3, collector pipe 2, overflow well 1, transverse connecting pipe 8 form, the construction method of band is detained in biological cleaning, Comprise the following steps:
Step 1, the excavation of band is detained in biological cleaning
Divide the width of band according in design of municipal road points of band and side, the excavation width b that band is detained in biological cleaning is equal to Bandwidth is divided in side.As shown in drawings, biological cleaning is detained with by the way of artificial bench excavation, and every grade of shoulder height is 50cm, width 50cm, cutting depth H are 1.45m.
Step 2, overflow well is built by laying bricks or stones
The building method of overflow well 1 is identical with the gully on road, spacing 40m, and internal diameter d is 60cm, and bottom is set Transverse connecting pipe 8 is connected with the gully on bicycle lane.The overhead height of overflow well 1 is less than Pavement Design absolute altitude 8cm, and Rain perforaled strainer is installed.
Step 3, waterproof geotextiles are laid
Along interface laying waterproof geotextiles 4 are excavated, spread using artificial rolling, at least overlapping 15cm of seam crossing, suture must connect Continuous to carry out, suture needle is apart from edge at least 3cm.
Step 4, flexible porous tube is laid
It is detained band longitudinal direction along biology and lays flexible porous tube 2, flexible porous tube caliber is 8cm.
Step 5, water purification layer is laid
1. 10~20mm rubbles of the particle diameters such as 25cm are inserted into biology is detained band, and using manually shakeouing, it is net to obtain rubble Water layer 3.
2. laying permeable geotextiles 6 at the top of rubble water purification layer, spread using artificial rolling, at least overlapping 15cm of seam crossing, seam Conjunction must be carried out continuously, and suture needle is apart from edge at least 3cm.
3. according to parts by weight:5 parts of fertile soil, 3 parts of charcoal, 22 parts of fine sand, 70 parts of planting soil, choose fertile soil, life Thing charcoal, fine sand, planting soil, the particle diameter of charcoal is 30~60 mesh, and the particle diameter of fine sand is 0.8~2mm, by fertile soil, charcoal, Fine sand, planting soil proportionally add compulsory mixer or Double-horizontal-shaft trough and paddle mixer together, are taken out after mixing and stirring 20 minutes, It is purified conditioned soil.
4. purification conditioned soil is backfilled into biology is detained band, coefficient of loose laying 1.1, and uses small-sized compacting equipment so that Compactness reaches 65%~75%, and the thickness after compacting is 1m, and top layer is manually trimmed to up concave type, concave surface distance from bottom road Face absolute altitude 20cm, obtain conditioned soil water purification layer 5.
Step 6, erosion control brush layer is laid
Pave 10~20mm rubbles of the particle diameters such as uniform thickness in conditioned soil water purification layer concave surface, thickness 5cm, obtains Erosion control brush layer 7, concave surface bottom is away from grade elevation 15cm.
Using storm flood administrative model, infiltration coefficient experiment, the observation of field test road, the examination of pollutant fluxes merit rating Test, draining, infiltration, backwater to sponge urban municipal road, water storage, water purification ability are evaluated.Storm flood administrative model Result of the test shows that, compared to common town road, the sponge urban municipal road earth's surface that band is detained using biological cleaning is integrated Runoff coefficient reduces 54%, and road most unfavorable combination depth of accumulated water reduces 6.2cm, and total measurement (volume) of regulating and storing is 2400m3.Taken from scene Not purified road table rainwater and biological cleaning are detained with the rainwater in interior flexible porous tube, analyze heavy metal Zn therein, Pb, Cd, Cu content, it is detained through biological cleaning and reduces 40% with the pollutant load in the rainwater after purification.Sponge city It is required that the reduction rate of pollutant is not less than 40%, illustrate that there is extraordinary row containing the town road that band is detained in biological cleaning Water, infiltration, backwater, water storage and water purification function, accelerate the construction in sponge city.
Embodiment 2:
The difference for being differing principally in that conditioned soil purifying layer composition of embodiment, the difference of its proportion of composing will have influence on life The detergent power and penetrating power of band are detained in thing purification.Remaining step is same as Example 1 or similar.
According to parts by weight:5 parts of fertile soil, 7 parts of charcoal, 15 parts of fine sand, 73 parts of planting soil, choose fertile soil, biology Charcoal, fine sand, planting soil, the particle diameter of charcoal is 30~60 mesh, and the particle diameter of fine sand is 0.8~2mm, by fertile soil, charcoal, thin Sand, planting soil proportionally add compulsory mixer or Double-horizontal-shaft trough and paddle mixer together, take out, obtain after mixing and stirring 20 minutes To purification conditioned soil.Biological cleaning, which is obtained, according to the step of embodiment 1 is detained band, thickness 0.8m.
Using storm flood administrative model, infiltration coefficient experiment, the observation of field test road, the examination of pollutant fluxes merit rating Test, draining, infiltration, backwater to sponge urban municipal road, water storage, water purification ability are evaluated.Storm flood administrative model Result of the test shows that, compared to common town road, the sponge urban municipal road earth's surface that band is detained using biological cleaning is integrated Runoff coefficient reduces 57%, and road most unfavorable combination depth of accumulated water reduces 6.6cm, and total measurement (volume) of regulating and storing is 1920m3.Taken from scene Not purified road table rainwater and biological cleaning are detained with the rainwater in interior flexible porous tube, analyze heavy metal Zn therein, Pb, Cd, Cu content, it is detained through biological cleaning and reduces 46% with the pollutant load in the rainwater after purification.
Embodiment 3:
According to parts by weight:5 parts of fertile soil, 5 parts of charcoal, 25 parts of fine sand, 65 parts of planting soil, choose fertile soil, biology Charcoal, fine sand, planting soil, the particle diameter of charcoal is 30~60 mesh, and the particle diameter of fine sand is 0.8~2mm, by fertile soil, charcoal, thin Sand, planting soil proportionally add compulsory mixer or Double-horizontal-shaft trough and paddle mixer together, take out, obtain after mixing and stirring 20 minutes To purification conditioned soil.Biological cleaning, which is obtained, according to the step of embodiment 1 is detained band, thickness 1.2m.
Using storm flood administrative model, infiltration coefficient experiment, the observation of field test road, the examination of pollutant fluxes merit rating Test, draining, infiltration, backwater to sponge urban municipal road, water storage, water purification ability are evaluated.Storm flood administrative model Result of the test shows that, compared to common town road, the sponge urban municipal road earth's surface that band is detained using biological cleaning is integrated Runoff coefficient reduces 59%, and road most unfavorable combination depth of accumulated water reduces 6.8cm, and total measurement (volume) of regulating and storing is 2880m3.Taken from scene Not purified road table rainwater and biological cleaning are detained with the rainwater in interior flexible porous tube, analyze heavy metal Zn therein, Pb, Cd, Cu content, it is detained through biological cleaning and reduces 45% with the pollutant load in the rainwater after purification.
Above-described embodiment is only preferred embodiment of the present invention according to entity project, for the common skill of the art For art personnel, under the premise without departing from the principles of the invention, some improvement and equivalent substitution can also be made, these are to this hair Bright claim be improved with the technical scheme after equivalent substitution, each fall within protection scope of the present invention.

Claims (7)

1. band is detained in a kind of biological cleaning for sponge urban municipal road, it is characterised in that the delay band include from it is lower to On be successively set on waterproof geotextiles (4), rubble water purification layer (3), permeable geotextiles in sponge urban municipal road dividing strip (6), conditioned soil water purification layer (5), erosion control brush layer (7), the overflow well (1) for being arranged on dividing strip center, along sponge Municipal road Collector pipe (2) that road is disposed longitudinally in the rubble water purification floor (3), the lateral connection connected with the overflow well (1) bottom Manage (8), the waterproof geotextiles (4) are detained the whole border with excavation pit along biological cleaning and laid, and the overflow well (1) is passed through Wear waterproof geotextiles (4), rubble water purification layer (3), permeable geotextiles (6), conditioned soil water purification layer (5) and erosion control brush layer (7), and with Collector pipe (2) connects, and the transverse connecting pipe (8) is laterally set along sponge urban municipal road, the conditioned soil water purification layer (5) By fertile soil, charcoal, fine sand, planting soil according to mass ratio 5: (3~7): (15~25): (65~73) mix, thickness For 0.8~1.2m;Described rubble water purification layer (3) is made up of 20~30cm of thickness 10~20mm grade Stone;It is described The overhead height of overflow well (1) be less than Pavement Design 7~10cm of absolute altitude, by rain perforaled strainer and gully with filtering function Composition.
2. band is detained in the biological cleaning according to claim 1 for sponge urban municipal road, it is characterised in that described Erosion control brush layer (7) is made up of 2~5cm 10~20mm rubbles, the conditioned soil water purification layer (5), rubble water purification layer (3) with it is permeable Geotextiles (6) form rainwater purification layer.
3. band is detained in the biological cleaning according to claim 1 for sponge urban municipal road, it is characterised in that described Charcoal particle diameter be 30~60 mesh, the fertile soil that phosphorus content is more than described in 95% is through for a long time containing the residual leaf of timbered deadwood The soil of putrid fermentation, described fine sand particle diameter are 0.8~2mm, and described planting soil is the normal soil for being adapted to plant growth.
4. band is detained in the biological cleaning for sponge urban municipal road according to claim 1,2 or 3, its feature exists In the flexible porous tube that, the collector pipe (2) is a diameter of 8~10cm, described permeable geotextiles (6) are with filtering and ooze The geotextiles acted on thoroughly, described waterproof geotextiles (4) are to prevent the geotextiles of rain penetration.
5. the construction method of band is detained in a kind of biological cleaning for sponge urban municipal road of claim 1,2,3 or 4, Characterized in that, this method comprises the following steps:
1) divide the width of band according in design of municipal road points of band and side, it is determined that biology is detained the width of band, and carry out biology The excavation of band is detained in purification;
2) build overflow well (1) by laying bricks or stones, and set transverse connecting pipe (8) to be connected with the gully on bicycle lane in its underpart;
3) along interface laying waterproof geotextiles (4) are excavated, at least overlapping 15cm of seam crossing of two waterproof geotextiles (4), suture It must be carried out continuously, suture needle is apart from edge at least 3cm;
4) it is detained band longitudinal direction along biology and lays collector pipe (2);
5) from bottom to up successively construct rubble water purification layer (3), permeable geotextiles (6), conditioned soil water purification layer (5), obtain water purification layer, Idiographic flow is:
1. 10~20mm rubbles of the particle diameters such as 20~30cm are inserted into biology is detained band, and using manually shakeouing, it is net to obtain rubble Water layer (3);
2. being spread using artificial rolling, permeable geotextiles (6), at least overlapping 15cm of seam crossing, seam are laid at the top of rubble water purification layer (3) Conjunction must be carried out continuously, and suture needle is apart from edge at least 3cm;
3. according to parts by weight:5 parts of fertile soil, 3~7 parts of charcoal, 15~25 parts of fine sand, 65~73 parts of planting soil, add together Enter compulsory mixer or Double-horizontal-shaft trough and paddle mixer, taken out after mixing and stirring, be purified conditioned soil;
4. purification conditioned soil is backfilled into biology is detained band, coefficient of loose laying is 1.1~1.2 so that compactness reaches 65%~ 75%, the thickness after compacting is 0.8~1.2m, and top layer is trimmed to up concave type, concave surface distance from bottom 17~20cm of grade elevation, Obtain conditioned soil water purification layer (5);
6) pave 10~20mm rubbles of the particle diameters such as uniform thickness in conditioned soil water purification layer (5) concave surface, and thickness is 2~5cm, Erosion control brush layer (7) is obtained, concave surface bottom is away from 12~18cm of grade elevation.
6. the construction method of band, its feature are detained in the biological cleaning for sponge urban municipal road according to claim 5 It is, in the step 1), biology is detained with by the way of artificial bench excavation, and every grade of shoulder height is 40~60cm, wide It is 1.25~1.65m to spend for 40~60cm, cutting depth.
7. the construction method of band, its feature are detained in the biological cleaning for sponge urban municipal road according to claim 5 It is, in the step 2), the overhead height of overflow well (1) is less than Pavement Design 7~10cm of absolute altitude, and installs rain perforaled strainer.
CN201610237192.7A 2016-04-15 2016-04-15 Band and its construction method are detained in biological cleaning for sponge urban municipal road Active CN105862549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610237192.7A CN105862549B (en) 2016-04-15 2016-04-15 Band and its construction method are detained in biological cleaning for sponge urban municipal road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610237192.7A CN105862549B (en) 2016-04-15 2016-04-15 Band and its construction method are detained in biological cleaning for sponge urban municipal road

Publications (2)

Publication Number Publication Date
CN105862549A CN105862549A (en) 2016-08-17
CN105862549B true CN105862549B (en) 2017-12-22

Family

ID=56632897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610237192.7A Active CN105862549B (en) 2016-04-15 2016-04-15 Band and its construction method are detained in biological cleaning for sponge urban municipal road

Country Status (1)

Country Link
CN (1) CN105862549B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368098A (en) * 2016-10-19 2017-02-01 西安工业大学 Rapid design method of road bioretention trough
CN106592731A (en) * 2016-11-18 2017-04-26 江苏花王园艺股份有限公司 Biological purifying retention band used for municipal road of sponge city
CN106650121B (en) * 2016-12-27 2019-11-12 重庆大学 Biology is detained facility minimum widith value calculating method in a kind of urban road section
CN106630430A (en) * 2016-12-30 2017-05-10 同济大学 Groundwater pollution circulating purification system under effects of key sponge-city modules
CN106835890A (en) * 2017-02-17 2017-06-13 中冶南方工程技术有限公司 Concave herbaceous field system and construction method based on sponge city
CN107100254B (en) * 2017-06-19 2019-03-12 河海大学 The biology of rainwater economic benefits and social benefits control is detained facility internal drainage system and implementation method
CN107021588A (en) * 2017-06-20 2017-08-08 湖南文理学院 A kind of sponge urban construction osmos tube
CN107143022B (en) * 2017-06-29 2023-07-25 中冶京诚工程技术有限公司 Multifunctional rainwater receiving well
CN107869179A (en) * 2017-12-12 2018-04-03 天津市水利科学研究院 Integrate the concave herbaceous field structure and method for accelerating diafiltration and water storage
CN109989474B (en) * 2017-12-29 2020-09-04 江苏森洋环境建设集团有限公司 Construction method of rainwater collection system
CN108755319A (en) * 2018-06-06 2018-11-06 上海景铭建设发展有限公司 A kind of road construction method and the road built using the engineering method
CN109024845A (en) * 2018-08-17 2018-12-18 西南交通大学 A kind of sponge urban road biology stranded belt
CN109183946A (en) * 2018-10-30 2019-01-11 西安公路研究院 A kind of sponge urban biology is detained facility and its construction method
CN110042724B (en) * 2019-04-30 2024-04-19 中国市政工程西北设计研究院有限公司 Rainwater collecting, utilizing and discharging system for sponge facilities in collapsible loess area
CN110219357A (en) * 2019-05-21 2019-09-10 筑邦建设集团股份有限公司 Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology
CN110528661A (en) * 2019-06-20 2019-12-03 兰州理工大学 A kind of town road rainwater multiplexing facility based on biological stranded belt system
CN112681476A (en) * 2020-12-14 2021-04-20 野趣生境环境设计(成都)研究院(有限合伙) Rainwater garden beneficial to improving biodiversity and construction method thereof
CN113403906A (en) * 2021-06-16 2021-09-17 中冶天工集团有限公司 Method for controlling waterproof geotextile of road side green belt from being damaged by sinking deformation
CN114855821B (en) * 2022-05-27 2023-10-13 广东南方建设集团有限公司 Foundation pit reinforcing system of sponge foundation and construction method
CN115306009A (en) * 2022-07-15 2022-11-08 中铁十局集团第三建设有限公司 Novel drainage green belt construction method based on LID concept

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177016A (en) * 1995-12-26 1997-07-08 Ngk Insulators Ltd Water permeable drain ditch
CN202031005U (en) * 2011-01-27 2011-11-09 上海市政交通设计研究院有限公司 Ecological drainage channel
CN103758204A (en) * 2014-01-26 2014-04-30 北京建筑大学 Rainwater bioretention pond for phosphorus removal beside expressway
CN104313974A (en) * 2014-10-15 2015-01-28 上海交通大学 Ecological grass planting trench for cities with rich water resource

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177016A (en) * 1995-12-26 1997-07-08 Ngk Insulators Ltd Water permeable drain ditch
CN202031005U (en) * 2011-01-27 2011-11-09 上海市政交通设计研究院有限公司 Ecological drainage channel
CN103758204A (en) * 2014-01-26 2014-04-30 北京建筑大学 Rainwater bioretention pond for phosphorus removal beside expressway
CN104313974A (en) * 2014-10-15 2015-01-28 上海交通大学 Ecological grass planting trench for cities with rich water resource

Also Published As

Publication number Publication date
CN105862549A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN105862549B (en) Band and its construction method are detained in biological cleaning for sponge urban municipal road
CN104313974B (en) A kind of grass-planting ecological ditch that city is enriched for water resource
CN109356225A (en) A kind of Multifunctional rain ecological utilization system
CN204959952U (en) Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system
CN105089142A (en) Low elevation greenbelt rainwater regulation scheduling pool and distributed rainwater regulation scheduling pool system
CN110249844A (en) A kind of shade tree tree pond with drainage device
CN106930387A (en) The sponge urban rainwater collection reclaiming system and processing method of a kind of one residential
CN102011379A (en) Pollution control method of farmland drainage in plain tidal river network area
CN208104958U (en) A kind of ecostagnation band applied to town road
CN110042724A (en) Collapsible Loess District road sponge facility rainwater catchment system and exhaust system
CN110219357A (en) Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology
CN106522350A (en) Underground ecological reservoir
CN207645999U (en) A kind of resident living area initial rainwater runoff intercepts, purification equipment
CN207958057U (en) Rain processing system
CN205893856U (en) A biological purification is detained area for sponge city town road
CN206693154U (en) A kind of town and country river course slope protection system
CN206768590U (en) Greenbelt rainwater utilization system under a kind of overpass
CN209161783U (en) Grass-planting ecological ditch for rich precipitation city
CN109457792B (en) Courtyard rainwater collection and purification structure
CN109250859A (en) A kind of resident living area initial rainwater runoff intercepts, purification equipment
CN206667418U (en) A kind of sponge urban rainwater collection reclaiming system of one residential
CN211447206U (en) Subway parking area drainage system
CN109836015A (en) Rain processing system
CN104234020A (en) Pollution control method for farmland drainage in plain tidal river network region
Wagner et al. How to safely retain stormwater in the city: technical tools

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201010

Address after: 214044 Jiangsu city of Wuxi province Lai Sun Road No. 108

Patentee after: WUXI CITY ROAD AND BRIDGE TECHNOLOGY Co.,Ltd.

Address before: 210096 Jiangsu city Nanjing Province four pailou No. 2

Patentee before: SOUTHEAST University

TR01 Transfer of patent right