Prior art keywords
cover plate
reinforcing bar
structure floor
base plate
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102402984A
Other languages
Chinese (zh)
Inventor
赵亚军
李栋
陈俊杰
曾度钢
张文拴
刘海宏
于新平
陈广林
黎金亮
孟令峰
陈界羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN2012102402984A priority Critical patent/CN102733604A/en
Publication of CN102733604A publication Critical patent/CN102733604A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a construction method of a reusable overhanging scaffold embedded ring, wherein the method mainly comprises the following steps: machining a U-shaped embedded part; arranging a plurality of U-shaped embedded parts on the surface of a slab form along the axial direction of an I-shaped beam, wherein the openings of the U-shaped embedded parts face upward; paving floor slab reinforcements, casting into a structural floor slab; arranging the I-shaped beam in the U-shaped embedded part; respectively fastening a cover board on the U-shaped embedded parts so as to compact the upper end of the I-shaped beam; after the overhanging is finished, taking off the cover board, dismounting the slab form, pulling the U-shaped embedded parts downwards from the structural floor slab; and filling holes remained on the structural floor slab. With the adoption of the embedded ring, nuts are unscrewed after the overhanging is finished, the cover board is taken off, then the U-shaped embedded parts are pulled out of the structural floor slab, the embedded ring is convenient to manufacture and is reusable, so that the material is saved greatly and the construction progress is speeded up.

Description

Pre-buried ring of reusable builder's jack and job practices thereof
Technical field
The present invention relates to a kind of highrise building builder's jack, pre-buried ring of especially a kind of reusable builder's jack and job practices thereof.
Background technology
The pre-buried ring of tradition builder's jack is directly to be embedded in the concrete; As shown in Figure 1; With pre-buried ring 5 i beam 7 bandings on structure floor 6; Between i beam 7 and the structure floor 6, use timber wedge 8 wedgings respectively between i beam 7 and the pre-buried ring 5, wherein, the buried end of going into structure floor 6 of pre-buried ring 5 becomes hook-shaped to guarantee the stability of pre-buried ring 5 in structure floor 6 inner bendings.The structure processed complex of this pre-buried ring, difficult installation will be removed pre-buried girdling after the end of encorbelmenting, very waste material.
Summary of the invention
Technical problem to be solved by this invention provides a kind of simple in structure, pre-buried ring of the reusable builder's jack of easy construction and job practices thereof.
For realizing above-mentioned technique effect, the invention discloses the pre-buried circulating application construction method of a kind of reusable builder's jack, said method mainly may further comprise the steps:
Processing U type built-in fitting;
The i beam axial direction is provided with plural U type built-in fitting in slab form face upper edge, and the opening of said U type built-in fitting up;
Lay floor bar, the casting complete structure floor;
In said U type built-in fitting, place i beam;
A fastening cover plate and then compress the upper end of said i beam on said U type built-in fitting respectively;
Encorbelment after the end, take off said cover plate, remove said slab form, said U type built-in fitting is extracted structure floor downwards;
Fill up the hole that stays on the structure floor.
Said method is further improved and is, processes said U type built-in fitting through following steps:
First end of vertical affixed two reinforcing bars on a base plate;
On second end of said reinforcing bar, a thread segment is set.
Said method is further improved and is, a sheathed sleeve pipe on said reinforcing bar respectively before the cast structure floor.
Said method is further improved and is, on said base plate, reserves two holes, with welding fixing through the mode of consent weldering between said reinforcing bar and the said base plate.
Said method is further improved and is, through following steps said cover plate is compressed the upper end on the said i beam:
On said cover plate, reserve two holes according to said reinforcing bar;
Through described hole said cover plate is installed on said reinforcing bar;
Cooperate said thread segment said cover plate to be compressed the upper end of said i beam through nut.
Said method is further improved and is, behind the said cover plate of installation with timber wedge with wedging around the said i beam.
The invention also discloses the pre-buried ring of a kind of reusable builder's jack, said pre-buried ring comprises:
One base plate, said base plate is embedded in the bottom of structure floor;
One cover plate, said cover plate are located on the i beam of builder's jack, are reserved with two holes on the said cover plate;
Two reinforcing bars; The perpendicular respectively both sides of being located at said i beam of said two reinforcing bars; First end and the said base plate of said reinforcing bar are affixed, and second end of said reinforcing bar runs through structure floor straight up and is arranged in the reserving hole on the said cover plate, and second end of said reinforcing bar is provided with a thread segment;
Two sleeve pipes, said two sleeve pipes are sheathed on said reinforcing bar respectively and contact said structure floor zone;
The plural number nut, said nut cooperates said thread segment that said i beam is fixed between said structure floor and the said cover plate.
Said pre-buried ring further improves and is, adopts the timber wedge wedging between said i beam and the said pre-buried ring.
Said pre-buried ring further improves and is, is reserved with two holes on the said base plate, adopts the mode of consent weldering to weld fixing between said reinforcing bar and the said base plate.
Said pre-buried ring further improves and is that the material of said sleeve pipe is PVC.
The present invention is owing to adopted above technical scheme; Make it have following beneficial effect to be: said pre-buried ring is turned on said nut after finishing encorbelmenting, take off said cover plate after, said U type built-in fitting is extracted structure floor downwards; Said pre-buried ring is easy to make; Can use repeatedly, practice thrift material greatly, accelerate construction speed.
Description of drawings
Fig. 1 is the structural representation of the pre-buried ring of traditional builder's jack.
Fig. 2 is the structural representation of the pre-buried ring of the reusable builder's jack of the present invention.
The specific embodiment
For the benefit of to the further understanding of structure of the present invention, the present invention explains with the preferred embodiment of Fig. 2.
Consult shown in Figure 2ly, the pre-buried ring 1 of reusable builder's jack of the present invention utilizes the screwed reinforcing bar of a base plate 11, a cover plate 12, two 10, sleeve pipe 13 and plural nut 14 that an i beam 2 is fixed on the structure floor 3, wherein:
Base plate 11 is embedded in the bottom of structure floor 3; Cover plate 12 is located at i beam 2 tops of builder's jack; Size according to i beam 2 on the cover plate 12 is reserved with two holes; Two reinforcing bars 10 run through the both sides that structure floor 3 is arranged at i beam 2 respectively straight down in above-mentioned reserving hole, and affixed with base plate 11 in first end 101 of reinforcing bar 10.As preferred embodiments of the present invention, corresponding cover plate 12 is also reserved two holes on base plate 11, adopts the mode of consent weldering to weld fixedly reinforcing bar 10 and base plate 11 then, welds more firmly, and structure is more stable.Second end 102 of reinforcing bar 10 is provided with a thread segment; Length is generally 100mm; Cooperate plural nut 14 that i beam 2 is fixed between structure floor 3 and the cover plate 12, like this, i beam 2 just has been fixed basically; Further plural timber wedge 15 wedgings of wedging between i beam 2 and pre-buried ring 1 guarantee i beam 2 fixations.Two sleeve pipes 13 are sheathed on respectively on the zone of two reinforcing bar 10 contact structures floors 3, and the material of sleeve pipe 13 generally adopts the PVC plastics, between reinforcing bar 10 and structure floor 3, form a separation layer; Prevent that reinforcing bar 10 from contacting with structure floor 3 concrete, be convenient to after the end of encorbelmenting, in sleeve pipe 13, extract reinforcing bar 10 out; Simple in structure, easy construction; Pre-buried ring 1 is reusable, and the economical with materials cost shortens the engineering time.
It is following that the present invention reuses the concrete construction of the pre-buried ring 1 of builder's jack:
1, processing U type built-in fitting
With the screw thread on silk processing machine processing reinforcing bar 10 second end 102, length is 100mm;
After processing, the reinforcing bar 10 that compliant is required carries out welding procedure; First end 101 according to big young pathbreaker's reinforcing bar 10 of i beam 2 is welded on the base plate 11; Make counter-force according to on-the-spot builder's jack and calculate pre-buried ring 1 weld seam stressing conditions; For the general selection of safety consent weldering more, welding tries to draw test after accomplishing;
2, U type built-in fitting processing qualified after; The base plate 11 of U type built-in fitting is arranged on the slab form face according to designing requirement (promptly lays plural U type built-in fitting) according to the i beam axial direction; Sleeve pipe 13 is sheathed on the reinforcing bar 10; And carry out floorslab concrete pouring, cast does not highly exceed the length of sleeve pipe 13;
3, behind the casting complete structure floor 3, place i beam 2, above i beam 2, add a cover cover plate 12, fastening with nut 14, and between i beam 2 and pre-buried ring 1 with timber wedge 15 wedgings, i beam 2 is completely fixed, the further completion builder's jack of constructing;
4, after the end of encorbelmenting, turn on said nut 14; Take off cover plate 12; Dismounting slab form face; Simultaneously U type built-in fitting is extracted structure floor 3 to lower edge sleeve pipe 13, fill up the hole that stays on the structure floor 3 with concrete at last, smooth getting final product handled in the PVC plastic bushing that is exposed to structure floor 3 surfaces 13 excisions.
More than combine accompanying drawing embodiment that the present invention is specified, those skilled in the art can make the many variations example to the present invention according to above-mentioned explanation.Thereby some details among the embodiment should not constitute qualification of the present invention, and the scope that the present invention will define with appended claims is as protection scope of the present invention.

Claims (10)

1. pre-buried circulating application construction method of reusable builder's jack, it is characterized in that: said method mainly may further comprise the steps:
Processing U type built-in fitting;
The i beam axial direction is provided with plural U type built-in fitting in slab form face upper edge, and the opening of said U type built-in fitting up;
Lay floor bar, the casting complete structure floor;
In said U type built-in fitting, place i beam;
A fastening cover plate and then compress the upper end of said i beam on said U type built-in fitting respectively;
Encorbelment after the end, take off said cover plate, remove said slab form, said U type built-in fitting is extracted structure floor downwards;
Fill up the hole that stays on the structure floor.
2. the method for claim 1 is characterized in that processing said U type built-in fitting through following steps:
First end of vertical affixed two reinforcing bars on a base plate;
On second end of said reinforcing bar, a thread segment is set.
3. method as claimed in claim 2 is characterized in that: a sheathed sleeve pipe on said reinforcing bar respectively before the cast structure floor.
4. method as claimed in claim 2 is characterized in that: on said base plate, reserve two holes, with welding fixing through the mode of consent weldering between said reinforcing bar and the said base plate.
5. method as claimed in claim 2 is characterized in that through following steps said cover plate being compressed the upper end on the said i beam:
On said cover plate, reserve two holes according to said reinforcing bar;
Through described hole said cover plate is installed on said reinforcing bar;
Cooperate said thread segment said cover plate to be compressed the upper end of said i beam through nut.
6. like the described method of claim 1 ~ 5, it is characterized in that: behind the said cover plate of installation with timber wedge with said i beam around wedging.
7. pre-buried ring of reusable builder's jack is characterized in that said pre-buried ring comprises:
One base plate, said base plate is embedded in the bottom of structure floor;
One cover plate, said cover plate are located on the i beam of builder's jack, are reserved with two holes on the said cover plate;
Two reinforcing bars; The perpendicular respectively both sides of being located at said i beam of said two reinforcing bars; First end and the said base plate of said reinforcing bar are affixed, and second end of said reinforcing bar runs through structure floor straight up and is arranged in the reserving hole on the said cover plate, and second end of said reinforcing bar is provided with a thread segment;
Two sleeve pipes, said two sleeve pipes are sheathed on said reinforcing bar respectively and contact said structure floor zone;
The plural number nut, said nut cooperates said thread segment that said i beam is fixed between said structure floor and the said cover plate.
8. pre-buried ring as claimed in claim 7 is characterized in that: adopt the timber wedge wedging between said i beam and the said pre-buried ring.
9. pre-buried ring as claimed in claim 7 is characterized in that: be reserved with two holes on the said base plate, adopt the mode of consent weldering to weld fixing between said reinforcing bar and the said base plate.
10. pre-buried ring as claimed in claim 7 is characterized in that: the material of said sleeve pipe is PVC.
CN2012102402984A 2012-07-12 2012-07-12 Reusable overhanging scaffold embedded ring and construction method thereof Pending CN102733604A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102402984A CN102733604A (en) 2012-07-12 2012-07-12 Reusable overhanging scaffold embedded ring and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102402984A CN102733604A (en) 2012-07-12 2012-07-12 Reusable overhanging scaffold embedded ring and construction method thereof

Publications (1)

Publication Number Publication Date
CN102733604A true CN102733604A (en) 2012-10-17

Family

ID=46989849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102402984A Pending CN102733604A (en) 2012-07-12 2012-07-12 Reusable overhanging scaffold embedded ring and construction method thereof

Country Status (1)

Country Link
CN (1) CN102733604A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153555A (en) * 2014-08-27 2014-11-19 中国建筑第五工程局有限公司东莞分公司 Detachable overhung steel beam pre-buried fixing device with horizontal fixing assembly
CN105926857A (en) * 2016-05-10 2016-09-07 江苏东晟新诚建设集团有限公司 Prefabricated pier and application of prefabricated pier to high-rise reversed beam overhanging scaffold construction
CN107675881A (en) * 2017-09-25 2018-02-09 中铁五局集团建筑工程有限责任公司 A kind of detachable mounting kit and method applied to aluminum alloy mould plate built-in fitting
CN108756202A (en) * 2018-06-14 2018-11-06 上海二十冶建设有限公司 A kind of recyclable building builder's jack fixing device and application method
CN112177320A (en) * 2020-09-28 2021-01-05 厦门安科科技有限公司 Attachment structure for creeping formwork frame body
CN114352002A (en) * 2021-12-31 2022-04-15 中冶天工集团有限公司 Handling method for placing scaffold cantilever beam on shear wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018583A (en) * 1996-07-08 1998-01-20 Misawa Homes Co Ltd Tenporary scaffold structure for building
CN201420310Y (en) * 2009-06-09 2010-03-10 中天建设集团有限公司天津分公司 Pre-buried crimping rack for mounting overhanging steel beam
CN201535061U (en) * 2009-04-30 2010-07-28 姚康华 Light scaffold with protective shed
CN202039590U (en) * 2011-04-29 2011-11-16 中铁十九局集团第一工程有限公司 Steel pipe type scaffold wall connecting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018583A (en) * 1996-07-08 1998-01-20 Misawa Homes Co Ltd Tenporary scaffold structure for building
CN201535061U (en) * 2009-04-30 2010-07-28 姚康华 Light scaffold with protective shed
CN201420310Y (en) * 2009-06-09 2010-03-10 中天建设集团有限公司天津分公司 Pre-buried crimping rack for mounting overhanging steel beam
CN202039590U (en) * 2011-04-29 2011-11-16 中铁十九局集团第一工程有限公司 Steel pipe type scaffold wall connecting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨明明: "悬挑脚手架预埋件的设计及施工应用", 《百度文库》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153555A (en) * 2014-08-27 2014-11-19 中国建筑第五工程局有限公司东莞分公司 Detachable overhung steel beam pre-buried fixing device with horizontal fixing assembly
CN105926857A (en) * 2016-05-10 2016-09-07 江苏东晟新诚建设集团有限公司 Prefabricated pier and application of prefabricated pier to high-rise reversed beam overhanging scaffold construction
CN107675881A (en) * 2017-09-25 2018-02-09 中铁五局集团建筑工程有限责任公司 A kind of detachable mounting kit and method applied to aluminum alloy mould plate built-in fitting
CN108756202A (en) * 2018-06-14 2018-11-06 上海二十冶建设有限公司 A kind of recyclable building builder's jack fixing device and application method
CN112177320A (en) * 2020-09-28 2021-01-05 厦门安科科技有限公司 Attachment structure for creeping formwork frame body
CN114352002A (en) * 2021-12-31 2022-04-15 中冶天工集团有限公司 Handling method for placing scaffold cantilever beam on shear wall

Similar Documents

Publication Publication Date Title
CN102733604A (en) Reusable overhanging scaffold embedded ring and construction method thereof
CN203462583U (en) Super high-rise exposed column foot
CN104032869B (en) A kind of Prefabricated stacking floor and precast construction method thereof
CN104295088A (en) Steel-wood combined formwork structure of shear walls on two sides of deformation joint and construction method of steel-wood combined formwork structure
CN103669655A (en) Construction technology for pouring concrete of walls on two sides of deformation joint
CN103790379B (en) In contrary sequence method without the construction method of connected node between beam slab and cap
CN103711298A (en) Method for constructing anchoring system of structural steel overhanging scaffold
CN108755984A (en) Late poured band support construction method based on concrete square column
CN105971276A (en) Integral aluminum formwork stair one-step continuous pouring forming structure and construction method
CN206625428U (en) Pipe shaft post-cast floor slab closed system
CN204531338U (en) The builder's jack assembly of ground construction can be shifted to an earlier date
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN115305833A (en) Capping beam construction system and method
CN102561392A (en) Structure for supporting construction elevator foundation on basement top plate and construction method thereof
CN106284981B (en) The mold method of two side templates in a kind of shear force wall deformation slit
CN205777527U (en) A kind of assembly of reserved split bolt eye
CN202672701U (en) Overhanging scaffold pre-buried ring capable of being repeatedly used
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
CN105155843A (en) Construction method and construction device of constructional columns
CN104453235B (en) Current conversion station fire wall construction technology
CN204059940U (en) A kind of concrete floor aluminum alloy mould plate
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN111042188A (en) Supporting-free template for reserved bolt holes of roughing mill body and construction method
CN102650158A (en) Connecting device used in casting of shear walls in upper and lower layers
CN202440833U (en) Structure for supporting construction elevator base on top plate of basement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121017