CN203320952U - Constructional column template drawing device - Google Patents

Constructional column template drawing device Download PDF

Info

Publication number
CN203320952U
CN203320952U CN2013200403662U CN201320040366U CN203320952U CN 203320952 U CN203320952 U CN 203320952U CN 2013200403662 U CN2013200403662 U CN 2013200403662U CN 201320040366 U CN201320040366 U CN 201320040366U CN 203320952 U CN203320952 U CN 203320952U
Authority
CN
China
Prior art keywords
constructional column
steel
template
pair
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2013200403662U
Other languages
Chinese (zh)
Inventor
张凤勇
王龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN2013200403662U priority Critical patent/CN203320952U/en
Application granted granted Critical
Publication of CN203320952U publication Critical patent/CN203320952U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a constructional column template drawing device which comprises steel pipes, a steel template and bolts; tensioning screw rods (5) are utilized to penetrate through mortar joints of the masonry to tension first double-steel-pipes on the two sides of a wall body, and the steel template (2) is fixed and tensioned; hook bolts (7) are utilized to pull the steel template to tension a second double-steel-pipe (4) so as to adjust the flatness of the steel template and improve the rigidity of a template of a constructional column (1). The constructional column template drawing device is suitable for installation of the template of the constructional column, and the construction technology can improve the construction quality of the constructional column. The construction is simple, the manufacturing is easy, all the components can be turnover, the operation is convenient, the pertinence is strong, and the popularization is easy.

Description

A kind of constructional column die drawing device
Technical field
The utility model belongs to technical field of building construction, particularly relates to a kind of constructional column die drawing device.
Background technology
The constructional column template of general brickwork is installed, and adopts the method support shuttering on top, but, often because template is pushed up tightly not, easily produces spillage after constructional column concreting, causes constructional column to produce a large amount of holes.Yet the utility model " constructional column die process " utilizes split bolt, template tightly is pulled on body of wall, effectively mortar leakage prevention and swollen mould.This job practices simple structure, make easily, and easy for installation, with strong points, various materials all can have enough to meet the need use.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of constructional column die drawing device, and the problem of rear easily spillage and swollen mould is installed to solve the constructional column template.
The utility model solves the technical scheme that its technical problem adopts: a kind of constructional column die drawing device is provided, comprise constructional column, steel form, first pair of steel pipe, second pair of steel pipe, split bolt, fastener, HOOK BOLTS and double-sided tape, described first pair of steel pipe is positioned at the steel form outside and by split bolt, the steel form on brickwork two sides is fixed on body of wall, and the outside of first pair of steel pipe also is fixed with second pair of steel pipe by HOOK BOLTS.
Be lined with double-sided tape between described steel form and body of wall.
Described first pair of steel pipe coordinates the steel form fixed strain on body of wall two sides on body of wall by split bolt and fastener.
Intersect between described first pair of steel pipe and the second pair of steel pipe and be 90 degree and install.
The outside of described first pair of steel pipe is also by the second pair of steel pipe that be fixed of HOOK BOLTS and fastener.
Beneficial effect
The utility model highly versatile, make simply, can have enough to meet the need use, with lower cost, prevented easily to produce spillage and swollen mould after constructional column concreting, eliminates the uncompacted hidden danger of constructional column concrete.Simple structure, make easily, easy to operate, with strong points, easily promotes.
The accompanying drawing explanation
Fig. 1 is the utility model constructional column schematic diagram.
Fig. 2 is the utility model lock sealing rod schematic diagram.
Fig. 3 is the utility model general assembly schematic diagram one.
Fig. 4 is the utility model general assembly schematic diagram two.
The specific embodiment
Below in conjunction with specific embodiment, further set forth the utility model.Should be understood that these embodiment only are not used in restriction scope of the present utility model for the utility model is described.Should be understood that in addition those skilled in the art can make various changes or modifications the utility model after the content of having read the utility model instruction, these equivalent form of values fall within the application's appended claims limited range equally.
Embodiment 1
A kind of constructional column die drawing device, comprise constructional column 1,2, the first pairs of steel pipes of steel form 3, the second pairs of steel pipes 4, split bolt 5, fastener 6, HOOK BOLTS 7, double-sided tape 8 and brickwork 9.
The outline drawing that Fig. 1 is the constructional column 1 in brickwork, according to the size of design and code requirement, reserve the position of illustrated concrete constructional column in the brickwork building process.
As Fig. 2 is the sealing rod scheme of installation: before template is installed, double-sided tape 8 is set between body of wall and template, double-sided tape 8 sticks on gingival cyst of mucous gland in the newborn (dotted line) outside of constructional column, and spillage in the time of can preventing concreting, guarantee the constructional column quality.
As shown in Figure 3,4, a kind of constructional column Formwork Installation Method of brickwork---constructional column die process, its objective is that solving the constructional column template installs spillage and swollen mould.Utilize Screw arbor with nut at both-ends 5 through the masonry mortar joint, first pair of body of wall both sides steel pipe 3 to be strained, in order to fix and to strain steel form 2.In brickwork is built by laying bricks or stones, at the constructional column 1 same mortar joint height in both sides, bury respectively 1 Screw arbor with nut at both-ends 5 underground.When template is installed, first pair of steel pipe 3 is set respectively in the body of wall both sides, Screw arbor with nut at both-ends 5 and first pair of steel pipe 3 coordinate, and along the constructional column short transverse, spacing 60cm left and right arranges respectively some groups of Screw arbor with nut at both-ends 5.
Finally utilize HOOK BOLTS 7, according to certain spacing, hold steel form by 4 tensions of second pair of steel pipe, in order to adjust the planeness of steel form, improve the rigidity of constructional column 1 template.
Split bolt 5 and HOOK BOLTS 7, all fix first pair of steel pipe 3 by mountain font fastener 6, in order to transmit pulling force.

Claims (5)

1. a constructional column die drawing device, comprise constructional column (1), steel form (2), first pair of steel pipe (3), second pair of steel pipe (4), split bolt (5), fastener (6), HOOK BOLTS (7) and double-sided tape (8), it is characterized in that: described first pair of steel pipe (3) is positioned at steel form (2) outside and by split bolt (5), the steel form (2) on brickwork (9) two sides is fixed on body of wall, and the outside of first pair of steel pipe (3) also is fixed with second pair of steel pipe (4) by HOOK BOLTS (7).
2. a kind of constructional column die drawing device according to claim 1, is characterized in that: be lined with double-sided tape (8) between described steel form (2) and body of wall.
3. a kind of constructional column die drawing device according to claim 1 is characterized in that: described first pair of steel pipe (3) coordinates the steel form on body of wall two sides (2) fixed strain on body of wall by split bolt (5) and fastener (6).
4. a kind of constructional column die drawing device according to claim 1, is characterized in that: intersect between described first pair of steel pipe (3) and second pair of steel pipe (4) and be 90 degree installations.
5. a kind of constructional column die drawing device according to claim 1 is characterized in that: the outside of described first pair of steel pipe (3) also has been fixed second pair of steel pipe (4) by HOOK BOLTS (7) and fastener (6).
CN2013200403662U 2013-01-24 2013-01-24 Constructional column template drawing device Active CN203320952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013200403662U CN203320952U (en) 2013-01-24 2013-01-24 Constructional column template drawing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013200403662U CN203320952U (en) 2013-01-24 2013-01-24 Constructional column template drawing device

Publications (1)

Publication Number Publication Date
CN203320952U true CN203320952U (en) 2013-12-04

Family

ID=49660316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013200403662U Active CN203320952U (en) 2013-01-24 2013-01-24 Constructional column template drawing device

Country Status (1)

Country Link
CN (1) CN203320952U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594529A (en) * 2015-01-19 2015-05-06 台州建筑安装工程公司 Outer wall of steel structure plant, model frame of upright post at corner and outer wall construction method
CN105178593A (en) * 2015-06-29 2015-12-23 江苏南通二建集团有限公司 Method and structure for erecting forms of structural columns of filler walls
CN109184103A (en) * 2018-09-30 2019-01-11 恒城建设科技有限公司 Building masonry wall exempts from plastering construction technique
CN110206303A (en) * 2019-06-05 2019-09-06 南通鑫金建设集团有限公司 Hollow elastic sealing strip secondary structure template construction method is installed

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594529A (en) * 2015-01-19 2015-05-06 台州建筑安装工程公司 Outer wall of steel structure plant, model frame of upright post at corner and outer wall construction method
CN105178593A (en) * 2015-06-29 2015-12-23 江苏南通二建集团有限公司 Method and structure for erecting forms of structural columns of filler walls
CN109184103A (en) * 2018-09-30 2019-01-11 恒城建设科技有限公司 Building masonry wall exempts from plastering construction technique
CN110206303A (en) * 2019-06-05 2019-09-06 南通鑫金建设集团有限公司 Hollow elastic sealing strip secondary structure template construction method is installed

Similar Documents

Publication Publication Date Title
CN203320952U (en) Constructional column template drawing device
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
CN203441100U (en) Formwork structure of constructional column
CN204212447U (en) Door and window concrete arch lintel strengthening construction device
CN204960953U (en) Vertical waterstop of formula of burying device of flare -outing in tunnel
CN203755676U (en) Perpendicularity control tool for wall column
CN204327112U (en) Tunnel outlet advance support system
CN202810195U (en) Template reinforcing system
CN203891468U (en) Fixing device for pouring building pipeline embedded part
CN203334661U (en) Scaffold-hole-free formwork construction device for brick-concrete structure construction column
CN103410345A (en) Reinforced concrete column reinforcement device and method
CN202520011U (en) Floor shore device
CN202416869U (en) Novel building engineering basement exterior wall split bolt
CN204040476U (en) The steel form that a kind of single side formwork is reinforced
CN103362304B (en) A kind of method of carrying out template anchor and position from anchor and position bolt device
CN204266216U (en) A kind of bamboo beam anchoring support structure of side slope
CN206070725U (en) Agent structure wall prestressed structure
CN202689344U (en) Tensioning bar connecting device
CN103541332A (en) Fixing device for rubber water stopping sheets and rubber slurry stopping sheets
CN203907010U (en) Flexible connection device for pipe jacking construction in soft soil layer
CN103089007A (en) Cast-in-place concrete floor punching pipe seal template device and using method
CN204174936U (en) A kind of template support structure of outer wall of basement
CN204252294U (en) Composite wallboard two ends Antileaking connecting apparatus
CN103397779A (en) Method of supporting large-height shear wall form
CN203867182U (en) Steady tubular well shaftway blocking construction formwork

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: MCC Tiangong Group Co., Ltd.

Patentee after: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee before: MCC Tiangong Group Co., Ltd.

Patentee before: CMTCC Shanghai Shisanye Construction Co., Ltd.

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: MCC Tiangong Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee before: MCC Tiangong Group Co., Ltd.

Patentee before: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190627

Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee after: China Twenty Metallurgical Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee before: MCC Tiangong Group Co., Ltd.

Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd.

TR01 Transfer of patent right