CN110206303A - Hollow elastic sealing strip secondary structure template construction method is installed - Google Patents

Hollow elastic sealing strip secondary structure template construction method is installed Download PDF

Info

Publication number
CN110206303A
CN110206303A CN201910484067.XA CN201910484067A CN110206303A CN 110206303 A CN110206303 A CN 110206303A CN 201910484067 A CN201910484067 A CN 201910484067A CN 110206303 A CN110206303 A CN 110206303A
Authority
CN
China
Prior art keywords
sealing strip
verticality
secondary structure
elastic sealing
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910484067.XA
Other languages
Chinese (zh)
Inventor
冯新林
张欢欢
毛思光
高春来
蒋冕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG XINJIN CONSTRUTION GROUP Co Ltd
Original Assignee
NANTONG XINJIN CONSTRUTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG XINJIN CONSTRUTION GROUP Co Ltd filed Critical NANTONG XINJIN CONSTRUTION GROUP Co Ltd
Priority to CN201910484067.XA priority Critical patent/CN110206303A/en
Publication of CN110206303A publication Critical patent/CN110206303A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/005Strips for covering joints between form sections, e.g. to avoid burring or spilling of laitance

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of hollow elastic sealing strip secondary structure template construction methods of installation, control the verticality and flatness of masonry, stay raft;The uneven place in metope part is polished with sanding machine;Required material planning is determined according to design drawing and scheme;During material purchases, material pass is maintained strict control over, it is ensured that material is absolutely qualified;In template processing, elastic packing adhesive tape is installed in template side, calculating size ensures that side is smooth, pastes straight;In formwork, piece vertical line of bullet, controls verticality on the wall, is reinforced and is stablized with screw;Vibration compacting when pouring concrete, by design or code requirement maintenance;After demoulding, pillar side is neat, and surface is smooth, tight, does not have voids and pits phenomenon, on the ground also without polluting caused by spillage.The present invention was both reusable, easy construction, and time, not only reliable but also economic, energy conservation and environmental protection is greatly saved, has preferable social and economic benefit.

Description

Hollow elastic sealing strip secondary structure template construction method is installed
Technical field
The present invention relates to a kind of hollow elastic sealing strip secondary structure template construction methods of installation.
Background technique
As modern science and technology continues to develop, living standard is continuously improved, and requirement of the people to building is also higher and higher, span Biggish frame structure becomes the mainstream built now gradually.Corresponding position between wall is being filled according to design or code requirement Constructional column is set, the stability of wall is increased.
Conventional constructional column way is: reserved horse tooth trough, the sticking two-faced adhesive tape on metope, later formwork casting concrete. There are each secondary structure constructional column will sticking two-faced adhesive tape, take a lot of work laborious, still need to manually root out double-sided adhesive after having poured;It pastes It in case of having dust, greasy dirt on masonry when double-sided adhesive, can not paste, and the flexible deformation of double-sided adhesive is small, once deformation can not be extensive Again, the disadvantages of concrete spillage being be easy to cause when pouring.
Summary of the invention
The purpose of the present invention is to provide a kind of reusable, secondary knots of the hollow elastic sealing strip of the installation of easy construction Structure template construction method.
The technical solution of the invention is as follows:
A kind of hollow elastic sealing strip secondary structure template construction method of installation, it is characterized in that: including the following steps:
(1), the verticality and flatness for controlling masonry, stay raft;
(2), the uneven place in metope part is polished with sanding machine;
(3), required material planning is determined according to design drawing and scheme;
(4), during material purchases, material pass is maintained strict control over, it is ensured that material is absolutely qualified;
(5), when template is processed, elastic packing adhesive tape is installed in template side, calculating size ensures that side is smooth, pastes It is straight;
(6), in formwork, piece vertical line of bullet, controls verticality on the wall, is reinforced and is stablized with screw;
(7), vibration compacting when pouring concrete, by design or code requirement maintenance;
(8), after demoulding, pillar side is neat, and surface is smooth, tight, does not have voids and pits phenomenon, also makes on the ground without spillage At pollution.
It is pre-buried that constructional column reinforcing bar is completed before building wall, binding.
The verticality and flatness of strict control wall when building wall, vertical error are no more than 5mm, and flatness error is not More than 5mm.
Constructional column stays raft, constructional column stays raft width and verticality necessary by specification or design requirement indwelling, the same wall thickness of width Meet specification and actual requirement, the bullet vertical control line up and down on constructional column side.
The present invention need to only install hollow elastic sealing strip in the template of secondary structure, both reusable, easy construction, Time, not only reliable but also economic, energy conservation and environmental protection is greatly saved, there is preferable social and economic benefit.
Below with reference to embodiment, the invention will be further described.
A kind of hollow elastic sealing strip secondary structure template construction method of installation, including the following steps:
(1), the verticality and flatness for controlling masonry, stay raft;
(2), the uneven place in metope part is polished with sanding machine;
(3), required material planning is determined according to design drawing and scheme;
(4), during material purchases, material pass is maintained strict control over, it is ensured that material is absolutely qualified;
(5), when template is processed, elastic packing adhesive tape is installed in template side, calculating size ensures that side is smooth, pastes It is straight;
(6), in formwork, piece vertical line of bullet, controls verticality on the wall, is reinforced and is stablized with screw;
(7), vibration compacting when pouring concrete, by design or code requirement maintenance;
(8), after demoulding, pillar side is neat, and surface is smooth, tight, does not have voids and pits phenomenon, also makes on the ground without spillage At pollution.
It is pre-buried that constructional column reinforcing bar is completed before building wall, binding.
The verticality and flatness of strict control wall when building wall, vertical error are no more than 5mm, and flatness error is not More than 5mm.
Constructional column stays raft, constructional column stays raft width and verticality necessary by specification or design requirement indwelling, the same wall thickness of width Meet specification and actual requirement, the bullet vertical control line up and down on constructional column side.

Claims (4)

1. a kind of hollow elastic sealing strip secondary structure template construction method of installation, it is characterized in that: including the following steps:
(1), the verticality and flatness for controlling masonry, stay raft;
(2), the uneven place in metope part is polished with sanding machine;
(3), required material planning is determined according to design drawing and scheme;
(4), during material purchases, material pass is maintained strict control over, it is ensured that material is absolutely qualified;
(5), when template is processed, elastic packing adhesive tape is installed in template side, calculating size ensures that side is smooth, pastes It is straight;
(6), in formwork, piece vertical line of bullet, controls verticality on the wall, is reinforced and is stablized with screw;
(7), vibration compacting when pouring concrete, by design or code requirement maintenance;
(8), after demoulding, pillar side is neat, and surface is smooth, tight, does not have voids and pits phenomenon, also makes on the ground without spillage At pollution.
2. the hollow elastic sealing strip secondary structure template construction method of installation according to claim 1, it is characterized in that: wall It is pre-buried that constructional column reinforcing bar is completed before building, binding.
3. the hollow elastic sealing strip secondary structure template construction method of installation according to claim 1, it is characterized in that: wall The verticality and flatness of strict control wall when masonry, vertical error are no more than 5mm, and flatness error is no more than 5mm.
4. the hollow elastic sealing strip secondary structure template construction method of installation according to claim 1, it is characterized in that: construction Column stays raft by specification or design requirement indwelling, the same wall thickness of width, and constructional column stays raft width and verticality must satisfy specification and reality Border requires, the bullet vertical control line up and down on constructional column side.
CN201910484067.XA 2019-06-05 2019-06-05 Hollow elastic sealing strip secondary structure template construction method is installed Pending CN110206303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910484067.XA CN110206303A (en) 2019-06-05 2019-06-05 Hollow elastic sealing strip secondary structure template construction method is installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910484067.XA CN110206303A (en) 2019-06-05 2019-06-05 Hollow elastic sealing strip secondary structure template construction method is installed

Publications (1)

Publication Number Publication Date
CN110206303A true CN110206303A (en) 2019-09-06

Family

ID=67790708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910484067.XA Pending CN110206303A (en) 2019-06-05 2019-06-05 Hollow elastic sealing strip secondary structure template construction method is installed

Country Status (1)

Country Link
CN (1) CN110206303A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042386A (en) * 2019-11-28 2020-04-21 江苏永联精筑建设集团有限公司 Novel constructional column anti-slurry-overflowing construction process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201593304U (en) * 2009-12-30 2010-09-29 中建六局第二建筑工程有限公司 Beam, pillar/wall node template abutted seam structure
KR20100134225A (en) * 2009-06-15 2010-12-23 (주)블루폼 Coner standing unit
CN203320952U (en) * 2013-01-24 2013-12-04 中冶天工上海十三冶建设有限公司 Constructional column template drawing device
CN106760503A (en) * 2016-11-22 2017-05-31 江苏大学 A kind of constructional column based on standard knot combination is poured uses template
CN206267523U (en) * 2016-11-22 2017-06-20 江苏大学 A kind of constructional column based on standard knot combination is poured uses template
CN106978907A (en) * 2017-04-07 2017-07-25 中建二局第三建筑工程有限公司 Construction method for secondary structure of high and large arc-shaped wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100134225A (en) * 2009-06-15 2010-12-23 (주)블루폼 Coner standing unit
CN201593304U (en) * 2009-12-30 2010-09-29 中建六局第二建筑工程有限公司 Beam, pillar/wall node template abutted seam structure
CN203320952U (en) * 2013-01-24 2013-12-04 中冶天工上海十三冶建设有限公司 Constructional column template drawing device
CN106760503A (en) * 2016-11-22 2017-05-31 江苏大学 A kind of constructional column based on standard knot combination is poured uses template
CN206267523U (en) * 2016-11-22 2017-06-20 江苏大学 A kind of constructional column based on standard knot combination is poured uses template
CN106978907A (en) * 2017-04-07 2017-07-25 中建二局第三建筑工程有限公司 Construction method for secondary structure of high and large arc-shaped wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李强: "构造柱模板支设方法改进", 《工程施工技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042386A (en) * 2019-11-28 2020-04-21 江苏永联精筑建设集团有限公司 Novel constructional column anti-slurry-overflowing construction process

Similar Documents

Publication Publication Date Title
CN106320691B (en) Aluminum wood template construction method
CN100582421C (en) Formwork method for concrete pillar
CN107023160A (en) A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN108894488A (en) A kind of construction method of Novel section steel keel steel and wood composite template
CN102433996A (en) Method for constructing wafer board with SMC (Sheet Molding Compound) hole forming mould
CN103206088B (en) Parts of shear wall structure wall, slab integral pouring construction method
CN111677275A (en) Adjustable column template
CN110206303A (en) Hollow elastic sealing strip secondary structure template construction method is installed
CN109868923B (en) Construction method of bare concrete of loose-spliced wood formwork
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN102808507A (en) Formwork system and construction method using same
CN106906747A (en) A kind of column and bent cap splicing structure
CN108756039A (en) floor construction method
CN203514793U (en) Equipment reservation template
CN102900233A (en) Dual face raw slurry clean water concrete construction method
CN204552097U (en) A kind of for controlling wall column formwork negative and positive angle spillage structure
CN102587543B (en) Building shading cast-in-place concrete lattice wall and construction method thereof
CN209145185U (en) A kind of staircase external angle protective device and constructing device
CN212715921U (en) Two-sided coincide wallboard door and window entrance to a cave formwork structure
CN204691249U (en) A kind of with can the stair step steel form of tread
CN107938907A (en) A kind of inclined roof exempts from formwork construction method
CN113323396A (en) Integrated construction method for external wall of fabricated building
CN208202554U (en) A kind of alter-pouring strips mould plate of flooring installs structure
CN208996449U (en) A kind of cast-in-situ clear-water concrete stair build-in type template
CN206999239U (en) A kind of stair step external corner precast construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906