CN110206227A - A kind of superelevation column template reinforcing bar integral hoisting construction method - Google Patents

A kind of superelevation column template reinforcing bar integral hoisting construction method Download PDF

Info

Publication number
CN110206227A
CN110206227A CN201910387876.9A CN201910387876A CN110206227A CN 110206227 A CN110206227 A CN 110206227A CN 201910387876 A CN201910387876 A CN 201910387876A CN 110206227 A CN110206227 A CN 110206227A
Authority
CN
China
Prior art keywords
column
reinforcing bar
superelevation
isolated footing
corrugated steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910387876.9A
Other languages
Chinese (zh)
Inventor
张坚
杨利剑
李聪
华永飞
张刚
刘燕
李华林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201910387876.9A priority Critical patent/CN110206227A/en
Publication of CN110206227A publication Critical patent/CN110206227A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of superelevation column template reinforcing bar integral hoisting construction method of the invention, step S1 pour isolated footing, and pre-buried multiple corrugated steel tubes in isolated footing, isolated footing maintenance is carried out, and reserved corrugated steel tube exceeds isolated footing surface 5mm-10mm, releases column mould dimension line;Step S2, production stirrup and welding positioning bar carry out welding positioning production and form steel reinforcement cage;Step S3 lifts steel reinforcement cage in advance, to judge the reinforcing bar of steel reinforcement cage bottom and the relative position accuracy of corrugated steel tube, and is molded using two pieces of C-shaped column moulds to steel reinforcement cage;Step S4 pours into high strength grout to pre-buried corrugated steel tube using sizing funnel;Step S5, at reinforcing bar cage hoisting to isolated footing, the bottom reinforcement bars of steel reinforcement cage are inserted into the pre- corrugated steel tube being embedded on isolated footing, are removed and are removed grouting material, and casting concrete is conserved.The superelevation column stiffness that the present invention pours is big, piece is few, and Forming Quality is excellent, and the present invention uses integral hoisting, and concentrated processing degree is high.

Description

A kind of superelevation column template reinforcing bar integral hoisting construction method
Technical field
The present invention relates to technical field of building construction, apply more particularly, to a kind of superelevation column template reinforcing bar integral hoisting Work method.
Background technique
In vertical supporting member reinforced concrete member be instantly using most load-bearing forms, and its sectional dimension compared with In big super-high column concrete pouring construction, a big difficulty of primary concreting forming technique or concrete construction field. It constructs according to traditional approach, needs to set up a large amount of scaffolds, and have more senior engineer's operation;Column is poured using conventional template Body, piece is more, and superelevation column column bottom is easy swollen mould, and Forming Quality is difficult to control.
Most enterprise is carried out generally in the form of secondary pour when facing the concrete structure column of this kind of large size Construction, this will propose exacting terms to the duration of construction and cost, in order to avoid the secondary generation poured, some enterprises Device is poured using built-in, is laid before casting concrete, the process of operation is relative complex, although being able to solve certain The problem of, but certain requirement also is proposed to the construction of template, and inconvenience is also brought to vibrating for concrete, it can not It is really fully solved problem of this superelevation column on the duration of construction and cost, and separates the construction party that chip pours Method, it will be able to the such problem of very good solution.
Summary of the invention
The present invention provides the superelevation column template that a kind of concentrated processing degree is high, environmentally protective and shaping strength is high, piece is few Reinforcing bar integral hoisting construction method, to solve above, existing superelevation column installation is at high cost, it is not high to pour out superelevation column intensity Technical problem.
According to an aspect of the present invention, a kind of superelevation column template reinforcing bar integral hoisting construction method is provided, including following Step:
Step S1 pours isolated footing, and pre-buried multiple corrugated steel tubes in isolated footing, carries out isolated footing maintenance, And reserved corrugated steel tube exceeds isolated footing surface 5mm-10mm, releases column mould dimension line;
Step S2, production stirrup and welding positioning bar carry out welding positioning production and form steel reinforcement cage;
Step S3 lifts steel reinforcement cage in advance, to judge the reinforcing bar of steel reinforcement cage bottom and the relative position of corrugated steel tube Accuracy, and steel reinforcement cage is molded using two pieces of C-shaped column moulds;
Step S4 pours into high strength grout to pre-buried corrugated steel tube using sizing funnel;
Step S5, at reinforcing bar cage hoisting to isolated footing, the bottom reinforcement bars of steel reinforcement cage, which are inserted into, pre- is embedded in independent base It in corrugated steel tube on plinth, removes and removes grouting material, casting concrete is conserved.
On the basis of above scheme preferably, in the step S1, it is clear to carry out de-oiling before pre-buried for the corrugated steel tube It washes, and corrugated steel tube, when pre-buried, the misalignment of axe of the corrugated steel tube is less than 5mm.
On the basis of above scheme preferably, in the step S1, column mould dimension line unwrapping wire is being carried out to isolated footing Condition is that the intensity of the isolated footing reaches 80% or more.
On the basis of above scheme preferably, in the step S2, when the production of steel reinforcement cage, the hoop in superelevation column bottom Muscle is 30 centimeters bigger than the length and width of the stirrup in superelevation column side.
On the basis of above scheme preferably, the column mould mold before, the column mould need to be pre-processed.
On the basis of above scheme preferably, the pretreatment includes the sundries of removal column mould edge joint position, to the column mould Inner surface progress surface is become rusty clearly, edible vegetable oil is handled, and in the stickup adhesive tape of column mould edge joint position, coats release agent to column mould inner surface.
On the basis of above scheme preferably, in the step S5,12h is conserved after concreting, in the strong of concrete When degree is greater than or equal to 1.2Mpa, demoulding processing is carried out.
On the basis of above scheme preferably, during the demoulding, pedestal dismounting is first carried out, then fix in the two sides of column mould Jack, while starting jack ejection column mould, then remove backform.
A kind of superelevation column template reinforcing bar integral hoisting construction method of the invention, has following excellent compared with prior art Point:
1. rigidity is big, piece is few, Forming Quality is excellent
The column mould that the present invention is constituted using the C-shaped steel form of regularization, rigidity is big, with common wooden model or small-sized punching block ratio Piece is few, it is ensured that concrete formation quality and impression quality, and reduce the cost of later period incrustation.
2. integral hoisting, concentrated processing degree is high
Template and reinforcing bar of the invention is completed the production and is assembled in concentrated processing area, scene only need complete lifting in place and Verticality is corrected, reduces the workload at scene, accelerates construction progress.
3. reducing high-rise working amount, site safety is improved
Integral hoisting of the invention, template are fixed using four side drawknot of wirerope, set up scaffold without high-altitude;Concrete When pouring, only needs a worker to operate in top operating platform, compare traditional construction technology, high-rise working amount greatly subtracts It is few, reduce engineering safety risk.
4. punching block is revolving strong, environmentally protective
Column mould rigidity of the invention is big, is not easy to be lost, and the repetition number of turnover is more compared with conventional wooden model, can weigh after use It is multiple to utilize, and residual value is higher.It is less to the consumption of resource compared to wooden model.
Detailed description of the invention
Fig. 1 is the process flow chart of superelevation column template reinforcing bar integral hoisting construction method of the invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", " clockwise ", The orientation or positional relationship of instructions such as " counterclockwise " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing The present invention and simplified description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific Orientation construction and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two It is a or more than two, unless otherwise restricted clearly.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, two members can also be can be indirectly connected through an intermediary Connection inside part.For the ordinary skill in the art, above-mentioned term can be understood in this hair as the case may be Concrete meaning in bright.
In the present invention unless specifically defined or limited otherwise, fisrt feature second feature "upper" or "lower" It may include that the first and second features directly contact, also may include that the first and second features are not direct contacts but pass through it Between other characterisation contact.Moreover, fisrt feature includes the first spy above the second feature " above ", " above " and " above " Sign is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.Fisrt feature exists Second feature " under ", " lower section " and " following " include that fisrt feature is directly below and diagonally below the second feature, or is merely representative of First feature horizontal height is less than second feature.
When performing the following operation, need to according to engineering drawing, size to superelevation column and reinforcing bar positioning, diameter and length, Cushion cap short column absolute altitude, corrugated steel tube model and positioning and built-in length, reinforcing bar cage hoisting point, are consolidated with mold column mould dimension line Fixed point, lifting reinforcing rib;Grouting material quantity, the grouting material including each grout hole avoid occurring grouting material mistake when reinforcing bar is in place It is overflow more;And column foundation edge embedded bar pull ring, the position fixed for the drawknot of surrounding steel form are required to carry out quasi- It really calculates, to obtain construction data.
Refering to Figure 1, the present invention provides a kind of superelevation column template reinforcing bar integral hoisting construction method, be according to What upper design accounting size carried out comprising following steps:
Step S1 pours isolated footing, and pre-buried multiple corrugated steel tubes in isolated footing, carries out isolated footing maintenance, And reserved corrugated steel tube exceeds isolated footing surface 5mm-10mm, releases column mould dimension line;
Step S2, production stirrup and welding positioning bar carry out welding positioning production and form steel reinforcement cage;
Step S3 lifts steel reinforcement cage in advance, to judge the reinforcing bar of steel reinforcement cage bottom and the relative position of corrugated steel tube Accuracy, and steel reinforcement cage is molded using two pieces of C-shaped column moulds;
Step S4 pours into high strength grout to pre-buried corrugated steel tube using sizing funnel;
Step S5, at reinforcing bar cage hoisting to isolated footing, the bottom reinforcement bars of steel reinforcement cage, which are inserted into, pre- is embedded in independent base It in corrugated steel tube on plinth, removes and removes grouting material, casting concrete is conserved.
In implementation steps S1, corrugated steel tube carries out de-oiling cleaning before pre-buried, and corrugated steel tube is when pre-buried, ripple The misalignment of axe of steel pipe is less than 5mm.Forbid vibrating head to touch corrugated steel tube when concreting, prevent from being displaced and damages.In concrete It is subjected to displacement in casting process if any corrugated steel tube, needs to correct in time.Zinc-plated corrugated steel tube bottom must block, to prevent Concrete slurry enters corrugated steel tube, and temporary plugging is also answered at top.
Wherein, in step sl, in the intensity that the condition for carrying out column mould dimension line unwrapping wire to isolated footing is isolated footing Reach 80% or more.The rubbish such as isolated footing surface concrete must be cleaned out, and must not have any foreign matter, rubbish in corrugated steel tube Rubbish.
And in step s 2, when the production of steel reinforcement cage, hoop of the stirrup in superelevation column bottom than being in superelevation column side The length and width of muscle is 30 centimeters big, and when lifting in place, the leading device to hole of angle muscle of stirrup can serve and draw orientation direction
It should be noted that in order to ensure architectural effect, column mould mold before, column mould need to be pre-processed. Pretreatment of the invention includes the sundries of removal column mould edge joint position, is become rusty clearly to the inner surface progress surface of column mould, edible vegetable oil processing, and In the stickup adhesive tape of column mould edge joint position, release agent is coated to column mould inner surface, with conveniently stripped processing.
Wherein, in the step S5,12h is conserved after concreting, is greater than or equal in the intensity of concrete When 1.2Mpa, demoulding processing is carried out.
In the present invention during demoulding, pedestal dismounting is first carried out, then in the fixed jack in the two sides of column mould, start simultaneously Jack ejects column mould, then removes backform, to will not destroy its overall structure during to ensure demoulding.
A kind of superelevation column template reinforcing bar integral hoisting construction method of the invention, has following excellent compared with prior art Point:
1. rigidity is big, piece is few, Forming Quality is excellent
The column mould that the present invention is constituted using the C-shaped steel form of regularization, rigidity is big, with common wooden model or small-sized punching block ratio Piece is few, it is ensured that concrete formation quality and impression quality, and reduce the cost of later period incrustation.
2. integral hoisting, concentrated processing degree is high
Template and reinforcing bar of the invention is completed the production and is assembled in concentrated processing area, scene only need complete lifting in place and Verticality is corrected, reduces the workload at scene, accelerates construction progress.
3. reducing high-rise working amount, site safety is improved
Integral hoisting of the invention, template are fixed using four side drawknot of wirerope, set up scaffold without high-altitude;Concrete When pouring, only needs a worker to operate in top operating platform, compare traditional construction technology, high-rise working amount greatly subtracts It is few, reduce engineering safety risk.
4. punching block is revolving strong, environmentally protective
Column mould rigidity of the invention is big, is not easy to be lost, and the repetition number of turnover is more compared with conventional wooden model, can weigh after use It is multiple to utilize, and residual value is higher.It is less to the consumption of resource compared to wooden model.
Finally, the present processes are only preferable embodiment, it is not intended to limit the scope of the present invention.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention Within the scope of.

Claims (8)

1. a kind of superelevation column template reinforcing bar integral hoisting construction method, which comprises the following steps:
Step S1 pours isolated footing, and pre-buried multiple corrugated steel tubes in isolated footing, carries out isolated footing maintenance, and pre- It stays corrugated steel tube beyond isolated footing surface 5mm-10mm, releases column mould dimension line;
Step S2, production stirrup and welding positioning bar carry out welding positioning production and form steel reinforcement cage;
Step S3 lifts steel reinforcement cage in advance, with judge steel reinforcement cage bottom reinforcing bar and corrugated steel tube relative position it is accurate Property, and steel reinforcement cage is molded using two pieces of C-shaped column moulds;
Step S4 pours into high strength grout to pre-buried corrugated steel tube using sizing funnel;
Step S5, at reinforcing bar cage hoisting to isolated footing, the bottom reinforcement bars of steel reinforcement cage are inserted into pre- be embedded on isolated footing Corrugated steel tube in, remove and remove grouting material, casting concrete conserved.
2. a kind of superelevation column template reinforcing bar integral hoisting construction method as described in claim 1, which is characterized in that in the step In rapid S1, the corrugated steel tube carries out de-oiling cleaning before pre-buried, and corrugated steel tube is when pre-buried, the axis of the corrugated steel tube Line deviation is less than 5mm.
3. a kind of superelevation column template reinforcing bar integral hoisting construction method as claimed in claim 2, which is characterized in that in the step It is that the intensity of the isolated footing reaches 80% or more carrying out the condition of column mould dimension line unwrapping wire to isolated footing in rapid S1.
4. a kind of superelevation column template reinforcing bar integral hoisting construction method as described in claim 1, which is characterized in that in the step In rapid S2, when the production of steel reinforcement cage, length and width of the stirrup in superelevation column bottom than the stirrup in superelevation column side It is 30 centimeters big.
5. a kind of superelevation column template reinforcing bar integral hoisting construction method as described in claim 1, which is characterized in that the column mould Carry out before molding, the column mould need to be pre-processed.
6. a kind of superelevation column template reinforcing bar integral hoisting construction method as claimed in claim 5, which is characterized in that the pre- place Reason includes the sundries of removal column mould edge joint position, is become rusty clearly to the inner surface progress surface of the column mould, edible vegetable oil processing, and spell in column mould Stickup adhesive tape at seam coats release agent to column mould inner surface.
7. a kind of superelevation column template reinforcing bar integral hoisting construction method as described in claim 1, which is characterized in that in the step In rapid S5,12h is conserved after concreting, when the intensity of concrete is greater than or equal to 1.2Mpa, carries out demoulding processing.
8. a kind of superelevation column template reinforcing bar integral hoisting construction method as claimed in claim 7, which is characterized in that the demoulding In the process, pedestal dismounting is first carried out, then in the fixed jack in the two sides of column mould, while starts jack ejection column mould, then remove Backform.
CN201910387876.9A 2019-05-10 2019-05-10 A kind of superelevation column template reinforcing bar integral hoisting construction method Pending CN110206227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910387876.9A CN110206227A (en) 2019-05-10 2019-05-10 A kind of superelevation column template reinforcing bar integral hoisting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910387876.9A CN110206227A (en) 2019-05-10 2019-05-10 A kind of superelevation column template reinforcing bar integral hoisting construction method

Publications (1)

Publication Number Publication Date
CN110206227A true CN110206227A (en) 2019-09-06

Family

ID=67785992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910387876.9A Pending CN110206227A (en) 2019-05-10 2019-05-10 A kind of superelevation column template reinforcing bar integral hoisting construction method

Country Status (1)

Country Link
CN (1) CN110206227A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302255A (en) * 2020-10-28 2021-02-02 中建三局第二建设工程有限责任公司 Frame column inverted insertion combined system and construction method
CN113338537A (en) * 2021-05-26 2021-09-03 中国五冶集团有限公司 Construction method of ultrahigh large-section concrete frame column
CN113431320A (en) * 2021-06-29 2021-09-24 中建八局第四建设有限公司 Construction method of novel horizontal constraint-free independent vertical supporting column mold
CN114737752A (en) * 2022-03-23 2022-07-12 浙江欣捷建设有限公司 Ultrahigh column pre-spliced steel mould and integral installation and construction method thereof
CN115012651A (en) * 2022-06-29 2022-09-06 中冶建工集团有限公司 Construction method for large-section turnover formwork small platform
CN115246052A (en) * 2021-12-16 2022-10-28 李俊 Simplified ore crusher feed opening light rail welding method
CN117574523A (en) * 2024-01-16 2024-02-20 安徽吾兴新材料有限公司 Concrete cylindrical member minimum hooping rate calculation method based on high-strength spiral hooping

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2061580U (en) * 1990-03-31 1990-09-05 中国建筑第一工程局 Shuttering device for lifting removal form of box-type building member
CN203639049U (en) * 2013-12-12 2014-06-11 中铁五局集团第一工程有限责任公司 Concrete T beam hydraulic demoulding device
CN106032692A (en) * 2015-11-06 2016-10-19 广州容联建筑科技有限公司 Integral pouring molding construction method for reinforced concrete column
CN107116674A (en) * 2017-06-30 2017-09-01 中交第航务工程局有限公司 A kind of jack form removal method of T-shaped beam monoblock type template
CN207620368U (en) * 2017-11-24 2018-07-17 杨众 The big punching block of class square column
CN109487955A (en) * 2018-02-13 2019-03-19 浙江中成建工集团有限公司 A kind of precast concrete column in-situ cast-in-place construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2061580U (en) * 1990-03-31 1990-09-05 中国建筑第一工程局 Shuttering device for lifting removal form of box-type building member
CN203639049U (en) * 2013-12-12 2014-06-11 中铁五局集团第一工程有限责任公司 Concrete T beam hydraulic demoulding device
CN106032692A (en) * 2015-11-06 2016-10-19 广州容联建筑科技有限公司 Integral pouring molding construction method for reinforced concrete column
CN107116674A (en) * 2017-06-30 2017-09-01 中交第航务工程局有限公司 A kind of jack form removal method of T-shaped beam monoblock type template
CN207620368U (en) * 2017-11-24 2018-07-17 杨众 The big punching block of class square column
CN109487955A (en) * 2018-02-13 2019-03-19 浙江中成建工集团有限公司 A kind of precast concrete column in-situ cast-in-place construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302255A (en) * 2020-10-28 2021-02-02 中建三局第二建设工程有限责任公司 Frame column inverted insertion combined system and construction method
CN113338537A (en) * 2021-05-26 2021-09-03 中国五冶集团有限公司 Construction method of ultrahigh large-section concrete frame column
CN113431320A (en) * 2021-06-29 2021-09-24 中建八局第四建设有限公司 Construction method of novel horizontal constraint-free independent vertical supporting column mold
CN115246052A (en) * 2021-12-16 2022-10-28 李俊 Simplified ore crusher feed opening light rail welding method
CN114737752A (en) * 2022-03-23 2022-07-12 浙江欣捷建设有限公司 Ultrahigh column pre-spliced steel mould and integral installation and construction method thereof
CN115012651A (en) * 2022-06-29 2022-09-06 中冶建工集团有限公司 Construction method for large-section turnover formwork small platform
CN115012651B (en) * 2022-06-29 2024-05-28 中冶建工集团有限公司 Construction method for large-section turnover formwork small platform
CN117574523A (en) * 2024-01-16 2024-02-20 安徽吾兴新材料有限公司 Concrete cylindrical member minimum hooping rate calculation method based on high-strength spiral hooping
CN117574523B (en) * 2024-01-16 2024-03-26 安徽吾兴新材料有限公司 Concrete cylindrical member minimum hooping rate calculation method based on high-strength spiral hooping

Similar Documents

Publication Publication Date Title
CN110206227A (en) A kind of superelevation column template reinforcing bar integral hoisting construction method
CN106677069B (en) A kind of construction method of bridge pier integral formwork support one-shot forming structure
CN105887685A (en) Railway high pier body template and scaffold integrated turnover formwork segmental construction method
CN205604088U (en) But bent cap quick adjustment support
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN108118890A (en) Walling body template system and its erection method to be poured in shear force wall deformation slit
CN110396937A (en) The asynchronous construction of hollow thin-walled high pier binder pier beam
CN110512524A (en) A kind of bridge pier column safe construction method
CN110878522B (en) Main tower lower cross beam construction system and construction method
CN110805259A (en) Integral steel platform formwork equipment for synchronous construction and construction method
CN102733604A (en) Reusable overhanging scaffold embedded ring and construction method thereof
CN106285002A (en) Cast-in-place walls difference of height tool-type hoisting die construction method
CN114368696A (en) Pre-buried construction method for tower crane wall-attached wall-connecting piece
CN205636497U (en) Pier shaft template and operation platform integration system
CN112554070A (en) Bridge upright post bracket-free construction method
CN105155843A (en) Construction method and construction device of constructional columns
CN206553938U (en) Bridge pier integral formwork support one-shot forming structure
CN101537660A (en) Process for assembling and disassembling flexible FRP (=Fiberglass-Reinforced Plastic) cylindrical formwork
CN109555021A (en) It is a kind of without pre-buried, movable continuous beam 0# block bracket
CN108005400A (en) A kind of construction method of existing building structure integral replacement
CN108331343A (en) The construction method of Cantilever Beams and aluminum alloy mould plate lap-joint
CN208870403U (en) Large form moves back modular system
CN112681730A (en) Prefabricated formwork column and machining method thereof
CN206503377U (en) A kind of movable railing of steel trestle
CN209323388U (en) Bridge breaking joint formwork of protecting wall tooling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906