CN108756039A - floor construction method - Google Patents

floor construction method Download PDF

Info

Publication number
CN108756039A
CN108756039A CN201810758646.4A CN201810758646A CN108756039A CN 108756039 A CN108756039 A CN 108756039A CN 201810758646 A CN201810758646 A CN 201810758646A CN 108756039 A CN108756039 A CN 108756039A
Authority
CN
China
Prior art keywords
barrels
shi
concrete
construction method
flat panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810758646.4A
Other languages
Chinese (zh)
Inventor
王龙
江华
龚锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201810758646.4A priority Critical patent/CN108756039A/en
Publication of CN108756039A publication Critical patent/CN108756039A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/48Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/326Floor structures wholly cast in situ with or without form units or reinforcements with hollow filling elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention provides a kind of floor construction methods, include the following steps:A:Construction Supporting System, and it is laid with flat panel form in the top of support system;B:In the upper surface of flat panel form, Qi Shi barrels of datum lines are set;C:Qi Shi barrels of lower covers are installed according to Qi Shi barrels of datum lines;D:Bind beam steel;E:Qi Shi barrels of ladle bodies and upper cover are installed;F:Casting concrete;G:Receive light, leveling concrete upper surface;H:After concrete reaches preset strength, Qi Shi barrels of upper covers and Qi Shi barrels of lower covers are removed.Floor construction method provided by the invention ensure that Qi Shi barrels of installation accuracy, meanwhile, improve construction efficiency.

Description

Floor construction method
Technical field
The present invention relates to technical field of building construction, especially a kind of floor construction method.
Background technology
Wafer board, that is, empty the floor of cross beam thread, current high-tech electronic workshop(Liquid crystal display, chip, semiconductor etc.)Cause Dustless vehicle very strict to the purity requirements of workshop for the particular/special requirement of production technology, that this high-cleanness, high requires Between the vertical direct current stratotype of generally use air current composition pattern.In order to ensure the air purity of this large area workshop, Needing workshop, floor establishes clean air conditioner ventilating system up and down, and cross beam ventilation template frame is used when doing workshop subject construction Structure, this cross beam ventilation template uniformly reserve a large amount of holes in architecture storey, upper and lower floor are made to form clean room Suspended particulate, to reach purity requirements required for workshop.One kind of Qi Shi barrels of templates of divulging information for cross beam.
Qi Shi installations want it is horizontal in a row, erect into line, installation site deviation requirement is within 2mm.In addition, wafer board preformed hole It is intensive cross beam between hole, and deck-molding is higher, reinforcing bar is intensive, and operating space is small, and reinforcing bar binding is deposited with Qi Shi installations In cross-operation, influence each other.It can increase reinforcing bar binding as using improperly construction method, can not only increased construction cost also Difficulty influences construction speed.
Invention content
The technical problem to be solved in the present invention is to provide a kind of floor construction methods, ensure Qi Shi barrels of installation accuracy, together When, improve construction efficiency.
The present invention provides a kind of floor construction methods, include the following steps:
A:Construction Supporting System, and it is laid with flat panel form in the top of support system;
B:In the upper surface of flat panel form, Qi Shi barrels of datum lines are set;
C:Qi Shi barrels of lower covers are installed according to Qi Shi barrels of datum lines;
D:Bind beam steel;
E:Qi Shi barrels of ladle bodies and upper cover are installed;
F:Casting concrete;
G:Receive light, leveling concrete upper surface;
H:After concrete reaches preset strength, Qi Shi barrels of upper covers and Qi Shi barrels of lower covers are removed.
Further, step A specifically comprises the following steps:
A1:Sheeting caps is installed in preset upright bar installation site;
A2:Upright bar is set up above sheeting caps, wherein the upright bar of contiguous structure column position is reserved in frame body, waits for that structural column is torn open It is installed again after mould;
A3:Vertically and horizontally bridging and horizontal cross brace are set up, carries out embracing knot with structural column again after structural column form removal;
A4:Adjustable rest is installed;
A5:Square tube is installed on the adjustable rest;
A6:The square tube adjusts the absolute altitude of its upper surface, the flatness of its all square tube upper surface is made to conform to after installation is complete It asks;
A7:Flat panel form is laid with above square tube;
A8:Flat panel form adjusts the absolute altitude of its upper surface, the flatness of its upper surface is made to meet the requirements after installation is complete.
Further, in the step B, unwrapping wire sequence is:Girder sideline is first oriented, after the survey of girder sideline is set, Respectively across inner opposite angle line should be met, it is ensured that respectively across accurate positioning, then survey and set the Qi Shi barrels of center lines in place, each center line crosspoint is strange Formula bucket installation center.
Further, in the step C, Qi Shi barrels of center chassis hole is directed at Qi Shi barrels of datum lines, then pass through self tapping Chassis is fixed in flat panel form by screw, and Qi Shi barrels of lower covers are set on chassis.
Further, in the step E, Qi Shi barrels of ladle bodies are put into beam steel gap, are mounted on Qi Shi barrels of lower lids, In Shang Qishi barrels of upper covers of Qi Shi barrels of ladle body upper covers, Screw arbor with nut at both-ends, tightening nuts, using Qi Shi barrels of upper covers of rubber belt sealing and very are penetrated The family name bucket gap of ladle body and the gap of Screw arbor with nut at both-ends and Qi Shi barrels of upper covers.
Further, in the step F, along the Qi Shi barrels of symmetrical placement layer by layer in periphery, lift height is 300~500mm.
Further, the step F specifically comprises the following steps:
G1:On the basis of Qi Shi barrels of upper covers, concrete is struck off using floating rule, should be acted with extruding when striking off;
G2:It being manually closed flat using trowel, emphasis smoothes out Qi Shi barrels of upper covers and edge concrete, removes any excess concrete, Ensure that Qi Shi barrels of periphery concrete are flushed with Qi Shi barrels of upper covers;
G3:Use sanding machine polishing twice.
Floor construction method provided by the invention ensure that Qi Shi barrels of installation accuracy, meanwhile, improve construction efficiency.
Description of the drawings
Fig. 1 is the flow chart of floor construction method of the present invention.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments, so that those skilled in the art can be with It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
A kind of floor construction method includes the following steps with reference to figure 1:
One, support system construction and leveling:
1)Sheeting caps is installed in preset upright bar position:Since wafer board is mostly two layers or more structural slabs, support is located at structure On body, by experiment and applicable cases, 15mm thickness wooden splints can be used in sheeting caps, and headblock board size can be 100mm long, 100mm wide.
2)Upright bar is set up, the upright bar of contiguous structure column position is reserved in frame body, is installed again after structural column form removal. Stand steel pipe is before use, need to conscientiously check, it is clear to tell somebody what one's real intentions are, and underproof tubing is placed unusable.Fastener needs one by one when installation It tightens.It should be noted at the top of tubing whether there is stopping state, if any should abandon.
3)Vertically and horizontally bridging and horizontal cross brace are set up, carries out embracing knot with structural column again after structural column form removal.
4)Adjustable rest is installed.
5)Square tube is installed in adjustable rest, and square tube specification is calculated by scheme to be confirmed.Square tube should ensure that Two bors d's oeuveres in adjustable rest, Avoid rest eccentric force.Square tube surface answer it is straight, otherwise to follow-up leveling work have larger impact.
6)Square tube leveling:After support system has been set up, flat panel form first carries out a levelling before being laid with to support system. The top square tube absolute altitude on adjustable rest is carried out copying survey with collimation method before leveling, absolute altitude is carried out by the lifting of adjustable rest It adjusts.
7)Flat panel form is laid with:It is particularly important to template type selecting before being laid with, by experiment, it should preferentially select bamboo splint conduct Flat panel form uses, and never uses waste and old template.When flat panel form is laid with, it should be noted that formwork edge joint, it is most that piece, which retains 3mm, It is good, with the space of fully reserved template later stage deformation, ensures the stress release of deformation, never fit together perfectly.Template fixed point is answered Using self-tapping screw, screw spacing uses 200~250mm.The square tube that flat panel form is passed through should all fix, and mould is controlled with this The deformation of plate.Flat panel form piece carries out closing mortar leakage prevention before pouring, using adhesive tape.
8)Flat panel form levelling:After flat panel form is laid with, flat panel form flatness and absolute altitude should be copied immediately It surveys, adjustment;Never in template because of levelling after being exposed to the sun or soaking.Spirit level should be used to carry out flat panel form surface level when copying survey Survey is copied, plate face mark is carried out to the position that elevation difference is more than 2mm, mark should use red paint punctuate, and record data;For mark The flat panel form position that height transfinites carries out absolute altitude adjusting, and the folding and unfolding by adjusting the adjustable rest of deviation position bottom comes into rower Height adjustment, when adjustment, should ensure that the communication of upper and lower personnel is unimpeded, and upper and lower staffing intercom determines position by tapping template It sets, spirit level answers all-the-way tracking when adjustment.
Two, structure column construction method and key control point:
1)It should be directed to flatness, verticality, column bottom mortar leakage prevention, capital construction joint before structural column construction to be told somebody what one's real intentions are in detail, supervise It implements;
2)The binding of column muscle, which finishes, should check tied silk situation, it is ensured that tied silk is all bent into master, is placed tied silk and is pasted mould;
3)Accurate setting-out is answered in the processing of column muscle, controls capital bent anchor point height, and inflection point should control at by capital at the top of reinforcing bar 50~100mm of lower section of two-way beam upper reinforcement.
4)After steel corrosion quantity, slurry seal plate is installed at column bottom, slurry seal plate uses 50mm wide wood laths, fixed by steel nail On floor, installed close to column mould outer edge;
5)The reinforcing of column mould should use shaped steel back cord, cancel the Screw arbor with nut at both-ends through cylinder;
6)Capital setting-up of construction joint is entering at top plate 15mm, installs one layer of template shelves item in massive plate formwork column mouth position, uses The batten of 50mm wide, 15mm thickness is set along the circle nail of column mouth one;
7)It pours Shi Yingxian and moistens template in watering, then 100~150mm thickness is poured into label mortar, by vibrating spear edge at column bottom Column is diagonally inserted into column bottom, is gradually poured with concrete and slowly vibrating spear is promoted to vibrate;Filling bed load slurry, which can be pre-equipped with, to be connect Hopper is retained;
8)After column pours, dabbing cleaning is carried out to capital immediately, and remove the concrete being scattered in flat panel form, entered Next procedure is constructed.
Three, surveying setting-out:
Before being installed at Qi Shi barrels, should accurate unwrapping wire, unwrapping wire sequence be in flat panel form:First orient girder sideline, girder side After line survey is set, respectively across inner opposite angle line should be met, it is ensured that respectively across accurate positioning;Then it surveys and sets the Qi Shi barrels of center lines in place, in each Heart line crosspoint is strange formula bucket installation center.
Four, Qi Shi barrels of installations:
After Qi Shi barrels of central point setting-outs, strange formula bucket metal chassis is mounted in flat panel form, by center chassis hole pair when installation Central point on quasi-mode plate, then Qi Shi barrels of metal chassis are fixed in flat panel form by self-tapping screw.Metal chassis is fixed After good, be sticked on metal chassis on centre bolt hole adhesive tape, places rubbish and falls into wherein.Qi Shi is set on metal chassis Bucket lower cover, to constrain reinforcing bar beam position.After waiting for beam steel bar colligation, then Qi Shi barrels of ladle bodies are installed one by one.It, will be strange when installation Family name's bucket ladle body is put into reinforcing bar beam gap, is mounted on Qi Shi barrels of lower lids, and cover Qi Shi barrels of upper covers, is penetrated Screw arbor with nut at both-ends, twist Tightly and nut is installed.Adhesive seal is also needed at Qi Shi barrels of upper cover screw holes to be sealed using adhesive tape, prevents the concrete poured It is flowed into Qi Shi barrels along gap, pollutes bucket wall.
Five, beam steel bar colligation:
According to the upper and lower relation of the vertically and horizontally beam of primary and secondary in design drawing before reinforcing bar binding, the reinforcing bar number of plies is analyzed, beam stirrup is calculated Size, and strictly control dimension of hoop reinforcement, reinforcing bar dew muscle or plate face flatness caused by preventing dimension of hoop reinforcement bigger than normal are abnormal.Reinforcing bar , should be in the anti-bank of concrete that preset parting seam position pours 100mm wide 30mm high before binding, anti-bank is mixed using C30 microliths Solidifying soil pours, and prevents construction joint concrete spillage.And elongated width is preset in the flat panel form on the outside of construction joint The formwork edge joint of 100mm is as spillage Butterworth Hatch.Plate to be closed on is blocked using wooden model lath again before pouring.Reinforcing bar is bound When, tied silk is bent into beam without exception.Beam lower protective layer uses the finished cement item of 150 × 30 × 50mm, spacing 1.5m to arrange, together When girder is propped up in structure capital position welded reinforcement holder.
Six, concreting:
Fast-easy closing-up net should be pushed down using the square steel tube of 30*30 at construction joint block before pouring, square tube upper edge should be wafer board Concrete surface absolute altitude, square tube point are welded on reinforcing bar.If being poured using ground pump, ground pump line must be arranged along girder, while need to be equipped with Automobile tire is several, and pad is located between horizontal tube and beam muscle, plays the impact force to reinforcing bar when buffering ground pump line pours.Before pouring Wafer board upper prop wall joint bar should be wrapped up with plastic film, joint bar bottom 1.2m altitude ranges is all wrapped up, to prevent concrete Ejecta pollution reinforcing bar.It should be noted that concrete discharge port cannot directly be directed at Qi Shi barrels of blowings when pouring, the impact force of discharging can incite somebody to action Qi Shi barrels of punchings are tiltedly to influence the flatness of wafer board.One block of plank sheathing is covered on Ying Qishi buckets, concrete blowing is in mould It is flat by manually catching up on plate, to reduce the destruction that concrete discharges to Qi Shi barrels.When pouring, the hand that vibrates can not be close to strange Family name's barrel side wall vibrates.It should be 300~500mm along the Qi Shi barrels of symmetrical placement layer by layer in periphery, lift height when pouring, be poured to prevent single side It builds, causes Qi Shi barrels of unstabilitys crooked.Mason can be struck off concrete using floating rule, when first levelling with Qi Shi barrels Upper cover is to strike off benchmark, should be acted with extruding when striking off;Second is levelling, is manually closed flat using trowel, emphasis is to Qi Shi barrels On upper lid and edge concrete is polished, and removes any excess concrete, ensures that Qi Shi barrels of periphery concrete and Qi Shi barrels of upper covers are neat It is flat;Third road is mechanical polishing machine polishing twice.After press polish, concrete surface covering curing blanket, moisture-keeping maintaining 28 days.
Seven, support system and bung are removed:
It removes frame body and bung dismounting sequence is:It tears Qi Shi barrels of upper cover nuts open, takes out Qi Shi barrels of upper covers, back out screw rod, remove branch Qi Shi barrels of lower covers are removed by support body system.The bung dismounting time should consider the demand of wafer board Superstructure Construction, wait for wafer board Self-strength reaches 80% or more and after last layer structure construction is completed, and can carry out dismounting work.
Eight, epoxy construction and the cleaning of bucket wall:
After the completion of removing work, waffle plate surface perception should be checked, it is careful to be carried out to construction joint and Qi Shi barrels of peripheries Grinding, and absolute altitude is carried out to flood wafer board and copies survey, pay close attention to the flatness in no raised floor region.After base's polishing, into The conventional ground of row and the construction of ceiling epoxy, all exposed concrete parts of waffle harden structure are all covered with epoxy.Ring After the completion of oxygen construction, the wiping cleaning of bucket wall is manually carried out using wet cloth.
Protection scope of the present invention is without being limited thereto.Those skilled in the art on the basis of the present invention made by it is equivalent It substitutes or converts, within protection scope of the present invention.Protection scope of the present invention is subject to claims.

Claims (7)

1. a kind of floor construction method, which is characterized in that include the following steps:
A:Construction Supporting System, and it is laid with flat panel form in the top of support system;
B:In the upper surface of flat panel form, Qi Shi barrels of datum lines are set;
C:Qi Shi barrels of lower covers are installed according to Qi Shi barrels of datum lines;
D:Bind beam steel;
E:Qi Shi barrels of ladle bodies and Qi Shi barrels of upper covers are installed;
F:Casting concrete;
G:Receive light leveling concrete upper surface;
H:After concrete reaches preset strength, Qi Shi barrels of upper covers and Qi Shi barrels of lower covers are removed.
2. floor construction method as described in claim 1, which is characterized in that step A specifically comprises the following steps:
A1:Sheeting caps is installed in preset upright bar installation site;
A2:Upright bar is set up above sheeting caps, wherein the upright bar of contiguous structure column position is reserved in frame body, waits for that structural column is torn open It is installed again after mould;
A3:Vertically and horizontally bridging and horizontal cross brace are set up, carries out embracing knot with structural column again after structural column form removal;
A4:Adjustable rest is installed;
A5:Square tube is installed on the adjustable rest;
A6:The square tube adjusts the absolute altitude of its upper surface, the flatness of its all square tube upper surface is made to conform to after installation is complete It asks;
A7:Flat panel form is laid with above square tube;
A8:Flat panel form adjusts the absolute altitude of its upper surface, the flatness of its upper surface is made to meet the requirements after installation is complete.
3. floor construction method as described in claim 1, which is characterized in that in the step B, unwrapping wire sequence is:First position Respectively across inner opposite angle line should be met after the survey of girder sideline is set by going out girder sideline, it is ensured that respectively across accurate positioning, then surveyed and set place Qi Shi barrels of center lines, each center line crosspoint are strange formula bucket installation center.
4. floor construction method as described in claim 1, which is characterized in that in the step C, by Qi Shi barrels of center chassis Hole is directed at Qi Shi barrels of datum lines, then chassis is fixed in flat panel form by self-tapping screw, is set under Qi Shi barrels on chassis Lid.
5. floor construction method as described in claim 1, which is characterized in that in the step E, Qi Shi barrels of ladle bodies are put into beam In reinforcing bar gap, it is mounted on Qi Shi barrels of lower lids, in Shang Qishi barrels of upper covers of Qi Shi barrels of ladle body upper covers, penetrates Screw arbor with nut at both-ends, tighten Nut uses Qi Shi barrels of upper covers of rubber belt sealing and the gap of Qi Shi barrels of ladle bodies and the gap of Screw arbor with nut at both-ends and Qi Shi barrels of upper covers.
6. floor construction method as described in claim 1, which is characterized in that in the step F, symmetrically divide along Qi Shi barrels of peripheries Layer pours, and lift height is 300~500mm.
7. floor construction method as described in claim 1, which is characterized in that the step F specifically comprises the following steps:
G1:On the basis of Qi Shi barrels of upper covers, concrete is struck off using floating rule, should be acted with extruding when striking off;
G2:It being manually closed flat using trowel, emphasis smoothes out Qi Shi barrels of upper covers and edge concrete, removes any excess concrete, Ensure that Qi Shi barrels of periphery concrete are flushed with Qi Shi barrels of upper covers;
G3:Use sanding machine polishing twice.
CN201810758646.4A 2018-07-11 2018-07-11 floor construction method Pending CN108756039A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810758646.4A CN108756039A (en) 2018-07-11 2018-07-11 floor construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810758646.4A CN108756039A (en) 2018-07-11 2018-07-11 floor construction method

Publications (1)

Publication Number Publication Date
CN108756039A true CN108756039A (en) 2018-11-06

Family

ID=63973310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810758646.4A Pending CN108756039A (en) 2018-07-11 2018-07-11 floor construction method

Country Status (1)

Country Link
CN (1) CN108756039A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924537A (en) * 2019-10-31 2020-03-27 江林 Construction process of H-shaped steel concrete transfer beam-reinforced concrete column joint
CN112627507A (en) * 2020-12-11 2021-04-09 上海宝冶集团有限公司 Method for building ultrahigh special-shaped waffle slab
CN114934665A (en) * 2022-06-30 2022-08-23 中国建筑第四工程局有限公司 Waffle slab flatness construction method and mechanism

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06272346A (en) * 1993-03-24 1994-09-27 Sumitomo Metal Ind Ltd Deck plate and composite slab
CN102433996A (en) * 2011-09-29 2012-05-02 中国建筑第八工程局有限公司 Method for constructing wafer board with SMC (Sheet Molding Compound) hole forming mould
CN107023104A (en) * 2017-06-05 2017-08-08 中建八局第建设有限公司 A kind of wafer board construction technology for clean room

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06272346A (en) * 1993-03-24 1994-09-27 Sumitomo Metal Ind Ltd Deck plate and composite slab
CN102433996A (en) * 2011-09-29 2012-05-02 中国建筑第八工程局有限公司 Method for constructing wafer board with SMC (Sheet Molding Compound) hole forming mould
CN107023104A (en) * 2017-06-05 2017-08-08 中建八局第建设有限公司 A kind of wafer board construction technology for clean room

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘凡: "奇氏桶华夫板施工", 《福建建材》 *
曾庆友: "奇氏桶华夫板施工技术探讨", 《福建建筑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924537A (en) * 2019-10-31 2020-03-27 江林 Construction process of H-shaped steel concrete transfer beam-reinforced concrete column joint
CN112627507A (en) * 2020-12-11 2021-04-09 上海宝冶集团有限公司 Method for building ultrahigh special-shaped waffle slab
CN114934665A (en) * 2022-06-30 2022-08-23 中国建筑第四工程局有限公司 Waffle slab flatness construction method and mechanism
CN114934665B (en) * 2022-06-30 2024-03-29 中国建筑第四工程局有限公司 Huafu plate flatness construction method and mechanism

Similar Documents

Publication Publication Date Title
CN101956458B (en) Construction method of overlong and superhigh single-side fair-faced concrete wall
CN112412027A (en) Method for manufacturing large-section special-shaped load-bearing concrete bare concrete member
CN108756039A (en) floor construction method
CN103184794B (en) Cylinder hoop tuype is to spelling wooden form quick template supporting construction method
CN111996906B (en) Efficient construction method of assembled pier
CN109944161B (en) Steel box concrete bent pier on steel pipe arch bridge arch and construction method
CN102359272A (en) Construction method for waffle slab by using veitch cylinder as hole reservation die
CN108532466A (en) A kind of bridge pier over-form construction technique
CN114109030A (en) Construction method of special-shaped structure of bare concrete diaphragm wall
CA1110803A (en) Method of constructing a swimming pool
CN106996190A (en) Alter-pouring strips mould plate and post-cast strip casting method
CN110184941A (en) A kind of bridge main tower construction method
CN110439265A (en) Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint
CN112227759B (en) Repair, reinforcement and migration method for historic building clean water wall
CN112049143A (en) Method for building large-volume concrete bearing platform of large-scale low-temperature storage tank
CN207363251U (en) A kind of track-type facilities for being used to control the pitched roof gradient and thickness
CN206189279U (en) Structure is assembled with bent cap to stand
CN106906747A (en) A kind of column and bent cap splicing structure
CN207079914U (en) The multi-ribbed plate putamina construction installed for beam bottom mother plate
CN108086363A (en) Underground waterproof shear wall post-pouring zone construction process
CN114277672B (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN208251409U (en) A kind of laminated floor slab of assembled architecture
CN106567329A (en) Semi-prefabricated reinforced concrete wall type guardrail
CN207296392U (en) Alter-pouring strips mould plate device
CN115890877A (en) Adjustable diaphragm plate template and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106

RJ01 Rejection of invention patent application after publication